design review board

design review board

process guidelines

(2)
(3)

1

UBCMFPGDPOUFOUT

02

EFTJHOSFWJFXQSPDFTT

02 Design Review Process Overview

03 Design Review Process – Minor Improvements 03 Pre-Design Conference

04 Preliminary Design Review 06 Final Design Review

09 Final Landscape Plan Review 09 Actions and Approvals 10 Design Review Schedule

12

TJHOEFTJHOSFWJFXQSPDFTT

12 Sign Review Overview

12 Sign Review Submission Materials 13 Sign Review Meeting

13 Sign Construction Review

14

DPOTUSVDUJPOHVJEFMJOFT

14 Pre-Construction

16 Work in Progress Observations 18 Builders Rules and Regulations 21 Waste Management

24 Site Considerations

26

BQQFOEJYFT

26 Fee and Deposit Schedule 27 Glossary

29 Index

(4)

2

EFTJHOSFWJFXQSPDFTT

(5)

3

(6)

2

The design review process has been developed to insure that all new construction, alterations and renovations to existing buildings, major site Improvements and sign work conform to the guiding principles of The St.

Kitts Peninsula as outlined in the Design Guidelines. Final approval from the DRB will result in Christophe Harbour’s submission of the plans to the St. Kitts Development Control and Planning Board for their review and subsequent issue of the building permit.

The design review process has been structured to operate as efficiently as possible, while still taking special care to ensure that consistent aesthetic standards are applied. When reviewing design and construction projects, the DRB will be looking for compliance with the principles outlined in this document as well as additional standards which may be established in select areas.

The DRB evaluates all development proposals on the basis of the Design Guidelines. Some of the Guidelines are written as broad standards and the interpretation of these standards is left up to the discretion of the DRB. An application is available from the DRB for each type of submission. Each submission must be accompanied by the required information, as specified in these Guidelines, and select area/neighborhood guidelines. Owners and/or design consultants are encouraged to attend preliminary or final review meetings as applicable.

EFTJHOSFWJFXQSPDFTTPWFSWJFX

The design review process, unless otherwise noted, takes place in four steps:

Pre-Design Conference Preliminary Design Review Final Design Review Final Landscape Review

Any Improvement as described above will require advance submission of plans and specifications describing the proposed Improvements and must be accompanied by an application form and fee. The Owner shall retain competent assistance from design professionals (Design Team) as appropriate. The Owner and Design Team shall carefully review the CC&R’s and the Guidelines prior to commencing the design review process.

The Owner is to commence construction within one year of final design approval with a licensed, and bonded, Contractor and is to diligently pursue completion of construction within 24 months of start.

 SFWJFXGFFT

In order to defray the expense of reviewing plans, monitoring construction and related data, and to compensate consulting Architects, Landscape Architects and other professionals, these Guidelines establish a total fee for each type of review payable upon submittal of the initial project application. Fees for resubmission shall be established by the DRB on a case-by-case basis. Application fees may be amended annually, as needed. A current fee schedule is included in the Appendix.

EFTJHOSFWJFXQSPDFTT J 02

(7)

3

SFRVJSFEEFTJHOQSPGFTTJPOBMT

The Design Team is to be comprised of the following consultants:

Licensed Architect

Licensed Landscape Architect Licensed Civil Engineer (as applicable)

Additional professional services, as required, to provide consultation regarding energy efficient and environmentally sensitive design, etc.

Strong project management and teamwork must be maintained to assure that Christophe Harbour Design Objectives are integrated throughout the planning, design, and construction stages of the project.

EFTJHOSFWJFXQSPDFTTÔNJOPSJNQSPWFNFOUT

Minor Improvements may generally be submitted as part of a two-step review process:

Plan Review

Completion of Construction Observation

Specific submission requirements and fees will be required based upon the nature of the Improvement.

Contact the DRB for the current fee schedule and to verify whether an Improvement qualifies for the abbreviated design review process. Upon receipt of permission to proceed with an abbreviated process, the Owner and/or Design Team will obtain a list of submission requirements from the DRB.

QSFEFTJHODPOGFSFODF

Prior to the Pre-Design Conference, the Owner is to have engaged the services of the Design Team and reviewed the Guidelines together with these consultants. Prior to preparing any detailed drawings for a proposed project, the Owner and Design Team are to meet with representatives of the DRB to discuss the proposed project. This meeting will initiate the review and approval process and allow any questions regarding building requirements, interpretation of the Guidelines, or the design review process to be clarified.

A current application form and fee schedule is included in the Appendix. The design review fee shall be paid at this initial meeting.

The following information and materials are required at the Pre-Design Conference:

A. Pre-Design Conference Application Form – a description of the proposed project including all uses and estimated square footage.

03 J EFTJHOSFWJFXQSPDFTT

(8)

4 B. Design Review Fee.

C. Survey – a property survey prepared by a licensed surveyor showing existing topography at one-foot contour intervals; tree locations, species and caliper size (DBH) for all trees of a size requiring approval for removal; existing utilities; building envelope and natural area boundaries as applicable; water edge;

water level; easements; the Peninsula Coastal Management Plan; location of any adjacent buildings; other legal encumbrances and/or existing building information if alterations or additions are proposed.

D. Homesite Diagram with Site Analysis – schematic site plan of home placement with analysis of prevailing breezes and sun movement.

E. Architectural Sketches – schematic sketches of the main structure including floor plans and elevations.

F. Location Map – a map highlighting the location of the proposed project in relation to adjacent buildings and/or properties.

G. Environmental Summary (as appropriate) – a report that identifies all existing site features and environmental characteristics such as vegetation type and coverage, wildlife, wetlands, cultural and biological resources, archaeological features, etc.

Additional information may be requested by the DRB as necessary to describe the project. The Pre-Design Conference may be scheduled by submitting the Pre-Design Conference Request Form and required drawings at least fourteen (14) working days prior to the desired meeting date.

QSFMJNJOBSZEFTJHOSFWJFX

Within six months of the Pre-Design Conference, the Owner shall submit a written application and

preliminary design documents for Preliminary Design Review. The Preliminary Design Review will insure that:

All structures are sited for energy efficiency, designed to blend into the

landscape, and follow the profile of the site to minimize grading and site impact.

The transition between the building and the surrounding environment accomplishes and compliments the intent and specifics of the Guidelines.

The roofs, massing, colors, tones, building materials, landscape materials, and other site and architectural Improvements are consistent with any adjoining buildings and/or outdoor amenities.

Proposed new construction, site work, and/or additions meet the objectives outlined in these Guidelines.

EFTJHOSFWJFXQSPDFTT J 04

(9)

5

QSFMJNJOBSZEFTJHOSFWJFXTVCNJTTJPONBUFSJBMT

The Applicant shall prepare and submit to the DRB for review and approval a preliminary design review package, which should adequately convey (as appropriate): existing site conditions, constraints, building orientation and design, vehicular and pedestrian access, the proposed use of exterior materials and colors, and conceptual landscape design. The package shall include a digital copy (PDF) of the plans, a full-size set and a half-size set of the below drawings and/or materials.

New construction projects shall submit all items listed below.

