Preface
DOLFIN Engineering and Construction Ltd. was established in 2006 to first serve various
con-sultancy, engineering and control works.
While DOLFIN Engineering and Construction Company is executing all of its activities in
com-pliance with the requirements defined in International Standard ISO 9001 Quality Management
System, in order to achieve the best solution, expectations and requirements of Clients and
Employees are of top priority at all times.
In consideration of consultancy services to be given, DOLFIN Engineering and Construction
Company has been acting mostly in the fields of oil and gas pipelines, oil and gas facilities and
industrial facilities . Regarding the construction works, it has been specialized in construction
of mostly the subsurface facilities such as pipelines, river bed training works, erosion
protec-tion structures, reinstatement works, etc.
DOLFIN Engineering and Construction Company aims to accelerate its growing rate, tends to
spread and increase its services within the global market with foreign partners and wants to
share its future achievements with its nation.
DOLFIN Engineering and Construction Ltd.;
is managed by Adnan KOÇAK.
DOLFIN Engineering and Construction Ltd. who is acting in Construction Sector was established in
2006 by Adnan KOÇAK who is currently serving as General Manager of the Company. The founder,
who graduated from ITU Civil Engineering Department and started his working life in 1991, has been
working in different private construction companies until 2006 and at BOTA Petroleum Pipeline
Corporation Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project Directorate between the years 2003 and
2005.
The Company, who was giving rather consultancy services in 2006 and 2007, has started construction
works in 2008 with BOTA International Limited irketi (BIL) and Baku-Tibilisi-Ceyhan Pipeline
Com-pany Turkey Branch (BTC Co.) , the operator comCom-pany of the BTC Pipeline, and has completed various
repair and construction works along the BTC Pipeline in 2008 and 2009 as Contractor.
We as DOLFIN Engineering and Construction Ltd. family, who has formed with the contributions of
each technical personnel specialized in their fields, and other administrative and supportive staff, would
like to present our respects to you.
Adnan KOÇAK
General Manager
QUALITY, HEALTH AND SAFETY,
ENVIRONMENT POLICIES
Quality Policy
DOLFIN Engineering and Construction Company committed to a
Quality Policy of meeting all requirements of its Clients at all times
and at minimal cost. All employees are responsible for performing all
the works with the best quality.
To ensure that, all our personnel are fully delegated to fulfill the
quality requirements, to improve our construction quality, to maintain
the Company’s competitive advantage, to constitute Client’s
satis-faction and to provide compliance with the requirements defined in
ISO 9001:2008 International Standard.
For these reasons, we have adopted our Quality Policy as;
To well understand Client’s needs and expectations,
To meet those needs and expectations in such a best and accurate way at all times and
at minimum cost,
To generate quick and permanent solutions,
To raise the bar while providing outcome and services,
To work with the personnel who are adopting team spirit, willing to learn, open-minded
and following up their work,
To fulfill all the works under our commitment on time and accurately,
To offer outcomes and services those give top priority to human safety,
To continuously measure, evaluate and improve the quality of our services that we
gener-ate by giving priority to total quality conception,
To improve the effectiveness of the Quality Management System continuously,
To contribute to ensure that the other companies that we work together are aware of the
Quality Management System.
Health and Safety Policy
DOLFIN Engineering and Construction Company aims to provide
sustainability of the Health & Safety Policy and safe working
conditions and practices while it is executing the works. In this
regard, we have adopted our Health and Safety Policy as;
To provide continuous improvement on Health & Safety Policy,
To use such technologies and methods that primarily keeps human health during our
ac-tivities,
To eliminate the Health & Safety risks by taking preventive actions,
To eliminate the possible accidents and occupational diseases at source,
To design safe work environments by the participation of our subcontractors and
suppli-ers,
To give support to our personnel for living healthy and safe lives,
To follow up and implement the existing law, legal arrangements and regulations, to obey
the rules of the organizations at which we have a membership,
To train personnel about awareness of their individual responsibilities,
To provide sustainability of the H&S Policy by periodic inspections, audits and reviews.
