• No results found

EARLSDON PARK. Former Technical College: Department for Education Building: Development Site: COVENTRY

N/A
N/A
Protected

Academic year: 2021

Share "EARLSDON PARK. Former Technical College: Department for Education Building: Development Site: COVENTRY"

Copied!
15
0
0

Loading.... (view fulltext now)

Full text

(1)

EARLSDON

PARK

COVENTRY

Department f

or Education Building:

75,639 sq ft

, BREEAM Ex

cellent

, Grade A o

ffice with 9.3 y

ears A

WUL

T

Former T

echnical C

ollege:

Mixed use r

efurbishment opportunity with a Pr

emier Inn

let for 11.6 y

ears t

erm c

ertain

Dev

elopment Sit

e:

2 dev

elopment sit

es with c

onsent f

or residential and c

ommer

cial uses

VIEW OPPOR

(2)

EARLSDON

PARK

COVENTRY

Executive Summary

A rare opportunity to acquire a

significant mixed use scheme

providing secure income

to undoubted covenants in

addition to development

and letting opportunities to

drive significant returns.

Coventry is one of the fastest developing regional economies. Earlsdon Park is a mixed use development centred around the iconic neo-classical former technical college on Butts Road Coventry which includes a care village, offices, hotel, retail and associated amenities. Earlsdon Park has already attracted occupiers including Extra Care, Premier Inn and Department for Education thanks to its accessible location, proximity to the city centre and public transport, since the first phase was completed in 2009.

The scheme comprises an award winning office investment, a hotel, the refurbishment opportunity of an iconic building and two cleared development sites.

The Investment Opportunity Comprises

A 75,639 sq ft BREEAM Excellent office building let to a single tenant with a vacant ground floor available for retail occupiers

A landmark building let to Premier Inn Hotels on the upper floors and 37,067 sq ft of vacant accommodation suitable for a variety of potential uses

2 development sites with consent for residential and commercial uses Offers may be submitted for the whole or for any of the three elements.

Offers are sought in

excess of £25,000,000

(Twenty Five Million

Pounds).

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER

TECHNICAL COLLE

GE

DEVELOPMENT SITE

FURTHER INFORMA

TION

EXECUTIVE SUMMAR

(3)

Former Technical College Department for

Education Building Development Sites Secure income for a further

11.6 years to Premier Inn

One of the best office buildings in the Coventry and Warwickshire area

A rare opportunity to acquire a city centre residential development site with existing consent for 210 residential units, or include 50,000 sq ft of office accommodation Refurbishment / change

of use opportunity on 37,067 sq ft

BREEAM Excellent building let to a single government occupier for an AWUT of 9.5 years Current interest from a

significant office occupier

Opportunity to let

8,323 sq ft of retail/leisure space

EARLSDON

PARK

COVENTRY

Investment Rationale

EXECUTIVE SUMMAR

Y

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER

TECHNICAL COLLE

GE

DEVELOPMENT SITE

FURTHER INFORMA

TION

INVEST MENT RATIONALE

(4)

EARLSDON

PARK

COVENTRY

Coventry

Second

largest city in the

West Midlands

Largest

employers include

University of Warwick,

Jaguar Land Rover,

Barclays Bank Plc,

Royal Mail, Severn

Trent and Peugeot

10th

highest city for

housing stock growth

Population of

329,810

6th best

city for private sector

jobs growth

11th

highest average

wage in the UK

Home to Warwick

University and Coventry

University with over

50,000

students combined

Best

performing

Midlands city

One of only four

cities outside the

south east where the

population

earn above the

national average

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER

TECHNICAL COLLE

GE

DEVELOPMENT SITE

FURTHER INFORMA

TION

COVENTR Y

(5)

