Program Category 2022 2023 2024 2025 2026 2027 Future Years Total Expenditure

Parks & Recreation Parks and Trails

PR169 - CORONADO HEIGHTS PARK AND ANTHEM ROSE TRAIL CONNECTIONS

- 3,100,000 - - - 3,100,000

PR170 - BOULDER HIGHWAY TRAIL - WATER STREET TO RUSSELL ROAD

- - - - 2,691,060 2,602,140 - 5,293,200

PR177 - UNION PACIFIC RAILROAD TRAIL - PHASE IV

7,772,618 - - - 7,772,618

PR226 - TERRA WETLANDS 1,000,000 - - - 1,000,000

PR247 - WEST HENDERSON PARKS AND RECREATION - PHASES II - V

1,000,000 44,000,000 40,000,000 - - - - 85,000,000

PR303 - SUNRIDGE PARK - BLEACHER SHADE COVER INSTALLATION

- - 100,000 - - - - 100,000

PR304 - ANTHEM HILLS PARK - BLEACHER SHADE COVER INSTALLATION

- 200,000 - - - 200,000

PR328 - HENDERSON H.O.M.E. - ADAPTIVE USE PARK

- 11,977,808 - - - 11,977,808 PR339 - VARIOUS - PLAYGROUND REPLACEMENTS - - - 750,000 750,000 PR352 - DOWNTOWN PARK RENOVATION - PHASE I - 675,000 - - - 675,000

PR356 - WHITNEY MESA RECREATION AREA - TENNIS HARD COURT SURFACING REPAIR

- 114,782 - - - 114,782

PR381 - RCT VARIOUS PARK PROJECTS - EAST

189,188 850,059 584,118 3,844,630 361,250 60,000 - 5,889,245

PR382 - RCT VARIOUS PARK PROJECTS - SOUTH

140,000 250,850 202,975 72,000 33,145 155,660 - 854,630

PR383 - RCT VARIOUS PARK PROJECTS - SOUTHWEST

225,950 845,279 1,313,910 413,125 222,575 - - 3,020,839

(2)

Program Category 2022 2023 2024 2025 2026 2027 Future Years Total PR384 - RCT VARIOUS PARK PROJECTS -

NORTHWEST

- 171,290 172,475 114,485 160,000 - - 618,250

PR385 - RCT VARIOUS PARK PROJECTS - WEST

145,500 587,118 420,853 223,125 252,428 - - 1,629,024

PR387 - BOULDER CREEK PARK - PHASE II

- 250,000 2,500,000 - - - - 2,750,000

PR402 - NEVADA STATE COLLEGE TO WETLANDS TRAIL

- 8,115,120 - - - 8,115,120

PR403 - RIVER MOUNTAIN LOOP TRAIL TO MCCULLOUGH HILLS TRAIL CONNECTOR

- - 10,500,000 - - - - 10,500,000

PR404 - LOWER PITTMAN WASH TRAIL - - 18,800,000 - - - - 18,800,000

PR405 - BLACK MOUNTAIN NATURE PRESERVE

- - 1,730,166 - - - - 1,730,166

PR406 - MACDONALD CANYONS NATURE PARK

- 1,400,000 - - - 1,400,000

PR407 - CORNERSTONE PARK - PHASE II

- 19,000,000 - - - 19,000,000

PR408 - WHITNEY MESA RECREATION AREA - PHASE II

- 4,094,640 - - - 4,094,640

PR409 - SUNRIDGE PARK - PHASE II - 1,430,000 - - - 1,430,000

PR410 - HIDDEN FALLS PARK - PHASE II - - 2,931,265 - - - - 2,931,265

PR411 - MOUNTAIN LAKE PARK - PHASE II

- - 11,495,000 - - - - 11,495,000

PR412 - HERITAGE PARK - PHASE III - - 10,340,000 - - - - 10,340,000

PR413 - AMADOR VISTA PARK - PHASE II

- - 2,622,642 - - - - 2,622,642

PR431 - MORRELL PARK - IRRIGATION RENOVATION

- 500,000 - - - 500,000

PR440 - HERITAGE PARK - IRRIGATION PUMP STATION REPLACEMENT

- 150,000 - - - 150,000

(3)

Program Category 2022 2023 2024 2025 2026 2027 Future Years Total PR443 - HIDDEN FALLS PARK -

