• No results found

VISIT US ON OUR

N/A
N/A
Protected

Academic year: 2021

Share "VISIT US ON OUR"

Copied!
16
0
0

Loading.... (view fulltext now)

Full text

(1)

Specification Requirements

Reference / Note

Operating Pressure 250.0 psid N/A °F 17.2 bar N/A °C

Proof Pressure 312.5 psid N/A °F 21.5 bar N/A °C

Proof Cycle 312.5 psid N/A °F 21.5 bar N/A °C 24 cycles

MEOP Cycle 250.0 psid N/A °F 17.2 bar N/A °C 25 cycles minimum

Design Burst Pressure 375.0 psid 92 °F 25.9 bar 33.3 °C

Total Tank Volume 103,700 in3 N/A °F 1,700.0 liters N/A °C

Required Propellant Volume N/A in3 N/A °F N/A liters N/A °C 20 to 96% fill fraction

Maximum Mass 130 lb 59.09 kg

Propellant Tube Diameter 0.375 inch 9.525 mm

Pressurant Tube Diameter 0.375 inch 9.525 mm

Frequency - lateral* > 20 Hz When immersed in propellant

Frequency - axial* > 100 Hz When immersed in propellant

Test

Test

SIZE: 1250.95 mm ID x 1836.17 mm length

Loaded Tank Sine Vibration - Acceptance (Wet)

3.46

3.46

* Allowance made for 1g gravitational

2

Ramp Down

1

52 - 100

2.6

Lateral (X or Y)

3.86

3.86

2.31

2.31

7.6*

7.6*

Ramp Down

Fluid: Loaded with 1670 kg of distilled water.

Protoflight

Axis

0.19 in. S.A

3.86

2.31

1.54

2

7.6*

5 - 13

13 - 17

17 - 45

Acceleration (g,0-peak)

Limit Acceleration(g)

5

3

2

0.2 in. S.A

10.2*

Ramp Down

5

5

3

3

10.2*

10.2*

10.2*

4.5

2.6

Ramp Down

1.3

0.25 in. S.A.

VISIT US ON OUR WEBSITE @ WWW.PSI-PCI.COM

Updated August 2011

Imperial Units

Ref. Temp.

Metric Units

Ref. Temp

Loaded Tank Sine Vibration-Qualification/Protoflight (Wet)

Axial(Z)

5 - 13

26 - 50

P/N 80517-1

SIZE: 49.25'' in ID x 72.29'' in length

The tank assembly is a hemispherical pressure vessel of all welded construction. It is mounted by 32 circumferential tabs with nut plates located on one of

the hemispheres near the girth weld joint. The tank contains an internally-mounted propellant management device (PMD), with perforated sheet and woven

screen, fabricated to maintain speration of liquid propellant and gaseous pressurant, and to provide predictable gas-free liquid propellant expulsion from the

tank under low or zero gravity conditions. The PMD has been designed to allow horizontal handling with low fill fractions. The PMD has also been modified

by the addition of a slosh control device to allow multiple erection and de-erection cycles. The propellant and pressurant ports are 3/8 inch titanium-to-304

CRES transition tubes.

Acceptance

Axial (Z)

Frequency

Acceleration(g, 0 -Peak)

Limit Acceleration (g)

4.5

13 - 17

17 - 45

45 - 100

5.0 - 22.3

22.3 - 24

24 - 26

50 - 52

52 - 100

26 - 30

50 - 52

45 - 100

5.0 - 22.3

22.3 - 24

24 - 26

0.13 in. S.A

7.6*

Lateral (X or Y)

Axis

Frequency

(2)

Test

Axis

90 to 100

100 to 800

800 to 2000

Unloaded Tank Sine Vibration - Qualification and Protoflight

Loaded Tank Water: Random Vibration Level

Acceptance (Reference only

- - test not required)

Protoflight and Qualification

Frequency

0.25 in. S.A

3

1.5

1

Sweep Rate: 2 octaves/min Qualification

4 octaves/min Protoflight and Acceptance

Qualification

All (X,Y,Z)

3.0 Minutes/Axis, Qualification

+30 dB/OCT

0.054 g

2

/hz

-3 dB/Oct

+30 dB/OCT

0.027 g

2

/hz

-3 dB/Oct

OVERALL (g

rms

)

8.7

6.2

Loaded with 1670 kg of water and pressurized to MEOP

Duration:

1.0 Minute/Axis, Acceptance and Protoflight

Frequency (Hz)

Acceleration (g, 0-Peak)

5.0 - 10.8

10.8 - 20

20.0 - 100

100.0 - 400

(3)

Vibration test plot

(4)
(5)
(6)

