Doha Beirut Cairo London
E
E
NGNGIINNEEEERRIINNGG,
,
P
P
ROROCCUURREEMMEENNTT,
,
C
C
OONNSSTTRRUUCCTTIIOONN,
,
T
T
UURRNNKKEEYY C COONNTTRRAACCTT FFOORR TTHEHE IINNTTEEGGRRAATTEDED DDIISSTTRRIICCTT CCOOOOLLIINNGG PPLLAANNTT AATT TTHHEE PPEEAARRLL PPRROOJJEECCTT D DOOHHAA-
-
QQAATTAARRP
ROJECT
E
XECUTION
P
LAN
Q06024-IDCP-PLN-GT-001-REV A
Q06024-IDCP-PLN-GT-001-REV A - 2 -
INDEX
PAGE
Preface scope of works
1. Execution statement
3
2. Interpretations and Abbreviations
3
3. Project Execution Plan
3
3.1 C.A.T. Approach Plan
3
3.2 Long Lead Items Procurement
5
3.3 Bulk Material Procurement
9
3.4 Construction Activities
9
3.4.1. Temporary Facilities
9
3.4.2. Organization Chart
10
3.4.3. Subcontractors
10
3.4.4. Field Coordination Procedures
10
3.4.5. Detailed Construction Schedule
10
4. Detailed Construction Schedule
11
4.1. Data Collection
11
4.2. Engineering and Design
11
4.3. Construction of the Cooling Plant
12
4.4. Construction of HEX Buildings and ETS’s
18
4.5. Calibration
18
4.6. Testing and Pre‐commissioning
19
4.7. Commissioning
19
4.8. Training
19
5. Quality Assurance (QA)
20
6. Health ,Safety and Environment (HSE)
20
Appendix 1‐ PROJECT CHARTAppendix 2‐ ORGANIZATION CHART
Appendix 3‐ LONG LEAD ITEMS LIST
Appendix 4‐ PROJECT KEY MILESTONES
Appendix 5‐ TEMPORARY FACILITIES
Appendix 6‐ LIST OF SUB‐CONTRACTORS
Appendix 7‐ CIVIL METHOD STATEMENT LIST
Appendix 8‐ MECHANICAL METHOD STATEMENT LIST
Appendix 9‐ E & I METHOD STATEMENT LIST
Appendix 10‐ DESIGN INTENT REPORT
Q06024-IDCP-PLN-GT-001-REV A - 3 -
1. Execution statement
For proper execution and timely completion of the project, we are planning to follow our proposed project execution plan, which is in line and conforms to the target scope of work and completion dates as stipulated in the contract documents.2. Interpretations and Abbreviations
In the project execution plan, the following words and expressions shall have the meaning hereby assigned to them, except if other specified or where the context other wise requires: EMPLOYER (or Client, Owner, Company) means QATAR COOL ‐ QC will be commonly used instead of QATAR COOL. PMC means DAR AL‐HANDASAH – DAR will be commonly used instead of DAR AL‐ HANDASAH. CONTRACTOR means C.A.T. INTERNATIONAL QATAR W.L.L – C.A.T. will be commonly used instead of C.A.T. INTERNATIONAL QATAR W.L.L. DESIGN TEAM means STANLEY Engineering ‐ SCI will be commonly used instead of STANLEY Engineering.3. Project Execution Plan
3.1. C.A.T. Approach The implementation of this project Execution Plan that complies with Q.C requirements will be the main objective of C.A.T. C.A.T. will be working with EMPLOYER (QC) personnel and PMC (DAR) personnel, and Design Team (SCI) personnel to ensure that this principal objective is accomplished. Our experience on similar projects has seasoned our personnel to complete any and all services required with optimum performance results. The C.A.T. Projects Team and senior management are committed to providing a project that meets EMPLOYER’s objectives as well as our own principal objectives. We take pride in our work and are confident these will be accomplished. The principle objectives that the C.A.T. management expects to be met are as follows: − Meet all critical milestones and complete the Project on scheduleQ06024-IDCP-PLN-GT-001-REV A - 4 - − Maintain project costs within budget − Meet technical performance objectives − Obtain total satisfaction from EMPLOYER The proposed Project Chart (see Appendix 1) has been developed to achieve the above mentioned expectations. The successful management of the project requires good communications between the engineering team and construction team, comprehensive management information systems and a competent, well‐directed project team.
Directly upon award, a qualified management and supervisory Project Team was appointed to prepare a detailed study of the project requirements as far as engineering, materials, equipment and labor force required (see Appendix 2, Contractor Organization Chart). This group of dedicated project personnel began identifying the priorities to be completed in the early stages of the project and planned for the initial “kick‐off” meeting that was held in QC offices. This initial meeting was important in establishing a strong team relationship with the QC, DAR & SCI. After award of the contract, the management personnel from areas began mobilizing to fulfill the staffing needed for the project .This staff started with SCI verifying the available design. Based on the concept design, procurement of the LLI Long lead items (see list in Appendix 3) started as per the procurement procedures. The project key mile stones (see Appendix 4) were to be confirmed as per the suppliers & project progress. SCI started with the concept design, aiming to submit the same to QC & DAR for clearance and to go ahead with the detailed design.
Q06024-IDCP-PLN-GT-001-REV A - 5 - 3.2. Long Lead Items Procurement FLOW OF PROCUREMENT ACTIVITIES Data Input
Requisition Commercial Terms Composite
Vendor List
Project
Vendor List Inquiry Concept Design
Procurement Policy and Procedures
Material Status Report
Traffic
Operations Arrival at Site Expediting and Shop Inspection Purchase Order Award Negotiation with Vendor Client Approval Bid Analysis and Tabulation Technical / Commercial
Q06024-IDCP-PLN-GT-001-REV A - 6 - The requisition of LLI is critical and will be developed on a rush basis, immediately after contract award and approval of concept design. Owning to the critical milestones requirements, it is essential that acceleration “premiums” for specific equipment and materials to be developed and reflected C.A.T.’s flow procurement activities, as shown above, include the following polices: ‐ A well‐screened project vendor list with a preference for QC recommended vendors will be prepared , reflecting C.A.T. recent procurement experience; due consideration is given not only to technical capabilities , commercial competitiveness and offered guarantee conditions, but also to delivery performance. ‐ Purchase order placement will be based on quotation development except where source or lead time constraints dictate otherwise. ‐ Fast‐ tracking procedures are established to facilitate early procurement of long lead time items; closely‐knit inter facing among QC, DAR, C.A.T. and SCI is expected and will be implemented. ‐ Rigorous expediting and frequent tracking of materials status will be performed in the realization that any delay from the Construction Required Dates (CRD) of materials arrival on the site will endanger meeting of the contractual project completion date. ‐ An efficient field materials control system will be established and through indoctrination on warehousing operation will be carried out. LLI procurement will be done as per our C.A.T. standard procurement procedure, in order to comply with the employer specified policies. 3rd Party Validation (if required) for LLI procedure will be performed as and when required. As part of procurement activity C.A.T. & SCI will carry out a technical evaluation for each item starting with technical clarification and finalizing with a Technical Evaluation Report C.A.T. & SCI will carry out also a review of vendors drawings / documentation as part of the above mentioned procurement activity.