A. Preliminary Design Application Form – A current application form can be obtained from the DRB office.

B. Location Map – indicating location of the lot and/or building on the peninsula.

C. Site Plan – (1" = 20'- 0" minimum scale), based on Pre-Design Survey required information showing proposed grading and drainage (1' contour interval), building footprint with grades, driveway, parking area, fences/walls, patios, decks, pools, and any other site amenities. Existing vegetation patterns, proposed clearance areas, and trees to be removed and/or preserved should be indicated. Calculations showing the percentage of impervious ground coverage (buildings, driveways, patios, pools, etc.) are required to be shown on the site plan.

D. Site Sections – (1" = 20'- 0" minimum scale), showing proposed buildings, building heights, elevations, and existing and finished grades in relation to the surrounding site, including adjacent buildings and roads as may be required by the DRB. This drawing should clearly illustrate how the proposed design conforms to the building height requirements, existing and proposed grades, and adjoining buildings.

E. Study Model – (1" = 20'- 0" minimum scale), illustrating the relationship between proposed and existing building forms and topography, tree and vegetation heights, and prevailing site conditions. This need not be an expensively detailed model, but simply adequate to communicate basic three-dimensional concepts. Additionally, a perspective rendering or perspective photos of the model may be included in the preliminary design review application.

F. Staking and Tree Taping – stake the corners of all proposed buildings, any proposed building additions, and all other major Improvements and driveway centerlines. Trees proposed for removal are to be marked in the field with red tape. Trees to be pruned and/or limbed are to have blue tape tied to the limb and/or area of trimming.

G. Staking Plan – (1" = 20'- 0" minimum scale), illustrating the layout of proposed building corners and site Improvements. This plan will be used to verify staking in the field by the DRB.

05 J EFTJHOSFWJFXQSPDFTT

(10)

6

H. Floor and Roof Plans – (1/8" = 1'- 0" minimum scale), unless otherwise specified, including all proposed uses, proposed walls, door and window locations, overall dimensions, and total gross square footage for all Buildings and Structures.

I. Elevations – (1/8" = 1'- 0" minimum scale), including Building Heights, roof pitch, existing and finished grades, sign design (where applicable) and notation of exterior materials.

J. Conceptual Landscape Plan – (1" = 20'- 0" minimum scale), a conceptual plan showing irrigated areas, areas of planting, a preliminary plant list, extent of lawns, areas to be revegetated, water features, patios, decks, courtyards, schematic utility layout, service areas, and any other significant design elements.

K. Energy Efficient Design Strategy – (to be submitted with written application) a brief written description of strategies for meeting water and energy conservation goals as described in the Guidelines.

Submissions will not be reviewed without all of the required materials being submitted. The DRB reserves the right to amend the Preliminary Design Review submission requirements on a case-by-case basis as required by conditions and considerations particular to each specific project and/or property.

QSFMJNJOBSZEFTJHOSFWJFXNFFUJOH

Once the submittal has been determined to be complete, the DRB will schedule the plans for review at the next regularly scheduled DRB meeting. The Owner and Design Team are encouraged to attend the meeting for discussion and clarification of the application. The DRB will review and comment on the application at the meeting and subsequently provide the Owner and Design Team with the conclusions of the meeting in writing. The DRB may grant approval contingent upon conditions and/or changes, which can be submitted for reconsideration or may be incorporated into the final drawings. In the case of denial, plans would have to be resubmitted at a subsequent meeting, and would be considered as preliminary only.

GJOBMEFTJHOSFWJFX

Within six months of Preliminary Design Review approval, the Owner shall initiate Final Design Review by submitting the written application and final design documents. This review will cover in more detail all items that need to be in compliance with the objectives of the Guidelines. All items should be in compliance with the Guidelines prior to submitting for Final Design Review.

GJOBMEFTJHOSFWJFXTVCNJTTJPONBUFSJBMT

Final design documents shall generally conform to the approved Preliminary Design Review documents, and shall include any conditions noted from the Preliminary Design Approval. The package shall include a digital copy (PDF) of the plans, a full-size set and a half-size set of the following drawings and/or materials.

EFTJHOSFWJFXQSPDFTT J 06

(11)

7

A. Final Design Application Form – A current application form should be obtained from the DRB office.

B. Site Plan – (1" = 20'- 0" minimum scale) based on approved Preliminary Site Plan and showing any requested changes.

C. Site Sections – (1" = 20'- 0" minimum scale), based on approved Preliminary Site Section and showing any requested changes.

D. Staking and Tree Taping – stake any requested changes from the Preliminary Review.

E. Staking Plan – (1" = 20'- 0" minimum scale), illustrating any requested changes to the layout of building corners and site Improvements. This plan will be used to verify staking in the field by the DRB.

F. Grading, Drainage, and Erosion Control Plans – (1" = 20'- 0" minimum scale) showing existing and proposed grades, all drainage structures and/or other drainage design solutions. Grading plan should comply with the overall master drainage and grading plan for the Peninsula. The extent and location of sediment fencing and measures taken to control erosion during grading and construction should also be indicated.

G. Foundation, Floor and Roof Plans – (1/4" = 1'- 0" minimum scale, unless otherwise specified), for all buildings, including total gross square footage for conditioned and unconditioned spaces; door and window locations and sizes; location of mechanical and electrical; location and type of all exterior lighting fixtures and proposed fireplaces. Roof plans should indicate ridge elevations, roof pitches and locations of drainage systems, satellites, antennas, skylights, and solar panels. Visual screening of satellites, antennas, skylights and solar panels should likewise be addressed.

H. Elevations – (1/4" = 1'- 0" minimum scale), illustrating the exterior appearance of all views labeled in accordance with the site plan. Indicate the highest ridge of the roof, finished floor elevations, and existing and finished grades for each elevation. Describe all exterior materials, colors and finishes (walls, roofs, trim, windows, doors, light fixtures, signs, etc.). Details submitted for all exterior materials should be properly dimensioned (window sill, jamb and head, wall sections - minimum scale 3/4”) and shall match exterior details shown on the elevation drawings. Details of doors, windows, wall openings, columns, fascias, fretwork and railings must be submitted. Light fixtures shall be shown on the elevation drawings.

In addition to the elevations included in each set of plans, one unbound set shall be rendered in color to illustrate the extent and areas of color application.

I. Schematic Landscape and Revegetation Plans – (1" = 20'- 0" minimum scale), including areas of automatic irrigation, a lighting plan with locations of all exterior and landscape light fixtures, and cut sheets for all proposed fixture types; proposed plant materials, including names, quantity, sizes, and locations; trees to be removed; areas of planting, water features, patios, decks, courtyards, utility layout, service areas and any other significant design elements; and a tree and vegetation protection plan. All landscaped areas are to be irrigated. All disturbed areas are to be grassed, vegetated, or mulched.

07 J EFTJHOSFWJFXQSPDFTT

(12)

8

J. Exterior, Telecommunications and Landscape Details – (3/4" = 1'- 0" minimum scale), details of retaining walls, paving, trellises, arbors, gazebos, garden features (e.g., sculptures, fountains), etc., which establish and describe the character and overall style of the building and landscape. Details should be accurately dimensioned and shall match exterior details shown on the elevation drawings. Details of telecommunications and security facilities for the buildings, underground connections to all buildings, and accessory structures shall be included.

