Schedule No. 2 – Payment Schedule

Task number according to Schedule No. 1 Scope of task

Lists of estimated quantities to be performed and prices

Date of execution Value/resulting value Language of the study Estimated quantities to be performed

Prices 100% amount of the net

bid

1. Mobilization 1 10% 7 % of the net amount

specified in the bid

-

2. Planning of Phase II and preparation of FEED 1 =/< 10% 31.07.2012 No more than 10% of

the net amount specified in the bid

Polish English 3.4 Preparation of the technical and economic parts

of the applications to obtain external financing by the Contracting Authority, including preparation of technical parts and cost data for such applications - optionally

1 The task price: - The price for the

technical and economic part per application should be used for cost estimation of the bid.

English

4. Risk analysis for storage component including risk management scenarios, which will be subsequently updated

The estimated quantity of Risk analyses to be performed: 1

The price for the first report:

The price per update:

The first Risk analysis by 31.10.2012 Intermediate updates after

The price for 1 Risk analysis and 2 updates should be used for cost estimation of the bid.

Polish English

(2)

2 The planned

number of updates: 2

completion of field work and its preliminary interpretation (deadline to be decided by the Contractor) The last update: 15 January 2014 5.2.2. Preparation of a drilling works project together

with the necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to the projects in accordance with the requirements of the government and local administration), including carrying out field reconnaissance

The planned quantity of drilling works projects to be prepared: 1-3

The price per drilling works project:

31.10.2012 Depending on the

number of completed projects.

The price for 3 projects should be used for cost estimation of the bid.

Polish

5.2.3. Preparation of a geological works project for 2D seismic acquisition together with the necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to

The planned quantity of projects for 2D seismic acquisition to be prepared: 1

The price per 2D seismic

acquisition project:

31.10.2012 The price per project should be used for cost estimation of the bid.

(3)

3

the projects in accordance with the

requirements of the government and local administration), including carrying out field reconnaissance – optionally

5.2.4. Preparation of a geological works project for 3D seismic acquisition together with the necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to

the projects in accordance with the

requirements of the government and local administration), including carrying out field reconnaissance The planned quantity of projects for 3D seismic acquisition to be prepared: 1

The price per 3D seismic

acquisition project:

31.10.2012 The price per project should be used for cost estimation of the bid.

Polish

Should it be necessary to prepare a joint project for 2D and 3D seismic acquisition, in order to pay for the task described in points 5.2.3 and 5.2.4, the Contracting Authority will make a payment by adding the amounts quoted by the Contractor for each of the above points.

5.2.5. Preparation of a geological works project for microgravimetry surveys together with the necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to the projects in accordance with the requirements of the government and local administration) - optionally

The planned quantity of projects to be prepared: 1

The price per microgravimetry survey project:

31.10.2012 Depending on the

necessity to perform the task.

The price per project should be used for cost estimation of the bid.

Polish

(4)

4 magnetotelluric surveys together with the

necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to the projects in accordance with the requirements of the government and local administration) – optionally quantity of projects to be prepared: 1 magnetotelluric survey project: necessity to perform the task.

The price per project should be used for cost estimation of the bid.

5.2.5. Preparation of a geological works project for geoelectrical surveys together with the necessary documents required by law for submission to the Ministry of the Environment and to obtain administrative permits for their implementation (together with any corrections and additions to the projects in accordance with the requirements of the government and local administration) - optionally

The planned quantity of projects to be prepared: 1

The price per geoelectrical survey project:

31.10.2012 Depending on the

necessity to perform the task.

The price per project should be used for cost estimation of the bid.

Polish

5.2.1 Preparation of the Environmental Impact

Report and/or Environmental Impact Reports on Natura 2000 Protected Areas for drilling work projects in compliance with the applicable law

The planned quantity of Reports to be prepared: 1

The price for the task performed:

31.10.2012 The price per Report

should be used for cost estimation of the bid.

Polish

5.2.1 Preparation of the Environmental Impact

Report and/or Environmental Impact Reports on Natura 2000 Protected Areas for 2D seismic

The planned quantity of Reports to be

The price for the task performed:

31.10.2012 The price per Report

should be used for cost estimation of the bid.

