Contents

Preface

3

Quality Policy

5

Health and Safety Policy

6

Environmental Policy

7

Examples from our Consultation Services

8

Superstructural Projects

9

Infrastructural Projects

11

Our Work Experiences

Contracted and Completed Works

13

Infrastructural Projects

14

Superstructural Projects

14

Our Work Experiences

16

(Examples from Consultation Services)

Our Work Experiences

17

(3)

Preface

DOLFIN Engineering and Construction Ltd. was established in 2006 to first serve various

con-sultancy, engineering and control works.

While DOLFIN Engineering and Construction Company is executing all of its activities in

com-pliance with the requirements defined in International Standard ISO 9001 Quality Management

System, in order to achieve the best solution, expectations and requirements of Clients and

Employees are of top priority at all times.

In consideration of consultancy services to be given, DOLFIN Engineering and Construction

Company has been acting mostly in the fields of oil and gas pipelines, oil and gas facilities and

industrial facilities . Regarding the construction works, it has been specialized in construction

of mostly the subsurface facilities such as pipelines, river bed training works, erosion

protec-tion structures, reinstatement works, etc.

DOLFIN Engineering and Construction Company aims to accelerate its growing rate, tends to

spread and increase its services within the global market with foreign partners and wants to

share its future achievements with its nation.

(4)

DOLFIN Engineering and Construction Ltd.;

is managed by Adnan KOÇAK.

DOLFIN Engineering and Construction Ltd. who is acting in Construction Sector was established in

2006 by Adnan KOÇAK who is currently serving as General Manager of the Company. The founder,

who graduated from ITU Civil Engineering Department and started his working life in 1991, has been

working in different private construction companies until 2006 and at BOTA Petroleum Pipeline

Corporation Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project Directorate between the years 2003 and

2005.

The Company, who was giving rather consultancy services in 2006 and 2007, has started construction

works in 2008 with BOTA International Limited irketi (BIL) and Baku-Tibilisi-Ceyhan Pipeline

Com-pany Turkey Branch (BTC Co.) , the operator comCom-pany of the BTC Pipeline, and has completed various

repair and construction works along the BTC Pipeline in 2008 and 2009 as Contractor.

We as DOLFIN Engineering and Construction Ltd. family, who has formed with the contributions of

each technical personnel specialized in their fields, and other administrative and supportive staff, would

like to present our respects to you.

Adnan KOÇAK

General Manager

(5)

QUALITY, HEALTH AND SAFETY,

ENVIRONMENT POLICIES

Quality Policy

DOLFIN Engineering and Construction Company committed to a

Quality Policy of meeting all requirements of its Clients at all times

and at minimal cost. All employees are responsible for performing all

the works with the best quality.

To ensure that, all our personnel are fully delegated to fulfill the

quality requirements, to improve our construction quality, to maintain

the Company’s competitive advantage, to constitute Client’s

satis-faction and to provide compliance with the requirements defined in

ISO 9001:2008 International Standard.

For these reasons, we have adopted our Quality Policy as;

To well understand Client’s needs and expectations,

To meet those needs and expectations in such a best and accurate way at all times and

at minimum cost,

To generate quick and permanent solutions,

To raise the bar while providing outcome and services,

To work with the personnel who are adopting team spirit, willing to learn, open-minded

and following up their work,

To fulfill all the works under our commitment on time and accurately,

To offer outcomes and services those give top priority to human safety,

To continuously measure, evaluate and improve the quality of our services that we

gener-ate by giving priority to total quality conception,

To improve the effectiveness of the Quality Management System continuously,

To contribute to ensure that the other companies that we work together are aware of the

Quality Management System.

(6)

Health and Safety Policy

DOLFIN Engineering and Construction Company aims to provide

sustainability of the Health & Safety Policy and safe working

conditions and practices while it is executing the works. In this

regard, we have adopted our Health and Safety Policy as;

To provide continuous improvement on Health & Safety Policy,

To use such technologies and methods that primarily keeps human health during our

ac-tivities,

To eliminate the Health & Safety risks by taking preventive actions,

To eliminate the possible accidents and occupational diseases at source,

To design safe work environments by the participation of our subcontractors and

suppli-ers,

To give support to our personnel for living healthy and safe lives,

To follow up and implement the existing law, legal arrangements and regulations, to obey

the rules of the organizations at which we have a membership,

To train personnel about awareness of their individual responsibilities,

To provide sustainability of the H&S Policy by periodic inspections, audits and reviews.