QUALITY, HEALTH AND SAFETY,
QUALITY, HEALTH AND SAFETY,
ENVIRONMENT POLICIES
Environmental Policy
DOLFIN Engineering and Construction Company aims to realize
the following principles regarding environment as part of our
engi-neering and contracting business:
To follow up and implement the existing law, legal arrangements and regulations
administrative arrangements and naturally dependant rules, to obey the rules of the
or-ganizations at which we have a membership,
To take preventive actions for the accidents and emergency cases,
To follow up and use the best technologies that enables us efficient use of the raw
ma-terials, natural resources and energy,
To prevent the ground, water and air pollution with the understanding of continuous
de-velopment,
To minimize the noise effect and solid, liquid (fuel, oil etc.) and gaseous wastes which
are released to the environment,
As far as possible, to reuse, recycle and minimize the wastes at source and to dispose
the non- recoverable wastes by using safe suitable methods,
To train the subcontractors’, suppliers’ and our employees to be attained the
aware-ness about environment,
Under the conditions that could not be interfered, not to get involved the services which
could have adverse effects on the environment,
To share the experiences that are gained about environment with the public, private
sector and non-governmental organizations mutually,
Within the scope of activities, to take care about the efficient use of natural resources,
recycling and saving of the sources.
EXAMPLES FROM OUR
CONSULTATION SERVICES
SUPERSTRUCTURAL PROJECTS
·
Intermarket Limited Liability Company
Lvov - Ukraine City Shopping Center Project
·
TOKI
Tefer Project Ceyhan Earthquake Houses CH2
Project
·
TOKI
Tefer Project Ceyhan Earthquake Houses CH1
Project
INFRASTRUCTURAL PROJECTS
·
Azersu JSC, Azerbaycan
AZERBAIJAN Oguz-Gebele-Baku GRP Pipeline
Project
·
BOTAS
Cankiri/Korgun – Aktaskurtlar Main Line Valve
Station Natural Gas Pipeline Project
·
BOTAS
Corum Natural Gas Compressor Station Project
·
BOTAS
Turkey-Greece Natural Gas Pipeline Project -
Phase II Offshore Part Construction
·
BOTAS
Samsun-Ankara Blue Stream Natural Gas
Pipeline Project
·
BOTAS
Samsun Tekkekoy Pressure Reducing and
Metering Station Construction Project
·
POLSAN (Police Fund Co.)
Bolu –Turkey , Total Area 630,000 m2 , 70,000
m2 Highway Shopping Center, 3 Nos of Fuel
Station and 3 Nos. of Service areas
Construc-tion Project
·
POLSAN (Police Fund Co.) -ATASU
Turkey Sakarya-Hendek, 30,000 m2
Construc-tion of Water Bottling Plant
Project
SUPERSTRUCTURAL PROJECTS
Turan Hazinedaroglu Construction Company
Ukraine/Lvov City Shopping Center Project
Client : Intermarket Limited Liability Company Scope of the Project : Leopolis Center Shopping Center Construction Area : 109.000 m2
Construction Date : 2007-2008
POLSAN (Police Fund Co.) - ATASU
30,000 m2 Construction of Water Bottling Plant
This Project was an Investment Project of Police Fund Company. Scope of Project : The Facility Works on 30,000 m2 includes:
SteelWorks,Infrastructure and Superstructure Works,Mechanical and Electricalworks.
Construction Area: 30,000 m2 Construction Date: 2010-2011
POLSAN (Police Fund Co.)
Turkey Bolu , Total Area 630,000 m2 , 70,000 m2 Highway Shopping Center, 3 Nos of Fuel Station and 3 Nos. of Service areas Construction Project on the Highway between Istanbul and Ankara.
POLSAN was one of the biggest Partner on this Project.
Scope of Project : The Facility Works on 630,000 m2 includes: SteelWorks,Infrastructure and Superstructure
Works,Mechanical and Electricalworks.
Construction Area : 630,000 m2 Construction Date :2010-2011
Turan Hazinedaroglu Construction Company
ADANA / Ceyhan Earthquake Houses Project
TEFER PROJECT CEYHAN EARTQUAKE HOUSES - CH2 CEYHAN – TURKEY
Construction of emergency housing after Ceyhan Earthquake in a very limited time such as 8 months.