PLAYGROUND SURFACING REPLACEMENT

- - 142,975 - - 57,190 - 200,165

PR449 - ESSELMONT PARK PHASE II B - - - 3,358,880 - 3,358,880

PR463 - RCT VARIOUS PARK PROJECTS - LAKE LAS VEGAS

- - - 114,250 - - - 114,250

PR465 - SPORTS FIELD LIGHTING RETROFIT

- 2,384,105 2,384,105 - - - - 4,768,210

PR466 - Drake Street Park - 4,051,394 - - - 4,051,394

PR474 - CACTUS WREN/I215 TRAIL CROSSING

- - - 800,000 3,200,000 4,000,000

PR477 - LOWER PITTMAN WASH TRAIL SEGMENT 3 - WARM SPRINGS TO GALLERIA

- - - 3,700,000 - - 14,800,000 18,500,000

PR478 - ST ROSE PARKWAY TRAIL NORTH SIDE - EASTERN TO LAS VEGAS BLVD

- - 670,000 - 2,680,000 - - 3,350,000

PR479 - ST ROSE PARKWAY PEDESTRIAN BRIDGE

- - 880,000 - 3,520,000 - - 4,400,000

PR482 - VIA NOBILA TRAIL PHASE I - VIA INSPIRADA TO LESLIE

- - 220,000 - 880,000 - - 1,100,000

Total Expenses / Expenditure 10,473,256 104,147,445 108,010,484 8,481,615 10,800,458 7,033,870 18,750,000 267,697,128

Recreation

PR326 - HENDERSON

MULTIGENERATIONAL CENTER - COMPETITIVE POOL BLEACHERS

- - 100,000 - - - - 100,000

PR416 - VARIOUS SPECIAL RECREATION EQUIPMENT AND MAINTENANCE PROJECTS

454,420 2,132,033 1,621,718 1,579,509 646,899 - - 6,434,579

Total Expenses / Expenditure 454,420 2,132,033 1,721,718 1,579,509 646,899 - - 6,534,579

Total Parks & Recreation 10,927,676 106,279,478 109,732,202 10,061,124 11,447,357 7,033,870 18,750,000 274,231,707

Total Expenditure $10,927,676 $106,279,478 $109,732,202 $10,061,124 $11,447,357 $7,033,870 $18,750,000 $274,231,707

(4)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2021-07-01 Completion Date 2022-06-30

Manager Amie Wojtech

Description An 6 acre park located near Horizon Ridge Parkway and Jeffreys Street in an area deficient in parks. Also located within close proximity to the St. Rose Parkway Trail and the Anthem Rose trail.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 3,100,000 - - - -

-Total Expenditure - 3,100,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies 122,173 124,616 127,108 129,650 132,243 133,088 137,586

Project Forecast

Operating Impact

Project Status Proposed

PR169 - CORONADO HEIGHTS PARK AND ANTHEM ROSE TRAIL CONNECTIONS

(5)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2025-07-01

Manager Amie Wojtech

Description This project is to construct the trail from Water Street to Russell Road, provide county access, and install necessary trail amenities to complete the final trail corridor from south to north (approximately 5 lineal miles).

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - - - 2,691,060 2,602,140

-Total Expenditure - - - - 2,691,060 2,602,140

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - - - 92,966 98,115 426,057

Project Forecast

Operating Impact

Completion Date 2027-06-30 Project Status Proposed

PR170 - BOULDER HIGHWAY TRAIL - WATER STREET TO RUSSELL ROAD

(6)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2020-07-01 Completion Date 2022-06-30

Manager Amie Wojtech

Description To design, construct and obtain right of way for the balance of the UPRR Trail, which runs from the mainline junction west of the I-15 southeast to its terminus in the center of Boulder City (approximately 10 lineal miles).

