• No results found

INSPIRE data harmonisation of mineral resources: contribution of MINERALS4EU project

N/A
N/A
Protected

Academic year: 2021

Share "INSPIRE data harmonisation of mineral resources: contribution of MINERALS4EU project"

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

Loading

References

Related documents

4.1 The Select Committee is asked to consider the proposed development of the Customer Service Function, the recommended service delivery option and the investment required8. It

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

more than four additional runs were required, they were needed for the 2 7-3 design, which is intuitive as this design has one more factor than the 2 6-2 design

• Follow up with your employer each reporting period to ensure your hours are reported on a regular basis?. • Discuss your progress with

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,

The threshold into the stadium is through a series of layers which delaminate from the geometry of the field to the geometry of the city and creates zones of separation,

For establishments that reported or imputed occupational employment totals but did not report an employment distribution across the wage intervals, a variation of mean imputation