Oklahoma Department of Transportation Notice of Contract Award Letting Date - 03/18/21 Award Date - 06/07/21

N/A
N/A
Protected

Academic year: 2021

Share "Oklahoma Department of Transportation Notice of Contract Award Letting Date - 03/18/21 Award Date - 06/07/21"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

210096 826

Call Order: Contract ID: J/P No.:33446(04) Project No.:

33447(04)

STP-273B(064)3P SSR-273B(065)SR

Counties:WAGONER

Contract Description:RESURFACE (ASPHALT)

SH-51: FROM 5.4 MILES EAST OF THE

MUSKOGEE TURNPIKE, EXTEND EAST NEAR WAGONER. PROJECT LENGTH = 5.495 MILES

Contract Amt:$2,476,763.64 Contractor:H & G Paving Contractors Inc. Muskogee, OK

(2)
(3)

200338 400

Call Order: Contract ID:

J/P No.:29511(04) Project No.:SSP-205C(090)PM

Counties:BECKHAM

Contract Description:BRIDGE AND APPROACHES

SH-34: OVER FARMRAIL RAILROAD AND UNNAMED CREEK, 1.1 MILES AND 1.3 MILES SOUTH OF I-40 NEAR ELK CITY. PROJECT LENGTH = 0.553 MILE

Contract Amt:$4,326,926.93 Contractor:OBC, INC. EDMOND, OK Awarded:

210126 405

Call Order: Contract ID:

J/P No.:32970(04) Project No.:STP-205C(092)CI

Counties:BECKHAM

Contract Description:RESURFACE (ASPHALT)

COUNTY ROAD (EW-114/NEW LIBERTY ROAD): FROM 2.0 MILES EAST OF THE SH-152 JUNCTION, EXTEND EAST NEAR NEW LIBERTY. PROJECT LENGTH = 2.978 MILES

Contract Amt:$899,563.43 Contractor:CASWELL CONTRACTING, INC. ELK CITY, OK

Awarded:

210127 410

Call Order: Contract ID:

J/P No.:28704(04) Project No.:CIRB-206C(036)RB

Counties:BLAINE

Contract Description:GRADE, DRAIN, AND SURFACE

COUNTY ROADS (EW-094 ROAD/AMERICAN HORSE LAKE ROAD/NS-252): FROM 7.5 MILES NORTH OF I-40, EXTEND NORTH ON NS-252

ROAD THEN EAST ON EW-094 ROAD NEAR GEARY. PROJECT LENGTH = 5.974 MILES

Contract Amt:$6,893,690.12 Contractor:THE CUMMINS CONSTRUCTION CO., INC. ENID, OK

Awarded:

210128 415

Call Order: Contract ID:

J/P No.:34414(04) Project No.:NHPP-CRRS(013)PM

Counties:BLAINE

Contract Description:RESURFACE (ASPHALT)

US-270: FROM 5.5 MILES SOUTHEAST OF THE SH-8 JUNCTION, EXTEND SOUTHEAST NEAR WATONGA. PROJECT LENGTH = 5.550 MILES

Contract Amt:$3,569,054.32 Contractor:THE CUMMINS CONSTRUCTION CO., INC. ENID, OK

(4)

J/P No.:24088(04) Project No.:STP-207C(105)PM

Counties:BRYAN

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE

SH-78: FROM 0.3 MILES NORTH OF THE SH-91 JUNCTION, EXTEND NORTH IN ACHILLE.

PROJECT LENGTH = 4.183 MILES

Contract Amt:$9,778,751.06 Contractor:L & N BRIDGE, LLC ANTLERS, OK

210130 425

Call Order: Contract ID:

J/P No.:31187(04) Project No.:CIRB-207D(097)RB

Counties:BRYAN

Contract Description:PAVEMENT RECONSTRUCTION (NO ADDED LANES) COUNTY ROAD (KIRSEY ROAD/NS-368): FROM THE US-70 JUNCTION, EXTEND SOUTH NEAR MEAD. PROJECT LENGTH = 1.985 MILES

Contract Amt:$1,385,466.40 Contractor:OVERLAND CORPORATION ARDMORE, OK

Awarded:

210131 430

Call Order: Contract ID:

J/P No.:28500(04) Project No.:STP-211C(042)CI

Counties:CHEROKEE

Contract Description:BRIDGE AND APPROACHES

COUNTY ROAD (NS-4501): OVER DOUBLE SPRINGS CREEK, 8.3 MILES NORTH OF SH-82 NEAR TERESITA.