EARLSDON

PARK

COVENTRY

Rail Connections

Drive Times

Airports

Station Distance Train Time to London Train Time to Birmingham New Street

Coventry 0.7 miles 1hr 3mins 21 mins

Birmingham International 10 miles 1 hr 13 mins 10 mins

Leamington Spa 10 miles 1 hr 12 mins 31 mins

Airport Distance

Birmingham 11 miles

East Midlands 40 miles

Luton 67 miles

City Distance

Birmingham 19 miles

London 98 miles

Nottingham 53 miles

Leicester 26 miles

M6 M6 M5 M4 M3 M50 M74 M77 M90 M54 M40 M42 M25 M1 M11 A1(M) M1 M1 M6 M8 100 miles 80 miles 60 miles 40 miles 20 miles BIRMINGHAM AIRPORT COVENTRY AIRPORT LUTON AIRPORT EAST MIDLANDS AIRPORT HEATHROW AIRPORT GATWICK AIRPORT LONDON MANCHESTER LEEDS GLASGOW NEWCASTLE UPON TYNE LIVERPOOL BRISTOL SOUTHAMPTON CARDIFF Leicester Nottingham Birmingham COVENTRY

Connections

76%

of the UK population

are within a 4.5

hour drive time

EXECUTIVE SUMMAR Y INVEST MENT RATIONALE COVENTR Y EARLSDON PARK SCHEME DEPART MENT FOR EDUCA

TION BUILDING FORMER TECHNICAL COLLE GE DEVELOPMENT SITE FURTHER INFORMA TION CONNECTIONS

(6)

EARLSDON

PARK

COVENTRY

Earlsdon Park Scheme

Earlsdon Park is one of Coventry’s

best known and largest mixed used

developments over the last 10 years.

The scheme is highly accessible on the edge of Coventry city centre, within a 5 minute walk of Coventry Railway station and offers significant prominence onto the B4101. Earlsdon Park is dominated by the 1935,

neo-classical former technology college, although it is also notable for blending this historic building with the ultra-modern BREEAM excellent office next door, built for the Department for Education in 2009. Earlsdon Park is situated on Butts Road (B4101), close to its junction with the Coventry Ring Road (A4053) on the western side of the city centre. The scheme is approximately 12 minutes’ walk, 0.7 miles north west of Coventry Railway station.

Income Profile

Income – The scheme currently generates an annual income of £1,633,554 per annum

Site Area – The investment opportunity extends to 4.40 acres

Net Internal Floor Area – 119,572 sq ft and 100 hotels rooms

Void Area of 37,067 sq ft

Development Opportunity – 1.48 acres net

Reversion – The potential reversionary position allowing for reasonable build costs on the two existing buildings is 9.98% excluding the cost of the development land and an additional potential GDV of in excess of £25,000,000 for the development sites

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

Site plan

FURTHER INFORMA

TION DEVELOPMENT

SITE FORMER

TECHNICAL COLLE

GE DEPART

MENT FOR EDUCA

TION BUILDING

(7)

EARLSDON

PARK

COVENTRY

Earlsdon Park Scheme:

Site plan

The scheme totals 7.55 acres and comprises:

104,382 sq ft of office accommodation,

100 hotel rooms

262 extra care units with full amenities (not included with sale)

8,324 sq ft of retail accommodation

1.48 acres net of residential and/or commercial consented development land, consent for 210 apartments or 90 apartments and 50,000 sq ft of offices with 476 car parking spaces

620 seat theatre

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

FURTHER INFORMA

TION DEVELOPMENT

SITE FORMER

TECHNICAL COLLE

GE DEPART

MENT FOR EDUCA

TION BUILDING

(8)

EARLSDON

PARK

COVENTRY

Department for Education Building

Situation

The Department for Education building fronts Butts Road, adjacent the former technical college. The two buildings form the main frontage of the Earlsdon Park development providing a blend of historic and modern architecture that the scheme is known for. Immediately north west of the Department for Education building is Coventry rugby clubs stadium, whilst to the rear and accessed off Albany Road is the 262 Extra Care faciliy which incorporates residential units and a range of amenities including shops, restaurants, café’s, bars and a gym. Between the Department for Education building and the Extra Care development is a commercial and residential development opportunity.

Description

The Department for Education Building is a modern, Grade A, headquarters office building completed in 2009 with an impressive double height ground floor reception, large central atrium, ground floor retail/leisure opportunity and an incorporated multi-story car park. The high quality design of the building disguises the car park as part of the offices with external glazing and has allowed the building to achieve a BREEAM Excellent rating in part due to features such as solar panels, ground source heat pump and a heat exchanger.