K. Energy Efficient Design Strategy – (to be submitted with written application) a brief written description of strategies for meeting water and energy conservation goals as described in the Guidelines.

L. Sample Color Board (as applicable) – including:

Roof materials and color Wall materials and colors Exterior trim material and color Window material and color Exterior door material and color Stone/rock materials

Exterior rails, fencing, paving materials Signage materials and colors

M. Cut Sheets – for all exterior light fixtures and for manufactured items, including sizes and finishes.

The DRB reserves the right to amend the Final Design Review submission requirements on a case-by-case basis as required by conditions and considerations particular to each specific project and/or property.

GJOBMEFTJHOSFWJFXNFFUJOH

Upon receipt of the required documents and staking of the property (where applicable), the DRB will notify the Owner of the scheduled meeting date to review the final design documents. The Owner and Design Team are encouraged to attend the meeting for discussion and clarification of the application. The DRB will review and comment on the application at the meeting, and subsequently provide the Owner and his Design Team with an approval or conclusive recommendations in writing for refinements to the design. A second review meeting may be necessary to review corrected and/or new materials. Corrected materials will be provided to the DRB a minimum of five (5) working days prior to the next regularly scheduled meeting.

GJOBMEFTJHOBQQSPWBM

The DRB will issue Final Design Approval in writing following a vote for approval at a Final Design Review meeting. If the decision of the DRB is to disapprove the proposal, the DRB shall provide the Owner with a written statement of the basis for such disapproval to assist the Owner in redesigning the project so as to obtain the approval of the DRB.

EFTJHOSFWJFXQSPDFTT J 08

(13)

9

GJOBMMBOETDBQFQMBOSFWJFX

The Final Landscape Plan is due 60 days prior to the substantial completion. The Landscape Architect and a representative of the DRB will meet on site to review any landscape issues, including the number of new trees required, tree mitigation requirements, tree locations for filtered views, screening of service and parking areas, foundation planting, blending with natural plant materials, final driveway layout, grading, landscape lighting, and repairing right-of-way damage. Requirements for the Final Landscape Plan are similar to the Schematic Landscape Plan in the Final Review section.

BDUJPOTBOEBQQSPWBMT

The DRB’s actions on matters will be by a majority vote of the DRB. Any action required to be taken by the DRB may be taken regardless of its ability to meet as a quorum, if a majority of the DRB is able to review the matter individually and come to a majority opinion. In such cases, the DRB shall make every effort to facilitate a discussion of the matter amongst all members through teleconferencing, email, and/or other means of communication. The DRB will keep and maintain a record of all actions taken by it. The powers of the DRB relating to design review will be in addition to all design review requirements imposed by the Ministry of Development.

SFTVCNJUUBMPGQMBOT

In the event a design scheme is abandoned, the Owner will follow the same procedures for a resubmission as for original submittals. An additional design review fee must accompany each resubmission as required by the DRB (consult the DRB for current fee for resubmittals). The DRB reserves the right to deny approval of a previously approved design based upon new information that alters the conditions of review.

WBSJBODFSFRVFTUT

Applicants wishing to alter property lines and / or boundaries of the building envelope or natural area are to submit a Variance Request Application Form. Variances may be permitted to save prominent vegetation, minimize disruption to unusual topographical features, to accommodate an irregularly shaped lot, or when the DRB determines in its sole discretion that a variance is otherwise appropriate to the site. The Variance Request Application Form is included in the Appendix.

TVCTFRVFOUDIBOHFT

Subsequent construction, landscaping or other changes in the intended Improvements that differ from approved final design documents must be submitted in writing to the DRB for review and approval prior to making changes. Changes must be described in the Design Change Form, which is included in the Appendix.

09 J EFTJHOSFWJFXQSPDFTT

(14)

10

 SJHIUPGXBJWFS

The DRB recognizes that each lot and/or building has its own characteristics and that each Owner has their own individual needs and desires. For this reason, the DRB has the authority to approve deviations from any of the Guidelines. It should be understood, however, that any request to deviate from these Guidelines will be evaluated at the sole discretion of the DRB. Prior to the DRB approving any deviation from a Guideline, it must be demonstrated that the proposal is consistent with the overall objectives of these Guidelines and that the deviation will not adversely affect adjoining properties or the Peninsula as a whole.

The DRB also reserves the right to waive any of the procedural steps outlined in the Guidelines upon demonstration of good cause.

OPOXBJWFS

An approval by the DRB of drawings, specifications, or work done or proposed, or in connection with other matters requiring approval under the Guidelines, including a waiver by the DRB, shall not be deemed to constitute a waiver of the right to withhold subsequent approval. For example, the DRB may disapprove an item shown in the final design submittal even though it may have been evident and could have been, but was not, disapproved at the preliminary design review. An oversight by the DRB of non-compliance at anytime during the review process, construction process or during its final inspection does not relieve the Owner from compliance with these Guidelines and all other applicable codes, ordinances, and laws.

 OPOMJBCJMJUZ

It is the responsibility of the Owner and the Design Team to ensure that Plans are prepared in accordance with the St. Kitts-Nevis Building Code. The DRB is not responsible for Building Code enforcement.

Neither the DRB, nor any member, employee or agent, will be liable to any party for any action, or failure to act, with respect to any matter if such action or failure to act was in good faith and without malice.

EFTJHOSFWJFXTDIFEVMF

The DRB will make every reasonable effort to comply with the time schedule for design review. However, the DRB will not be liable for delays that are caused by circumstances beyond their control. The DRB will provide design review according to the following schedule:

 QSFEFTJHODPOGFSFODF

Meeting scheduled within fourteen (14) days of receipt of Pre-Design Conference Application Form.

EFTJHOSFWJFXQSPDFTT J 10

(15)

11

 QSFMJNJOBSZEFTJHOSFWJFX

Application documents to be submitted fourteen (14) days prior to the next scheduled DRB meeting, and within six months of pre-design conference.

Written comments from the DRB meeting provided to Owner within seven (7) days.

GJOBMEFTJHOSFWJFX

Application documents to be submitted fourteen (14) days prior to the next scheduled DRB meeting, and within six months of Preliminary Design Approval.

Written comments from the DRB meeting and/or written notice of Final Design Approval provided to Owner within seven (7) days.

 NJOPSJNQSPWFNFOU

Application documents to be submitted a minimum of seven (7) days prior to the next scheduled DRB meeting.

Written comments from DRB meeting and/or written notice of approval provided to Owner within seven (7) days.

A second review meeting may be necessary to review refinements, revisions, and/or new materials.

These materials will be provided to the DRB a minimum of seven (7) days prior to the next regularly scheduled meeting.

11 J EFTJHOSFWJFXQSPDFTT

(16)

TJHOEFTJHOSFWJFXQSPDFTT

(17)
(18)

12

A sign design review package must be submitted for the installation of all new signs and/or the alteration of any existing sign.

TJHOSFWJFXPWFSWJFX

Commercial signs are reviewed by the DRB in order to assure that signage is compatible with the overall SEP aesthetic. All new signs and/or alterations of existing signs must be approved by the DRB prior to installation.

