(1)

Doha Beirut Cairo London

E

E

NGNGIINNEEEERRIINNGG

,

,

P

P

ROROCCUURREEMMEENNTT

,

,

C

C

OONNSSTTRRUUCCTTIIOONN

,

,

T

T

UURRNNKKEEYY C COONNTTRRAACCTT FFOORR TTHEHE IINNTTEEGGRRAATTEDED DDIISSTTRRIICCTT CCOOOOLLIINNGG PPLLAANNTT AATT TTHHEE PPEEAARRLL PPRROOJJEECCTT D DOOHHAA

-

-

QQAATTAARR

P

ROJECT

E

XECUTION

P

LAN

Q06024-IDCP-PLN-GT-001-REV A

(2)

Q06024-IDCP-PLN-GT-001-REV A - 2 -

INDEX 

PAGE 

Preface scope of works 

 

1. Execution statement 

2. Interpretations and Abbreviations  

3. Project Execution Plan 

      3.1 C.A.T. Approach Plan 

      3.2 Long Lead Items Procurement  

      3.3 Bulk Material Procurement 

      3.4 Construction Activities 

      3.4.1. Temporary Facilities  

      3.4.2. Organization Chart 

10 

      3.4.3. Subcontractors  

10 

      3.4.4. Field Coordination  Procedures 

10 

      3.4.5. Detailed Construction Schedule 

10 

4. Detailed Construction Schedule 

11 

       4.1. Data Collection 

11 

       4.2. Engineering and  Design  

11 

       4.3. Construction of the Cooling Plant 

12 

       4.4. Construction of HEX Buildings and ETS’s 

18 

       4.5. Calibration   

18 

       4.6. Testing and Pre‐commissioning 

19 

       4.7. Commissioning  

19 

       4.8. Training 

19 

5. Quality Assurance (QA) 

20 

6. Health ,Safety and Environment (HSE) 

20 

Appendix 1‐ PROJECT CHART 

 

Appendix 2‐ ORGANIZATION CHART 

 

Appendix 3‐ LONG LEAD ITEMS LIST 

 

Appendix 4‐ PROJECT KEY MILESTONES 

 

Appendix 5‐ TEMPORARY FACILITIES 

 

Appendix 6‐ LIST OF SUB‐CONTRACTORS 

 

Appendix 7‐ CIVIL METHOD STATEMENT LIST 

 

Appendix 8‐ MECHANICAL METHOD STATEMENT LIST 

 

Appendix 9‐ E & I METHOD STATEMENT LIST 

 

Appendix 10‐ DESIGN INTENT REPORT 

 

 

 

(3)

Q06024-IDCP-PLN-GT-001-REV A - 3 -

 

 

1. Execution statement 

  For proper execution and timely completion of the project, we are planning to follow our proposed  project execution plan, which is in line and conforms to the target scope of work and completion  dates as stipulated in the contract documents.     

2. Interpretations and Abbreviations 

  In the project execution plan, the following words and expressions shall have the meaning hereby  assigned to them, except if other specified or where the context other wise requires:    EMPLOYER (or Client, Owner, Company) means QATAR COOL ‐ QC will be commonly used  instead of QATAR COOL.  PMC means DAR AL‐HANDASAH – DAR will be commonly used instead of DAR AL‐ HANDASAH.  CONTRACTOR means C.A.T. INTERNATIONAL QATAR W.L.L – C.A.T. will be commonly used  instead of C.A.T. INTERNATIONAL QATAR W.L.L.  DESIGN TEAM means STANLEY Engineering ‐ SCI will be commonly used instead of STANLEY  Engineering.     

