• No results found

The effect of contract type and size on competitiveness in construction contract bidding

N/A
N/A
Protected

Academic year: 2020

Share "The effect of contract type and size on competitiveness in construction contract bidding"

Copied!
426
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 3.1: Competitiveness factors in terms of constraints and preferences
Figure 4.1: Bidding performance of contractors (Flanagan and Norman 1982b)
Figure 5.1: Classification of bidders according to competitiveness andconsistency in bidding
Table 5.1: Contract type breakdown based on CUSfb building typeclassification
+7

References

Related documents

In short, this paper examines the effects of a managerial training program on participating entrepreneurs’ business practices and performance and compares the cost

Key words: Ahtna Athabascans, Community Subsistence Harvest, subsistence hunting, GMU 13 moose, Alaska Board o f Game, Copper River Basin, natural resource management,

The most commonly reported nanomaterials for the development of biosensing platforms were AuNPs, carbon nanomaterials (CNTs and graphene), and polymers, and these displayed a variety

Given the widespread interest in online education and the growth in digital learning at the K-12 and post-secondary levels of education, as documented by the Maryland State

If sales drop to 185,000 blue rugs, Xander should look to reduce fixed costs and produce less to reduce variable costs and inventory

After controlling for severity of physical and mental symptoms, individuals who stated that they were less likely to make a full recovery (NRS 5–10), were more likely to have a

Analogously, stable pointed curves are defined to be pointed nodal curves with finite automorphism group, where by an automorphism we mean an automorphism of the curve fixing

The EXs we analyze are those associated with vulcanian and strombolian eruption styles and gas bursts at Sakurajima, Suwanosejima, and Tokachi-dake in Japan, Semeru and Lokon