PROJECT LENGTH = 0.153 MILE

Contract Amt:$876,515.00 Contractor:PARADIGM CONSTRUCTION & ENGINEERING, INC SAPULPA, OK

Awarded:

210133 440

Call Order: Contract ID:

J/P No.:26497(04) Project No.:NHPP-019N(118)PM

Counties:ELLIS

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE

SH-15: FROM 5.5 MILES EAST OF THE US-283 JUNCTION, EXTEND NORTHEAST NEAR GAGE.

PROJECT LENGTH = 2.736 MILES

Contract Amt:$6,403,700.61 Contractor:THE CUMMINS CONSTRUCTION CO., INC. ENID, OK

(5)

210134 445

Call Order: Contract ID:

J/P No.:32907(04) Project No.:STP-230B(037)AD

Counties:HARPER

Contract Description:PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

US-283: FROM S 5TH STREET, EXTEND NORTH IN LAVERNE. PROJECT LENGTH = 0.375 MILE

Contract Amt:$296,718.21 Contractor:SCHIRALLI CONSTRUCTION CORP. WILSON, OK

Awarded:

210136 455

Call Order: Contract ID:

J/P No.:32975(04) Project No.:CIRB-232D(066)RB

Counties:HUGHES

Contract Description:GRADE, DRAIN, AND SURFACE

COUNTY ROADS (NS-393/EW-123): FROM THE SH-9 JUNCTION EXTEND SOUTH ON NS-393, THEN EAST ON EW-123 NEAR DUSTIN. PROJECT LENGTH = 4.19 MILES

Contract Amt:$4,492,528.53 Contractor:C-GAWF CONSTRUCTION, INC. HENRYETTA, OK

Awarded:

210137 460

Call Order: Contract ID:

J/P No.:34829(04) Project No.:NHPP-CRRS(014)PM

Counties:JACKSON

Contract Description:RESURFACE (ASPHALT)

US-62: FROM 0.96 MILES WEST OF THE SH-6 JUNCTION, EXTEND EAST NEAR ALTUS. PROJECT LENGTH= 3.900 MILES

Contract Amt:$2,631,070.02 Contractor:CORNELL CONSTRUCTION COMPANY, INC. CLINTON, OK

Awarded:

210138 465

Call Order: Contract ID:

J/P No.:32353(04) Project No.:CIRB-240C(089)RB

Counties:LEFLORE

Contract Description:RESURFACE (ASPHALT)

COUNTY ROAD (NS-462/TWILIGHT ROAD): FROM

THE SH-31 JUNCTION, EXTEND NORTH NEAR BOKOSHE. PROJECT LENGTH = 5.100 MILES

Contract Amt:$2,764,936.75 Contractor:JOB CONSTRUCTION CO., INC. POTEAU, OK

(6)

J/P No.:23264(07) Project No.:STP-244C(074)PM

Counties:MCCLAIN

Contract Description:WIDEN AND RESURFACE

SH-76: FROM 3.4 MILES NORTH OF THE SH-19 JUNCTION, EXTEND NORTH NEAR LINDSAY.

PROJECT LENGTH = 4.886 MILES

Contract Amt:$8,956,200.00 Contractor:SILVER STAR CONSTRUCTION COMPANY, INC. MOORE, OK

210082 475

Call Order: Contract ID:

J/P No.:29459(04) Project No.:STP-244C(072)PM

Counties:MCCLAIN

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE

SH-59: FROM 5.6 MILES SOUTH OF THE SH-39 JUNCTION, EXTEND NORTH NEAR CRINER.

PROJECT LENGTH = 0.857 MILE

Contract Amt:$3,455,100.00 Contractor:SILVER STAR CONSTRUCTION COMPANY, INC. MOORE, OK

Awarded:

210140 480

Call Order: Contract ID:

J/P No.:33483(04) Project No.:STP-244C(076)CI

Counties:MCCLAIN

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (NW 180TH STREET/EW-141): FROM THE SH-59 JUNCTION, EXTEND WEST NEAR CRINER.

PROJECT LENGTH = 2.277 MILES

Contract Amt:$5,018,860.29 Contractor:Treas Construction Inc Coalgate, OK Awarded:

210141 485

Call Order: Contract ID:

J/P No.:33485(04) Project No.:STP-244D(075)CI

Counties:MCCLAIN

Contract Description:BRIDGE AND APPROACHES

COUNTY ROAD (CASCARA ROAD/NS-3035): OVER WALNUT CREEK, 0.8 MILES NORTH OF THE SH-74B JUNCTION NEAR BLANCHARD.

