• No results found

Data management maturity model (DM3) for an exploration and production company

N/A
N/A
Protected

Academic year: 2020

Share "Data management maturity model (DM3) for an exploration and production company"

Copied!
30
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1.1 : Value Chain of the National Oil and Gas Company
Figure 1.2 : Illustration of subsurface structure
Figure 1.3 : Illustration of processes that generates data

References

Related documents

(1) If the Contractor considers himself to be entitled to an extension of the Time for Completion and/or additional payment under any clause of the Conditions or otherwise, the

R2/R3: Constant Generator Registers (CG1/CG2) Depending of the source- register addressing modes (As) value, six commonly used constants can be generated without a code word or

It is taught from Foundation Stage to Year 6 as a weekly lesson and also as part of Oral and mental starters.. Mental maths is taught as part of a lesson, enabling children

Industry have set up the Food Industry Intelligence network that aims to better facilitate the sharing of (sensitive) information on risks to the food chain. At a European Level

(1) In recommending approval or approving any zoning map amendment, the planning commission and city council shall make findings regarding the requirements of

1 PIPE 2 CARBON BURN-SHIELD TM008 3 ASSEMBLY KIT INOX COLLECTOR Kit components ASSEMBLY NOTE: MONTESA CARBON SILENCER Kit components. ASSEMBLY NOTE: TO BE MOUNTED

The research takes the monk Yinshun kPJId (1906-2005) as a case-study and focuses on the Madhyamika pattern in Yinshun’s thought as the field within which the monk defined

The Brain Injury Group exists to support individuals and families affected by brain injury and the health and social care professionals working in this specialist fi eld... A one