• No results found

Towards the prioritization of system test cases

N/A
N/A
Protected

Academic year: 2020

Share "Towards the prioritization of system test cases"

Copied!
25
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1:  PORT Prioritization Factor Collection Process
Figure 2 presents a flow chart to represent the PORT structure.
Figure 3b: Project 2
Table 1: WPFD for 20 Random Sets of TCP and PORT TCP Random TCP Set #
+5

References

Related documents

At the conclusion of the site meetings, two focus groups were conducted (one at each of the pilot sites) with the committee of interprofessional providers to

Association Between Behavioral and Psychological Symptoms in Persons with Alzheimer's Disease and Depression in Caregivers from Low Income Families..

The information on bioequivalence was more present in the pharmaceutical documentation of EU format and in EU CTD format is primary discussed inside of the clini- cal information and

After successfully supporting the development of the wind power technology, an approach is needed to include the owners of wind turbines in the task of realizing other ways, other

AIRWAYS ICPs: integrated care pathways for airway diseases; ARIA: Allergic Rhinitis and its Impact on Asthma; COPD: chronic obstructive pulmonary disease; DG: Directorate General;

It was decided that with the presence of such significant red flag signs that she should undergo advanced imaging, in this case an MRI, that revealed an underlying malignancy, which

Given that coronary artery disease is the major cause of death in the Western world, we speculated that this protective Ser249Ser TLR-6 genotype would be overrep- resented in an

The high bandwidth network capacity and quality of network services available to research and higher education could be very severely compromised if new missions towards schools