• No results found

Software Project Visualization Using Task Oriented Metaphors

N/A
N/A
Protected

Academic year: 2020

Share "Software Project Visualization Using Task Oriented Metaphors"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 1. List of measures.
Figure 1. Overview of T-Cube.
Figure 2. Overview of MetroMap when “Type of task” is selected.
Figure 3. Steps required to analyze the values of different measures for a task.
+4

References

Related documents

Atherosclerosis, a chronic disorder and the main pathogenesis of various cardiovascular diseases, is initiated by the formation of the macrophage foam cell at the subendothelial

With the entrance of Islamic dynasties Islam was introduced to India. With introduction of Islam the traditional education system was greatly

Here we present an original characterization of the energy spent to transmit information using ME and MME as function of the coding activity, the transmit radio powers, the

In Zimbabwe, according to Mvumi and Stathers (2003), control of insect pests in stored maize grain has been based on curative chemical methods and several studies in

The printed colors shown in this brochure may vary from actual available tile colors..

With this high percentage of Indigenous students within the state education sector, the Northern Territory Department of Education offers Indigenous Languages and Culture as a

(2011) The Impact of Foreign Direct Investment in Economic Growth in Nigeria, International Research Journal of Finance and Economics, Vol. (2008) The

Based on the results of trial excavations which unearthed a number of canal sections (see paragraph “ System of canals in the sanctuary of Pachacamac ”), and other ancillary