The technical bid evaluation will be undertaken by each engineering discipline. The technical bid evaluation is used to summarize the technical aspects of bids received for a specific requisition, in order that the bids may be compared and evaluated. Proposals (bids) are forwarded to the SCI Engineers and CAT Construction Managers for evaluation.
A thorough review of technical data will be made to determine whether bids conform to the specified technical requirements. Any deviations or inadequate information is identified at that time. In addition, C.A.T & SCI coordinate any other reviews applicable to the particular evaluation (construction impacts, technical specialist review, etc.) and incorporate the results of these reviews on the technical bid evaluation.
The technical bid evaluation is then reviewed and approved by the Project Manager. At this point, C.A.T. area procurement department shall evaluate the bids based on project requirements and
Q06024-IDCP-PLN-GT-001-REV A
- 7 -
commercial issues. Compliance with project requirements will be imposed on the vendor for all aspects of his equipment.
Once a bid is determined to be technically acceptable and commercially optimal, C.A.T. will send its recommendation to DAR for approval. C.A.T. will award purchase orders only upon obtaining QC/DAR approvals.
Upon receiving Company’s vendor approvals, C.A.T. will issue purchase orders to the selected vendors. All purchase orders are monitored. Suppliers will submit monthly progress reports to track the equipment status. Similarly, the shop drawings/production and delivery schedule report will depict, in details, the status of vendor drawings, data, factory acceptance tests and inspections, other relevant documents as requested.
All LLI will be received on site. All LLI will be checked upon receipt for quality, quantity, conformance with specifications, damage and tag or identification number, and entered on stock cards.
A receipt report and, if applicable, an overage, shortage or damage report will be prepared. Issue will be made on a materials requisition form signed by a signatory from a limited list of persons authorized by the project manager. The project procurement officer will oversee all locally supplied material. Receiving, warehousing, reporting and materiel issued for construction activities shall follow C.A.T. QA/QC procedures. Imported items will be received by purchase order number/tag number if appropriate, and checked for quantity and evidence of any shipment damage. Contractor will establish a construction warehouse system, which include covered and open storage to control the material until it is needed for construction. The Construction Manager will be responsible for issuing material transfer authorizations to release materials to the various Construction Superintendents.
The Procurement Officer will be responsible for providing marking and tagging instructions on all purchase orders. This effort will provide means in the identification of all materials received and establish traceability as required.
As project LLI are received, a report of materials received will be transmitted to update the records and generate reports for construction management and QC use. Material inventories will be adjusted as contractor issues materials and equipment for construction through standard material transfer document.
The procurement team will interface with the quality control function to ensure that materials and equipment are acquired without disrupting the design and construction schedules. Given the high coordination demands of this function, the Project Procurement Officer will serve as a key facilitator between the various elements of timely procurement. He will track the progress of materials and
Q06024-IDCP-PLN-GT-001-REV A
- 8 -
equipment through delivery to the work site, providing a centralized point of information for all project management.
The project quality and project controls functions will supplement the procurement effort in support roles. Inherently linked by their common goals of vendor quality and schedule impact, these two functions will closely interface with Procurement throughout the life of the project.
The quality control function monitors the procurement function with each of its supporting positions. Working to ensure quality from both its subcontractors and vendors, this function assumes the role of quality assurance for its vendors and quality control for the entire project through continued analysis of our efforts as well as our vendors and subcontractors.
Where discrepancies are observed, non‐conformance reports will be prepared and submitted. Provision has been made for FAT tested and witnessed by QC and C.A.T.
The QA/QC Manager will verify the technical viability of potential vendors and subcontractors. Through a documented process and inspection, this coordinator will research the above criteria as well as the quality systems of potential suppliers.
The project Planning Engineer will predominantly assist in the scheduling and document control activities. Working with the Expediter on the area Procurement Department, the project Planning Engineer will develop procurement schedules, linking the relationship between procurement of specific equipment and materials with critical design and construction activities.
The Document Controller will maintain the officials vendor data control register, updating and tracking all vendor data processed for review/approval. The Document Controller will coordinate vendor communications, receiving and returning marked‐up and/or approved drawings or other vendor data. This data will include, but is not limited to, design calculations, parts lists, special tools, spare parts recommended by the vendor and various sub‐vendor documents.
Vendor data submissions will include drawings, spare parts data packages, operating and maintenance manuals/instructions, procedures, and other pertinent data needed to support the equipment or material being purchased.
On arrival of products to storage area, the storekeeper with the help of relative department (Mechanical, Electrical, etc) or his designate shall start unloading, checking against the purchase order or the loading note and labeling each item with its correct description, tally sheet number, stock number, drawing number, and store it in its proper place as advised by the specifications. Upon receipt of equipment, each delivery shall be checked for quantity and quality, shortages visible or concealed damages. Should there be any damages, shortages, etc then the Site Management shall be informed according to applicable procedure. The material received shall be recorded on stock records as per the applicable procedure.
Q06024-IDCP-PLN-GT-001-REV A
- 9 -
To avoid double handling and only in the event that it suits, lifts will be initially programmed to arrive to site after their prospective foundations are ready. The QA/QC Department and the storekeeper shall ensure that the handling of products is according to vendor specifications, contractual documents, safety standards and project requirements. Similarly, he shall ensure that concerned people are properly and currently informed of material received or to be received. All concerned employed in material handling shall be well conversant with various projects and have had previous experience dealing with construction permanent material. Special considerations shall be applied to materials and components that should not have unnecessary handling due to weight, or configuration. 3.3. Bulk Material Procurement
The materials procurement, other than LLI, will be done as per the same described procedure for LLI.
3.4. Construction Activities
Soon after N.T.C. a construction group was organized within the Project Team. Based on the construction strategy established and project requirements identified during the bidding stage, this group will develop the Construction Plan, keeping in close contact with the engineering and procurement groups. The Construction Plan will be continually revised and updated as required to reflect the latest information affecting construction operations and will cover the following areas: ‐ 3.4.1. Temporary Facilities ‐ 3.4.2. Organization Charts ‐ 3.4.3. Subcontractors ‐ 3.4.4. Field Coordination Procedures ‐ 3.4.5. Detailed Construction Schedule 3.4.1. Temporary Facilities Temporary facilities (see Appendix 5) shall be erected in close proximity to the works, after securing M/S UDC’s & DAR’s approval to the layout and locations of site offices, stores, workshops, etc... Site Plot Plan and offices Areas shall be fenced in accordance with the Construction Regulations.