PROJECT LENGTH = 0.264 MILES

Contract Amt:$1,045,616.02 Contractor:H & H BRIDGE COMPANY JOPLIN, MO

(7)

210142 490

Call Order: Contract ID: J/P No.:18859(04) Project No.:

18859(10)

NHPP-022N(102)SS NHPP-022N(225)PM

Counties:MCCURTAIN

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE US-70: FROM 0.3 MILES WEST OF THE SH-98 JUNCTION, EXTEND WEST NEAR VALIANT. PROJECT LENGTH = 4.548 MILES

Contract Amt:$23,248,537.02 Contractor:THE CUMMINS CONSTRUCTION CO., INC. ENID, OK

Awarded:

210143 495

Call Order: Contract ID:

J/P No.:27855(04) Project No.:CIRB-250D(032)RB

Counties:MURRAY

Contract Description:GRADE, DRAIN, SURFACE, AND BRIDGE

COUNTY ROAD (EW-168/BUEL GREEN ROAD): FROM THE US-177 JUNCTION, EXTEND WEST NEAR SULPHUR. PROJECT LENGTH = 5.982 MILES

Contract Amt:$8,137,662.15 Contractor:OVERLAND CORPORATION ARDMORE, OK

Awarded:

210146 510

Call Order: Contract ID:

J/P No.:35255(04) Project No.:SAP-4400(088)ES

Counties:OKLAHOMA

Contract Description:BRIDGE REPAIR

CITY STREET (NW 36TH STREET): REPAIR VEHICLE IMPACT DAMAGE OVER I-44, 3.5 MILES WEST OF I-235 IN OKLAHOMA CITY.

PROJECT LENGTH = 0.000 MILE

Contract Amt:$45,347.80 Contractor:BUILT RIGHT CONSTRUCTION, LLC SAVANNA, OK

Awarded:

210147 515

Call Order: Contract ID:

J/P No.:32897(04) Project No.:STP-258B(083)AD

Counties:OTTAWA

Contract Description:PEDESTRIAN IMPROVEMENTS (SIDEWALKS)

US-60: FROM THE SH-125 JUNCTION, EXTEND NORTHEAST IN FAIRLAND. PROJECT LENGTH = 0.606 MILE

Contract Amt:$610,481.00 Contractor:PARADIGM CONSTRUCTION & ENGINEERING, INC SAPULPA, OK

(8)

J/P No.:27978(04) Project No.:STP-260B(043)PM

Counties:PAYNE

Contract Description:GRADE, DRAIN, AND SURFACE

SH-51: FROM THE SH-18 INTERSECTION, EXTEND EAST NEAR YALE. PROJECT LENGTH = 3.083 MILES

Contract Amt:$10,685,000.00 Contractor:BECCO CONTRACTORS, INC. TULSA, OK

210150 530

Call Order: Contract ID:

J/P No.:23284(12) Project No.:SSP-262F(067)PM

Counties:PONTOTOC, POTTAWATOMIE

Contract Description:BRIDGE PAINTING

US-270 RAMP/SH-18/SH-99: AT MULTIPLE LOCATIONS IN DIVISION III.

PROJECT LENGTH = 0.00 MILES

Contract Amt:$555,291.00 Contractor:POSEIDON CONSTRUCTION, INC. CLEARWATER, FL

Awarded:

210153 545

Call Order: Contract ID: J/P No.:28204(04) Project No.:

28204(05)

STP-263C(074)3P STP-263C(075)3P

Counties:POTTAWATOMIE

Contract Description:RESURFACE (ASPHALT)

SH-9A: FROM THE SH-59 JUNCTION, EXTEND NORTH NEAR MAUD. PROJECT LENGTH = 10.22 MILES

Contract Amt:$1,978,831.66 Contractor:HASKELL LEMON CONSTRUCTION CO. OKLAHOMA CITY, OK

Awarded:

210154 550

Call Order: Contract ID:

J/P No.:23144(16) Project No.:SSP-264F(078)PM

Counties:BRYAN, LEFLORE, MCCURTAIN, PUSHMATAHA

Contract Description:BRIDGE WATER PROOF SEAL

SH-3/SH-22/SH-63: AT MULTPLE LOCATIONS IN DIVISION II.

PROJECT LENGTH = 0.00 MILE

Contract Amt:$52,834.08 Contractor:B & B CONSTRUCTION SERVICE J.T., INC. CLAYTON, OK

(9)

210155 555

Call Order: Contract ID:

J/P No.:32362(04) Project No.:CIRB-264C(075)RB

Counties:PUSHMATAHA

Contract Description:BRIDGE REHABILITATION

COUNTY ROAD (JUMBO ROAD): OVER CLEAR CREEK, 2.6 MILES AND 3.2 MILES SOUTH OF THE INDIAN NATION TURNPIKE NEAR DAISY. PROJECT LENGTH = 0.030 MILES

Contract Amt:$232,649.80 Contractor:B & B CONSTRUCTION SERVICE J.T., INC. CLAYTON, OK