If the building, to which the sign(s) will be applied, is a new construction project or an existing building undergoing major renovations and/or additions, the Applicant may submit the Sign Submissions Application simultaneously with the Final Design Review Application. Otherwise, the Applicant may submit the sign submission materials as noted below.

TJHOSFWJFXTVCNJTTJPONBUFSJBMT

The Applicant shall prepare and submit to the DRB for review and approval a sign design review package, which should adequately convey compliance with the standards set forth in the Sign Guidelines. The package shall include a full-size set, a half-size set and a digital copy of the following drawings and/or materials:

A. Sign Design Application Form and Fee – In order to defray the expense of reviewing plans and monitoring installation, a sign review fee is due upon submittal of the sign application. Application fees may be amended annually, as needed. A current sign design application form and fee schedule is included in the Appendix.

B. Sign Detail – (scaled as appropriate), showing the size, design, shape, materials, color, lighting and lettering of the proposed sign and mounting/supporting elements. The square footage calculation is to be noted on the sign detail. Details of sign lighting (including wattage) shall also be submitted.

C. Site Plan – (1"=20'- 0" minimum), showing the location of all signs within the proposed site as well as the location, direction, and quantity of sign lighting.

D. Elevation – (scaled as appropriate), showing the proposed location of the sign on the building, wall or window.

E. Building Section – (scaled as appropriate), showing the proposed location and height of projecting/

hanging signs extending from the building wall and their relationship to the pedestrian traffic areas and/

or landscape adjacent to the building.

F. Materials – Wood, metal, and/or cloth samples and paint chips matching the exact color of the proposed sign.

TJHOEFTJHOSFWJFXQSPDFTT J 12

(19)

13

G. Colored Rendering – Adequately depicting colors, materials, size, form, and height.

H. Time Frame – Noting the length of display for any banners or other temporary signs.

TJHOSFWJFXNFFUJOH

Application documents are to be submitted a minimum of seven (7) days prior to the next scheduled DRB meeting. Upon receipt of the required sign design application and materials, the DRB will notify the Owner of the scheduled meeting date during which the DRB will review the materials. The DRB may or may not require that the Owner and/or Consultant(s) be present at the meeting. During the meeting, the DRB will review and comment on the application and allow time for discussion with the Owner and/or Consultant(s) (if present).

The DRB will make every reasonable effort to comply with the time schedule for design review. However, the DRB will not be liable for delays that are caused by circumstances beyond their control. The DRB will provide design review according to the following schedule:

Within seven (7) days of the review meeting, the DRB will provide the Owner either an approval or conclusive recommendations, in writing, for refinements to the design.

A second review meeting may be necessary to review corrected and/or new materials.

Corrected materials will be provided to the DRB a minimum of seven (7) days prior to the next regularly scheduled meeting.

TJHODPOTUSVDUJPOSFWJFX

Upon completion of sign construction, the Applicant shall notify the DRB of its installation. The DRB will make a final in-field inspection of the sign(s) within seven (7) days of notification. The DRB will issue in writing a Notice of Completion within seven (7) days of observation. If it is found that the sign(s) were not built in compliance with the approved sign design documents, the DRB will issue a Notice to Comply within three (3) days of observation. The DRB will describe the specific instances of non-compliance and will require the Owner to comply or resolve the discrepancies.

13 J TJHOEFTJHOSFWJFXQSPDFTT

(20)

DPOTUSVDUJPOHVJEFMJOFT

(21)
(22)

14

To assure the construction of any Improvement within Christophe Harbour occurs in a safe and timely manner and implements sustainable design principles without damaging the natural landscape of the Peninsula or disrupting residents or guests, these regulations will be enforced during the construction period.

Construction, including the clearing of vegetation, may not begin until final approvals have been issued from the DRB.

pre-construction

Prior to the start of construction, the Applicant shall prepare and submit to the DRB the following:

Construction Application Form Construction Area Plan

Tree and Vegetation Protection Fencing Installation Contractor Emergency Contact Information Sheet Temporary Construction Sign

Compliance Deposit Site Observation

Electrical Load Calculation

Following review and approval of all required items, the DRB will issue a Christophe Harbour permit to proceed that is to be posted at the Construction Site throughout the building period.

1. construction area plan

The Contractor must provide the DRB with a detailed Construction Area Plan, showing the area in which all construction activities will be confined, and how the remaining portions of the lot will be protected. Access during all stages of construction, including after completion of framing, should be addressed to insure the continued protection of existing trees. Construction activities are to be limited to within 50 feet of proposed structures with the exception of access drives, and utility Improvements.

The Construction Area Plan should indicate the following:

Vehicular access routes (maximum of one) Extent of construction fence (where approved) Extent of tree and vegetation protection fencing Location and size of the construction material storage

Parking areas (including maximum number of vehicular parking spaces)

Locations of the chemical toilet, temporary trailer/structure, dumpster and debris storage, and fire fighting equipment

Fueling and staging areas

Areas of utility trenching including temporary water and electricity installations

construction guidelines i 14

(23)

15 Limit of excavation

Location and size of stockpiles and the length of time stockpiles will remain in that location.

Drainage patterns Erosion control measures

The DRB may approve the Construction Area Plan with or without conditions, or require changes to be made and the revised plan resubmitted for review and approval.

DPOTUSVDUJPOBSFBGFODF

With the approval of the DRB, a construction fence may be installed to completely enclose the Construction Area. Construction fences should meet the following guidelines:

The fence shall follow the alignment of the Construction Area boundary, and shall have a single entrance located at the driveway entrance, and shall be maintained intact until the completion of construction.

The construction trailer(s) (if approved by the DRB), portable toilet(s), construction material storage and dumpsters must all be contained within the construction fence.

In special cases and when approved in advance, the DRB may allow materials to be stored outside the construction fence.

USFFBOEWFHFUBUJPOQSPUFDUJPO

The following procedures are to be adhered to:

A. No tree of a size requiring approval is to be removed without prior approval from the DRB.

B. Exclusionary fencing must be installed around the perimeter of the drip line of all trees not approved for removal. Rice straw bales are required for all trees closer than four (4) feet from the driveway or within four (4) feet of where heavy equipment is being operated.

C. The drip line is defined as the point where the distance from the edge of the tree canopy to the trunk is the greatest.

D. Fencing material must be highly visible and sturdy.

E. Construction equipment or activity is not permitted within the fenced area (exclusionary zone) without written authorization from the DRB.

F. Adequate drainage must be provided to prevent ponding of water around the base of trees.

15 J DPOTUSVDUJPOHVJEFMJOFT

(24)

16

G. Vehicle/equipment parking and materials storage is not allowed within the drip line of trees.

H. Soil compaction must be avoided around all trees and vegetation.

I. Mesh netting must be used to protect trees and vegetation from dust and paint drift.

 DPOTUSVDUJPOTJHO

Temporary construction signage will be limited to one sign per site and must be installed parallel to the street.

A temporary construction sign detail may be obtained from the DRB. Construction signs must be removed at the completion of construction.