We shall accommodate our personnel in existing camp in Rayyan & Shahaniyah Areas. Proper transport shall be provided to ensure the transfer of employees from and to site in comfortable and suitable conditions .Staff will be accommodated in furnished apartments.
QC & DAR requirements for Temporary Facilities shall be completed in accordance with the supplemental terms and specifications. Safety and Environmental Protection shall be maintained by our Safety department as per Requirements and as per CAT Safety Manual.
Q06024-IDCP-PLN-GT-001-REV A - 10 - Our HSE Department personnel are as well familiar with the handling and securing passes from the local authorities and UDC; immediately, the process of securing passes to all personnel entering the zone shall proceed to guarantee that such passes will be available on time. 3.4.2. Organization Charts The Project Chart (see Appendix 1) and the Contractor Chart (see Appendix 2) have been structured to effectively and economically achieve the project construction objectives. The proposed organization addresses all the project trade requirements as far as management and supervision. It is designed in a way to provide QC & DAR with a comprehensive and homogeneous team effective in the execution of this type of works and meeting the project milestones. Staff C.V’s, from Supervisor level and above, shall be submitted to QC & DAR for prior approval. 3.4.3. Subcontractors The subcontractors (see Appendix 6. List of Subcontractors) shall cover specific areas and shall be specialized for their expertise area. Prior approval will be obtained from DAR before subcontracting the work. The Project Manager, Construction Managers, Project Engineers, Discipline Engineers, QC and Safety Engineer shall control the Subcontractor’s field of activities. 3.4.4. Field Coordination Procedures
Field control will be broken down into the following areas, with management coordinating the separate efforts into an effective and efficient field organization: ‐Manpower Control ‐Safety and Security Control ‐Warehousing and Materials Management Plan ‐Construction Equipment Control ‐Field Changes Control ‐Document Control 3.4.5. Detailed Construction Schedule The detailed Construction Schedule is covering: ‐Data Collection ‐Engineering and Design ‐Construction of Cooling Plant ‐Construction of HEX buildings and ETS’s ‐Calibration ‐Testing and Pre‐commissioning ‐Commissioning ‐Training ‐Warranty Period
Q06024-IDCP-PLN-GT-001-REV A - 11 - The construction schedule is detailed in next chapter.
4.
Detailed Construction Schedule
4.1 Data Collection C.A.T. & SCI will prepare the checklists to identify the information needed and the information to be obtained from DAR and other parties. The data collection activities embrace each of the various disciplines and will be structured to meet the needs for the design. Critical to the schedule for this project is the data site survey that will be undertaken by C.A.T. at the start of the project. 4.2. Engineering and Design SCI will review the project requirements with QC, DAR & C.A.T. to confirm and obtain all required data pertaining to the project deliverables. During the meetings, the main equipments and systems will be finalized. Data, such as production rates, physical properties of the products and other relevant data will be reviewed and agreed. SCI will develop the concept design, pass it to CAT for double checking and reviewing it, and verify it with QC/DAR prior to developing the design. A Design Intent Report will be issued, (Appendix no. 10).Based on the verified design, the procurement of the LLI‐Long Lead Items will start as per the procurement procedures already described. The exact sequence of activities during the engineering and design phase will be dependent on the schedule requirements for construction and consequently the manufacturing and shipping times for procurement. Thus, some activities may need to start earlier based on the information provided by QC in the stage prior to award.
SCI will perform detailed design ensuring that all process related activities defined in the project requirements will be undertaken in accordance with international and QC standards and codes. SCI’s experience of similar projects will enable a recognized and effective design. Once the detailed design is substantially completed and approved, the mechanical, instrumentation and electrical designs will commence and the finalized specifications and requisitions completed. Following QC/DAR approval, the material and equipment will be tendered and purchased.
Using the data obtained during the surveys and the finalized process drawings, the plot plans and layout drawings will be developed for DAR approval.
Q06024-IDCP-PLN-GT-001-REV A
- 12 -
The piping drawings and specifications will commence, based upon the approved plot plan and layout drawings. These will be completed once finalized vendor data is received and approved. Where applicable SCI/C.A.T. will check for compact designs with simplicity of installation but which retain ease of access for operation and maintenance. SCI/C.A.T. will ensure that the plant piping is laid out in an economical and effective manner to suit the process and operability requirements.
SCI/C.A.T. will ensure that all civil engineering will be detailed with due regard to the local conditions and taking into account the specificity of the area. SCI/C.A.T. will also ensure that full consideration will be given to operational functionality, safety and aesthetic considerations.
Based upon the equipment & piping arrangements and relevant approved vendor data the mechanical, electrical and instrumentation drawings will be completed and final MTO’s established. When drawings are finalized and approved by QC/DAR they will be issued as Approved for Construction (AFC).
The construction of the whole project will be performed according to our proposed construction schedule that gives the start and finish date of each activity.
4.3. Construction of the Cooling Plant
The works for the plant and administration building shall cover but shall not be limited to the following: ‐ Site clearing ‐ Excavation and compaction ‐ De watering ‐ Water Proofing ‐ Raft foundation & Building Concrete Works ‐ Precast Concrete Works ‐ Equipment foundations ‐ Finishing Works ‐ Equipment Works ‐ Piping Works ‐ Fabrication & Erection ‐ Electrical & Instrumentation works ‐ Landscape, Roads, curbstone and sidewalks Site Clearing We shall carry on all the necessary clearing, grubbing and soft landscaping in accordance with the specifications .Excavated material shall be removed from the site and replaced by suitable one if required, all as specified .We confirm that such works shall start after site possession and securing the related approval and permits and agreeing to the levels. Site clearing will be performed partially by C.A.T. and mainly by our excavation Sub Contractor.
Q06024-IDCP-PLN-GT-001-REV A
- 13 -
Excavation for Foundation and Substructures
The building shall be divided into 4 Areas. Areas are separated by construction joints. Each area might have a different excavation level. These levels will be calculated by SCI and agreed by DAR. The excavation work shall be executed, by our Subcontractor and under our supervision, in accordance with drawings, specifications and instructions. Thus, excavation shall be done to the lines and grades or elevation, agreed with QC & DAR during concept Design evaluation and cleared with UDC. Excavated material shall be used for backfilling providing it passes required tests. Unsuitable material shall be removed when encountered and replaced by suitable one. Permanent works blinding concrete membrane or such other protection as specified on the drawings shall be placed, by our concrete subcontractor, following completion of excavation and compaction works, clearing the soil tests with DAR and as soon as it is practical .All precedent works is to be executed to DAR satisfaction. Dewatering Dewatering shall be done via submersible pumps in wells distributed around the perimeter of the excavation. Water will be pumped to the near by sea. The pumps shall be fed from two Electrical sources for redundancy. Dewatering shall be subcontracted to a Professional Specialist. Water Proofing Waterproofing shall be done by a Professional Specialist subcontractor using Material approved by DAR. The water proofing activities are mainly in the Foundation stage, wherever the concrete touches surrounding soil and on the roof where we have the Cooling Towers. Raft Foundations & Building Concrete works The building shall be divided into 4 Areas. Areas are separated by construction joints and therefore can follow different schedule of works once they reach the superstructure levels.
