1) Understand and prioritise site hazards and exposures, such as risks from combustible construction, combustible storage, hazardous materials, hazardous processes, external

Trace heating and localised heating systems Inspect/Test Weekly Check for correct function to prevent freezing including water tank and valve houses Remote alarms to

• A policy document that mandates use of a formal permit to monitor all impairments to fire protection and/or detection systems.. • Senior management support and endorsement for

• Form a dedicated project management group that will be responsible for initial screening, gathering feedback, validating action points and following changes through to completion..

This checklist should be used at sites in cold weather climates that have water-based fire protection equipment, to prevent or reduce the potential for freezing of

 Thermographic testing shall be performed on a yearly basis (twice per year where combustible materials are present) These surveys must include all electrical equipment such

Fire sprinkler systems provide a network of pipes that deliver pressurised water to a system of sprinkler heads that open when a predetermined temperature is reached, typically around

This Risk Control Guide provides information and guidance on some of the common risk exposures in which businesses who are responsible for the Protection of Children and