DPNQMJBODFEFQPTJU

The amount of the Compliance Deposit shall be determined by the DRB. The DRB may use, apply or retain any part of a Compliance Deposit to the extent required to reimburse the DRB for any cost that the DRB may incur on behalf of the project’s construction activity. Any monies shall be reimbursed to the DRB for any fees incurred by the DRB to restore the Compliance Deposit to its original amount. Construction activity shall be halted until the Compliance Deposit is brought up to the original amount.

The DRB shall return the Compliance Deposit to the Builder after the issuance of a Notice of Completion from the DRB.

TJUFPCTFSWBUJPO

This observation includes review of staking of the Construction Area (as shown on the Construction Area Plan) including all corners of proposed buildings, driveways and extent of grading. In addition, Tree and Vegetation Protection fencing installation will be reviewed. This observation must occur prior to the start of any construction activity.

XPSLJOQSPHSFTTPCTFSWBUJPOT

During construction, the DRB will check construction to ensure compliance with approved final design documents. If changes or alterations have been found that have not been approved, the DRB will issue a Notice to Comply.

The following construction observations must be scheduled with the DRB:

GPVOEBUJPO

This observation occurs after the foundation and/or subfloor is substantially complete. To schedule this

DPOTUSVDUJPOHVJEFMJOFT J 16

(25)

17

meeting, the Contractor must submit to the DRB a Foundation Survey and the Construction Observation Request Form seven (7) days prior to the requested meeting date.

During this observation, the DRB will look at the general site conditions and confirm they are consistent with what was agreed upon at the Site Observation and with the Construction Area Plan. The DRB recognizes that the excavation and foundation phase of construction impacts the site substantially. However, at this point in construction, the Contractor should have the site orderly, safe, and clean.

s Drainage should be in place.

s Foundation should be s Trenches should be in.

s Rough grading for the landscaping should be completed and mulched.

There will be exceptions due to construction sequencing. Exceptions should be addressed in the Site Observation when scheduling this inspection.

The Foundation Survey must depict setbacks and distances from all foundation corners to adjacent property lines.

The DRB will issue either an approval or a Notice to Comply. If approved, $1,500 of the Contractor’s portion of the construction deposit will be returned. In the event a Notice to Comply is issued, the Contractor must rectify the discrepancies found and schedule an additional observation.

2. color and material review

Prior to shipping of materials and application of exterior color, a field review of proposed materials and color samples is required. This observation occurs after the framing and sheathing is substantially complete. To schedule this meeting, the Contractor must submit to the DRB the Color Sample Review Form seven (7) days

Samples of the following must be of sufficient size to confirm compliance with Guideline objectives and compatibility with neighboring properties:

s Roof materials and color s Wall materials and colors s Exterior trim material and color

The DRB will issue either an approval or a Notice to Comply. In the event a Notice to Comply is issued, the Contractor must rectify the discrepancies found and schedule an additional observation.

17 i construction guidelines

prior to the requested meeting date.

(26)

18

 GJOBMPCTFSWBUJPO

This observation must be scheduled when all Improvements, including all structures, landscaping and grading have been completed. To schedule this meeting, seven (7) days prior to the requested meeting date, the Contractor must submit to the DRB an As-Built Survey and the Construction Observation Request Form along with a “Certificate of Compliance” signed by the Contractor, stating the construction was completed in substantial conformance with the approved drawings.

During this observation, the DRB will verify that final construction and landscaping have been completed in accordance with final plans.

Before the DRB may issue a Notice of Completion, the Contractor must have a qualified, third party analyst affirm that all electric and water conservation systems are operating efficiently and

according to original design.

The As-Built Survey must depict setbacks and distances from all foundation corners to adjacent property lines, calculations showing the percentage of impervious ground coverage (buildings, driveways, patios, pools, etc.), and ridge height.

The DRB issues either a Notice of Completion within seven (7) working days, or a Notice to Comply within three (3) working days. In the event a Notice to Comply is issued, the Contractor must rectify the discrepancies found and schedule an additional observation.

The Owner cannot take occupancy of any Improvement(s) until a Notice of Completion is issued or an appropriate bond is filed with the DRB.

 OPUJDFUPDPNQMZ

When as a result of a construction observation the DRB finds changes and/or alterations that have not been approved, the DRB will issue a Notice to Comply following the observation. The DRB will describe the specific instances of non-compliance and will require the Owner to comply or resolve the discrepancies.

 SJHIUUPGJOF

The DRB reserves the right to issue fines to the Owner and/or Contractor, or to apply the fine to the posted Compliance Deposit, for the violation of any of the procedures set forth in these Guidelines. All fines imposed will be responsive to the nature and consequences of the violation.

DPOTUSVDUJPOHVJEFMJOFT J 18

(27)

19

CVJMEFSTSVMFTBOESFHVMBUJPOT

The time of construction will be limited to between the hours of 7:00 am and 6:00 pm, Monday – Friday, and from 8:00 am to 1:00 pm on Saturday, unless otherwise approved by the DRB. Construction activities may not occur on nationally recognized holidays unless otherwise approved by the DRB. Essentially quiet activities that do not involve heavy equipment or machinery may occur at other times subject to the review and approval of the DRB. No personnel are to remain at the Construction Site after working hours.

In addition:

No Pets – Construction personnel are prohibited from bringing pets, particularly dogs, onto Construction Sites.

Security – Security precautions at the Construction Site may include temporary fencing approved by the DRB. Security lights, audible alarms, and guard animals will not be permitted.

Noise – Contractor will make every effort to keep noise to a minimum. In order to minimize disturbance to neighbors and wildlife, radios will not be allowed.

BDDFTTUPDPOTUSVDUJPOBSFB

The only access during the construction of a building or other Improvement will be by a prescribed DRB- approved route. All access to the Construction Site shall be in accordance with the following requirements:

Only one construction access route will be permitted onto any one Construction Site, unless otherwise approved by the DRB.

All construction vehicles must be issued a vehicle pass by the DRB to access the Construction Site.

Access for heavy equipment and tower cranes (including crane reach) will require specific DRB approval.

All construction vehicles must be identified with the Contractor’s name and job site.

Material and equipment deliveries must be consolidated to the extent feasible.

WFIJDMFTBOEQBSLJOHBSFBT

Each Contractor shall be responsible for its subcontractors and suppliers obeying the speed limits and traffic regulations posted within the development. Fines will be imposed by the local police and the DRB against the Builder/Contractor and/or the Compliance Deposit for repeated violations.

All vehicle and parking areas should be in accordance with the following requirements:

19 J DPOTUSVDUJPOHVJEFMJOFT

(28)

20

The vehicular access route (one only), staging and parking areas are to be included on the Construction Area Plan.

All vehicles must adhere to posted speed limits. Fines will be issued for those exceeding the speed limit as posted or as required by road and weather conditions. Adherence to the speed limits is to be a condition included in the contract between the Contractor and its subcontractors/suppliers. The DRB may deny repeat offenders future access.

Construction crews are not to park on, or otherwise use, other sites or any open space.

Private and construction vehicles and machinery are to be parked only within the Construction Area unless otherwise approved by the DRB.

All vehicles are to be parked so as not to inhibit traffic.