Concrete works shall be executed by an approved Concrete Subcontractor. For civil method statement list, refer to Appendix 7
A QA/QC procedure covering all the activities related to the concrete works shall be submitted to DAR for approval. The latter provide for all the sampling and testing activities carried out in the field and/or in the laboratory. Sources of material i.e. suppliers/manufacturers and material to be used shall be in prior approved by DAR including working methods and delivery conditions. Transport, transport means, protection, delivery, storage and certification of cement shall be done in accordance with specifications and approved procedures and to the satisfaction of DAR.
A bar bending schedule shall be submitted to DAR for approval. The number, size, form and position of all steel reinforcing bars, ties, links, stirrups and other parts of the reinforcement are to be in accordance with the drawings and kept in the correct position in the forms without displacement during the process of vibrating, tamping and ramming the concrete in place. The approved spacers shall be used during the process. The concrete cover shall not exceed tolerance unless particularly otherwise specified.
Q06024-IDCP-PLN-GT-001-REV A - 14 - During the previously detailed activities, inspection and tests shall be conducted as required in the specifications and to DAR satisfaction. Records shall be generated, maintained and kept for all the duration of the process. Concrete shall be placed in the positions and sequences indicated on the drawings or in the specifications.
Raft foundations shall be constructed first, after watering proofing and screeding works is done. Different Rafts sizes will be constructed for different areas. Sizes will be calculated depending on loads in various floors and equipment vibrations. Method statements shall be submitted for large pouring areas.
Backfilling will be made on top of the raft foundations to bring the construction to the required levels, prior to proceeding with the different floor plans.
Two large Tower cranes will be erected to cover most of the building area and adjacent steel workshop. Mobile cranes will be used to cover the minor areas unreachable by Tower Cranes. The work sequence will follow our schedule of works in order to match the delivery and installation schedule of main equipment. Civil crews shall be allocated to Foundations, Structures, and other crews to Buildings. The crews shall be scheduled in accordance with the Construction Program. Concrete specified in the documents shall be obtained from approved batching plants. For workability and protection of concrete, admixtures shall be used, if needed.
For all concrete works, ordinary or Medium Sulfate Portland cement shall be used. Concrete surfaces adjacent to soil shall be covered by bituminous paint. Slump control shall be executed and samples shall be taken for strength control during the placing of concrete. Concrete will be compacted with the use of a vibrator. Afterwards, the necessary curing will be done.
Foundation, column and concrete wall Formwork shall be made of conventional wooden or steel formwork. Formworks shall be prepared for concrete placing after the control of axes, elevation, alignment and the necessary strengthening have been carried out. All formwork systems shall be strengthened by scaffoldings and working platforms. The client/PMC shall approve the completed works.
Precast Concrete works
Precast hollow core panels and beams will be subcontracted to a specialist company, following approval by DAR. This company shall supply and erect the precast items with the assistance of the Concrete Subcontractors and CAT. Some of the works will be erected by the large Tower Cranes and the rest with long reach, properly sized Mobile Cranes
Q06024-IDCP-PLN-GT-001-REV A
- 15 -
A QA/QC procedure covering all the activities related to the precast concrete works shall be submitted to DAR for approval.
Equipment Foundations
Once Material is approved and shop drawings produced and approved, Major Equipment foundations shall be designed, coordinated with concrete works and constructed on site in accordance with Manufacturer recommendations.
Finishing Works
All Sundry and finishing works shall be executed by C.A.T and by different approved Subcontractors in accordance with approved finishing schedules and Material.
Selection of Finishing Material will be based on the requirements of the Acoustic Study that caters for the noise requirement of the Project and with the Aesthetic requirements of the specifications detailed in our Alternative No. 2.
Equipment Works
Once the major Equipment and Material are approved, manufacturer shop drawings will be coordinated and integrated into the Shop Drawings. C.A.T. shall also prepare the necessary procedures /method statements for the mechanical material and equipment installation, prior to any Installation. (See Appendix 8 for Mechanical Method Statement list).
For the major equipments to be erected by C.A.T. the work is to be executed under the direct supervision of the supplier representative when required and in accordance with provided instructions and manuals. All necessary measures shall be taken to protect and preserve the supplied equipment.
C.A.T shall execute the works with all necessary safety and security precautions.
Having the concrete foundations properly cured, brush‐hammered and shimmed to the right elevation, the chillers, RO equipment, and other mechanical equipment shall be installed as per approved method statements on the respective foundations leveled and properly centered.
For pumps, preliminary alignment shall be carried out before grouting. All equipment shall be installed as per QC/DAR requirements and vendor’s specifications and recommendations.
Special Platform on rail/track system will be manufactured in our workshop to bring the chillers, pumps and other equipment into the building and right to the location where they should be installed. Hydraulic jacks, telehandlers and special tools will be used to maneuver inside the plant building. Equipment on the first floor can be brought in via external platforms with the help of a crane or from the inside in the ground floor with the use of electrical hoists. Equipment on the roof will be installed using the tower cranes or telescopic external mobile cranes. Cooling Towers shall
Q06024-IDCP-PLN-GT-001-REV A - 16 - be assembled by the manufacturer. All Major Equipment shall be started, tested and commissioned by the manufacturers. Piping Works Shop Drawings for piping fabrication and erection will be prepared and utilized in the fabrication shop for preparing spools, ready to be erected. All works shall be carried out in line with above. Piping erection shall commence when building is ready. Fabrication and Erection Pipe fabrication work shall start in the fabrication shop in the designated area on site. An N.D.T. subcontractor will be carrying out the required N.D.T. for C.S. welds as per specifications done in the fabrication shop so that any repairs are carried out before transporting the spools to site.
Prior to fabrication, field checks shall be carried out to ensure that the shop drawings are compatible with the site conditions.
Copies of the shop drawings used by the fabrication crews shall be given to the erection crews. These copies shall show the numbers assigned to the welding joints and shall indicate which joints were already tested in the fabrication shop. This shall enable the site crews to correctly identify and mark the welds performed on site. This shall ensure proper reporting and assist the N.D.T. crews/QC Inspectors to attend and control all the field welds.