QUALITY, HEALTH AND SAFETY,

(7)

QUALITY, HEALTH AND SAFETY,

ENVIRONMENT POLICIES

Environmental Policy

DOLFIN Engineering and Construction Company aims to realize

the following principles regarding environment as part of our

engi-neering and contracting business:

To follow up and implement the existing law, legal arrangements and regulations

administrative arrangements and naturally dependant rules, to obey the rules of the

or-ganizations at which we have a membership,

To take preventive actions for the accidents and emergency cases,

To follow up and use the best technologies that enables us efficient use of the raw

ma-terials, natural resources and energy,

To prevent the ground, water and air pollution with the understanding of continuous

de-velopment,

To minimize the noise effect and solid, liquid (fuel, oil etc.) and gaseous wastes which

are released to the environment,

As far as possible, to reuse, recycle and minimize the wastes at source and to dispose

the non- recoverable wastes by using safe suitable methods,

To train the subcontractors’, suppliers’ and our employees to be attained the

aware-ness about environment,

Under the conditions that could not be interfered, not to get involved the services which

could have adverse effects on the environment,

To share the experiences that are gained about environment with the public, private

sector and non-governmental organizations mutually,

Within the scope of activities, to take care about the efficient use of natural resources,

recycling and saving of the sources.

(8)

EXAMPLES FROM OUR

CONSULTATION SERVICES

SUPERSTRUCTURAL PROJECTS

·

Intermarket Limited Liability Company

Lvov - Ukraine City Shopping Center Project

·

TOKI

Tefer Project Ceyhan Earthquake Houses CH2

Project

·

TOKI

Tefer Project Ceyhan Earthquake Houses CH1

Project

INFRASTRUCTURAL PROJECTS

·

Azersu JSC, Azerbaycan

AZERBAIJAN Oguz-Gebele-Baku GRP Pipeline

Project

·

BOTAS

Cankiri/Korgun – Aktaskurtlar Main Line Valve

Station Natural Gas Pipeline Project

·

BOTAS

Corum Natural Gas Compressor Station Project

·

BOTAS

Turkey-Greece Natural Gas Pipeline Project -

Phase II Offshore Part Construction

·

BOTAS

Samsun-Ankara Blue Stream Natural Gas

Pipeline Project

·

BOTAS

Samsun Tekkekoy Pressure Reducing and

Metering Station Construction Project

·

POLSAN (Police Fund Co.)

Bolu –Turkey , Total Area 630,000 m2 , 70,000

m2 Highway Shopping Center, 3 Nos of Fuel

Station and 3 Nos. of Service areas

Construc-tion Project

·

POLSAN (Police Fund Co.) -ATASU

Turkey Sakarya-Hendek, 30,000 m2

Construc-tion of Water Bottling Plant

Project

(9)

SUPERSTRUCTURAL PROJECTS

Turan Hazinedaroglu Construction Company

Ukraine/Lvov City Shopping Center Project

Client : Intermarket Limited Liability Company Scope of the Project : Leopolis Center Shopping Center Construction Area : 109.000 m2

Construction Date : 2007-2008

POLSAN (Police Fund Co.) - ATASU

30,000 m2 Construction of Water Bottling Plant

This Project was an Investment Project of Police Fund Company. Scope of Project : The Facility Works on 30,000 m2 includes:

SteelWorks,Infrastructure and Superstructure Works,Mechanical and Electricalworks.

Construction Area: 30,000 m2 Construction Date: 2010-2011

POLSAN (Police Fund Co.)

Turkey Bolu , Total Area 630,000 m2 , 70,000 m2 Highway Shopping Center, 3 Nos of Fuel Station and 3 Nos. of Service areas Construction Project on the Highway between Istanbul and Ankara.

POLSAN was one of the biggest Partner on this Project.

Scope of Project : The Facility Works on 630,000 m2 includes: SteelWorks,Infrastructure and Superstructure

Works,Mechanical and Electricalworks.

Construction Area : 630,000 m2 Construction Date :2010-2011

(10)

Turan Hazinedaroglu Construction Company

ADANA / Ceyhan Earthquake Houses Project

TEFER PROJECT CEYHAN EARTQUAKE HOUSES - CH2 CEYHAN – TURKEY

Construction of emergency housing after Ceyhan Earthquake in a very limited time such as 8 months.

Client : TOKI

Scope of the Project : 540 apartments, complete infrastructure works, internal roads, water, stormwater & sewer network, electric & communication network and landscaping.