(5)

5 acquisition project in compliance with the

applicable law- optionally

prepared: 1

5.2.1 Preparation of the Environmental Impact

Report and/or Environmental Impact Reports on Natura 2000 Protected Areas for 3D seismic acquisition project in compliance with the applicable law

The planned quantity of Reports to be prepared: 1

The price for the task performed:

31.10.2012 The price per Report

should be used for cost estimation of the bid.

Polish

* In case of the necessity to perform one cumulative Environmental Impact Report and/or Environmental Impact Report on Natura 2000 Protected Areas including all overlapping elements specified in point 5.2.1, in order to estimate the task cost, the Contracting Authority will make the payment adding the cost of each Report evaluated in the bid.

6.1.1. Preparation of the technical specification for the tender to select the drilling works contractor

The planned quantity of the specification to be prepared: 1-3

The price per specification:

31.10.2012 Depending on the

quantity of the

specifications prepared. The price for 3

specifications should be used for cost estimation of the bid.

Polish

6.1.1.1 Participation in the tendering process for the selection of the drilling works contractor as the Contracting Authority’s “expert” until the contractor is selected

The planned quantity of tendering processes: 1

The price for the task performed:

31.12.2012 The price for the participation in one tendering process should be used for cost

estimation of the bid.

-

6.1.2. Preparation of technical specification for the tender to select the 2D seismic works contractor – optionally

The planned quantity of the 2D specifications to be prepared: 1

The price per 2D

specification:

31.10.2012 The price per

specification should be used for cost estimation of the bid.

(6)

6 6.1.2.1 Participation in the tendering process for the

selection of the 2D seismic works contractor as the Contracting Authority’s “expert” until the contractor is selected* - optionally

The planned quantity of tendering processes: 1

The price for the task performed:

31.12.2012 The price for the participation in one tendering process should be used for cost

estimation of the bid.

-

6.1.3. Preparation of technical specification for the tender to select the 3D seismic works contractor

The planned quantity of 3D specifications to be prepared: 1

The price per 3D

specification:

31.10.2012 The price per

specification should be used for cost estimation of the bid.

Polish

6.1.3.1 Participation in the tendering process for the selection of the 3D seismic works contractor as the Contracting Authority’s “expert” until the contractor is selected*

The planned quantity of tendering processes: 1

The price for the task performed:

31.12.2012 The price for the participation in one tendering process should be used for cost

estimation of the bid.

-

* In case of the necessity to conduct one tendering process for the selection of the 2D and 3D seismic works contractor, in order to calculate the price of the task defined in points 6.1.2.1 and 6.1.3.1, the Contracting Authority will make the payment based on the arithmetic mean of the amounts quoted by the Contractor for each of the points

6.1.4. Preparation of technical specifications for the tender to select the microgravimetric survey contractor - optionally

The planned quantity of the specifications to be prepared:- 1

The price per specification:

31.10.2012 Depending on the

necessity. The price per

specification should be used for cost estimation of the bid.

Polish

6.1.4.1 Participation in the tendering process for the selection of the microgravimetric survey

The planned quantity of

The price for the task performed:

31.12.2012 The price for the participation in one

(7)

7 contractor as the Contracting Authority’s

“expert” until the contractor is selected -

optionally

tendering processes: 1

tendering process should be used for cost

estimation of the bid. 6.1.5. Preparation of technical specification for the

tender to select the magnetotelluric survey contractor - optionally

The planned quantity of specifications to be prepared: 1

The price per specification:

31.10.2012 Depending on the

necessity. The price per

specification should be used for cost estimation of the bid.

Polish

6.1.5.1 Participation in the tendering process for the selection of the magnetotelluric survey contractor as the Contracting Authority’s “expert” until the contractor is selected -

optionally

The planned quantity of tendering processes: 1

The price for the task performed:

31.12.2012 The price for the participation in one tendering process should be used for cost

estimation of the bid.

-

6.1.6. Preparation of technical specifications for the selection of the geoelectrical survey contractor – optionally

The planned quantity of specifications to be prepared: 1

The price per specification:

31.10.2012 Depending on the

necessity. The price per

specification should be used for cost estimation of the bid.