The QA/QC officer along with the foreman responsible for the fabrication will ensure that all welds on the drawings are clearly marked to distinguish the fabrication welds from the field welds. A record of every day welds and N.D.T. will kept. Once fabrication, welding of the spools are complete, the spools shall be transported to site for erection. All the spools to be tagged properly prior to transportation to site.
All erection works shall be in accordance with the drawings and specifications.
The fabricated spools shall be transported to their designated area one day ahead of the start of erection to avoid any congestion in the existing facilities. Once the spools belonging to the system are all erected, connected to the rest of erected pipes and checked, the system will be punched out by us to ensure that installation was carried out as per the drawings, field supports are all in position. Once satisfied, all relevant paper work will be submitted to DAR and a request to start hydrostatic testing will be put in.
Q06024-IDCP-PLN-GT-001-REV A
- 17 -
Electrical & Instrumentation Works
Upon design approval and in accordance with material specifications, manufacturer and supplier will be submitted to Client for approval, orders will be placed upon suppliers and weekly status reports will be requested to ensure timely delivery to site. Transformers, switchboards, light fixtures and flood lights will all be installed as per manufacturer’s recommendations. Vendor’s representatives will conduct the commissioning of the switchgears and the transformers. (See Appendix 9 for Electrical Method Statement list). All Electrical Switchgears and MCC’s will be delivered in sections and assembled on site by C.A.T. except for the 3.3 KV Switchgears and Soft Starters which shall be assembled by the Manufacturer/Supplier.
Supervision of installation, checking of Bus Bars jointing, Testing and Commissioning will be performed by the manufacturer.
All Transformers will be delivered and installed on site by C.A.T.
Supervision of installation, Testing and Commissioning will be performed by the manufacturer.
All raceways, cables, lighting, electrical accessories, lo current systems will be delivered and installed on site by C.A.T.
Cable terminations will be made by C.A.T. except for 11 KV cables which shall be made by approved and licensed subcontractor.
Supervision of installation, Testing and Commissioning of Lo Current systems will be performed by the Suppliers.
All electrical cables shall be laid according to the cable schedules and adhering to the following steps:
Prior to cable installation, a cable cutting schedule detailing the cable number, type, size, length, and cable drum number shall be established to avoid and minimize any wastage as much as possible. The said schedules shall be based on the following data:
‐ Actual individual cable length. ‐ Cable length on the drum
‐ Place on installation to minimize double handling
Cable drums shall be transported to their respective site. Actual length of the cable shall be measured on site and a record of each cable number type and length shall be made.
All distribution boards (lighting, small power), Push button Control station, and marshalling box will be connected in accordance with Electrical Installation Specification, attached schedules and
Q06024-IDCP-PLN-GT-001-REV A - 18 - drawings. All lightning and grounding shall be done as per specification and with relevance to the applicable drawings.
Electrical systems will be tested as per relevant test procedures that will be submitted during the course of the project.
Instrumentation and control will be subcontracted to a nominated subcontractor and system integrator. Instrumentation and Control Subcontractor will install all Controls and Instrumentation as per his approved Method Statement. He shall also install and terminate the instrument cables as per C.A.T. Method Statement. Absolutely no pre‐commissioning shall start until the grounding system is completed and tested. Landscape, Roads, Curbstone and Sidewalks Works Once the building is erected and main Equipment installed and the need for large mobile cranes is over, the above work shall start, noting that the final area to be landscaped is subject to QC/UDC approval. 4.4 Construction of the HEX Building & ETS ’s Construction of all Heat Exchangers buildings and ETS’s will be similar to methodology to the once of the plant. Close coordination will be made with other contractors, via DAR, in order to possess sites of HEX’s and to coordinate works for ETS’s. 4.5 Calibration
Qualified technicians will be utilized to carry out the calibration of the instruments. Records documenting the calibration will be kept in our Document Control Department. All instruments used for calibration shall be certified by a Third party. A team shall be assigned to remove the skid‐ mounted instruments and their re‐installation along with the field instruments. Dedicated instrument fitters will be responsible for the installation of the tubing on site under the supervision of the instrument and instrument supervisor. The fitters will proceed with the testing of the tubing after completion the installation.
After complete installation of the tubing, instruments, instrument cables and all required testing, loop checking shall start according to loop sheets previously prepared by the instrument engineer and approved by the Client.
Q06024-IDCP-PLN-GT-001-REV A
- 19 -
4.6 Testing and Pre‐Commissioning
Upon the completion of construction of an individual system, a testing / pre‐commissioning crew shall be assigned to carry out the final inspection before offering the system to the Employer for final inspection. This crew shall be responsible: ‐ Ensuring that the installation was carried out as per the project’s specifications. ‐ Make certain that all the required testing had been carried out successfully. ‐ Confirm that all the related documentation is in order
During the construction phase the QA/QC engineer along with the discipline engineers shall be responsible for maintaining the quality and ensuring that the supervisors are carrying out the installation as per the drawings and specifications. The inspection facilities utilized on this project shall include: ‐ Hydrostatic testing A schedule shall be made and submitted to the client approval. This schedule shall indicate the date and the location in the field of the proposed hydro test. Pipe flushing and cleaning to be included. ‐ Loop Checking
The loop sheets shall be prepared and submitted to the client for approval. A schedule of loop checking shall be made and agreed with the client to avoid any disruptions and ensure the smooth continuity of work. ‐ Testing and inspection procedures Detailed testing and inspection procedures shall be prepared at the beginning of the project. These procedures shall cover all the aspects of the works and be implemented throughout the execution of the project. On every successful test completion, results shall be transcribed onto formats, copies of which shall be submitted to the company for their records. 4.7 Commissioning C.A.T. is considering employing a subcontractor for the Testing and commissioning activities. This subcontractor shall check the design drawings at the design stage. Commissioning will be performed following on approved Method Statement which shall be submitted during the course of the project providing electricity and other services are available. 4.8 Training C.A.T. through its subcontractors and suppliers will provide training services for QC personnel as specified in our proposal. The training program will be set up for managers, supervisors, operators and maintenance personnel.
Q06024-IDCP-PLN-GT-001-REV A
- 20 -
A full program will be developed in detail and in close cooperation with QC. Such a service is considered one of the most important steps for a successful execution of the project including commissioning and maintenance. The foreseen Training Aids are but not limited to: ‐ Training Manual, prepared for this specific purpose. ‐ Operation Manual. ‐ Maintenance Manual. ‐ Safety Manual.
5.
Quality Assurance (QA)
We confirm that all QC requirements and recommendations shall be adhered to and put into application. The QA Plan for IDCP has been issued to meet the Employer and C.A.T. QA system requirements.