3. Project Execution Plan 

    3.1. C.A.T. Approach    The implementation of this project Execution Plan that complies with Q.C requirements will be the  main objective of C.A.T.    C.A.T. will be working with EMPLOYER (QC) personnel and PMC (DAR) personnel, and Design  Team (SCI) personnel to ensure that this principal objective is accomplished. Our experience on  similar projects has seasoned our personnel to complete any and all services required with optimum  performance results.    The C.A.T. Projects Team and senior management are committed to providing a project that meets  EMPLOYER’s objectives as well as our own principal objectives.  We take pride in our work and are  confident these will be accomplished.  The principle objectives that the C.A.T. management expects  to be met are as follows:    − Meet all critical milestones and complete the Project on schedule 

(4)

Q06024-IDCP-PLN-GT-001-REV A - 4 - − Maintain project costs within budget  − Meet technical performance objectives  − Obtain total satisfaction from EMPLOYER  The proposed Project Chart (see Appendix 1) has been developed to achieve the above mentioned  expectations.    The successful management of the project requires good communications between the engineering  team  and  construction  team,  comprehensive  management  information  systems  and  a  competent,  well‐directed project team. 

 

Directly  upon  award,  a  qualified  management  and  supervisory  Project  Team  was  appointed  to  prepare a detailed study of the project requirements as far as engineering, materials, equipment and  labor  force  required  (see  Appendix  2,  Contractor  Organization  Chart).    This  group  of  dedicated  project personnel began identifying the priorities to be completed in the early stages of the project  and planned for the initial “kick‐off” meeting that was held in QC offices.  This initial meeting was  important in establishing a strong team relationship with the QC, DAR & SCI.     After award of the contract, the management personnel from areas began mobilizing to fulfill the  staffing needed for the project .This staff started with SCI verifying the available design.    Based on the concept design, procurement of the LLI Long lead items (see list in Appendix 3)  started as per the procurement procedures. The project key mile stones (see Appendix 4) were to be  confirmed as per the suppliers & project progress.    SCI started with the concept design, aiming to submit the same to QC & DAR for clearance and to  go ahead with the detailed design.                                   

(5)

Q06024-IDCP-PLN-GT-001-REV A - 5 -   3.2. Long Lead Items Procurement    FLOW OF PROCUREMENT ACTIVITIES    Data Input

Requisition Commercial Terms Composite

Vendor List

Project

Vendor List Inquiry Concept Design

Procurement Policy and Procedures

Material Status Report

Traffic

Operations Arrival at Site Expediting and Shop Inspection Purchase Order Award Negotiation with Vendor Client Approval Bid Analysis and Tabulation Technical / Commercial

(6)

Q06024-IDCP-PLN-GT-001-REV A - 6 - The requisition of LLI is critical and will be developed on a rush basis, immediately after contract  award and approval of concept design. Owning to the critical milestones requirements, it is  essential that acceleration “premiums” for specific equipment and materials to be developed and  reflected     C.A.T.’s flow procurement activities, as shown above, include the following polices:         ‐   A well‐screened project vendor list with a preference for QC recommended vendors will be  prepared , reflecting C.A.T. recent procurement experience; due consideration is given not only to  technical capabilities , commercial competitiveness and offered guarantee conditions, but also to  delivery performance.         ‐ Purchase order placement will be based on quotation development except where source or  lead time constraints dictate otherwise.         ‐ Fast‐ tracking procedures are established to facilitate early procurement of long lead time  items; closely‐knit inter facing among QC, DAR, C.A.T. and SCI is expected and will be  implemented.          ‐ Rigorous expediting and frequent tracking of materials status will be performed in the  realization that any delay from the Construction Required Dates (CRD) of materials arrival on the  site will endanger meeting of the contractual project completion date.        ‐ An efficient field materials control system will be established and through indoctrination on  warehousing   operation will be carried out.    LLI procurement will be done as per our C.A.T. standard procurement procedure, in order to  comply with the employer specified policies. 3rd Party Validation (if required) for LLI procedure  will be performed as and when required.     As part of procurement activity C.A.T. & SCI will carry out a technical evaluation for each item  starting with technical clarification  and finalizing with a Technical Evaluation  Report C.A.T. & SCI  will carry out also a review of vendors drawings / documentation as part of the above mentioned  procurement activity.  

