• No results found

DATA CENTERS AND CRITICAL FACILITIES

N/A
N/A
Protected

Academic year: 2021

Share "DATA CENTERS AND CRITICAL FACILITIES"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

(1)
(2)

01

As a leader in the data center and critical facility market since the beginning days of the dot.com era, we understand the increasing challenges facing data centers and critical facilities today:

» Reduce costs » Improve efficiency » Increase computing power » Facilitate integration

and consolidation

HDR is committed to helping clients develop strategies for complex facility operations and environments that support their mission. Our architects, engineers and planners are experts in designing some of the world’s most technologically

M E E T I N G CO M P L E X FA C I L I T Y D E S I G N N E E D S

advanced facilities, offering the full range of services demanded by the end to end availability and reliability essential to critical facility and data center operations:

» Strategic and Master Planning » Architecture Design

» MEP and Structural Engineering » Sustainable Design Consulting

and Certification

» Energy Use and CFD Modeling » Commissioning

» Renewable Energy Systems » Structured Cable for Inside and

Outside Plant » Security Design » IT Systems Consulting

» Life Cycle Cost Analysis and Total Cost of Ownership Modeling

(3)

01 Confidential Federal Government Client, Classified Location

02 Communications Security Establishment Canada (CSEC), Ottawa, Ontario, CA

02

50% OF LARGE ENTERPRISES WILL FACE A

SHORTAGE OF DATA CENTER FLOOR SPACE.”

~Environmental Protection Agency (EPA)

(4)

03

We have designed more than 24 million square feet of mission critical facilities in a 24/7 environment, with special expertise in:

» Co-location » Enterprise » Academic » Healthcare

» Telecommunications » Data and call centers » Federal Command and

Control Centers » Wireless technologies

(5)

03 Sandia National Laboratories Center for Integrated Nanotechnology (CINT) Core Facility, Albuquerque, NM, USA

04 Communications Security Establishment Canada (CSEC), Ottawa, Ontario, CA Our experience has earned

us top spots in many leading industry rankings:

Building Design + Construction “Giants 300” 2012

» No. 2 - Top A/E Firms » No. 3 - Top Data Center

Design Firms

» No. 1 - Top Healthcare Design Firms

» No. 1 - Top Science & Technology Design Firm

» No. 1 - Military Sector Architecture Firms

» No. 2 - Top BIM Design Firms » No. 6 - Top Government

Design Firms

“World Architecture Survey” 2013 » No. 2 - Top North American

Design Firms

» No. 12 - Top 100 Global Design Firms

» No. 1 - Healthcare » No. 1 - Science

Architectural Record “Top 250 Architecture Firms” 2012

(6)

05 06

We have an extensive portfolio of computer facilities and “smart” buildings that support data processing and software development. In addition to buildings that were programmed and designed as new construction, several of these projects involved major renovations or the adaptive re-use of existing buildings.

We were innovators in the use of fuel cells as the base source of power for a data center at the First National Technology Center in Omaha—fuel cells that have been providing power at the center without interruption since the day they were energized.

Today, our clients host, design, develop, or manufacture networking products that provide connectivity solutions for multiuse computing environments, local area networks and wide area networks. Our experience includes provision of microwave and satellite communications for video, data and voice transmissions to support regional and international data operations.

(7)

“FACILITIES COSTS HAVE GROWN FROM THE

HISTORIC 1% TO 3% OF IT’S TOTAL BUDGET

TO SOMEWHERE BETWEEN 5% AND 15%.”

~The Uptime Institute

05 & 06 Omaha Douglas Public Building Commission- Civic Data Center, Omaha, NE, USA in the Federal sector. Over the last

decade, we have delivered several large, complex Federal project which included command and control centers containing extensive computing facilities served by fault tolerant and concurrently maintainable critical power systems and cooled by redundant and reliable HVAC systems. Key Federal projects include:

» Pentagon Military Command Centers (2005)

» A federal communications and computing center in Texas (2010) » The Department of Homeland

Security Headquarters and National Operations Center (2012) » A DoD Command and Control

facility in Nebraska (2012) » Communications Security

Establishment Canada, Long-Term Accommodation Project or CSEC-LTAP (2012)

As a leader in the green building industry, HDR has designed and engineered green buildings of all types throughout the world. We have endorsed the Architecture 2030 Challenge, and all HDR projects are required to set goals for energy use reduction and water use reduction. Additionally, all projects utilize a sustainable design checklist and a sustainable QA/QC process to assure that goals are addressed during the design process. We have completed nearly 41 million square feet of LEED-certified space, including 69 projects that have earned the following LEED certifications:

» 7 Platinum » 22 Gold » 22 Silver » 18 Certified

(8)

hdrarchitecture.com

We practice increased use of sustainable materials and reduction of material use. © 2013 HDR Architecture, Inc., all rights reserved.

00

56

49

4 111

References

Related documents

Conclusion: The study showed that Children with co-morbidities, family history of epilepsy and female children of older age group (12-16 years) had poor QOL.. Types of

This elicited a transition from graphical user interfaces (GUI) of desktop PCs to tangible user interfaces (TUIs) with the physical world serving as an interface. Furthermore,

The IMP film is based on the common structures of linear narrative storytelling and provides the viewer with various decision points within the evolving story that support an

The pattern of drives illustrated in this research quantifies for the first time ever the frequencies, closing rates and the amount of time winning crews are able to make up in

After the portion of the Student Conduct Board Hearing concludes in which all pertinent information has been received, the Student Conduct Board shall determine by majority

Puji dan syukur Penulis panjatkan kehadirat Tuhan Yang Maha Esa karena dengan karunia dan berkat-Nya maka Penulis dapat menyelesaikan laporan skripsi yang berjudul “STUDI

Should the renter’s motor home vacation be interrupted by an automotive mechanical breakdown (not accident or damages caused by the renter) for more than 12 working hours

Instruction in specific types of context clues is necessary and an effective approach for teaching students to use context to infer word meanings.. Activity: Identify the