Driving or parking within the drip line (canopy) of trees is not permitted.

Staging and parking areas should be laid out with 3"-4" of mulch over the entire area.

TUPSBHFPGNBUFSJBMTFRVJQNFOU

The following Guidelines regarding material and equipment storage are to be adhered to:

All construction materials, equipment and vehicles are to be stored within the DRB-approved Construction Area.

Equipment and machinery are to be stored on-site only while needed.

All flammable products must be stored in a metal cabinet with doors.

Equipment is to be inspected daily for damaged hoses, leaks, and hazards. Equipment that is not in proper working order should not be utilized.

Equipment cleaning, maintenance, and painting may not occur under tree canopies.

Proposed storage facility areas are to be designated in the Construction Area Plan.

Paints and primers, etc. are to be stored in an enclosed area that is bermed or sealed from spills.

Fueling and fluid filling is to be confined to contained and designated staging areas as shown on the Construction Area Plan.

GJSFTBGFUZQSFDBVUJPOT

The following fire and safety precautions must be adhered to at all Construction Sites:

All fires shall be reported even if it is thought to be contained, extinguished, or already reported.

One or more persons are to be appointed as the individual(s) responsible for reporting emergencies.

Access for emergency vehicles is to be maintained at all times. A minimum of 16 feet of horizontal clearance is required for emergency vehicles.

Access to fire hydrants, emergency water tanks, and emergency turnouts should not be blocked at any time. A 16-foot clearance in all directions must be maintained.

Discard smoking materials in approved containers.

A shovel and fire extinguisher, rated at least 4A, 20BC, must be mounted in plain view.

All equipment, including small tools, should have a working spark arrestor.

DPOTUSVDUJPOHVJEFMJOFT J 20

(29)

21

DPOTUSVDUJPOUSBJMFSTBOEPSUFNQPSBSZTUSVDUVSFT

The use and siting of any construction trailer or the like must be in compliance with the approved Construction Area Plan. One such facility is allowed per site and must be neutral brown in color. The DRB will work closely with the Owner and/or Contractor to site the trailer in the best possible location to minimize impacts to the site and to adjacent Owners. All such facilities will be removed from the property prior to issuance of a Notice of Completion.

 TBOJUBSZGBDJMJUJFT

Sanitary facilities must be provided for construction personnel on-site in a location approved by the DRB.

The facility must be maintained regularly and screened from view from adjacent properties and roads.

Sanitary facilities may not be situated closer than 50 feet from drainages and/or sensitive resources.

 BJSRVBMJUZDPOUSPM

Air quality control procedures shall be in accordance with the following requirements:

Construction equipment exhaust emissions shall not exceed Development Standards requirements for air pollution limitations.

Open burning of removed vegetation is not permitted.

 DPOTUSVDUJPOTDIFEVMF

All Improvements commenced on a lot and/or homesite shall be completed within 24 months after commencement according to approved final design review plans unless an exception is granted in writing by the DRB. If an Improvement is commenced and construction is then abandoned for more than 90 days, or if construction is not completed within the required 24 month period, the DRB may impose a fine of not less than $100.00 per day (or such other reasonable amount as the DRB may set) to be charged against the Owner of the Property until construction is resumed, or the Improvement is completed, as applicable, unless the Owner can prove to the satisfaction of the Board that such abandonment is for circumstances beyond the Owner’s control.

XBTUFNBOBHFNFOU

To the greatest extent practicable, the Contractor shall develop and maintain a waste management program that separates all construction waste on-site for recycling or reuse and diverts it from landfill disposal. The waste management program might include designating a specific area on the Construction Site where recyclable materials may be sorted. Contractors should check with local waste disposal agencies to determine whether recycling services are available for construction waste materials, such as cardboard, metals, concrete,

21 J DPOTUSVDUJPOHVJEFMJOFT

(30)

22

asphalt, land clearing debris, clean dimensional wood, glass, plastic, gypsum board, carpet, and insulation.

Salvage may include the donation of materials to charitable organizations.

The Contractor shall work with the Architect to develop a program for incorporating into construction salvaged and refurbished building materials as well as materials that contain post-consumer/post-industrial recycled content.

 EFCSJTXBTUFSFNPWBM

The following procedures must be adhered to at all Construction Sites:

Contractors must clean up all trash and debris on the Construction Site at the end of each day.

All trash should be securely covered to prevent access by wildlife.

Trash and debris must be removed from each Construction Site at least once a week and transported to an authorized disposal site.

Lightweight material, packaging, and other items must be covered or weighted down to prevent wind from blowing such materials off the Construction Site.

Temporary concrete “wash pits” must be within the lot on which construction is taking place and cleaned by the Contractor after completion of construction.

Paints, solvents, and other hazardous materials are not to be disposed of on-site.

Contractors are prohibited from dumping, burying, or burning trash anywhere on a lot, homesite or other property within the SEP.

During the construction period, each Construction Site must be kept neat and tidy to prevent it from becoming a public eyesore or affecting adjacent areas.

Dirt, mud, or debris resulting from activity on each Construction Site must be promptly removed from roads, open spaces, and driveways or other portions of the Peninsula.

Any clean up costs incurred by the DRB in enforcing these requirements will be taken out of the Compliance Deposit or billed to the Builder/Owner as needed.

 IB[BSEPVTXBTUF

In order to be able to respond and monitor hazardous material use and/or spills, the Contractor shall comply with the following criteria:

A. The Contractor shall provide a contact person and telephone number for a company experienced in emergency response for vacuuming and containing spills for oil or other petroleum products.

B. In the event of a spill, the Contractor shall immediately attempt to stop the flow of contaminants.

C. Absorbent sheets are to be used for spill prevention and clean up. Several boxes should be located at fuel trucks, storage areas and in maintenance vehicles. Inventories must be maintained as necessary.

DPOTUSVDUJPOHVJEFMJOFT J 22

(31)

23

D. The responsible on-site Contractor shall commit all necessary manpower, equipment, and materials to the containment and rapid clean-up of spills.

E. A reportable spill is defined as a spill of one or more gallons and a significant spill is defined as more than ten gallons.

F. After any reportable spill is contained, the Contractor shall notify the appropriate authority.

G. The Contractor is to maintain a list of product names and a Materials Safety Data Sheet (MSDS) for all hazardous material products used or located on-site. In the event of a leak, spill or release, the Contractor is to provide MSDS to emergency personnel for health and safety concerns.

H. Equipment is to be fueled in designated staging areas only. Equipment that cannot be readily moved to designated staging areas (track mounted equipment) must be fueled a minimum of 100 feet from a known drainage course.

I. Disposal of paint residue on-site or anywhere on the Peninsula is not permitted.

J. Disposal of mortar, cement, concrete (containers), etc. must occur in designated containment areas.

K. Prior to storing a hazardous material, the Contractor shall check to ensure that:

The material is stored in an approved container;

The container is tightly closed;

The container has the proper warning label;

The container is inspected for leaks.

L. All contaminated soil shall be stored in a lined and bermed storage area that is protected from wind, erosion and rainfall.

M. Always inspect equipment/vehicles for damaged hoses, leaks and hazards prior to start and at the end of each shift. Do not run equipment that is leaking hazardous products.