The  technical  bid  evaluation  will  be  undertaken  by  each  engineering  discipline.  The  technical  bid  evaluation is used to summarize the technical aspects of bids received for a specific requisition, in  order  that  the  bids  may  be  compared  and  evaluated.  Proposals  (bids)  are  forwarded  to  the  SCI  Engineers and CAT Construction Managers for evaluation. 

 

A  thorough  review  of  technical  data  will  be  made  to  determine  whether  bids  conform  to  the  specified  technical  requirements.  Any  deviations  or  inadequate  information  is  identified  at  that  time. In addition, C.A.T & SCI coordinate any other reviews applicable to the particular evaluation  (construction impacts, technical specialist review, etc.) and incorporate the results of these reviews  on the technical bid evaluation. 

 

The technical bid evaluation is then reviewed and approved by the Project Manager. At this point,  C.A.T.  area  procurement  department  shall  evaluate  the  bids  based  on  project  requirements  and 

(7)

Q06024-IDCP-PLN-GT-001-REV A

- 7 -

commercial  issues.  Compliance  with  project  requirements  will  be  imposed  on  the  vendor  for  all  aspects of his equipment. 

 

Once a bid is determined to be technically acceptable and commercially optimal, C.A.T. will send its  recommendation  to  DAR  for  approval.  C.A.T.  will  award  purchase  orders  only  upon  obtaining  QC/DAR approvals. 

 

Upon  receiving  Company’s  vendor  approvals,  C.A.T.  will  issue  purchase  orders  to  the  selected  vendors.  All  purchase  orders  are  monitored.  Suppliers  will  submit  monthly  progress  reports  to  track the equipment status. Similarly, the shop drawings/production and delivery schedule report  will depict, in details, the status of vendor drawings, data, factory acceptance tests and inspections,  other relevant documents as requested. 

 

All  LLI  will  be  received  on  site.  All  LLI  will  be  checked  upon  receipt  for  quality,  quantity,  conformance  with  specifications,  damage  and  tag  or  identification  number,  and  entered  on  stock  cards. 

A receipt report and,  if applicable, an overage, shortage or damage report will be prepared. Issue  will  be  made  on  a  materials  requisition  form  signed  by  a  signatory  from  a  limited  list  of  persons  authorized by the project manager.      The project procurement officer will oversee all locally supplied material. Receiving, warehousing,  reporting and materiel issued for construction activities shall follow C.A.T. QA/QC procedures.     Imported items will be received by purchase order number/tag number if appropriate, and checked  for  quantity  and  evidence  of  any  shipment  damage.  Contractor  will  establish  a  construction  warehouse system, which include covered and open storage to control the material until it is needed  for  construction.  The  Construction  Manager  will  be  responsible  for  issuing  material  transfer  authorizations to release materials to the various Construction Superintendents. 

 

The Procurement Officer will be responsible for providing marking and tagging instructions on all  purchase  orders.  This  effort  will  provide  means  in  the  identification  of  all  materials  received  and  establish traceability as required. 

 

As project LLI are received, a report of materials received will be transmitted to update the records  and  generate  reports  for  construction  management  and  QC  use.  Material  inventories  will  be  adjusted  as contractor  issues materials  and  equipment for  construction  through  standard  material  transfer document. 

 

The procurement team will interface with the quality control function to ensure that materials and  equipment are acquired without disrupting the design and construction schedules. Given the high  coordination demands of this function, the Project Procurement Officer will serve as a key facilitator  between  the  various  elements  of  timely  procurement.  He  will  track  the  progress  of  materials  and 

(8)

Q06024-IDCP-PLN-GT-001-REV A

- 8 -

equipment  through  delivery  to  the  work  site,  providing  a  centralized  point  of  information  for  all  project management. 

 

The  project  quality  and  project  controls  functions  will  supplement  the  procurement  effort  in  support  roles.  Inherently  linked  by  their  common  goals  of  vendor  quality  and  schedule  impact,  these two functions will closely interface with Procurement throughout the life of the project. 