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Grant Proceeds Fund 7,772,618 - - -

-Total Expenditure 7,772,618 - - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR177 - UNION PACIFIC RAILROAD TRAIL - PHASE IV

(7)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2020-07-01 Completion Date 2022-06-30

Manager Amie Wojtech

Description Parking lot and other amenities for a potential, future 25 acre natural park in Lake Las Vegas.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - LLV 1,000,000 - - -

-Total Expenditure 1,000,000 - - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies 137,962 328,594 142,579 147,352 152,285 157,384 162,655

Project Forecast

Operating Impact

Project Status Planned

PR226 - TERRA WETLANDS

(8)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2021-07-01 Completion Date 2025-06-30

Manager Amie Wojtech

Description Second of an estimated five phases that include a total of 88 acres of neighborhood parks, 75 acres of community parks/sports complexes, and 38 acres of trails.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Grant Proceeds Fund 1,000,000 - - -

-To Be Determined - 44,000,000 40,000,000 - - -

-Total Expenditure 1,000,000 44,000,000 40,000,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - 1,700,000 1,700,000 1,700,000 1,700,000 1,700,000

Project Forecast

Operating Impact

Project Status Planned

PR247 - WEST HENDERSON PARKS AND RECREATION - PHASES II - V

(9)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Doug Guild

Description Install shade covers over bleacher areas at fields 1-2.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 100,000 - - -

-Total Expenditure - - 100,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR303 - SUNRIDGE PARK - BLEACHER SHADE COVER INSTALLATION

(10)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Doug Guild

Description Install shade covers over bleacher areas at fields 1-3.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 200,000 - - - -

-Total Expenditure - 200,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR304 - ANTHEM HILLS PARK - BLEACHER SHADE COVER INSTALLATION

(11)

Sub Program Recreation Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Ray Everhart

Description Bleachers for the Henderson Multigenerational Center competition pools.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Special Recreation Fund - - 100,000 - - -

-Total Expenditure - - 100,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR326 - HENDERSON MULTIGENERATIONAL CENTER - COMPETITIVE POOL BLEACHERS

(12)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Amie Wojtech

Description Fully Accessible Recreation Facility for Children of all abilities and ages. Includes ballfield, multi-use field, waterplay, fully accessible playground, and administrative and meeting space for Recreation, Therapeutic Recreation, Inclusion, Sports and Operations. (17,000 sq. ft. on 5.5 acres)

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Neighborhood Service Grants - 11,977,808 - - - -

-Total Expenditure - 11,977,808 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - 386,595 399,250 412,324 425,827 1,838,027

Project Forecast

Operating Impact

Project Status Planned

PR328 - HENDERSON H.O.M.E. - ADAPTIVE USE PARK

(13)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2027-07-01 Completion Date 2028-06-30

Manager Amie Wojtech

Description Replacement of playgrounds at Dos Escuelas, Vivaldi and Sonata Parks

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - Southwest - - - 750,000

Total Expenditure - - - - - - 750,000

Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR339 - VARIOUS - PLAYGROUND REPLACEMENTS

(14)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Doug Guild

Description Complete renovation of 3 acres of Downtown Park phase 1.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 675,000 - - - -

-Total Expenditure - 675,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR352 - DOWNTOWN PARK RENOVATION - PHASE I

(15)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Doug Guild

Description Repair 71,739 square feet of hard court surfacing for the tennis courts at Whitney Mesa Recreation Area.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Special Recreation Fund - 114,782 - - - -

-Total Expenditure - 114,782 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR356 - WHITNEY MESA RECREATION AREA - TENNIS HARD COURT SURFACING REPAIR

(16)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2014-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects utilizing RCT funding for the East district.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - East 189,188 850,059 584,118 3,844,630 361,250 60,000

-Total Expenditure 189,188 850,059 584,118 3,844,630 361,250 60,000

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR381 - RCT VARIOUS PARK PROJECTS - EAST

(17)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2017-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects utilizing RCT funding for the South District.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - South 140,000 250,850 202,975 72,000 33,145 155,660

-Total Expenditure 140,000 250,850 202,975 72,000 33,145 155,660

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR382 - RCT VARIOUS PARK PROJECTS - SOUTH

(18)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2014-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects utilizing RCT funding for the Southwest district

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - Southwest 225,950 845,279 1,313,910 413,125 222,575 -

-Total Expenditure 225,950 845,279 1,313,910 413,125 222,575 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR383 - RCT VARIOUS PARK PROJECTS - SOUTHWEST

(19)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2019-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects utilizing RCT funding for the Northwest district

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - Northwest - 171,290 172,475 114,485 160,000 -

-Total Expenditure - 171,290 172,475 114,485 160,000 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR384 - RCT VARIOUS PARK PROJECTS - NORTHWEST

(20)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2017-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects utilizing RCT funding for the West district

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - West 145,500 587,118 420,853 223,125 252,428 -

-Total Expenditure 145,500 587,118 420,853 223,125 252,428 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR385 - RCT VARIOUS PARK PROJECTS - WEST