The specification of the building includes:

Raised floors with a 320mm clear void

Chilled beam comfort cooling

Clear floor to ceiling height of 2.7m

Suspended ceilings with integral uplighters

Three 13 person passenger lifts

Triple glazed external façade high performance window system

Vertical and horizontal solar shading

Green roof areas

476 car parking spaces

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

Schedule o f Areas

Covenant Inf

ormation

FURTHER INFORMA

TION FORMER

TECHNICAL

COLLEGE

DEVELOPMENT SITE

(9)

EARLSDON

PARK

COVENTRY

Department for Education Building:

Schedule of Areas

Occupation

The office accommodation is let to the Department for Education for a maximum term of 20 years commencing 24 July 2009, by way of four separate leases under a single agreement. The leases are for an average term of 15 years from 24.07.09, however the lease allows for any of the leases to be terminated upon not less than 12 months’ notice, subject to satisfying a “Minimum Floor Area Days Condition” to ensure the landlord enjoys the same minimum income as they would have were the tenant to have occupied all four floors until 23rd July 2024, up to a maximum term of 20 years. The passing rent of the four occupational leases is £1,211,301 which reflects £18.00 per sq ft.

Example of the Break Mechanism

There are numerous permutations of how this clause can operate however we have provided a simple example below, which demonstrates the basic purpose of the lease: Should the Department for Education serve notice to exercise their option to break on a single floor (say 7th) effective as at April 2016, the earliest the tenant would then be able to break on any other single floor would be 2022.

Car Parking

The Department for Education have 130 demised car parking spaces and the right to call upon a further 266 spaces.

Premier Inn have exclusive rights to over 80 spaces.

Occupational Schedule

Demise Tenant Area Comments

Part Ground Floor Vacant 8,324 sq ft Currently vacant in shell condition Part Ground Floor Department For Education 2,322 sq ft

Part Ground Floor Car Parking 16 Spaces

1st Floor Car Parking 46 Spaces

2nd Floor Car Parking 101 Spaces

3rd Floor Car Parking 108 Spaces

4th Floor Car Parking 108 Spaces

5th Floors Car Parking 107 Spaces

6th Floor Department For Education 17,997 sq ft 7th Floor Department For Education 16,340 sq ft 8th Floor Department For Education 16,340 sq ft 9th Floor Department For Education 14,316 sq ft

Total 75,639 sq ft

476 Spaces

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART

MENT

FOR EDUCA

TION BUILDING

FURTHER INFORMA

TION FORMER

TECHNICAL

COLLEGE

DEVELOPMENT SITE

Covenant Inf

ormation

Schedule o f Areas

(10)

EARLSDON

PARK

COVENTRY

The Department for Education Building:

Covenant Information

Covenant Information

The Department for Education is responsible for education and children’s services in England, and are a Government body providing a minimum risk of failure and a D&B failure score of 100 out of 100.

Planning

The entire scheme was consented under planning reference 53847 (approved 28th August 2007), which allowed for a range of uses across the site. We therefore understand that the building has consent for offices, under the B1 use classes.

Planning consent, reference 53847/D was approved for the change of the ground floor unit of Department for Education Building (commercial unit) to use class A1 retail, subject to development commencing with 3 years of the date of permission (i.e. by October 2012) and prior approval of shop front details. It is a condition of the approval that the site is used predominantly for the sale of convenience goods. A summary of all planning conditions can be found in the dataroom, access available on request.

EPC

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

FURTHER INFORMA

TION FORMER

TECHNICAL

COLLEGE

DEPART

MENT

FOR EDUCA

TION BUILDING

Covenant Inf

ormation

DEVELOPMENT SITE

Schedule o f Areas

(11)

EARLSDON

PARK

COVENTRY

Former Technical College

Situation

The former technical college fronts Butts Road, adjacent the Department for Education Building. The two buildings form the main frontage of the Earlsdon Park Development, providing a blend of historic and modern architecture that the scheme is known for. The surrounding land uses include residential, offices, student accommodation, leisure and stadia in the form of Coventry Rugby Club’s ground, demonstrating the truly mixed use nature of this area of the city centre.