ACCEPTANCE TESTS

Examination of Product N/A

Weight Determination N/A

Pre-Proof Volume Determination N/A

Proof Pressure Test N/A

Post-Proof Volume Determination N/A

Expulsion Efficiency N/A

PMD Bubble Point Test Propietary N/A

External Leakage Test <1x10-6 std/cc N/A

Penetrant Inspection N/A

Radiographic Inspection N/A

Final Examination of Product N/A

Cleanliness Verfication N/A

QUALIFICATION TESTS

Examination of Product Pass

Weight Determination 130 111.52

Pre-Proof Volume Determination 103700 104192

Proof Pressure Test 312.5 320

Post-Proof Volume Determination 104344 105188

Proof Pressure Cycle Test 312.5 320

MEOP Pressure Cycle Test 250 252

Expulsion Efficiency > 99.5 99

Vibration Test

PMD Bubble Point Test Proprietary Propietary

External Leakage Test 1x10-6 3.6x10-8

Penetrant Inspection Pass

Radiographic Inspection Pass

Final Examination of Product Pass

Cleanliness Verfication Pass

Burst Pressure Test 375 519

Natural Frequency Required min frequency X-Axis Y-Axis (lateral) Z-Axis (axial) Axis Frequency(Hz) 90 - 100 100 - 800 800 - 2000 Overall G-rms Axis Levels + 30 dB/Octave .054 G2/Hz -3dB/Octave 8.7

Prior to and after the full level random vibration test a 1/4 g sine survey shall be performed from 5 Hz to 2000 Hz at 4 octaves per minute with a 3 g limit in the lateral axis and a 4.5 g limit in the

axial axis.

*Qualification Sine Vibration Levels (Wet)

Lateral (Y)

See below for more details* Acceptance Test not

available as of 08/11/2011

*Qualification Sine Vibration Levels (Dry)

Fluid: 3682 lb of Water or Nitrogen Gas @ 250 psig and ~ 64 deg. F

*Qualification Vibration Test Charts

> 35 Hz > 35 Hz > 55 Hz ~ 47 Hz

*Qualification Random Vibration Levels

Axial (Z) Frequency (Hz) 5 - 13 13 - 17 17 - 45 45 - 100 Acceleration (G) (0-Peak) .25 inch SA 5.0 3.0 2.0 5 - 22.3 22.3 - 24 24 - 26 26 - 50 50 - 52 52 - 100 .20 inch SA 10.2 Ramp Down 2.6 Ramp Down 1.3 Y & Z Frequency (Hz) 5 - 10.8 10.8 - 20 20 - 100 100 - 400 Acceleration(G) (0-PEAK) .25 inch SA 3.0 1.5 1.0 lb actual in3, record actual 56-000263 56-000263 psig,record rupture Record actual Actual Test Data: Serial No. XXX

Pass/fail ~ 47 Hz ~ 61 Hz Pass required Record required Pass required Pass required Pass required 56-000265 56-000266 std/cc He max in3, record required lb maximum in3, record required

psig, record required 56-000269 Record required

psig, record required

%, record required 56-000267 Reference Document 56-000263 Reference Document Record required Pass required lb maximum in3, record required Pass/fail psig, record required

in3, record required %, record required Record required Record required

psig, record actual in3, record actual %, record actual

Pass required Pass required

psig, record required psig, record required

psig, 24 cycles psig, 100 cycles 56-000263

56-000263

56-000268

Actual Test Data: SN 0001Q Pass/fail

lbs actual in3, record actual psig, record actual in3, record actual %, record actual Record actual Pass required Record actual Record actual Pass/fail Pass/fail

std/cc He, record actual Pass/fail Pass/fail Pass/fail Record actual 56-000263 56-000263 56-000263 56-000263 56-000264

(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)

References

Related documents

John Olivieri stated that the Commercial Automobile Committee has been discussing the development of a consistent commission rate for commercial classes, with further

In this respect, the goals that organizers presented considering their events include: hosting international stars of the rock scene and well-established bands,

The younger petroleum systems are not present in the study area; therefore, it is crucial to determine the timing of generation, migration and accumulation of

[4] Therefore, the current study reports the development and validation of a flexible visible spectrophotometric method for the determination of selexipag in bulk drug and

Also you do not want to review, you could straight close the book soft data as well as open Introduction To Biofuels (Mechanical And Aerospace Engineering Series) By David M..

The current Wacom driver supports only the macro keys of the ultrapad series, the macro area of the intuos products is not yet usable for that. Now we should talk about how the

This training must have commenced within eight weeks from the day you started receiving Incapacity Benefit paid at the short-term higher rate or long-term rate, or. Severe

specification, which is the most powerful of the three models, the majority of funds do not have significant timing ability until the manager correctly forecasts sector returns 70%