Campus Master Plan Update

September 30, 2021

(2)

Welcome Message

(3)

Kathleen Kirleis

Vice Chancellor

Administration and Finance

Michael Kearns

Associate Vice Chancellor Facilities

Dennis Swinford

Director, Office of Campus Planning

UMB Team

(4)

Yesterday we launched two tightly coupled components of strategic planning

A. University Strategic Planning

B. Campus Master Planning

• Addresses all administrative and academic/scholarly aspects of the organization

• Mission / Vision alignment and Academic Master Planning are the anchors that drive all other planning

• 1 year of planning, 10 year vision, 5 years of implementation

• Addresses physical space – the buildings and grounds of the university

• Runs in parallel to strategic planning, as much data gathering is required

• Ultimate plans will be heavily driven by strategic planning work

(5)

Current 2009 Master Plan

(6)

2009 Master Plan

Integrated Science Building

(7)

2009 Master Plan

Utility Corridor and Road Replacement (UCRR)

(8)

2009 Master Plan

REAB

• CNHS

• Engineering

University Hall

(9)

2009 Master Plan

West Garage

(10)

2009 Master Plan

Residence Halls

(11)

2009 Master Plan

New Quad (SDQD)

(12)

2009 Master Plan

Renovation of Existing Academic Buildings

• Microbiology Teaching Lab - Wheatley

(13)

2009 Master Plan

Renovation of Existing Academic Buildings

• Computer Science Lab - McCormack

(14)

2009 Master Plan

Renovation of Existing Academic Buildings

• Nursing Simulation - Quinn

(15)

Master Planning Process

(16)

The two tightly coupled components of strategic planning

A. University Strategic Planning

B. Campus Master Planning

• Addresses all administrative and academic/scholarly aspects of the organization

• Mission / Vision alignment and Academic Master Planning are the anchors that drive all other planning

• 1 year of planning, 10 year vision, 5 years of implementation

• Addresses physical space – the buildings and grounds of the university

• Runs in parallel to strategic planning, as much data gathering is required

• Ultimate plans will be heavily driven by strategic planning work

(17)

Phases of Campus Master Planning

Pre-planning

Launch

Phase A

Discover and Analyze

Phase B Program

• Select Consultant

• Develop charge

• Develop process/

Schedule

• Identify Committees

• Assemble Data

• Analyze existing data/reports

• Engagement Strategy

• Existing Condition Assessment

• Space use analysis

• Begin to synchronize physical future to Strategic Plan

• Establish Master Plan Program including Deferred Maintenance needs

Campus Strategic Planning Pre-planning

Fall Semester 2021 Winter Session Spring 2022

Activities:

Engagement:

• Announce process • Work Shops Tours and Interviews

• Work Shops Analysis Summary

• Work Shops - Master Plan Program

• Social Media Campaign

• Master Plan Update Alternatives

• Vision confirmation

• Check in with Strategic Plan

• Synchronize with Energy Master Plan

• Develop Draft Plan

Summer 2022 Fall Semester 2022

• Work Shops Alternatives

• Work Shop Energy Master Plan implications

• Plan integration Phase C

Explore

Phase D

Refine and Document

• Draft Plan Documentation

• Review Draft Plan

• Implementation Details

• Detailed Deferred

Maintenance and Energy Master Plan improvement programs

• Works Shops Draft Plan and Final Plan

• Publish Master Plan

(18)

How will we

work together to design the future?

By design thinking which begins by understanding the experience of individuals in physical space.

Great research and leveraging data from o r team s decades of

experience with colleges and universities planning.

The solutions will unite

programmatic and physical

considerations with unique

approaches for each problem.

(19)

ACTIVITIES IN THE PLANNING PROCESS

DISCOVER + ANALYZE

CAMPUS COMMUNITY ENGAGEMENT

EXPLORE

Study Compilation

+ Final Presentations REFINE +

DOCUMENT

Existing Conditions Understanding The ne Normal

Explore and evaluate ideas together

Capture the process and current thinking

Listen | Test | Synthesize Preliminary Discovery

+ Materials Review

(20)

Phases of Campus Master Plan Update

Pre-planning

Launch

Phase A

Discover and Analyze

Phase B Program

• Analyze existing data/reports

• Engagement Strategy

• Existing Condition Assessment

• Space use analysis

University Strategic Planning Pre-planning

Fall Semester 2021 Winter Session Spring 2022

• Work Shops Tours and Interviews

• Work Shops Analysis Summary

Summer 2022 Fall Semester 2022

Phase C Explore

Phase D

Refine and Document

Activities:

Engagement:

(21)

PHASE A: DISCOVER & ANALYZE

ASSESS EXISTING CONDITIONS

(22)

DISCOVER & ANALYZE

Tours Introductory Meetings Online Presence

ESTABLISHING KEY WORKING PARTNERSHIPS

(23)

DISCOVER & ANALYZE

ACTIVE ENGAGEMENT

(24)