Polish

6.1.6.1 Participation in the tendering process for the selection of the geoelectrical survey contractor as the Contracting Authority’s “expert” until the contractor is selected - optionally

The planned quantity of tendering processes: 1

The price for the task performed:

31.12.2012 The price for the participation in one tendering process should be used for cost

estimation of the bid.

-

(8)

8 Works carried out by Third Parties including

coordination and supervision of the quality of well drilling until the completion of the relevant agreements with Third Parties; field work implementation report number of wells to be performed: 1-3 coordination and supervision per well: number of wells. The price for the coordination and supervision of 3 wells should be used for cost estimation of the bid.

7. Coordination and supervision of Geological

Works carried out by Third Parties including coordination and supervision of the quality of 2D seismic acquisition until the completion of the relevant agreements with Third Parties; field work implementation report- optionally

The planned quantity to be performed: 100 km

The price for the entire task

31.07.2013 The price for the entire task should be used for cost estimation of the bid.

Polish

7. Coordination and supervision of Geological

Works carried out by Third Parties including coordination and supervision of the quality of 3D seismic acquisition until the completion of the relevant agreements with Third Parties; field work implementation report

The planned quantity to be performed: 100 km2

The price for the entire task

31.07.2013 The price for the entire task should be used for cost estimation of the bid.

Polish

7. Coordination and supervision of Geological

Works carried out by Third Parties including coordination and supervision of the quality of microgravimetry survey until the completion of the relevant agreements with Third Parties; field work implementation report - optionally

The planned quantity to be performed: 12 thousand points

The price for the entire task

31.07.2013 Depending on the

necessity.

The price for the entire task should be used for cost estimation of the bid.

Polish

(9)

9 Works carried out by Third Parties including

coordination and supervision of the quality of magnetotelluric survey until the completion of the relevant agreements with Third Parties; field work implementation report - optionally

quantity to be performed: 70 km of lines

entire task necessity.

The price for the entire task should be used for cost estimation of the bid.

7. Coordination and supervision of Geological

Works executed by Third Parties including coordination and supervision of the quality of geoelectrical survey until the completion of the relevant agreements with Third Parties; field work implementation report - optionally

The planned quantity to be performed: 500 points

The price for the entire task:

31.07.2013 Depending on the

necessity.

The price for the entire task should be used for cost estimation of the bid.

Polish

8.1 Execution of geophysical log interpretation in new wells (documentation + report) and log reinterpretation in legacy wells (documentation + report)

a) In the newly drilled one well (expected number of new wells: 1-3)

30.09.2013 Depending on the

number of interpretations performed in the new and legacy wells. The total of all listed interpretations (i.e. 23 interpretations in each of the newly drilled wells + 16 reinterpretations in each of the legacy wells) should be used for cost estimation of the bid.

Polish English

• Gamma-Ray

Log

interpretation

The price for interpretation of one well: • Spectral Gamma-Ray Log interpretation

The price for interpretation of one well:

Gamma-Gamma Density Log

The price for interpretation of one well:

(10)

10 interpretation

• Selective

Gamma-Gamma Log (for instance

Photoelectric Effect Log) interpretation

The price for interpretation of one well: • Neutron-neutron Logging interpretation

The price for interpretation of one well:

• Spontaneous

Potential Log interpretation

The price for interpretation of one well:

• Sonic Log interpretation-

optionally

The price for interpretation of one well: • Borehole Compensated Sonic or Dipole Sonic

The price for interpretation of one well:

(11)

11 interpretation • Sonic Scanning Log interpretation - optionally

The price for interpretation of one well: • Micro Resistivity Imaging interpretation- optionally

The price for interpretation of one well: • Dual Laterolog or Dual Induction Laterolog interpretation

The price for interpretation of one well: • Microlaterolog or Shallow Laterolog interpretation

The price for interpretation of one well:

• Nuclear Magnetic

The price for interpretation

(12)

12 Resonance interpretation of one well: • Formation Tester interpretation

The price for interpretation of one well:

• Mini-frac or micro-frac interpretation

The price for interpretation of one well: • Vertical interference test interpretation - optionally

The price for interpretation of one well: • Temperature Log interpretation after well reaches stable thermal conditions – optionally

The price for interpretation of one well:

• Temperature

Log

The price for interpretation

(13)

13 interpretation before reaching thermal equilibrium – optionally of one well: • Calliper interpretation

