• No results found

Integrated Control of Chart Items for Error Repair

N/A
N/A
Protected

Academic year: 2020

Share "Integrated Control of Chart Items for Error Repair"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1. Integrated agenda manager
Table 1. Performance of CHAPTER on ill-formed sentences *Peters2 data are not considered in the averages because Peters2 consists of only the sentences that were covered by

References

Related documents

We use cell synchrony and two methods to show that all chromatids of budding yeast segregate randomly and that there is no mother – daughter bias with respect to Watson

Adding more dispatchers will introduce load balancing problems on the front-end dispatchers, and secondly most content-aware distribution strategies (like LARD) need

Although most work in the fMRI evaluation of language processing (semantic, phono- logical, and other) has demonstrated predominantly left hemispheric areas of supratentorial

It seems best to consider that flexion-withdrawal reflexes are graded in intensity, from those which result from a train of spikes in motoneurones A31S and A32S just sufficient to

The pipeline architecture known as MOUSETRAP, pro- posed in [11], has a good performance, it is based on logic gates and can be implemented on FPGAs (see Fig. 1).In this paper,

The results of the study hypotheses indicate a positive and significant impact of strategic management of human resources with the value of 0.21, organizational culture with a

NeTservices allows NetServer 7000 systems to concurrently deliver native file services to hundreds of UNIX and NT/95 clients, without compromising on support of native file

Gooding CR, Bartlett W, Bentley G, Skinner JA, Carrington R, Flanagan A: A prospective, randomised study comparing two techniques of autologous chondrocyte implantation