Awarded:

210156 560

Call Order: Contract ID:

J/P No.:31827(04) Project No.:STP-CRRS(019)PM

Counties:SEMINOLE

Contract Description:RESURFACE (ASPHALT)

SH-56: FROM 0.8 MILES SOUTH OF THE SH-99A JUNCTION, EXTEND NORTH IN CROMWELL. PROJECT LENGTH = 4.990 MILES

Contract Amt:$1,225,445.49 Contractor:ROSSCON, LLC MUSKOGEE, OK Awarded:

210157 565

Call Order: Contract ID:

J/P No.:29657(14) Project No.:SSP-269B(087)RW

Counties:STEPHENS

Contract Description:RIGHT-OF-WAY CLEARANCE

SH-29: FROM 11.5 MILES EAST OF THE US-81 JUNCTION, EXTEND EAST NEAR BRAY. PROJECT LENGTH = 5.890 MILES

Contract Amt:$87,288.00 Contractor:ROBIN HAUSNER HOUSE MOVERS & DEMOLITION, LLC

SPERRY, OK Awarded:

210158 570

Call Order: Contract ID:

J/P No.:30700(04) Project No.:STP-271C(069)CI

Counties:TILLMAN

Contract Description:BRIDGE AND APPROACHES

COUNTY ROAD (NS-245): OVER DEEP RED CREEK, 6.3 MILES NORTH OF THE US-70 JUNCTION NEAR GRANDFIELD.

PROJECT LENGTH = 0.208 MILE

(10)

J/P No.:33316(04) Project No.:NHPP-272N(325)IG

Counties:TULSA

Contract Description:SAFETY IMPROVEMENT (LIGHTING)

US-64/SH-51 (BROKEN ARROW EXPRESSWAY): FROM PEORIA AVENUE, EXTEND SOUTHEAST IN TULSA.

PROJECT LENGTH = 1.820 MILES

Contract Amt:$1,164,876.00 Contractor:TRAFFIC & LIGHTING SYSTEMS, LLC OKLAHOMA CITY, OK

210159 580

Call Order: Contract ID:

J/P No.:35010(04) Project No.:SAP-019N(147)ES

Counties:TULSA

Contract Description:BRIDGE REPAIR

CITY STREET (65TH W AVENUE): REPAIR VEHICLE IMPACT DAMAGE OVER US-64, 5.8 MILES

NORTH OF I-44 NEAR SAND SPRINGS. PROJECT LENGTH = 0.00 MILES

Contract Amt:$51,021.59 Contractor:GIBSON & ASSOCIATES, INC. BALCH SPRINGS, TX Awarded:

210160 585

Call Order: Contract ID:

J/P No.:32104(04) Project No.:NHPP-CRRS(007)PM

Counties:MUSKOGEE, WAGONER

Contract Description:RESURFACE (ASPHALT)

US-69: FROM THE MUSKOGEE COUNTY LINE, EXTEND NORTH. PROJECT LENGTH = 2.047 MILES

Contract Amt:$3,157,000.00 Contractor:BECCO CONTRACTORS, INC. TULSA, OK

(11)

210161 590

Call Order: Contract ID:

J/P No.:31766(04) Project No.:STP-CRRS(011)PM

Counties:WOODS

Contract Description:RESURFACE (ASPHALT)

US-64: FROM 3.0 MILES WEST OF THE SH-14 JUNCTION, EXTEND EAST NEAR ALVA. PROJECT LENGTH = 5.840 MILES

Estimated Contract Amt:$1,479,880.00 Contractor:

(12)

References

Related documents

Flights from Oklahoma City OKC to Tulsa TUL Book low fares from Oklahoma City to Tulsa with Southwest Airlines It's easy feat find now Will Rogers World Airport to Tulsa

The offeror shall furnish the City with the signed contract and the required insurance documents within 15 calendar days after the date of the notice of award or within

3 Department of Urology, University of Oklahoma Health Sciences Center, Oklahoma City, OK 73104, USA 4 Children’s Hospital, University of Oklahoma Health Sciences Center, Oklahoma

The Oklahoma Constitution provides that in eminent domain proceedings, the property is taken, and its fair mar- ket value determined, as of the date of paying the

According to the Ministry of Education, the second phase of the 985 Scheme has the following tasks: to consolidate the results achieved and the foundations laid in the first phase

The hypothesis I put forward is that it was something dif- ferent, and that Le Corbusier’s attitude, like that of oth- ers committed to the same research programme, was rather guided

1) Determination the effect of the open -and closed- end deck forms on the value of the effective shear stiffness. 2) A comparison of the shear stiffness value in

[r]