(21)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Complete build-out of Boulder Creek Park with additional amenities and landscaping.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 250,000 2,500,000 - - -

-Total Expenditure - 250,000 2,500,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR387 - BOULDER CREEK PARK - PHASE II

(22)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Amie Wojtech

Description Providing trail segment from Nevada State College (NSC) to the Wetlands Trail along Pueblo

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 8,115,120 - - - -

-Total Expenditure - 8,115,120 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR402 - NEVADA STATE COLLEGE TO WETLANDS TRAIL

(23)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2027-06-30

Manager Amie Wojtech

Description Providing a recreational and transportation trail that provides a connection from the River Mtns. Loop Trail to McCullough Hills Trail. There is a connection through the future NSC site

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 10,500,000 - - -

-Total Expenditure - - 10,500,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR403 - RIVER MOUNTAIN LOOP TRAIL TO MCCULLOUGH HILLS TRAIL CONNECTOR

(24)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Trail connection from Arroyo Grande Sports Complex north to Russell Road Sports Complex along Stephanie Street and along the channel. Connections to various parks and schools

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 18,800,000 - - -

-Total Expenditure - - 18,800,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR404 - LOWER PITTMAN WASH TRAIL

(25)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description A passive park made up of a network of natural trails to compliment the natural area of Black Mountain. A trailhead would be constructed and multiple interpretive/scenic overlook areas. Connection to other parks and trails

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 1,730,166 - - -

-Total Expenditure - - 1,730,166 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR405 - BLACK MOUNTAIN NATURE PRESERVE

(26)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Amie Wojtech

Description A natural park with passive amenities. The project includes a parking lot, signage, natural surface trails, restrooms and connection to other COH trails

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 1,400,000 - - - -

-Total Expenditure - 1,400,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - 780,366 120,860 136,855 128,985 133,254 137,964

Project Forecast

Operating Impact

Project Status Planned

PR406 - MACDONALD CANYONS NATURE PARK

(27)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Phase II would consist of the installation of a dog park, play area, plaza, restroom, and trail connection to Stephanie Street

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Redev. Agency - Eastside - 19,000,000 - - - -

-Total Expenditure - 19,000,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR407 - CORNERSTONE PARK - PHASE II

(28)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Amie Wojtech

Description Completion of the neighborhood park component consisting of basketball courts, natural area, trails, trailhead, parking, and other park amenities.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 4,094,640 - - - -

-Total Expenditure - 4,094,640 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Proposed

PR408 - WHITNEY MESA RECREATION AREA - PHASE II

(29)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Amie Wojtech

Description Expansion of playground area.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 1,430,000 - - - -

-Total Expenditure - 1,430,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR409 - SUNRIDGE PARK - PHASE II

(30)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Project would consist of basketball courts, open play area, tennis courts, and landscape.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 2,931,265 - - -

-Total Expenditure - - 2,931,265 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR410 - HIDDEN FALLS PARK - PHASE II

(31)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2024-07-01 Completion Date 2025-06-30

Manager Amie Wojtech

Description Consists of a dog park, fields, and disc golf.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 11,495,000 - - -

-Total Expenditure - - 11,495,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR411 - MOUNTAIN LAKE PARK - PHASE II

(32)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Future improvements include; open space, volleyball courts, bocce courts, interpretive signage, youth baseball fields, and possible facilities.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 10,340,000 - - -

-Total Expenditure - - 10,340,000 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR412 - HERITAGE PARK - PHASE III

(33)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Amie Wojtech

Description Phase II would consist of the installation of landscape, irrigation, park amenities, tennis wall, and bike rodeo.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - 2,622,642 - - -

-Total Expenditure - - 2,622,642 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR413 - AMADOR VISTA PARK - PHASE II

(34)

Sub Program Recreation Department CAP-4301 - Parks and Recreation

Start Date 2015-07-01 Completion Date 2027-06-30

Manager Kevin Sigman

Description Various projects including but not limited to maintenance, replacement and equipment utilizing Special Recreation funds.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Special Recreation Fund 454,420 2,132,033 1,621,718 1,579,509 646,899 -

-Total Expenditure 454,420 2,132,033 1,621,718 1,579,509 646,899 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR416 - VARIOUS SPECIAL RECREATION EQUIPMENT AND MAINTENANCE PROJECTS

