• No results found

Excavation at Buildings Nos.1 and 20 at Shahr-i-Sokhta

N/A
N/A
Protected

Academic year: 2020

Share "Excavation at Buildings Nos.1 and 20 at Shahr-i-Sokhta"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 2. Sections of Building no. 1 during Level C. The brick layout of the various walls is clearly evident.
Fig. 3. Central room no. 5 of Building no. 1 and the horse shoe fireplace at the center of room
Fig. 4. Blocking of doors in Level B in the building no. 1.
Fig. 6. Room no. 6 and a storage jar.
+7

References

Related documents

charity sport events foster the properties of community among participants. The results reveal

When using one or more LoopBoxes, the detections from several timing points will be received through the one and only main race result System with Active Extension or USB Timing

When the water level in the header tank reaches the top of the overflow tube, adjust the bench flow control valve to give a water level of 2 to 3mm above the overflow level..

European Competence Profiles in e-Tourism Functions – e-Tourism Marketing Specialist 11 Dimension 3: e- Competence proficiency levels Level 1 Level 2. Level 3 Exploits skills

It is possible to work out the third degree McLaurin polynomial from the definition, but it would take a lot of time for this function since the derivatives require

Level 0.5 Level 0.5 Level I Level I Level II.1 Level II.1 Level II.5 Level II.5 Level III.1 Level III.1 Level III.3 Level III.3 Level III.5 Level III.5 Level I Level I - - D

It is hoped that the analysis of auction database and the developed models will help the practitioners of the New Zealand wool industry in better understanding the role of

In order to increase the use of ERP systems it is recommended to begin with the Financial Section, the applications invoicing, cost control, accounting and financial then it should