Description

The former technical college is an imposing four storey neo-classical building, completed in 1935. The building is in a ‘C’ shaped formation, with a theatre sitting in the centre of the ‘C’. The building is the most significant landmark in the area, which includes a 100 room Premier Inn hotel on the 2nd and 3rd floors, a 620 seat theatre and two and a half floors currently in a shell condition. The building benefits from a full height reception which provides access to the main foyer, the ground floor dedicated reception for Premier Inn and access to the Albany Theatre to the rear.

The Premier Inn provides 100 rooms aligned with the corporate specification.

The part ground, first and second floors are currently in a shell condition and provide potential for high quality offices in a prestigious address, but also residential and student accommodation opportunities, subject to planning. There are ongoing discussions with occupiers for the vacant office accommodation.

The Albany Theatre is an impressive, art deco style, 620 seat theatre with a part stain glassed vaulted ceiling, stage, production and preparation areas. The building was designed in 1919 and opened in 1935. The theatre was reopened as part of the Earlsdon Park development in 2013, prior to which a large amount of refurbishment had been undertaken. The theatre is home to a range of local companies as well as hosting professional productions.

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER TECHNICAL

COLLE GE

Schedule o f Areas

Covenant Inf

ormation

FURTHER INFORMA

TION DEVELOPMENT

(12)

EARLSDON

PARK

COVENTRY

Former Technical College:

Schedule of Areas

Floor Area

Occupation

Premier Inn has a lease commencing 19 December 2011 for a term of 25 years, expiring 19 December 2036. The rent is subject to review every 5 years with reviews linked to the Consumer Price Index, capped and collared at 1% and 4%. Premier Inn are currently paying

£393,500 pa (£3,935 per room per annum). The lease is subject to a tenant break on 19 December 2026 subject to 12 months written notice.

The National Association of School Business Management have a lease commencing 6th June 2014 expiring 5th June 2034 without break. The current rent passing is £28,753 pa (£14.27 per sq ft). The Albany Theatre has a lease available for signing and forms part of the consent, the lease is for a term of 25 years without break, at a peppercorn rent.

Demise Tenant Area Comments

Part Ground Floor Premier Inn 4,851 sq ft

Albany Theatre 620 seats

Part Ground Floor NASBM 2,015 sq ft

Part Ground Floor Vacant 3,171 sq ft

Part Ground Floor Vacant 10,134 sq ft

1st Floor Vacant 23,762 sq ft

2nd Floor & 3rd Floor Premier Inn 100 rooms

Total 43,933 sq ft

620 seats 100 rooms

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

Schedule o f Areas

FORMER TECHNICAL

COLLE GE

FURTHER INFORMA

TION DEVELOPMENT

SITE

Covenant Inf

(13)

EARLSDON

PARK

COVENTRY

Former Technical College:

Covenant Information

Covenants

Premier Inn Hotels Ltd. are rated by Dun and Bradstreet as a 5A1 and represent a minimum risk of business failure. The company have reported the recent financial results:

Planning

Coventry technical college is ‘locally listed’ as a building of special architectural or historic Interest The building is subject to planning consent, reference 53847/B, permitting demolition of part of and change of use of retained college building to provide for ground floor restaurants and drinking establishments (use classes A3 & A4), first floor offices and second floor hotel accommodation: roof top extension to provide for further hotel accommodation: rear extension to retained theatre and alterations to existing car parking and service areas. This was approved on March 2010 subject to

conditions and a legal (s106) agreement.

This application has been implemented in part (i.e. demolition and the hotel development). However we are not aware of whether the first floor office element has been implemented (the original approval provided for either office or residential at first floor).