(35)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Doug Guild

Description Complete renovation of the irrigation system located at Morrell Park.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - East - 500,000 - - - -

-Total Expenditure - 500,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR431 - MORRELL PARK - IRRIGATION RENOVATION

(36)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2022-07-01 Completion Date 2023-06-30

Manager Doug Guild

Description Replacement of the irrigation pump station located at Heritage Park.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - East - 150,000 - - - -

-Total Expenditure - 150,000 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR440 - HERITAGE PARK - IRRIGATION PUMP STATION REPLACEMENT

(37)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2023-07-01 Completion Date 2024-06-30

Manager Doug Guild

Description Replacement of the playground surfacing located at Hidden Falls Park

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

Park Development - South - - 142,975 - - 57,190

-Total Expenditure - - 142,975 - - 57,190

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR443 - HIDDEN FALLS PARK - PLAYGROUND SURFACING REPLACEMENT

(38)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2026-07-01 Completion Date 2027-06-30

Manager Amie Wojtech

Description Continue upgrades and additions to Esslemont Park. Build out of remaining acreage located at Esslemont Park.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - - 3,358,880

-Total Expenditure - - - - - 3,358,880

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR449 - ESSELMONT PARK PHASE II B

(39)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2024-07-01 Completion Date 2027-06-30

Manager Doug Guild

Description Various park projects including but not limited to playgrounds, surfacing, irrigation and landscape for parks located in the Residential Construction Tax District of Lake Las Vegas.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - - - 114,250 - -

-Total Expenditure - - - 114,250 - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR463 - RCT VARIOUS PARK PROJECTS - LAKE LAS VEGAS

(40)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2021-07-01 Completion Date 2023-06-30

Manager

Description Retrofit lighting for sports fields at the following locations: Acacia Park, Anthem Park, Arroyo Grande Park, Basic High School Baseball Fields, Basic High School Softball Fields, Dos Esquelas Park, Mission Hills Park, Pecos Legacy Park, Russell Road Park, Silver Springs Park, Stephanie Lynn Craig Park, Wells Park

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 2,384,105 2,384,105 - - -

-Total Expenditure - 2,384,105 2,384,105 - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR465 - SPORTS FIELD LIGHTING RETROFIT

(41)

Sub Program Parks and Trails Department CAP-4301 - Parks and Recreation

Start Date 2020-07-01 Completion Date 2023-06-30

Manager Carrie Becker

Description Drake Street Park is a proposed 3.5 acre park adjacent to John C. Kish Boys and Girls Club near the intersection of North Major Avenue and Boulder Highway in east Henderson. Proposed amenities include: a community garden, outdoor classroom, playground, splash pad, open turf grass area, restroom, shaded picnic areas, and other typical park amenities.

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

To Be Determined - 4,051,394 - - - -

-Total Expenditure - 4,051,394 - - - -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Active

PR466 - Drake Street Park

(42)

Sub Program Parks and Trails Department CAP-3900 - Public Works

Start Date 2026-07-01 Completion Date 2028-06-30

Manager Amie Wojtech

Description Construction of trail system and amenities

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

RTC/County Funded Projects - - - 800,000 3,200,000

Total Expenditure - - - - - 800,000 3,200,000

Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR474 - CACTUS WREN/I215 TRAIL CROSSING

(43)

Sub Program Parks and Trails Department CAP-3900 - Public Works

Start Date 2025-07-01 Completion Date 2028-06-30

Manager Amie Wojtech

Description Construction of trail system and amenities

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

NDOT - - - 3,700,000 - - 14,800,000

Total Expenditure - - - 3,700,000 - - 14,800,000

Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR477 - LOWER PITTMAN WASH TRAIL SEGMENT 3 - WARM SPRINGS TO GALLERIA

(44)

Sub Program Parks and Trails Department CAP-3900 - Public Works

Start Date 2024-07-01 Completion Date 2027-06-30

Manager Amie Wojtech

Description Construction of trail system and amenities

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

NDOT - - 670,000 - 2,680,000 -

-Total Expenditure - - 670,000 - 2,680,000 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR478 - ST ROSE PARKWAY TRAIL NORTH SIDE - EASTERN TO LAS VEGAS BLVD

(45)

