Request for Proposal

For Installation, Care and Maintenance of Landscape

and Plant Materials at Specified Locations

Issued By:

The Village of Hainesville

100 N. Hainesville Road

Hainesville, Illinois 60030

Issue Date: April 1

s t

, 2013 9:00 a.m.

thru April 9th, 2013 5:00 p.m.

(2)

The Village of Hainesville ("Hainesville" or "Village") invites landscaping contractors to submit proposals for Installation, Care and Maintenance of Landscape and Plant Materials at Specified Locations in accordance with the requirements, terms, and conditions of this Request for Proposal (RFP).

Mandatory Pre-Proposal Meeting:

All contractors interested in submitting a proposal for this project must attend a mandatory pre-proposal meeting at the Village Hall, 100 N. Hainesville Road, Hainesville, Illinois on April 10t h, 2013, beginning at 10:00 a.m. Following a brief discussion of the project, attendees will visit all sites depicted on Exhibit A.

1.0 - Objective

The Village is seeking a contractor to undertake the updating and renovation of the plants and landscaping materials in several subdivision entrances, street islands, outside the Village Hall, and adjacent to Village boundary entry signs, as depicted on the map attached hereto as Exhibit A. Currently, the landscaping at those locations includes plants designed to create a "prairie look". Those plants do not create the appearance desired by the Village and are not appropriate because they are intolerant to conditions which occur at those locations, such as snowplowing, application of salt to the Villages streets, and shallow concrete islands.

The Village desires to have the landscaping at those locations updated, leaving in place plants which are appropriate, both in terms of durability and aesthetics, and removing plant species which are either intolerant to the conditions or aesthetically inappropriate. Further the Village desires certain levels of ongoing maintenance and care for the plants at the prescribed locations.

2.0 - Scope of Work

A. Initial Work

(3)

B. Removal of Plant Materials/Planting New Materials

Prior to removal or installation of any plant and landscaping materials, Village will review Contractor's inventory lists and recommendations. After mutual agreement on which plants are to be removed or rehabilitated and which new plants are to be installed, Contractor will proceed with the removal, rehabilitation, and installation.

C. Maintenance/Care

Once the initial removal/installation process has been completed within a mutually agree upon timeline, and all work is approved and accepted by the Village, the care and maintenance schedule will commence in accordance with the following schedule:

Bi-Weekly:

1. Edging

2. Pruning back any plant material overhanging curbs. 3. Removing litter and leaves from islands and open spaces. 4. Removing broken or fallen branches from trees. Removing sucker growth from the bottom of trees.

5. Removing weeds.

6. Smoothing the much layer.

7. Checking plants for stress or disease. Replacing any plants that meet conditions for replacement at contractor's expense.

Contractor shall first seek Village authorization prior to removing or replacing any dead or missing plants for which the Village will incur additional costs.

Monthly:

1. Adding new mulch as needed.

2. Applying granular fertilizer and weed control as ppropriate. 3 Planting annual color plants for spring/summer and fall bloom. 4. Pruning shrubs to maintain proper shape. Pruning trees or shrubs that may interfere with public safety.

(4)

NOTE: Watering and any gator bag refill will be performed by the Village Public Works Department.

3.0 - Pricing

The Village will accept proposals based on a price not to exceed $15,000 for the provision of all work and materials described in the Request for Proposal.

4.0 - Terms and Conditions

Contractor shall comply with all applicable laws, regulations, and rules promulgated by any Federal, State, County, Municipal and or other governmental unit or regulatory body now in effect during the performance of the work. By way of example, the following are included within the scope of the laws, regulations and rules referred to in this paragraph, but in no way to operate as a limitation on the laws, regulations and rules with which Contractor must comply, are all forms of Workers Compensation Laws, all terms of the Equal Employment Opportunity Clause of the Illinois Fair Employment Practices Commission, the Illinois Preference Act, the Social Security Act, Statutes relating to contracts let by units of government, all applicable Civil Rights and Anti-Discrimination Laws and Regulations, and traffic and public utility regulations.

(5)

default of any provisions of the Contract. The indemnification obligations under this paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under Workers' Compensation or Disability Benefit Acts or Employee Benefit Acts.

Contractor shall be required to keep in force, to the satisfaction of the Village, at all times during the performance of any work referred to above, Workers Compensation and Employer's Liability Insurance, Commercial General Liability Insurance, and Automobile Insurance in at least the type and amounts as follows:

1. Workers'Compensation:

a. State: Statutory b. Applicable Federal (e.g., Longshoremen's): Statutory

c. Employer's Liability $500,000.00 Per Accident

$500,000.00 Disease, Policy Limit $500,000.00 Disease, Each Employee 2. Commercial General Liability: a. $2,000,000.00 General Aggregate

b. $1,000,000.00 Products Completed Operations Aggregate c. $1,000,000.00 Personal and Advertising Injury

d. $1,000,000.00 Each Occurrence

e. $ 50,000.00 Fire Damage (any one fire)

f. $ 5,000.00 Medical Expense (any one person)

3. Business Automobile Liability (including owned, non-owned and hired vehicles): a. Bodily Injury: $1,000,000.00 Per Person $1,000,000.00 Per Accident b. Property Damage: $1,000,000.00 Per Occurrence 4. Umbrella Excess Liability:

$2,000,000.00 over Primary Insurance

(6)

Certificates of Insurance and Policy Endorsements evidencing the coverages and the addition of the Village as an additional insured. No such policy of insurance shall have a deductible or self-insurance retention amount in excess of $5,000.00 per occurrence. All insurance shall be written on an "occurrence" basis rather than a "claims-made" basis.