EPC

28/02/2013

(£’000) 01/03/2012 (£’000) 03/03/2011 (£’000)

Turnover 201,014 124,048 87,378

Profit 44,568 37,400 13,651

Tangible Net Worth 569,523 536,522 512,108

Net Current Assets

(Liabilities) 175,061 233,952 279,534

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FURTHER INFORMA

TION DEVELOPMENT

SITE

Covenant Inf

ormation

FORMER TECHNICAL

COLLE GE

Schedule o f Areas

(14)

EARLSDON

PARK

COVENTRY

Development Site

Situation

The development site is situated to the rear of the Former Technical College and accessed off Albany Road. The site is split into two separate areas, which separate the predominantly commercial uses in the buildings fronting Butts Road and the Extra Care Village at the rear of the Earlsdon Park scheme. Albany Road is predominantly made up of residential land uses, which include traditional Victorian semi-detached houses and more modern, 1960/70s low rise apartment schemes.

Description

The development site extends to approximately 1.48 acres of cleared development sites capable of uses including offices, retail, residential and potentially student housing. Due to the current layout and the surrounding land uses, the sites would be capable of accommodating both apartments or lower density housing, although this would be subject to planning.

Planning

The planning consents regarding the development sites apply to four proposed blocks. Blocks C & D which run parallel and front Albany Road are consented for 90 residential apartments under planning consent FUL/2013/0085.

The second area of the development site which runs parallel with Butts Road, situated behind The Former Technical College, is noted in the planning application and schematic drawing as commercial building blocks E & F. Under The aforementioned planning consent Blocks E & F are consented for 50,000sq ft of offices or 120 apartments.

Area

The residential site

(blocks C & D) extends

to 0.85 acres.

Commercial blocks E & F

extends to 0.62 acres.

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER

TECHNICAL COLLE

GE

FURTHER INFORMA

TION

DEVELOPMENT SITE

(15)

EARLSDON

PARK

COVENTRY

Further Information

A data site has been prepared which includes a full legal pack of information including building surveys, measured surveys, and planning documentation is available upon request from the BNP Paribas Real Estate.

Pricing

We are instructed to seek offers in excess of £25,000,000 (Twenty Five Million Pounds) for the freehold interest in the subject property, subject to contract and exclusive of VAT. Yields are stated assuming standard purchasers costs of 5.8%. Offers will be accepted on the whole or any of the three elements individually or combinations thereof.

We are instructed to seek offers in excess of £25,000,000 (Twenty Five Million Pounds) for the freehold interest in the subject property, subject to contract and exclusive of VAT. Yields are stated assuming standard purchasers costs of 5.8%. Offers will be accepted on the whole or any of the three elements individually or combinations thereof.

Contacts

earlsdonpark.co.uk

Andrew Meikle

[email protected]

0121 237 1238

Oliver Forster

[email protected]

0121 237 1213

Simon Robinson

[email protected]

0121 237 1212

Element Price Yield Reversionary

Position Capital Value

Department for

Education £16,000,000 7.15% 9.75% £211 Former Technical

College

£7,750,000 5.15% 10.1% TBC

Development Land £1,250,000 £845,000 per acre

Total £25,000,000

EXECUTIVE SUMMAR

Y

INVEST MENT RATIONALE

COVENTR Y

CONNECTIONS

EARLSDON PARK SCHEME

DEPART MENT FOR EDUCA

TION BUILDING

FORMER

TECHNICAL COLLE

GE

DEVELOPMENT SITE

FURTHER INFORMA

References

Related documents

The selection of a level sensor is often affected by a great uncertainty with respect to how suitable a technology is for the specific application. The great popularity of

These deblurred images were then compared with the deblurred image obtained from the method discussed in this paper, and it was shown that the relative error of this deblurred image

Most career services programs were designed for a 2+years-of-work- experience American student. However, international students need. significantly more assistance in

Freshwater sponge host data for spongillafl y larvae in the Americas is limited primarily to studies completed in North America (Canada and USA) (Brown 1952; Parfi n and Gurney

The selection of citizens is part of the overall participation process and requires early planning on issues such as methods of sortition, deter- mining the sample space, and

A caching strategy must decide for each user request, whether it will download the complete video or only those parts that have been requested by a user.. Zink

We focus on questions 1a, b, and c, and 2a, b, and c, relating to the Scope of Borrower Hardship; questions 3, 4, and 5, relating to Current Options for Borrowers with

กลุ่มชุมชนและสังคม (ชุมชนรอบพื้นที่โครงการใหม่/ชุมชนรอบพื้นที่โรงไฟฟ้า)