Execution Method for Spillway Hydraulic Surfaces: Upper Gotvand Dam

N/A
N/A
Protected

Academic year: 2020

Share "Execution Method for Spillway Hydraulic Surfaces: Upper Gotvand Dam"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1. General view of spillway structures, located on left abutment.
Fig. 4. Ogee concrete placement using scape form, DE part.
Fig. 8. Upper network (a), Space holder seat for slab (b).
Fig. 9. Removing excess concrete and manual trowelling.
+3

References

Related documents

are based on some approximations, the simulation results can be different. In this paper, fractional-order operators were approximated by continued fraction expansion of the

4,8 Com- paring rescue time of HEMS and ground ambulance, we found that helicopter dispatch to the cities including Lamerd, Lar, Khonj, Abadeh can be more effective be- cause

Sketch of the proposed idea for estimating fatigue loads: one derives a stochastic model from the data series of the wind speed and torque measured at Turbine 1; using this model

1) runway surfaces specified under paragraph 5 (a) on which the aircraft may operate and for which suitable performance data has been determined. The method used to determine

Experienced staff has to lead from the front and motivate junior staff to help in implementing new action plan.. Communicate the vision: After implementing all changes in

The charger supplied with the electric motor bike should be regularly examined for damage to the cord, plug, enclosure and other parts, and in the event of such damage, the motor

Eighty percent of the killers had signs or diagnoses of mental illness, 68% had criminal records, 56% had childhood trauma, 40% had substance abuse problems, and 36% of the

For pipes and tubes manufactured according to the same MS only a tube or pipe in the upper thickness range specified in the MS, see Table 1, need to be tested for qualification.