The price for interpretation of one well: • Inclinometer Log interpretation- optionally

The price for interpretation of one well:

• Dipmeter

interpretation-

optionally

The price for interpretation of one well:

• Cement Bond

Log

interpretation

The price for interpretation of one well:

• Vertical Seismic Profiling (VSP) interpretation

The price for interpretation of one well:

b) In one legacy well (expected number of legacy wells: 4)

(14)

14 reinterpretation - optionally reinterpretation of one well: • Micro-Calliper reinterpretation - optionally

The price for reinterpretation of one well: • Inclinometer Log reinterpretation - optionally

The price for reinterpretation of one well: • Gamma-Ray Log reinterpretation - optionally

The price for reinterpretation of one well: • Gamma-Gamma Log reinterpretation - optionally

The price for reinterpretation of one well: • Neutron-Gamma Log reinterpretation - optionally

The price for reinterpretation of one well:

Neutron-Neutron Log reinterpretation

The price for reinterpretation of one well:

(15)

15 - optionally • Spontaneous Potential reinterpretation - optionally

The price for reinterpretation of one well: • Electrical Resistivity Log reinterpretation - optionally

The price for reinterpretation of one well: • Micro-Resistivity Log reinterpretation - optionally

The price for reinterpretation of one well: • Focused Resistivity Log (Laterolog) reinterpretation - optionally

The price for reinterpretation of one well:

• Microlaterolog reinterpretation - optionally

The price for reinterpretation of one well: • Resistivity Sounding reinterpretation - optionally

The price for reinterpretation of one well:

(16)

16

• Induction Log reinterpretation - optionally

The price for reinterpretation of one well:

• Sonic Log reinterpretation - optionally

The price for reinterpretation of one well: • Temperature Log reinterpretation - optionally

The price for reinterpretation of one well: 8.2. Interpretation of hydrogeological test data and

of water sample analysis carried out by Third Parties in the scope specified in Schedule No. 1 point 8.2.1. – documentation + report

In the newly drilled well (expected number of wells: 1-3; expected number of reservoir horizons and overlying aquifers tested for each of the 1-3 wells)

The price for complete interpretation for one well:

30.09.2013 Depending on the

number of newly drilled wells to be performed. The price for complete interpretation in 3 wells should be used for cost estimation of the bid.

Polish English

8.3.1./ 8.3.2.

Core samples selection, collection of samples - documentation

The planned number of samples to be

The price for one sample:

15.07.2013 Depending on the

number of samples and depending on the

Polish English

(17)

17 Transportation of core samples to laboratories

and back to permanent storage location

collected from all wells: 803 The planned number of sample kilograms per well: 150 kg (number of wells: 3)

The price for one kilogram:

samples’ weight.

The price for 803 samples and the price for the weight of samples from 3 wells, i.e. 450 kg should be used for cost

estimation of the bid.

8.3.3. Preparation of conventional core sample analysis – documentation • Description of core samples, including photographic documentation (it is expected that the total of 803 samples from the 3 wells will need to be described)

The price per sample:

31.08.2013 Depending on the

number of descriptions of core samples.

The price for the description of 803 samples should be used for cost estimation of the bid.

Polish English

•Thin sections analysis, 150 analyses in all the wells are expected in total

The price per analysis:

31.08.2013 Depending on the

number of analyses. The price for 150 analyses should be used for cost estimation of the bid.

(18)

18 analysis (50

analyses in all the wells are expected in total) –

optionally

analysis: number of analyses.

The price for 50 analyses should be used for cost estimation of the bid.

•Entire suite of petrophysical studies of reservoir and seal core samples (the entire suite of

petrophysical analyses of 150 core samples from all wells are expected in total)

The price for the entire suite of petrophysical studies per sample:

31.08.2013 Depending on the

number of core samples. The price for 150 core samples should be used for cost estimation of the bid.

• Mineralogical analysis and X-ray studies of

claystones (50 analyses in all wells are expected in total)

The price per analysis:

31.08.2013 Depending on the

number of analyses. The price for 50 analyses should be used for cost estimation of the bid.

• Full core GR log (total and

The price per meter of core

31.08.2013 Depending on the

(19)

19 spectral); it is

expected that in total 1000 m of core from all wells will be logged-

optionally

logged: core logged.