N. Working equipment must be visually inspected daily for proper working condition. Maintenance and service records must be made available upon request.

O. Intentional or unreported spillage or dumping of fuels, hydraulics, solvents and other hazardous materials will be cause for eviction.

23 J DPOTUSVDUJPOHVJEFMJOFT

(32)

24

TJUFDPOTJEFSBUJPOT

It is recommended that the Owner seek the assistance of a licensed soil engineer to examine and test soil conditions prior to undertaking any design or construction of foundations.

The Owner and the Owner’s Design Team and Contractor shall give due consideration to the design of the foundation systems of all structures.

It is the Owner’s responsibility to conduct an independent soil engineering investigation to determine the suitability and feasibility of any site for construction of the intended Improvement.

 FYDBWBUJPOHSBEJOH

During construction, erosion must be minimized on exposed cut and/or fill slopes through proper soil stabilization, water control and revegetation. To insure proper control of erosion and sedimentation, the following procedures must be adhered to:

A. Silt fencing must be placed around the down-slope perimeter of areas that are to be graded while providing adequate space for construction activities. Soil may not be placed against the fence. Silt must be cleared out regularly.

B. Outer slopes are to be completed first and stabilized immediately.

C. Modification and/or repair of fencing must be performed as soon as need is evident. Inspect erosion control measures regularly, especially during storm cycles. Perform pre- and post-storm inspections.

D. Emergency erosion control materials, including rice straw bales and silt fencing, are to be stockpiled on-site. Cover bales with plastic or suitable tarp.

E. In some areas, multiple silt fences may be required.

F. Vegetation disturbances must be limited to within 50' of proposed buildings

G. Topsoil is to be properly stockpiled, covered to minimize blowing dust within the Construction Area, and reused as part of the site.

H. Slope roughening/terracing may be desirable to stabilize revegetation on exposed cut bedrock slopes.

I. Disturbed areas must be watered to prevent dust from leaving the Construction Area.

DPOTUSVDUJPOHVJEFMJOFT J 24

(33)

25

2. damage repair & restoration

Please be advised that loaded concrete trucks are restricted to an 8 cubic yard limit. Damage and scarring to other property, including adjacent properties, existing buildings, roads, driveways, ponds and/or other Improvements will not be permitted. If any such damage occurs, it must be repaired and/or restored promptly

If the Contractor crosses into protected areas or other areas outside the limits of clearing, the Contractor shall:

A. To the DRB’s satisfaction, revegetate the area disturbed immediately and maintain said vegetation until established; and,

B. Pay any fines imposed by the St. Kitts Ministry of Development as a result of said violation.

Upon completion of construction, each Owner and Contractor will be responsible for cleaning up the Construction Site and for the repair of all property that was damaged, including but not limited to restoring grades, planting shrubs and trees as approved or required by the DRB, and repair of streets, driveways, pathways, drains, culverts, ditches, signs, lighting, and fencing. Any property repair costs as mentioned above, incurred by the DRB, will be taken out of the Compliance Deposit or billed to the Owner.

3. preservation of archaeological and historic sites

An archaeological survey has been conducted for the Peninsula. All known significant archaeological sites existing on individual properties have been clearly delineated. Artifacts may be encountered during the construction process. Should artifacts be uncovered, it is the Contractor’s responsibility to notify the Ministry of Development, the Builder/Owner and the DRB. Owners may contact the DRB office for information regarding the archaeological survey specific to their Property.

4. hurricane preparedness

In the event of an imminent hurricane, all Construction Sites must be secured. Materials should be removed from the site or stored securely. Equipment, including dumpsters, must be removed from the site.

at the expense of the person causing the damage or the Owner of the Property.

25 i construction guidelines

(34)

BQQFOEJYFT

(35)
(36)

26

GFFBOEEFQPTJUTDIFEVMF

New Home Review Fee $45 per 100 square feet (heated and screened) or $2,000 minimum, whichever is greater.

St. Kitts Development Control $375 And Planning Board Fee

Major Improvement Review Fee $45 per 100 square feet (heated and screened) or $1,000 minimum, whichever is greater.

Minor Improvement Review Fee $150 - $500 at discretion of DRB

Sign Review Fee $150 - $500 at discretion of DRB

Design Change Review Fee $200

Compliance Deposit $7,500 by the Property Owner and $7,500 by the Contractor. $1,500 of the Contractor deposit will be considered the Foundation Deposit.

Major Improvement Construction Deposit $2,500 by the Property Owner and $2,500

by the Contractor.

Minor Improvement Construction Deposit $1,000

Sign Construction Deposit $1,000

A combined check will only be accepted if the Property Owner and Contractor are the same entity. A more substantial deposit may be required for larger commercial projects, to be determined by the DRB at the time of application.

BQQFOEJYFT J 26

(37)

27

HMPTTBSZ

BEKBDFOU

Next to or within 100 feet. Adjacent properties include those properties which abut a property, as well as properties with any portion being located within 100 feet of any boundary of the subject property.

BQQVSUFOBODF

Architectural accessories including play structures, pools, game structures, docks, bridges, walls, mailboxes, etc.

CBTFGMPPEFMFWBUJPO

Height of the base flood, usually in feet, in relation to the National Geodetic Vertical Datum in the Flood Insurance Study Report, or average depth of the base flood above ground surface.

CVJMEBCMFBSFB

Area within allocated setback lines where building can occur.

DBMJQFS

Diameter in inches of tree (bark to bark) usually measured at breast-height (dbh) for existing trees and 1 foot above grade for nursery stock.

DPWFOBOUTBOESFTUSJDUJPOT

Declaration of Covenants, Conditions, and Restrictions for Christophe Harbour, as amended and/or supplemented from time to time.

DSJUJDBMBSFBT

An operational area that requires specific environmental control because of the equipment or information contained therein. Areas of fragile habitat growth that typically border salt marsh and lagoons including all areas designated as critical area.

GFODJOH

Any barrier, structure, or installation that may enclose, surround, or mark off any part of a yard. All fencing references include deer, electric, wood/lattice, and woven-wire mesh fencing, etc.

GFOFTUSBUJPO

Any opening in a building’s envelope including windows, doors, and skylights.

GJOJTIFEHSBEF

The average elevation of a lot after construction.

27 J BQQFOEJYFT

(38)

28

IFJHIU

Elevation as measured in feet and stories. Building height does not include chimneys, antennae, or ventilation pipes. Height in stories is the number of habitable floors (stories) exclusive of the area below the first finished floor. One-half story is a habitable floor which has heated square footage that is no greater than one-half the heated square footage of the largest story.

OBUVSBMHSBEF

The average elevation of a lot or development parcel prior to development activity.

QFSWJPVTDPWFS

Land which permits the absorption of stormwater into the ground. This may include walkways and driveways which are pervious to stormwater.

ZBSEBSU

Decorative elements or objects that are placed in yards or on the outside of houses (that are not part of the approved plans). Yard art consists of such items as fountains, columns, columnar adornments, sculptures of all types, certain light-generating structures, etc.