Phases of Campus Master Plan Update

Pre-planning

Launch

Phase A

Discover and Analyze

Phase B Program

• Begin to synchronize physical future to Strategic Plan

• Establish Master Plan Program including Deferred Maintenance needs

University Strategic Planning Pre-planning

Fall Semester 2021 Winter Session Spring 2022

• Work Shops - Master Plan Program

• Social Media Campaign

Summer 2022 Fall Semester 2022

Phase C Explore

Phase D

Refine and Document

Activities:

Engagement:

(25)

PHASE B: PROGRAM

Steep Slope 100-yr Flood Plain Stream Buffer Forest Stand

DATA-INFORMED APPROACH TO PROGRAMMATIC AND PHYSICAL CONSIDERATIONS

(26)

PHYSICAL PROGRAM

New Space

Existing Space Program Alignment

Deferred Maintenance

Small Projects Conditions of

Success:

Renovate/

Build New

Physical Recommendations Rating Systems

(ILFI, LBC, EUI) Facilities Condition Assessment

(FCA)

Space Utilization and Programming

Study (SUPS)

ASSESS EXISTING CONDITIONS MASTER PLAN PROGRAM

(27)

Phases of Campus Master Plan Update

Pre-planning

Launch

Phase A

Discover and Analyze

Phase B Program

University Strategic Planning Pre-planning

Fall Semester 2021 Winter Session Spring 2022

• Master Plan Update Alternatives

• Vision confirmation

• Check in with Strategic Plan

• Synchronize with Energy Master Plan

• Develop Draft Plan

Summer 2022 Fall Semester 2022

• Work Shops Alternatives

• Work Shop Energy Master Plan implications

• Plan integration Phase C

Explore

Phase D

Refine and Document

Activities:

Engagement:

(28)

COLLABORATIVE ITERATION

PHASE C: EXPLORE ALTERNATIVES

(29)

ENGAGEMENT SUSTAINS IMPLEMENTATION

MORE THAN JUST MEETINGS

(30)

ENGAGEMENT SUSTAINS IMPLEMENTATION

ACTIVE PARTICIPATION

(31)

Phases of Campus Master Plan Update

Pre-planning

Launch

Phase A

Discover and Analyze

Phase B Program

University Strategic Planning Pre-planning

Fall Semester 2021 Winter Session Spring 2022

Activities:

Engagement:

Summer 2022 Fall Semester 2022

Phase C Explore

Phase D

Refine and Document

• Draft Plan Documentation

• Review Draft Plan

• Implementation Details

• Detailed Deferred

Maintenance and Energy Master Plan improvement programs

• Works Shops Draft Plan and Final Plan

• Publish Master Plan

(32)

PHASE D: REFINE & DOCUMENT

DOCUMENTATION WITH PRINTED AND ONLINE MEDIA

(33)

Participation

(34)

We are forming a number of Strategic Planning Committees

Led by Provost Joe Berger

Led by Deputy Chancellor Garrett Smith 1. Mission and Vision Committee

2. Academic Master Planning Committee i. Academic Program Development

ii. Research & Grand Scholarly Challenges iii. Educational Effectiveness

iv. Faculty Support & Development 3. Strategic Enrollment Planning Committee 4. Student Success Committee

5. Student Life Committee

6. Services and Responsiveness Committee i. Human Resources Sub-Committee 7. Community Engagement Committee

A. University Strategic Planning

B. Campus Master Planning

8. Campus Master Planning Working Group Led by VC of A&F

Kathleen Kirleis

(35)

We are forming a number of Campus Master Plan Update Committees

A. University Strategic Planning B. Campus Master Planning

i. Leadership Committee - Decisions

ii. Steering Committee – Direction and Guidance

iii. Working Group – Inclusive and Comprehensive Input

iv. Stakeholders – Existing Conditions and Future Requirements

(36)

Welcome Message

(37)

Thank you

Questions and Comments

[email protected]

References

Related documents

COVID Syllabus Statement: It is the policy of South Plains College for the Spring 2021 semester that as a condition of on-campus enrollment, all students are required to engage

The Institute of Malaysian and International Studies (IKMAS) was established on 1 April 1995 as a centre for research in Social Sciences at Universiti Kebangsaan Malaysia (UKM)..

Primary R 1 R 2 R 3 Update transactions Secondaries Updates CSE 444 – Spring 2021 June 2, 2021... CSE 444 – Spring

○ For example, you joined and became an Active Member in Spring 2020, earned your stole at the end of Fall 2020, so for every Spring semester thereafter,. starting with Spring

September 30, 2021 TCSS422: Operating Systems [Fall 2021].. School of Engineering and Technology, University of Washington

Supporting Narrative & Recommendations.. CAC Work Session | 05/12/2021 | 14 Crozet Master Plan Update. Transportation chapter - new

Instructors admitted that they started to or planned to use more technology and in a more intentional manner in the classroom in the Fall 2020 and Spring 2021 semester, whether

Discussion and Voting on F-20-01: A Resolution to Support Alternative Methods to Compensate for the Mental Health Effects of Eliminating Spring Break for the Winter 2021 Semester