The price for 1000 m of core should be used for cost estimation of the bid.

• CT images and/or core photography using UV and white light of selected core fragments

(documentation of the total of 50 samples from all wells is expected) -

optionally

The price per sample:

31.08.2013 Depending on the

number of samples. The price for

documenting 50 samples should be used for cost estimation of the bid.

•Palynological analysis (the total of 50 analyses in all the wells are expected) –

optionally

The price per analysis:

31.08.2013 Depending on the

number of analyses. The price for 50 analyses should be used for cost estimation of the bid. 8.3.4. Geomechanical core testing.

Documentation, including photographic documentation and CT

•Continuous strength profiling ("scratch test”)

The price per meter of core test:

31.08.2013 Depending on the

number of core meters. The price for testing 60 m

Polish English

(20)

20 (the testing of 60

m of the core from all wells is expected in total) - optionally

of the core should be used for cost estimation of the bid. •Standard uniaxial compression test (testing of 18 core sections from all wells is expected in total) – optionally

The price for testing one core section :

31.08.2013 Depending on the

number of core sections tested.

The price for 18 core sections should be used for cost estimation of the bid.

•Fracture resistance (testing of 18 core sections from all wells is expected in total) - optionally

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 18 core sections should be used for cost estimation of the bid.

•Brazilian indirect tensile tests (testing of 18 core sections from all wells is expected in total)

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 18 core sections should be used for cost estimation

(21)

21

- optionally of the bid.

•ISRM type-2 test (testing of 15 core sections from all wells is expected in total) - optionally

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 15 core sections should be used for cost estimation of the bid. •Permeability tests at 3 different confining pressures (testing of 15 core

sections from all wells is expected in total) -

optionally

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 15 core sections should be used for cost estimation of the bid.

•Pore volume compressibility test (testing of 15 core sections from all wells is expected in total) - optionally

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 15 core sections should be used for cost estimation of the bid.

(22)

22 (testing of 24

core sections from all wells is expected in total) - optionally

testing one core section:

number of core sections tested.

The price for testing 24 core sections should be used for cost estimation of the bid. •“Pulse Decay” or “Pressure Decay” permeability test of argillaceous rocks (testing of 24 core sections from all wells is expected in total) – optionally

The price for testing one core section:

31.08.2013 Depending on the number of core sections tested.

The price for testing 24 core sections should be used for cost estimation of the bid.

•Capillary pressure test (testing of 24 core sections from all wells is expected in total) - optionally

The price for testing one core section:

31.08.2013 Depending on the number of core sections tested.

The price for testing 24 core sections should be used for cost estimation of the bid.

8.3.5. Special (unconventional) core analysis: CO2 core flooding, under reservoir conditions -

documentation

•Permeability test (testing of 24 core sections

The price for testing one core section:

31.08.2013 Depending on the number of core sections tested.

Polish English

(23)

23 from all wells is

expected in total)

The price for testing 24 core sections should be used for cost estimation of the bid. •CO2-saturated brine and/or dense CO2/rock interaction tests (testing of 24 core sections from all wells is expected in total) – optionally

The price for one core section tested:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 24 core sections should be used for cost estimation of the bid.

•Capillary entry pressure test (testing of 24 core sections from all wells is expected in total)

The price for testing one core section:

31.08.2013 Depending on the

number of core sections tested.

The price for testing 24 core sections should be used for cost estimation of the bid.

8.3.6 Summary Report describing all core analysis results specified in points 8.3.1. to 8.3.5

1 report is expected to be prepared

The price for the task performed:

15.09.2013 The price for 1 Report should be used for cost estimation of the bid.

Polish English 8.4. Analysis of petrophysical properties for all new

wells and all legacy wells, taking into account all types of well data – documentation + report

The planned number of new wells: 1-3

The price per new well:

15.10.2013 Depending on the

number of wells (new and legacy).

Polish English

(24)

24 The planned

number of legacy wells: 4

The price per legacy well:

The price for 3 new wells + the price for 4 legacy wells should be used for cost estimation of the bid.