BQQFOEJYFT J 28

(39)

29

*OEFY

Appurtenances

Buildable Area Building Permit Color Samples

Colors

Construction Sign

Covenants and Restrictions Deposits

Docks

Elevations Fees

Fencing Final Inspection

Fines

Floor Plans

Foundation Planting Grading and Drainage Plan

Height

Improvements

Inspections Landscape Landscape Plan

Lighting

Lot Coverage Percentage

Mailboxes Material Storage

Materials

Painting Paving Permits Play Structures Pools Pruning Service Area Setbacks

Shrubs

Signage Site Plan

Specifications

29 J BQQFOEJYFT

27 27 2 17

4, 5, 7, 8, 13, 17 14, 16 27

14, 16, 17, 18, 19, 22, 25, 26 27

4, 5, 6, 7, 8, 12, 27, 28

2, 3, 4, 9, 12, 14, 15, 16, 20, 21, 23, 26, 27, 28 7, 8, 14, 15, 16, 19, 24, 25, 27

10

18, 19, 20, 25 4

9 7

5, 6, 12, 13, 18, 27, 28 2, 3, 4, 5, 7, 9, 14, 18, 21, 25 10, 13, 17, 24

2, 3, 4, 5, 6, 7, 8, 9, 12, 14 6, 9

7, 9, 12, 25 5, 18 27 14, 15

3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 15, 16, 17, 20, 21, 22, 23, 24, 25 20

5, 6, 7, 18 2, 14 27 5, 18, 27 5 6, 7 17, 18, 27 25 8, 12, 16 4, 5, 7, 12 2, 10

(40)

30

Staking

Surveys

Temporary Trailer / Temporary Structure Tree Protection

Tree Removal

Variances

BQQFOEJYFT J 30

5, 7, 8, 16 4, 5, 17, 18, 25 14, 21 14, 15 4, 5, 7 9

(41)

GPSNT

(42)
(43)

EBUFMPUOP

DPMPSTBNQMFSFWJFXGPSN

DISJTUPQIFIBSCPVSEFTJHOSFWJFXCPBSE

Address of Project

Owner

Address

Telephone Fax Telephone Fax

FOUNDATION MATERIAL Color Name/Number Manufacturer

LIST MORTAR INFORMATION IF APPLICABLE

SIDING MATERIAL Color Name/Number Manufacturer TRIM MATERIAL Color Name/Number Manufacturer

WINDOWS

Color Name/Number Manufacturer GARAGE DOOR Color Name/Number Manufacturer FRONT DOOR Color Name/Number Manufacturer ROOFING MATERIAL Color Name/Number Manufacturer

SHUTTERS

Color Name/Number Manufacturer LOUVERS/LATTICE Color Name/Number Manufacturer DECKING/STAIRS Color Name/Number Manufacturer

DRB ACTION Approved Disapproved

(44)

EBUFMPUOP

DPOTUSVDUJPOBQQMJDBUJPO

DISJTUPQIFIBSCPVSEFTJHOSFWJFXCPBSE

Address of Project

Owner

Address

Telephone Fax

Contractor

Address

Telephone Fax

Est. Start Date ID # Est. Completion Date Parcel #

Heated Square Footage Deposit Amount Lot Coverage Percentage Check #

Type of Construction: New Home Improvement (description)

Primary Subcontractors:

Foundation/Footing Plumbing Foundation/Block Electrical Framing Painting Roofing Mechanical Trim/Siding Landscaping

I, , as property owner, and I, ,

as contractor for the above described construction project acknowledge and agree that the above describe deposit is being held by Christophe Harbour Design Review Board in order to insure that the improvements will be constructed in accordance with plans and specifications which have been approved by the Design Review Board. Any failure on my part to do so will entitle the DRB to deduct part or all of my deposit as well as any other remedy provided by law or contract.

We further acknowledge and agree that:

1. We have read and understand the Covenants and Restrictions applicable to the property and all Design Review Board Guidelines and will follow and obey the said Covenants, Restrictions, and Guidelines.

2. We are responsible for completing the project as described by the drawings and specifications approved by the DRB.

3. We will maintain a clean construction site at all times and install a job sign, commercial dumpster, and job toilet in conformance with DRB Guidelines.

4. We are responsible for the conduct of all workers performing services on this project at all times while they are engaged by us.

5. We understand that when accepting a construction pass to enter the neighborhood, all workers and vehicles are subject to be searched to help prevent theft of materials and equipment.

6. As the Deposit will be held in a non‐interest bearing account, I understand that it shall be returned after Final Inspection approval with no interest added.

7. Any monies paid out by Christophe Harbour Design Review Board for the correction of changes not approved by the DRB, the cost of work necessary to improve the appearance of untidy sites, or the cost to repair any damage to the road right‐of‐ways, roads, road shoulders, or utilities will be deducted from the Deposit.

8. The DRB’s review and approval are limited to aesthetic considerations. DRB approval does not relieve you and your contractor of responsibility for compliance with all municipal or federal laws that may be applicable. DRB approval does not constitute any opinion or representation by the DRB that the plans comply with these requirements.

This Construction Application made this day of , 20 by and

PROPERTY OWNER CONTRACTOR

Application approved this day of , 20 by

DESIGN REVIEW BOARD

(45)

EBUFMPUOP

DPOTUSVDUJPOPCTFSWBUJPOSFRVFTU

DISJTUPQIFIBSCPVSEFTJHOSFWJFXCPBSE

Address of Project

Owner

Address

Telephone Fax

Contractor

Address

Telephone Fax

Type of Observation Foundation Color Sample Final

Before requesting Foundation Construction Observation, please ensure the following:

Drainage is in place Foundation is backfilled Trenches filles

Rough grading complete and mulched

Final Construction Observation Requests Must Include:

As‐built Survey with Setbacks and Lot Coverage Percentage Photographs of all four sides of the completed home Certificate of Compliance

Before requesting Final Construction Observation, please ensure the following:

Construction sign is removed Toilet is removed

Dumpster is removed Light Pole Removed Debris is removed Mailbox is installed

Adequate mulching is installed

Adequate landscape screening is installed ROW is sodded and regraded

Meter box, exposed flashing, and roof vents are painted HVAC unit is adequately screened

DRB Comments DRB Action:

Approved Disapproved

References

Related documents

(2) The Design Review Board shall review renewable energy systems applications for compliance with the Building Code, general design standards, and design standards established

The applicant shall submit a revised/corrected final construction site plan including all conditions of approval for review and approval by the City Engineer and

The Applicant shall prepare and submit to the DRB for review and approval a preliminary design review package, which should adequately convey (as appropriate): existing

Approval of the Specific Parcel Master Plan by City Council shall grant the applicant authority to submit an application for site plan/master plan review for a building permit..

Upon review and approval of the preliminary design technical memorandum for the new well prepare 70% detail design drawings and technical specifications of the well facility

Nearly all cooperative and condominium buildings require buyers to submit a purchase application, aka a “board package,” for review and approval by the board of directors..

3.2 The members of the Audit Committee shall superintend the internal audit department to review the following matters, prepare a review report and submit it to the

The CONSULTANT shall prepare a comprehensive design criteria memorandum for this entire project, and submit it to the OZARKS TRANSPORTATION ORGANIZATIONS for review and approval