6.
Health, Safety and Environment (HSE)
C.A.T. ensures that all construction employees are aware of and adhere to all safety rules and regulations. C.A.T. ensures the promotion of safety, health, and environment protection as a mutual objective for management and employees at all levels, including subcontractors. We will give detailed safety and security instructions to each subcontractor prior to the commencement of work and during the construction period.
We confirm that all QC requirements and recommendations shall be adhered to and put into application. The HSE Plan for IDCP has been issued to meet the Employer and C.A.T. requirements. List of Appendixes: Appendix 1 – PROJECT CHART Appendix 2 – ORGANIZATION CHART Appendix 3 – LONG LEAD ITEMS LIST Appendix 4 – PROJECT KEY MILESTONE Appendix 5 – TEMPORARY FACILITIES Appendix 6 – LIST OF SUBCONTRACTORS Appendix 7 – CIVIL METHOD STATEMENT LIST Appendix 8 – MECHANICAL METHOD STATEMENT LIST Appendix 9 – E & I METHOD STATEMENT LIST Appendix 10 – DESIGN INTENT REPORT
PMC DAR AL HANDASAH CONTRACTOR C.A.T. INTERNATIONAL QATAR W.L.L DESIGN TEAM STANLEY CONSULTANTS INC. EMPLOYER QATAR COOL APPENDIX 1
PROJECT CHART
RELATIONS:FORMAL AUTHORITY / COMMUNICATIONS / REPORTING COORDINATION LIMITED AUTHORITY
E&I Foreman -HEX & ETS
B. Shamshad E. Syaiaozy
E&I Engineer -HEX & ETS
G.Faraj
Engineer - HEX & ETS
R. Ragih
Mech. Foreman -HEX & ETS
A. Farhoud Civil Gen. F/M -HEX G. Kodoor Civil Foreman -HEX Civil Foreman -HEX QA / QC Engineer N. Agtarap QA / QC Inspector - HEX A. Kumaraswamy QA / QC Inspector - HEX B. Mahendran Ass. Safety Engineer - HEX &
ETS
Safety Inspector -HEX & ETS
A. Mohd Mech. services Eng. Y. Hamdani M. Wehbeh Bldg. Mech. Foreman Bldg. Mech. Foreman A. El-Khoury Piping Eng. D. Hanna E. Engalia Piping Foreman A. Kirubana J. Olvida R. Mantilla S.ST.F/M B. Sayyah Instrument Eng. A.A Hajjar E&I Supervisor F. Nassar E&I Foreman J. Espadelia S. Paniker S. Nassar J. Tiakarajan Cons. Mang. Mech. Z.Nazzal Deputy PM -Cons. Mngr M,E&I P. Natrajan Civil Foreman -B. Fetiluna Civil Foreman -Civil Engineer K. Wehbe Cons. Mngr. Civil N. Saba S/C NDT Ins/Pain Civil Gen. F/M N. Bou Daher N. Reghupathy R. Babu Proc.Coordintor A. Pacedio (**) Local Purch. I.A. Kadir Sr. Eng. Coord. F. Takieddine (**) Engineering S/C M/S Stanley Shop Drawing S/C M/S DEP QA/QC Eng. D. Mankikis (*)
QA/QC Insp. Civil
A. Perona S. George M. Kumar QA/QC Insp. Mech. R. Marquez A. Mejorada J. Obaob
QA/QC Insp. E&I.
F. Medina U. Maheshwaran V. Chinnasamy Sr. Safety Eng. R. Seyouri Safety Supervisor G. Felix Safety Off. A. Tiro J. Page G. Saliba Scaff. F/M Scaff. F/M Ass. Str. Keeper T. Botros Store Keeper Time Keeper A. Majeed A. Jackson M. Ahmed S. Riyas Wages Clerk A. Kannan K. Lal C. Imp. Holder J. Kantinal M. Samuel Accountant A. Sarkis Ins. Off. G. Tabet Office Boy A. Devasia A. Khan S. Selvaraj Sec / Typist J. Mathew V. M. Nair A. Prasadan S. Ali Transp. Off P. Bala. PR/Passport R. Koshy S. Moolya Admin. Mngr. M. Saadeh Campboss N. Asaad Watchman Watchman Project Manager Nazih Ghazi Cost Eng / Plann Eng C. Ashkouti D. Dahwan Contract Eng. F. Bustani QS G. Gobatan Project Coord. Mohan M.G. Sr. Planning Eng. N.A. Nahed Sr. ELEC. Eng. R. Prasad Equip. Eng. H. Rahhal P. Sarudar Equip. Foreman R. Prabhu E. E. Elrizz G. Vijayaku Fabr. F/M A. Atem S/ Contractors ELEC. Eng. N. Faysal AREA PROC. UNIT C.A.T. H.O C.O.O M. El Hajjar Surveyor Z. Daher
Ass. Eng. - HEX & ETS
G. Bitar
T&C - Mech. Eng.
H. Jumao A. Basak
T&C - Elec. Eng.
Subramanian K. T&C Sub Contractors Doc. Control D. Ramos Deepak E.P. Expedition / IT Admin R. Geryes Acc. Clerk J. Khan CAD Operator T. Thomas Weld. F/M W.A. Rish
(*) QA/QC Engineer has the full right to Contact the Area Manager and the Group QA/QC Manager in case he feels a non cooperation om site or he sees a matter that reflects on the Group's global QA/QC system
(**) The Sr. Eng. Coordinator & The Procurement Coordinator communicate & interact directly with the Area Procurement office for Design/Procurement related matters. Qatar Area Manager M. Matar Qatar Cool N.El- Saadi PMC - DAR K. Salman Civil Engineer -HEX Bldgs E. Harb Inst & Cntrl S/C M/S CIMAC Civil Gen. F/M J. Chalitta Civil F/M N. Maccagerr J. Lukose T. Ahmad Excavation Dewatering Concrete Precast S/C Tes./Bal.