8.5. Execution of structural and sedimentological profiles for new wells, based on high resolution formation images - documentation + report

The planned number of new wells: 1-3

The price per new well:

30.09.2013 Depending on the

number [of new wells]. The price for 3 new wells should be used for cost estimation of the bid.

Polish English

9.1. Preparation of the interpretation of potential field data (gravimetric) with regard to

structural-parametric (static) model construction – documentation + report-

optionally

The planned quantity of interpretations:1

The price for the performed task:

31.08.2013 Depending on the necessity.

The price per

interpretation should be used for cost estimation of the bid.

Polish English

9.1. Preparation of the interpretation of potential field data (magnetotelluric) with regard to structural-parametric (static) model construction – documentation + report-

optionally

The planned quantity to be performed: 70 km

The price per km:

31.08.2013 Depending on the

necessity. Depending on the number of kilometres performed by Third Parties and

interpretations. The price for 70 km of profiles should be used for cost estimation of the bid.

Polish English

(25)

25 9.1. Preparation of the interpretation of potential

field data (geoelectrical) with regard to structural-parametric (static) model construction – documentation + report-

optionally The planned quantity of measurement points for Interpretation: 500 points

The price per measurement point: 31.08. 2013 Depending on the necessity. Depending on the quantity of measurement points performed by Third Parties and interpretations. The price for 500 measurement points should be used for cost estimation of the bid.

Polish English

9.2.2. Processing 2D seismic data using advanced methods - documentation + report - optionally

The planned quantity to be performed: 100 km The price per km: 30.09.2013 Depending on the number of kilometres performed by Third Parties and intended for processing.

The price for 100 km should be used for cost estimation of the bid.

Polish English

9.2.2. Processing 3D seismic data using advanced methods - documentation + report - optionally

The planned quantity to be performed: 100 km2 The price per km2: 30.09.2013 Depending on the necessity. Depending on the number of kilometres performed by Third Parties and intended for processing.

Polish English

(26)

26 The price for 100 km2

should be used for cost estimation of the bid. 9.2.1 Reprocessing legacy seismic profiles (as

additional input data for 3D model)-documentation + report - optionally

The planned quantity to be performed: 100 km The price per km: 31.08.2013 Depending on the necessity. Depending on the number of kilometres performed by Third Parties and intended for reprocessing.

The price for 100 km should be used for cost estimation of the bid.

Polish English

9.2. 3D time domain model construction of CO2

storage site and its vicinity, based on 3D seismic data interpretation –documentation + report

The planned quantity to be performed: 1

The price for the task performed:

15.10.2013 The price for one model construction based on 3D seismic data

interpretation should be used for cost estimation of the bid.

Polish English

9.2. 3D time domain model construction of CO2

storage site and its vicinity, based on 3D and 2D seismic data interpretation - optionally – documentation + report

The planned quantity to be performed: 1

The price for the task performed:

15.10.2013 Depending on the necessity.

The price for one model construction based on 3D and 2D seismic data interpretation should be used for cost estimation

Polish English

(27)

27 of the bid.

9.3. Preparation of advanced pre- and post- stack seismic data analysis in time domain for the 2D seismic survey- documentation + report- -

optionally The planned quantity to be performed: 100 km The price per km: 15.10.2013 Depending on the necessity. Depending on the number of kilometres. The price for 100 km should be used for cost estimation of the bid.

Polish English

9.3. Preparation of advanced pre- and post- stack seismic data analysis in time domain for the 3D seismic survey- documentation + report

The planned quantity to be performed: 100 km2 The price per km2: 15.10.2013 Depending on the number of kilometres. The price for 100 km2 should be used for cost estimation of the bid.

Polish English

9.4.3. Advanced velocity modelling using additional geophysical data (microgravimetric) -

documentation + report - optionally

The planned quantity to be performed:- 1

The price for the task performed:

15.10.2013 Depending on the

necessity.

The price for the entire task performed should be used for cost estimation of the bid.

Polish English

9.4. Velocity modelling of rock complex and time-depth conversion - documentation + report

The planned quantity to be performed: 1

The price for the task performed:

15.10.2013 The price for the entire task performed should be used for cost estimation of the bid.

Polish English

9.5 Construction of structural-parametric static models – documentation and report

Multi-variant 3D modelling of

The task price: 15.11.2013 The price for the entire task should be used for

Polish English

(28)

28 facies and

petrophysical parameters distribution

cost estimation of the bid.