Sub Program Parks and Trails Department CAP-3900 - Public Works

Start Date 2024-07-01 Completion Date 2027-06-30

Manager Amie Wojtech

Description Pedestrian bridge near Jeffreys

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

NDOT - - 880,000 - 3,520,000 -

-Total Expenditure - - 880,000 - 3,520,000 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR479 - ST ROSE PARKWAY PEDESTRIAN BRIDGE

(46)

Sub Program Parks and Trails Department CAP-3900 - Public Works

Start Date 2024-07-01 Completion Date 2027-06-30

Manager Amie Wojtech

Description Construction of trail system, ammenities and pedestrian bridge

Funding Source 2022 2023 2024 2025 2026 2027 Future Years

NDOT - - 220,000 - 880,000 -

-Total Expenditure - - 220,000 - 880,000 -

-Description 2022 2023 2024 2025 2026 2027 Future Years

Salaries and Benefits - - -

-Services and Supplies - - -

-Project Forecast

Operating Impact

Project Status Planned

PR482 - VIA NOBILA TRAIL PHASE I - VIA INSPIRADA TO LESLIE

(47)

" " " " " " " " " " " " " " " " " " " " "

Horizon Ridge Pkwy

G re e n Sunset Rd B ould erH wy StR ose Pkw y An th em Pkw y

§

¨

¦

15

Ea s te rn Av e V ia In sp irad a Lake Me ad Pkw y M a g ic W y G re e n w a y R d G ib s o n R d C o lle g e D r P u e b lo B lv d S te p h a n ie S t

§

¨

¦

215 P k w y Va lle y

§

¨

¦

11

§

¨

¦

515 HENDERSON EVENTS CTR & MULTIGEN CTR DOS ESCUELAS PARK

AMADOR VISTA PARK

ACACIA PARK HIDDEN FALLS PARK ANTHEM HILLS PARK SONATA PARK ESSELMONT PARK CORNERSTONE PARK WHITNEY MESA REC AREA MOUNTAIN LAKE PARK HERITAGE PARK MORRELL PARK DOWNTOWN PARK BLACK MOUNTAIN NATURE PRESERVE BOULDER CREEK PARK CORONADO HEIGHTS PARK HENDERSON H.O.M.E.

ADAPTIVE USE PARK RIVER MOUNTAIN LOOP TRAIL BOU LDER H WY T RAIL ST R OS E TR AI L N OR TH SUNRIDGE PARK MACDONALD CANYONS NATURE PARK Ma jor Ave DRAKE ST PARK UPR R TRAIL PR408 PR407 PR440 PR409 PR169 PR326 PR352 PR356 PR405 PR412 PR303 PR387 PR413 PR328 PR410 PR304 PR339 PR466 PR411 PR431 PR449 PR403 PR40 3 PR 40 3 PR403 PR403 PR403 PR406 PR170 PR177

PARKS AND RECREATION

²

PARKS AND

RECREATION

THIS MAP IS INTENDED TO BE A GUIDE ONLY AND IS SUBJECT TO CHANGE BY PERIODIC UPDATES THAT

MAY NOT BE SHOWN HEREIN. THE CITY OF HENDERSON MAKES NO GUARANTEE OR WARRANTY EXPRESSLY OR IMPLIED AS TO THE ACCURACY OF THE INFORMATION CONTAINED HEREIN.

0 0.5 1 2 3 4

Miles

References

Related documents

The results have shown that geographical factors increasing the price dispersion across gas stations such as the average distance between them, overall area of the zip code

Завдання дипломної роботи: Розглянути теоретичні управління активами і пасивами банку; Визначити та систематизувати методичні підходи

Given a social choice problem, one may compute the interim utility for every type of every individual associated to any given incentive compatible mechanism.. After ranking

Various theories including Gardner’s (1993) multiple intelligences, Vermunt’s (1992) theory of learning styles, Kolb’s (1984) theory of experiential learning, and Sternberg’s

Even the isolates belonging to species represented in the reference library by only one or two references, such as Leishmania lainsoni, Leishmania aethiopica, and Leishmania

- Perlu dikelola dengan baik rantai yang panjang (chain) aliran bahan baku sampai barang jadi dan diterima pelanggan atau customer.. • Keuntungan menggunakan MRP

MoDMaCAO proved to be powerful enough to model different distributed cloud applications and we were also able to use its implementation framework to successfully provide plugins

1.1.1 Other samples such as glass and fibres will only be retrieved by Crime Scene Investigator ’s or Volume Crime Scene Investigator ’s following consultation with the