To the extent that the Prevailing Wage Act applies, Contractor shall pay and require every Subcontractor to pay prevailing wages as established by the Illinois Department of Labor for each craft or type of work needed to execute the contract in accordance with 820 ILCS 130/.01 et seq. Contractor shall prominently post the current schedule of prevailing wages at the Contract site and shall notify immediately in writing all of its Subcontractors, of all changes in the schedule of prevailing wages. Any increases in costs to Contractor due to changes in the prevailing rate of wage during the terms of any contract shall be at the expense of Contractor and not at the expense of the Village. Contractor shall be solely responsible to maintain accurate records as required by the prevailing wage statute and to obtain and furnish all such certified records to the Village of Hainesville as required by Statute. Contractor shall be solely liable for paying the difference between prevailing wages and any wages actually received by laborers, workmen and/or mechanics engaged in the Work and in every way defend and indemnify Village against any claims arising under or related to the payment of wages in accordance with the Prevailing Wage Act. The Illinois Department of Labor publishes the prevailing wage rates on its website at http://www.state.il.us/agency/idol/rates/rates.HTM. The Department revises the prevailing wage rates and the Contractor/subcontractor has an obligation to check the Department's web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website.

The Contractor, before commencing the Work, shall furnish a Performance Bond and a Labor and Material Payment Bond. The Performance Bond shall be in an amount equal to 100% of the full amount of the Contract Sum as security for the faithful performance of the obligation of the Contract Documents, and the Labor and Material Payment Bond shall be in an amount equal to 100% of the full amount of the Contract Sum as security for the payment of all persons performing labor and furnishing materials in connection with the Contract Documents. Such bonds shall be on standard AIA Documents, shall be issued by a surety satisfactory to the Village, and shall name the Village as a primary co-obligee. The cost of the bonds is to be included in the Proposal. The Performance Bond and Labor and Material Payment Bond will become a part of the Contract.

(7)

by the Village under the Freedom of Information Act so that the Village may provide records to those requesting them within the time frames required. If additional time is necessary to compile records in response to a request, then Contractor shall so notify the Village and if possible, the Village shall request an extension so as to comply with the Act. In the event that the Village is found to have not complied with the Freedom of Information Act due to Contractor's failure to produce documents or otherwise appropriately respond to a request under the Act, then Contractor shall indemnify and hold the Owner harmless, and pay all amounts determined to be due including but not limited to fines, costs, attorneys' fees and penalties.

5.0 - Procedures

Please deliver signed proposal on or before April 18t h, 2013 by 5:00 p.m. or electronically by email to jeffgately@hainesville.org.

Do not contact the Mayor or Trustees of the Village. Questions regarding this proposal should be directed to Jeff Gately, who will administer the process:

Telephone: (847) 223-2032 Fax: (847)223-2274

Email: jeffgately@hainesville.org

6.0 - Other Information

The Village reserves the right to reject any and all proposals, waive any, to negotiate with any or all companies submitting proposals and to enter into an agreement with any company for any services sought in this RFP.

The Village reserves the right to later modify any portion of this request for proposals and to request additional specific information and submit additional questions in the discretion of the Village.

All costs incurred by the Company in preparing a response to this proposal, including any meetings or visits, shall be at the Company's expense.

Each Company shall be responsible for insuring that all Federal, State and Local laws are followed.

Your response will become the property of the Village once received.

(8)

ATTACHMENT 1 VILLAGE OF HAINESVILLE

PROPOSAL

For Installation, Care and Maintenance of Landscape and Plant Materials at Specified Locations VENDOR QUALIFICATIONS Summary of Experience Company Name Address Phone # Fax# Email

Year Company was founded Years in Landscape Maintenance

Last Calendar Year Landscape Maintenance Volume

Have you ever operated a landscaping business under another name? If so, list previous name

References

(9)

Reference #2 Name of Project Address of Project _ Owner Contact Person Telephone Email Contract Amount Description of Work Reference #3 Name of Project Address of Project _ Owner Contact Person Telephone Email Contract Amount Description of Work C O S T P R O P O S A L

Contractor proposes to perform the following services described in Article 2 of the Request for Proposal for the amounts listed below:

A. Initial Work Lump sum amount $ B. Removal of Plant Materials/Planting New Materials Lump sum amount $ C. Bi-Weekly and Monthly Maintenance Lump sum amount $ I certify that I am authorized to submit this proposal on behalf of

and hereby agree that, if selected, to enter into a contract with the Village of Hainesville in accordance with the terms of this proposal.

(10)

EXHIBIT A

(11)

VILLAGE OF HAINESVILLE

January 21,2004 Scale 1" = 700'

1 - Island areas on Cranberry Lake Drive, as well as side areas by signs. 2 - Island area and east side area by sign.

3 - Island 4 - Island 5 - Island

References

Related documents

In this review, the research carried out using various ion-exchange resin-like adsorbents including modified clays, lignocellulosic biomasses, chitosan and its derivatives, microbial

While in Table 3 we present a pooled specification, to increase the chances for the added variables to exert a significant impact, in unreported regressions we repeat the

The output characteristic (Fig. 6-1) for a water-gated PBTTT film is close to ideal, with very little hysteresis and a low threshold between 0V and 0.1V. The responses of PBTTT

The Village of Gurnee ("Village") is requesting proposals for the development, design, hosting and ongoing maintenance of a new website (the current website may be viewed

[r]

[r]

As mentioned above, the 2011 legislative reforms codify for the first time the previously existing recognized standard on burden of proof and causation. For the first time, rather

university reform claims that strategic manage- ment has been strengthened in the universities, while the role of university per- sonnel has remained weak. Two major strategy