Total Built Closed Area : 53.000 m2

Construction Date :1998-1999

SUPERSTRUCTURAL PROJECTS

Oztas Construction Company

ADANA / Ceyhan Earthquake Houses Project

TEFER PROJECT CEYHAN EARTQUAKE HOUSES - CH1 CEYHAN – TURKEY

Construction of emergency housing after Ceyhan Earthquake in a very limited time such as 8 months.

Client : TOKI

Scope of the Project : 460 apartments, complete infrastructure works, internal roads, water, stormwater & sewer network, electric & communication network and landscaping.

Total Built Closed Area : 45.000 m2

(11)

Turan Hazinedaroglu Construction Company

AZERBAIJAN Oguz-Gebele-Baku GRP Pipeline Project

Client : Azersu JSC, Azerbaycan

Scope of the Project: Design and construction of a 2000 mm diameter GRP water transmission pipeline from Oguz Water Wells region to City of Baku including main water reservoirs and intermediary pressure breaking stations.

Pipeline Length : 251 km Construction Date : 2007-2008

Metin Yilmaz Construction Company

Cankiri/Korgun – Aktaskurtlar Main Line Valve Station Natural Gas Pipeline Project

- 103 KM 24 inch High Pressure Steel Pipeline, - 55 km 8 inch High Pressure Steel Pipeline,

• Eskipazar Pig Station:

- 24 inch Launcher and Receiver 2 no. of Pigs (multi-directional), - Karabük direction 12 inch Launcher 1 no. of Pig (one-directional),

• For Çerke -K lcahamam Line; 8 inch-1 ea Pig station with Launcher (one-directional),

• For Çerke -K lcahamam Line;8 inch 1 ea Pig Station with Receiver (one-directional),

• 24 inch 4 no's Valve Stations,

• 8 inch 1 no Valve Station,

• 12 inch Take-off Station for Karabuk Line,

• 8 inch Take-off Station for Kur unlu,

• 8 inch 2 no's of Take-off Stations for K lcahamam Line,

• 6 inch Take-off Valve for Çerke .

Construction Date: 2007-2008

(12)

Oztas Construction Company

Turkey/Greece Natural Gas Pipeline Project

PHASE 2 OFFSHORE SECTION ÇANAKKALE – TURKEY

Turkey-Greece Natural Gas Pipeline Project - Offshore Part Construction. 36" pipeline is 17 km in legth and 68 m in depth within the sea.

Construction Date: 2005-2006

OHS JOINT VENTURE

Samsun-Ankara Blue Stream Natural Gas Pipeline Project

Construction, installation and commissioning of 500 km, 48’’ dia., 14,3mm wall thickness, API 5L GrX65 natural gas pipeline from Samsun to Ankara, which known as “BLUE STREAM” Pipeline.

The project aims transportation of Russian natural gas to Mediterranean sea through Black Sea and Turkish distribution lines.

Works done in the scope of the Project:

• 7 ea 16’’ branch valves and 1500 class 16 billion m3/year capacity “pressure reducing and measurement” station,

• 4 ea 48’’ pigging stations, • 17 ea 48’’ line valves,

• Excavation & backfilling of 500 kms, 48’’ dia. Pipeline,

• Railway, highway and river crossings through the line via micro-tunneling method, • NDT tests, hydraulic pressure tests and cathodic protection.

Construction Date: 1999-2001

OHS JOINT VENTURE

Samsun Tekkekoy Pressure Reducing and Metering Station Construction Project

EPIC (Engineering procurement installation and commissioning) of a 1500 class Natural Gas Pressure Reducing and Metering Station having capacity of 16 billion m3 per year.

Construction Date: 2000-2002

Oztas Construction Company

Corum Natural Gas Compressor Station Project NATURAL GAS PRESSURIZING STATION

Construction of a complete Natural Gas Pressurizing Station (Compressor Station) as a Turbine plus Compressor pack in the configuration of 2 +1 (2 operating units and 1 spare) or 3+1 (3 operating units and 1 spare)

(13)

OUR WORK EXPERIENCES

CONTRACTED AND COMPLETED WORKS

INFRASTRUCTURAL PROJECTS

·

Punj Lloyd - Limak JV

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline

LOT C Section, Reinstatement Works of

Orensehir Camp Area and Pipe Stockyard at KP

820

·

BIL

(BOTAS INTERNATIONAL LTD.)

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline

LOT B Section, Replacement of River Bed of

Acisu River at KP 659

·

BIL

(BOTAS INTERNATIONAL LTD.)