Client : TOKI
Scope of the Project : 540 apartments, complete infrastructure works, internal roads, water, stormwater & sewer network, electric & communication network and landscaping.
Total Built Closed Area : 53.000 m2
Construction Date :1998-1999
SUPERSTRUCTURAL PROJECTS
Oztas Construction Company
ADANA / Ceyhan Earthquake Houses Project
TEFER PROJECT CEYHAN EARTQUAKE HOUSES - CH1 CEYHAN – TURKEY
Construction of emergency housing after Ceyhan Earthquake in a very limited time such as 8 months.
Client : TOKI
Scope of the Project : 460 apartments, complete infrastructure works, internal roads, water, stormwater & sewer network, electric & communication network and landscaping.
Total Built Closed Area : 45.000 m2
Turan Hazinedaroglu Construction Company
AZERBAIJAN Oguz-Gebele-Baku GRP Pipeline Project
Client : Azersu JSC, Azerbaycan
Scope of the Project: Design and construction of a 2000 mm diameter GRP water transmission pipeline from Oguz Water Wells region to City of Baku including main water reservoirs and intermediary pressure breaking stations.
Pipeline Length : 251 km Construction Date : 2007-2008
Metin Yilmaz Construction Company
Cankiri/Korgun – Aktaskurtlar Main Line Valve Station Natural Gas Pipeline Project
- 103 KM 24 inch High Pressure Steel Pipeline, - 55 km 8 inch High Pressure Steel Pipeline,
• Eskipazar Pig Station:
- 24 inch Launcher and Receiver 2 no. of Pigs (multi-directional), - Karabük direction 12 inch Launcher 1 no. of Pig (one-directional),
• For Çerke -K lcahamam Line; 8 inch-1 ea Pig station with Launcher (one-directional),
• For Çerke -K lcahamam Line;8 inch 1 ea Pig Station with Receiver (one-directional),
• 24 inch 4 no's Valve Stations,
• 8 inch 1 no Valve Station,
• 12 inch Take-off Station for Karabuk Line,
• 8 inch Take-off Station for Kur unlu,
• 8 inch 2 no's of Take-off Stations for K lcahamam Line,
• 6 inch Take-off Valve for Çerke .
Construction Date: 2007-2008
Oztas Construction Company
Turkey/Greece Natural Gas Pipeline Project
PHASE 2 OFFSHORE SECTION ÇANAKKALE – TURKEY
Turkey-Greece Natural Gas Pipeline Project - Offshore Part Construction. 36" pipeline is 17 km in legth and 68 m in depth within the sea.
Construction Date: 2005-2006
OHS JOINT VENTURE
Samsun-Ankara Blue Stream Natural Gas Pipeline Project
Construction, installation and commissioning of 500 km, 48’’ dia., 14,3mm wall thickness, API 5L GrX65 natural gas pipeline from Samsun to Ankara, which known as “BLUE STREAM” Pipeline.
The project aims transportation of Russian natural gas to Mediterranean sea through Black Sea and Turkish distribution lines.
Works done in the scope of the Project:
• 7 ea 16’’ branch valves and 1500 class 16 billion m3/year capacity “pressure reducing and measurement” station,
• 4 ea 48’’ pigging stations, • 17 ea 48’’ line valves,
• Excavation & backfilling of 500 kms, 48’’ dia. Pipeline,
• Railway, highway and river crossings through the line via micro-tunneling method, • NDT tests, hydraulic pressure tests and cathodic protection.
Construction Date: 1999-2001
OHS JOINT VENTURE
Samsun Tekkekoy Pressure Reducing and Metering Station Construction Project
EPIC (Engineering procurement installation and commissioning) of a 1500 class Natural Gas Pressure Reducing and Metering Station having capacity of 16 billion m3 per year.