 

The  quality  control  function  monitors  the  procurement  function  with  each  of  its  supporting  positions.  Working  to  ensure  quality  from  both  its  subcontractors  and  vendors,  this  function  assumes  the  role  of  quality  assurance  for  its  vendors  and  quality  control  for  the  entire  project  through continued analysis of our efforts as well as our vendors and subcontractors. 

 

Where  discrepancies  are  observed,  non‐conformance  reports  will  be  prepared  and  submitted.  Provision has been made for FAT tested and witnessed by QC and C.A.T. 

 

The  QA/QC  Manager  will  verify  the  technical  viability  of  potential  vendors  and  subcontractors.  Through a documented process and inspection, this coordinator will research the above criteria as  well as the quality systems of potential suppliers. 

 

The  project  Planning  Engineer  will  predominantly  assist  in  the  scheduling  and  document  control  activities.  Working  with  the  Expediter  on  the  area  Procurement  Department,  the  project  Planning  Engineer  will  develop  procurement  schedules,  linking  the  relationship  between  procurement  of  specific equipment and materials with critical design and construction activities. 

 

The  Document  Controller  will  maintain  the  officials  vendor  data  control  register,  updating  and  tracking  all  vendor data  processed  for  review/approval. The  Document  Controller  will  coordinate  vendor  communications,  receiving  and  returning  marked‐up  and/or  approved  drawings  or  other  vendor  data.  This  data  will  include,  but  is  not  limited  to,  design  calculations,  parts  lists,  special  tools, spare parts recommended by the vendor and various sub‐vendor documents. 

 

Vendor  data  submissions  will  include  drawings,  spare  parts  data  packages,  operating  and  maintenance  manuals/instructions,  procedures,  and  other  pertinent  data  needed  to  support  the  equipment or material being purchased. 

 

On  arrival  of  products  to  storage  area,  the  storekeeper  with  the  help  of  relative  department  (Mechanical,  Electrical,  etc)  or  his  designate  shall  start  unloading,  checking  against  the  purchase  order  or  the  loading  note  and  labeling  each  item  with  its  correct  description,  tally  sheet  number,  stock number, drawing number, and store it in its proper place as advised by the specifications.  Upon  receipt  of  equipment,  each  delivery  shall  be  checked  for  quantity  and  quality,  shortages  visible  or  concealed  damages.  Should  there  be  any  damages,  shortages,  etc  then  the  Site  Management  shall  be  informed  according  to  applicable  procedure.  The  material  received  shall  be  recorded on stock records as per the applicable procedure. 

(9)

Q06024-IDCP-PLN-GT-001-REV A

- 9 -

To  avoid  double  handling  and only  in the  event  that  it  suits,  lifts  will  be  initially  programmed  to  arrive  to  site  after  their  prospective  foundations  are  ready.  The  QA/QC  Department  and  the  storekeeper  shall  ensure  that  the  handling  of  products  is  according  to  vendor  specifications,  contractual  documents,  safety  standards  and  project  requirements.  Similarly,  he  shall  ensure  that  concerned  people  are  properly  and  currently  informed  of  material  received  or  to  be  received.  All  concerned employed in material handling shall be well conversant with various projects and have  had previous experience dealing with construction permanent material. Special considerations shall  be applied to materials and components that should not have unnecessary handling due to weight,  or configuration.    3.3. Bulk Material Procurement   

The  materials  procurement,  other  than LLI,  will be  done  as per  the  same  described  procedure  for  LLI. 

 

3.4. Construction Activities   

Soon  after  N.T.C.  a  construction  group  was  organized  within  the  Project  Team.  Based  on  the  construction strategy established and project requirements identified during the bidding stage, this  group  will  develop  the  Construction  Plan,  keeping  in  close  contact  with  the  engineering  and  procurement groups. The Construction Plan will be continually revised and updated as required to  reflect the latest information affecting construction operations and will cover the following areas:    ‐ 3.4.1.  Temporary Facilities  ‐ 3.4.2.   Organization Charts  ‐ 3.4.3.   Subcontractors  ‐ 3.4.4.   Field Coordination Procedures  ‐ 3.4.5.   Detailed Construction Schedule    3.4.1. Temporary Facilities    Temporary facilities (see Appendix 5) shall be erected in close proximity to the works, after securing  M/S UDC’s & DAR’s approval to the layout and locations of site offices, stores, workshops, etc... Site  Plot Plan and offices Areas shall be fenced in accordance with the Construction Regulations.  