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline

LOT B Section, Temporary Support of eroded

pipe section at KP 659 (Acisu River)

·

Golder Associates Ltd. / Turkey

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,

Soil Decomposition Work at BVT30 Block Valve

Station Pipeline Failure

·

BTC Co.

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,

Reinstatement Works on the BTC Pipeline

between Posof (Georgia Border) to Ceyhan

Marine Terminal

·

BTC Co.

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,

DCVG Survey and Coating Repair Works on the

BTC Pipeline (1076 Km)

·

BTC Co.

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline

(1076 Km), RoW Remedial Works at Lot A Lot B

and Lot C Sections of the BTC Pipeline and

RoW Reinstatement Works

·

BTC Co.

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline

(1076 km) , Geohazard Repair and Maintenance

Works

(14)

Client: Punj Lloyd - Limak JV

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT C Section, Reinstatement Works of Orensehir Camp Area and Pipe Stockyard at KP 820

Construction Date: June 2008

Due to completion of the BTC Pipeline constrcution, removal of infrastructural facilities from camp site and reinstatement of the land together with pipe stockyard area.

INFRASTRUCTURAL PROJECTS

Client: BIL (BOTA International Ltd.)

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT B Section, Replacement of River Bed of Acisu River at KP 659

Construction Date: June 2008

Reroute and reconstruction of Ac su River Bed due to its possible adverse effect on the BTC Pipeline at KP 659.

Client: BIL (BOTA International Ltd.)

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT B Section, Temporary Support of eroded pipe section at KP 659 (Acisu River)

Construction Date: July 2008

Due to change in the river bed, taking the part of river bed which get close to the Pipeline under protection with sand-cement mixture bags.

Client: Golder Associates Ltd./Turkey

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, Soil Decomposition Work at BVT30 Block Valve Station Pipeline Failure

Construction Date: August 2008

After the explosion at BVT30 Block Valve Station on the BTC Pipeline, decomposition and transportation of burned soil from unburned soil under the extent of pipeline repair services executed.

(15)

Client: BTC Co. Turkey Branch

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, Reinstatement Works on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal

Construction Date: 06/2008 - 10/2008

Reinstatement works on the BTC Pipeline where was defined (in different points) by BTC Co.

Client: BTC Co. Turkey Branch

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, DCVG Survey and Coating Repair Works on the BTC Pipeline (1076 Km)

Construction Date: 06/2008 - 10/200

After DCVG survey, excavation, blasting and repair of 120 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal.

Client: BTC Co. Turkey Branch

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline (1076 Km), RoW Remedial Works at Lot A Lot B and Lot C Sections of the BTC Pipeline and RoW Reinstatement Works

Construction Date: 06/2009 - 10/2009

Reinstatment works such as stone collection, grading, channel, road, soil transportation and biorestoration works at totally 238 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine

Client: BTC Co. Turkey Branch

BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline (1076 km), Geohazard Repair and Maintenance Works

Construction Date: 08/2009 - 12/2009

River bed training works at KP 659+200 Ac su River Bed, generation of erosion protective structures such as riprap, gabion, slope breakers, etc. at totally 29 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal. Remedial works such as stone collection,

(16)
(17)
(18)

Phone: +90 312 478 47 42

Fax: +90 312 478 17 43

E-mail: [email protected]

Öveçler 4.Cadde

1335. Sokak No: 4/13

06460 Çankaya, Ankara

References

Related documents

The opinion most representative of present Nebraska law would appear to be the 1917 decision in Manning v. The condition worsened for three days, when there was

The information stored by the Reuse Map component allows producers and consumers to detect the real responsible for implementing a given change over a

Language barriers, decreased access to healthcare, and poor understanding of the health care system are significant factors for why Hispanic patients delay stroke care... To complete

Women more strongly connect leadership with personability, employee and social impact; for men vision and charisma are relatively ‘more important’.. Sectors: Appeal; impact on

To generate the greatest business value from mobility, organizations need to create a long-term mobility strategy that directly aligns to business objectives and individual

Culture and Recreation VRC Aquatics Single Use - Youth/Adult/Senior (14 years or older) 1 $ 3.81 $ 3.81 All aquatic policies apply, Includes recreational swim,

In order to establish a secure connection between the thin client computer and the server in the FDZ guest network, the data user at the external site opens Windows Internet Explorer

In spite of the fact that the observed brown pelicans had no chance to reach the distant and continuously moving off mirage appearing on hot asphalt surfaces, they landed on