Construction Date: 2000-2002
Oztas Construction Company
Corum Natural Gas Compressor Station Project NATURAL GAS PRESSURIZING STATION
Construction of a complete Natural Gas Pressurizing Station (Compressor Station) as a Turbine plus Compressor pack in the configuration of 2 +1 (2 operating units and 1 spare) or 3+1 (3 operating units and 1 spare)
OUR WORK EXPERIENCES
CONTRACTED AND COMPLETED WORKS
INFRASTRUCTURAL PROJECTS
·
Punj Lloyd - Limak JV
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline
LOT C Section, Reinstatement Works of
Orensehir Camp Area and Pipe Stockyard at KP
820
·
BIL
(BOTAS INTERNATIONAL LTD.)
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline
LOT B Section, Replacement of River Bed of
Acisu River at KP 659
·
BIL
(BOTAS INTERNATIONAL LTD.)
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline
LOT B Section, Temporary Support of eroded
pipe section at KP 659 (Acisu River)
·
Golder Associates Ltd. / Turkey
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,
Soil Decomposition Work at BVT30 Block Valve
Station Pipeline Failure
·
BTC Co.
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,
Reinstatement Works on the BTC Pipeline
between Posof (Georgia Border) to Ceyhan
Marine Terminal
·
BTC Co.
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline,
DCVG Survey and Coating Repair Works on the
BTC Pipeline (1076 Km)
·
BTC Co.
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline
(1076 Km), RoW Remedial Works at Lot A Lot B
and Lot C Sections of the BTC Pipeline and
RoW Reinstatement Works
·
BTC Co.
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline
(1076 km) , Geohazard Repair and Maintenance
Works
Client: Punj Lloyd - Limak JV
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT C Section, Reinstatement Works of Orensehir Camp Area and Pipe Stockyard at KP 820
Construction Date: June 2008
Due to completion of the BTC Pipeline constrcution, removal of infrastructural facilities from camp site and reinstatement of the land together with pipe stockyard area.
INFRASTRUCTURAL PROJECTS
Client: BIL (BOTA International Ltd.)
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT B Section, Replacement of River Bed of Acisu River at KP 659
Construction Date: June 2008
Reroute and reconstruction of Ac su River Bed due to its possible adverse effect on the BTC Pipeline at KP 659.
Client: BIL (BOTA International Ltd.)
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline LOT B Section, Temporary Support of eroded pipe section at KP 659 (Acisu River)
Construction Date: July 2008
Due to change in the river bed, taking the part of river bed which get close to the Pipeline under protection with sand-cement mixture bags.
Client: Golder Associates Ltd./Turkey
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, Soil Decomposition Work at BVT30 Block Valve Station Pipeline Failure
Construction Date: August 2008
After the explosion at BVT30 Block Valve Station on the BTC Pipeline, decomposition and transportation of burned soil from unburned soil under the extent of pipeline repair services executed.
Client: BTC Co. Turkey Branch
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, Reinstatement Works on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal
Construction Date: 06/2008 - 10/2008
Reinstatement works on the BTC Pipeline where was defined (in different points) by BTC Co.
Client: BTC Co. Turkey Branch
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline, DCVG Survey and Coating Repair Works on the BTC Pipeline (1076 Km)
Construction Date: 06/2008 - 10/200
After DCVG survey, excavation, blasting and repair of 120 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal.
Client: BTC Co. Turkey Branch
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline (1076 Km), RoW Remedial Works at Lot A Lot B and Lot C Sections of the BTC Pipeline and RoW Reinstatement Works
Construction Date: 06/2009 - 10/2009
Reinstatment works such as stone collection, grading, channel, road, soil transportation and biorestoration works at totally 238 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine
Client: BTC Co. Turkey Branch
BTC (Baku-Tbilisi-Ceyhan) Crude Oil Pipeline (1076 km), Geohazard Repair and Maintenance Works
Construction Date: 08/2009 - 12/2009
River bed training works at KP 659+200 Ac su River Bed, generation of erosion protective structures such as riprap, gabion, slope breakers, etc. at totally 29 different points of which coordinates defined by BTC Co. on the BTC Pipeline between Posof (Georgia Border) to Ceyhan Marine Terminal. Remedial works such as stone collection,