HEX BLDGS & ETS's
APPENDIX 2 ORGANIZATION CHART
APPENDIX 3
LONG LEAD ITEMS LIST
Item Description Manufactures/Supplier Name
1. HV/MV Switchgears Siemens/ABB/Schneider/ Transformers & Starters Ben Shaw or Approved Equal 2. Chillers Trane/York or Approved Equal 3. Cooling Towers Hamon/BAC or Approved Equal
4. Pumps Goulds/Weir/Flowserve or Approved Equal 5. Heat Exchangers Alfa Laval or Approved Equal
APPENDIX 6
LIST OF SUB CONTRACTORS
C.A.T. International Qatar W.L.L proposes to subcontract parts of the works and to
supply principal items of the plants as follows:
Work Description
SubContractor Address
1. Site Investigation
ACTS
P.O.Box 22159, Doha, Qatar
2. Excavation & Backfilling
ACI
P.O.Box 20040, Doha, Qatar
3. Dewatering
United Equipment
P.O.Box 5673, Doha, Qatar
4. Water Proofing
BMC Qatar
P.O. Box 24407, Doha, Qatar
5. Concrete Works Somac Group P.O. Box 7098, Doha, Qatar
6. Pre Cast Concrete Slabs
United
Precast
Doha,
Qatar
7. Doors,
Windows,&
Louvres
8. False Ceiling
9. Raised
Flooring
10. Painting
Hempel/Jotun
Doha, Qatar
11. Elevator
12. Roads & Pavement
13. NDT
Qatar Inspection Services
Doha, Qatar
14. Controls & SCADA
Cimac Or Approved Equal
Dubai, U.A.E
N
ote: the above names are only for reference. Other Subcontractors will
be submitted as applicable. Selection will be based on Compliance to
specifications and Milestones
Reference No
1 Preconstruction Survey Q06024-IDCP-MOS-CI-001
2 Excavation & Backfilling Q06024-IDCP-MOS-CI-002
3 Reinforcement Q06024-IDCP-MOS-CI-003
4 Concrete Receiving, Testing, Placing & Curing Q06024-IDCP-MOS-CI-004
5 Sub-Structure Waterproofing Q06024-IDCP-MOS-CI-005
6 Major Concrete Placement for Area (3) Raft Foundation Q06024-IDCP-MOS-CI-006
7 Erection of Pre-Stressed Beams & Hollow Core Slabs Q06024-IDCP-MOS-CI-007
APPENDIX 7
Structural / Civil
Reference No
1 Rigging ,installation and pipe connection of chillers Q06024-IDCP-MOS-ME-001
2 Rigging , erection and pipe connection of cooling towers Q06024-IDCP-MOS-ME-002
3 Rigging , installation and pipe connection of chilled water pumps Q06024-IDCP-MOS-ME-003
4 Rigging , installation and connection of condenser water vertical turbine pumps Q06024-IDCP-MOS-ME-004
5 Rigging ,installation and connection of plate heat exchangers Q06024-IDCP-MOS-ME-005
6 Installation and connection of tertiary pumps Q06024-IDCP-MOS-ME-006
7 Rigging , installation and connection of expansion tanks Q06024-IDCP-MOS-ME-007
8 Installation and connection of pressurization units Q06024-IDCP-MOS-ME-008
9 Installation and connection of in line centrifugal solid separators on first floor Q06024-IDCP-MOS-ME-009
10 Installation and connection of refrigerant silencers on roof Q06024-IDCP-MOS-ME-010
11 Installation of condenser tube cleaning system including 4 way valves Q06024-IDCP-MOS-ME-011
Reference No
12 Installation of sluice gate valves in cooling tower basins Q06024-IDCP-MOS-ME-012
13 Installation of process valves Q06024-IDCP-MOS-ME-013
Reference No
14 Rigging , installation and pipe connection of RO system Q06024-IDCP-MOS-ME-014
15 Installation and connection of transfer pumps Q06024-IDCP-MOS-ME-015
Reference No
16 Installation of inserts (pipe connections) in concrete tanks and cooling tower
basins Q06024-IDCP-MOS-ME-016
17 Installation of Overhead cranes Q06024-IDCP-MOS-ME-017
18 Tagging and labelling of pipe,duct and equipment Q06024-IDCP-MOS-ME-018
19 Installation of Antivortex fittings in concrete tanks Q06024-IDCP-MOS-ME-019
20 Pipe handling and storage Q06024-IDCP-MOS-ME-020
21 Installation of process ,HVAC and domestic water pipes Q06024-IDCP-MOS-ME-021
22 Insulation of Process , HVAC and domestic water pipes Q06024-IDCP-MOS-ME-022
23 Jacketing of pipes Q06024-IDCP-MOS-ME-023
24 Fabrication and installation of pipe supports Q06024-IDCP-MOS-ME-024
25 Painting of pipes and supports Q06024-IDCP-MOS-ME-025
26 Hydrotesting of pipes Q06024-IDCP-MOS-ME-026
27 Installation and connection of diesel tanks Q06024-IDCP-MOS-ME-027
28 Introducing new equipment into the system at different stages Q06024-IDCP-MOS-ME-028
Reference No
29 SMAW Welding Q06024-IDCP-MOS-ME-029
30 Installation and soldering of copper pipes Q06024-IDCP-MOS-ME-030
Reference No
1 Installation and pipe connection of electric water heaters ( admin part ) Q06024-IDCP-MOS-PL-001
2 Installation of cast iron storm water and drainage pipes . Q06024-IDCP-MOS-PL-002
3 Installation of frames for drainge gratings and manhole covers Q06024-IDCP-MOS-PL-003
4 Installation of floor drains , roof drains and flower bed drains Q06024-IDCP-MOS-PL-004
5 Installation of sanitary fixtures , toilet mixers and accessories ( admin part ) Q06024-IDCP-MOS-PL-005
6 Installation of oil interceptors Q06024-IDCP-MOS-PL-006
7 Installation and pipe connection of submersible pumps in basement Q06024-IDCP-MOS-PL-007
APPENDIX 8
ME Equipment
MECHANICAL METHOD STATEMENT LIST
Valves
RO System
Common to all Systems
Welding and Soldering
Reference No
1 Rigging , Installation and connection of fire pump room equipment and
components Q06024-IDCP-MOS-FP-001
2 Installation of preaction ,deluge , alarm zone valves and siamese connections Q06024-IDCP-MOS-FP-002
3 Installation of fire hose cabinets Q06024-IDCP-MOS-FP-003
4 Installation of fire fighting grooved pipes and fittings ( vertical and horizontal ) Q06024-IDCP-MOS-FP-004
5 Installation of diesel pump exhaust with supports up to roof Q06024-IDCP-MOS-FP-005
6 Installation of FM-200 fire fighting system Q06024-IDCP-MOS-FP-006
Reference No
1 Installation of chemical treatment systems Q06024-IDCP-MOS-WTR-001
2 Chemical cleaning of pipes Q06024-IDCP-MOS-WTR-002