9.6 Analysis and comparison of long duration

pumping and injection well tests and, if available, vertical interference well tests with the results of caprocks and fault parameters in structural-parametric static models and

detailed definition of fault and caprock integrity – documentation + report

The planned quantity to be performed: 1

The price for the task performed:

31.12.2013 The price for the entire task should be used for cost estimation of the bid.

Polish English

9.7.1 Construction of geomechanical 1D models of geological volume mechanical parameter distributions as well as in-situ stresses, for structural-parametric model – documentation + report The planned quantity of the geomechanical 1D models to be performed: 1-3

The price for one geomechanical 1D model in one well: 30.11.2013 Depending on the number of geomechanical 1D models performed. The price for 3

geomechanical 1D models should be used for cost estimation of the bid.

Polish English

9.7.2. Construction of geomechanical 3D models of geological volume mechanical parameter distributions as well as in-situ stresses, for structural-parametric model – documentation + report The planned quantity of the geomechanical 3D models to be performed: 1 (1 model for 3 wells)

The price for the task performed:

30.11.2013 The price for 1 model should be used for cost estimation of the bid.

Polish English

(29)

29

9.8. Construction of geochemical 1D models –

documentation + report

The planned quantity of the geochemical 1D models: 1-3

The price per geochemical 1D model:

30.11.2013 Depending on the

number of geochemical 1D models performed. The price for 3

geochemical 1D models should be used for cost estimation of the bid.

Polish English

9.9. Dynamic modelling of pure CO2 behaviour within the storage complex - documentation + report The planned quantity of multi-variant models including 6 basic injection scenarios: 1

The price for the task performed:

31.12.2013 The price for 1 multi-variant model including 6 basic injection scenarios should be used for cost estimation of the bid.

Polish English It is planned to perform up to 18 consecutive scenarios - optionally

The unit price per consecutive scenario performed: Depending on the necessity. Depending on the number of additional scenarios performed. The price for 18 consecutive scenarios should be used for cost estimation of the bid. 9.9.1 Multi-variant hydrodynamic steady-state and

transient vertical flow modelling for planned injection wells

The planned quantity of injection wells: 2

The price per injection well modelling:

31.12.2013 Depending on the

number of modelled injection wells. The price for 2 injection wells

Polish English

(30)

30 should be used for cost

estimation of the bid. 10. Summary Report for Final Investment Decision

(FID)

The planned quantity of the Report for FID: 1

The price for the task performed:

31.01.2014 The price for 1 Report for FID should be used for cost estimation of the bid.

Polish English

11. Storage Site concept - optionally The planned

quantity to be prepared: 1

The price for the task performed:

30.04.2014 Depending on the

necessity.

The price for 1 storage site concept should be used for cost estimation of the bid.

Polish English

12. Preparation of injection permit (concession) application, including the necessary

documentation to obtain licences (concessions) for CO2 storage in case of a positive FID – optionally

The planned quantity of applications to be prepared:- 1

The price for the task performed: 30.09.2015 The date of obtaiment by Contracting Authority the injection licence

The price for the

preparation of 1 injection permit (concession) application should be used for the cost estimation of the bid.

References

Related documents

The above analysis from the primary and secondary study help us to conclude that Sericulture in Madhya Pradesh has a huge prospective but this short survey in block study helps us

Among these, Reliability Engineering &amp; Systems Safety is the most significant source of articles related to the resilience research, with Risk Analysis,

Although no significant anti- dependency was seen at T1, we believe it is likely that the associations already interfere with each other either at immediate retrieval, or at the

Background on Municipal Solid Waste Landfill Growth and Consolidation Prior to the proposal of the technical criteria for Subtitle D landfills in 1988, the municipal solid

 Flammable materials are substances that, when transported under forced heating, at or above their flashpoint, or substances transported at elevated temperatures (e.g., molten),

Writing assignments and activities in writing-active courses are designed primarily to assist students in mastering course content, secondarily to strengthen students' writing

The reviewer’s worldview Meta- narrative Critical interpretive synthesis Meta-ethno- graphy Grounded theory Thematic synthesis The JBI meta- aggregative approach Framework

[r]