Reference No
1 Rigging , installation and pipe connection of Air handling units Q06024-IDCP-MOS-AC-001
2 Installation and pipe connection of fan coil units Q06024-IDCP-MOS-AC-002
3 Installation and duct connection of fresh and exhaust fans Q06024-IDCP-MOS-AC-003
4 Galvanised duct and accessories fabrication and installation Q06024-IDCP-MOS-AC-004
5 Internal and external Insulation of galvanised sheet metal duct Q06024-IDCP-MOS-AC-005
6 Jacketing of galvanised sheet metal duct Q06024-IDCP-MOS-AC-006
7 Installation of grilles , diffusers , louvers ,dampers sand trap louvers Q06024-IDCP-MOS-AC-007
Fire Fighting Systems
Chemical Treatment
Reference No
1 11KV Switchgear Q06024-IDCP-MOS-EL-001
2 3.3KV MCC & Soft Starter Q06024-IDCP-MOS-EL-002
3 415V MCC & VFD Q06024-IDCP-MOS-EL-003
4 11KV/3.3KV Transformer Q06024-IDCP-MOS-EL-004
5 11KV/415V Transformer Q06024-IDCP-MOS-EL-005
6 Emergency Generator Q06024-IDCP-MOS-EL-006
7 Battery Charger & UPS Q06024-IDCP-MOS-EL-007
8 Panel Board & Junction box Q06024-IDCP-MOS-EL-008
9 Earthing System Q06024-IDCP-MOS-EL-009
10 Lightning Protection System Q06024-IDCP-MOS-EL-010
11 Wiring Accessories & Small Power Devices Q06024-IDCP-MOS-EL-011
12 Interior / Exterior & Emergency Lighting Q06024-IDCP-MOS-EL-012
13 Wires & Cables Q06024-IDCP-MOS-EL-013
14 Cable Terminations Q06024-IDCP-MOS-EL-014
15 Raceways Q06024-IDCP-MOS-EL-015
Reference No
1 Voice & Data System Q06024-IDCP-MOS-LC-001
2 Security Access Control System Q06024-IDCP-MOS-LC-002
3 CCTV System Q06024-IDCP-MOS-LC-003
4 Fire Alarm System Q06024-IDCP-MOS-LC-004
Reference No
1 Instuments Q06024-IDCP-MOS-IC-001
2 PLC / SCADA System Q06024-IDCP-MOS-IC-002
APPENDIX 9
A- HV & MV ELECTRICAL SYSTEM
B- LOW CURRENT SYSTEMS
C- INSTRUMENTATION
Integrated District Cooling Plant at The Pearl, Qatar
Design Intent Report
-Conceptual Design Edition
Project Number: Q06024 - IDCP
FINAL REPORT
September 2006
C.A.T. Qatar International W.L.L.
Doha, Qatar
Q06024-IDCP-RPT-GT-001-REV 3
Integrated District Cooling Plant
at The Pearl, Qatar
Q06024-IDCP-RPT-GT-001-REV 3
Design Intent Report
C.A.T. Qatar International W.L.L.
Doha, Qatar
Conceptual Design Edition
Q06024-IDCP-RPT-CI-001-REV 3 i Stanley Consultants
Table of Contents
Section 1 - Project Description ...1-1 Section 2 - Civil Engineering and Landscaping Design Statement ...2-1 General...2-1 Compliance Statement ...2-1 Traffic Control ...2-2 Paving ...2-2 Drainage...2-2 Landscaping ...2-2 Section 3 - Architectural Design Statement ...3-1 General...3-1 Compliance Statement ...3-1 Building Exterior ...3-1 Accessibility and Maintenance ...3-2 Containment Requirements...3-2 Building Interior ...3-3 Occupancy ...3-3 Section 4 - Structural Design Statement ...4-1 General...4-1 Compliance Statement ...4-1 Design Criteria ...4-1 Codes and Standards ...4-1 Design Loads ...4-2 Material Properties...4-3 Concrete Design...4-3 Structural Steel Design ...4-3 Material ...4-3 Structural System ...4-4
Q06024-IDCP-RPT-CI-001-REV 3 ii Stanley Consultants
Section 5 - Mechanical Design Statement ...5-1 General...5-1 Compliance Statement ...5-1 Chilled Water Plant Process...5-3 Codes and Standards ...5-3 General...5-4 Chillers...5-4 Cooling Towers...5-6 Chilled Water Pumping Scheme ...5-8 Condenser Water Pumping Scheme...5-8 Piping System ...5-9 Chemical Treatment System ...5-9 Miscellaneous ...5-10 Reverse Osmosis (R.O.) System ...5-10 Energy Transfer Stations...5-11 Heating, Ventilating, and Air-Conditioning ...5-11 Standards and Codes ...5-11 Outdoor Design Conditions ...5-12 Indoor Design Conditions ...5-12 Minimum Ventilation Requirements ...5-12 System Description ...5-13 Plumbing ...5-13 Codes and Standards ...5-13 Water Supply Network ...5-14 Waste Water Drainage ...5-15 Waste Water Drainage ...5-15 Compressed Air ...5-16 Standards and Codes ...5-16 Service Air ...5-16 Fire Suppression System...5-16 Codes and Standards ...5-16 Fire Suppression System...5-16 Section 6 - Electrical Design Statement...6-1 General...6-1 Compliance Statement ...6-1 Extra Low Voltage...6-2 Applicable Codes and Standards and Basic Design Criteria ...6-2 Ambient Conditions ...6-3 Electrical Power Distribution...6-3 Overall System Description ...6-3 Emergency Engine Generators ...6-4 415/240-Volt Distribution Network...6-4 Uninterruptible power Supply UPS ...6-4 Lighting and Emergency Lighting ...6-4 Boards ...6-5 Circuit Breakers, Residual Current Interrupters, Contactors and Disconnect Switches ...6-5 Cables and Wires ...6-6 Raceways ...6-6 Earthing Network...6-6 Lightning Protection ...6-7
Q06024-IDCP-RPT-CI-001-REV 3 iii Stanley Consultants
Extra Low Voltage...6-7 Fire Alarm System ...6-7 Voice and Data System ...6-8 Q-Tel GSM Station ...6-8 Closed Circuit Television System (CCTV) ...6-8 Access Control and Door Status System...6-9 Section 7 - Control System Design Statement ...7-1 General...7-1 Compliance Statement ...7-1 Control Philosophy ...7-2 Chilled Water System ...7-5 Cooling Towers...7-6 Make-Up Water System...7-6 Blowdown System ...7-6 Electrical System ...7-6 Instrumentation ...7-6 Field Instruments ...7-6 Section 8 - Utility Services Design Statement ...8-1 General...8-1 Compliance Statement ...8-1 Chilled Water ...8-1 Codes and Standards ...8-1 System Description ...8-2 Potable Water...8-2 Codes and Standards ...8-2 System Description ...8-2 Sanitary Sewer ...8-2 Codes and Standards ...8-2 System Description ...8-2 Storm Sewer...8-2 Codes and Standards ...8-2 System Description ...8-3 Section 9 - Maintenance and Accessibility ...9-1 General...9-1 Compliance Statement ...9-1 Maintenance and Accessibility ...9-1