We  shall  accommodate  our  personnel  in  existing  camp  in  Rayyan  &  Shahaniyah  Areas.  Proper  transport shall be provided to ensure the transfer of employees from and to site in comfortable and  suitable conditions .Staff will be accommodated in furnished apartments. 

   

QC  &  DAR  requirements  for  Temporary  Facilities  shall  be  completed  in  accordance  with  the  supplemental terms and specifications. Safety and Environmental Protection shall be maintained by  our Safety department as per Requirements and as per CAT Safety Manual. 

(10)

Q06024-IDCP-PLN-GT-001-REV A - 10 - Our HSE Department personnel are as well familiar with the handling and securing passes from the  local authorities and UDC; immediately, the process of securing passes to all personnel entering the  zone shall proceed to guarantee that such passes will be available on time.    3.4.2. Organization Charts    The Project Chart (see Appendix 1) and the Contractor Chart (see Appendix 2) have been structured  to  effectively  and  economically  achieve  the  project  construction  objectives.  The  proposed  organization addresses all the project trade requirements as far as management and supervision. It  is designed in a way to provide QC & DAR with a comprehensive and homogeneous team effective  in  the  execution  of  this  type  of  works  and  meeting  the  project  milestones.  Staff  C.V’s,  from  Supervisor level and above, shall be submitted to QC & DAR for prior approval.    3.4.3. Subcontractors    The subcontractors (see Appendix 6. List of Subcontractors) shall cover specific areas and shall be  specialized for their expertise area. Prior approval will be obtained from DAR before subcontracting  the work. The Project Manager, Construction Managers, Project Engineers, Discipline Engineers, QC  and Safety Engineer shall control the Subcontractor’s field of activities.    3.4.4. Field Coordination Procedures   

Field  control  will  be  broken  down  into  the  following  areas,  with  management  coordinating  the  separate efforts into an effective and efficient field organization:    ‐Manpower Control    ‐Safety and Security Control    ‐Warehousing and Materials Management Plan    ‐Construction Equipment Control    ‐Field Changes Control    ‐Document Control    3.4.5. Detailed Construction Schedule     The detailed Construction Schedule is covering:    ‐Data Collection     ‐Engineering and Design     ‐Construction of Cooling Plant      ‐Construction of HEX buildings and ETS’s    ‐Calibration     ‐Testing and Pre‐commissioning     ‐Commissioning    ‐Training     ‐Warranty Period 

(11)

Q06024-IDCP-PLN-GT-001-REV A - 11 -   The construction schedule is detailed in next chapter.     

4.

Detailed  Construction Schedule 

  4.1 Data Collection    C.A.T. & SCI will prepare the checklists to identify the information needed and the information to  be obtained from DAR and other parties. The data collection activities embrace each of the various  disciplines and will be structured to meet the needs for the design.    Critical to the schedule for this project is the data site survey that will be undertaken by C.A.T. at  the start of the project.    4.2. Engineering and Design    SCI will review the project requirements with QC, DAR & C.A.T. to confirm and obtain all required  data pertaining to the project deliverables. During the meetings, the main equipments and systems  will  be  finalized.  Data,  such  as  production  rates,  physical  properties  of  the  products  and  other  relevant data will be reviewed and agreed.    SCI will develop the concept design, pass it to CAT for double checking and reviewing it, and verify  it with QC/DAR prior to developing the design. A Design Intent Report will be issued, (Appendix  no. 10).   

Based  on  the  verified  design,  the  procurement  of  the  LLI‐Long  Lead  Items  will  start  as  per  the  procurement procedures already described. The exact sequence of activities during the engineering  and  design  phase  will  be  dependent  on  the  schedule  requirements  for  construction  and  consequently  the  manufacturing  and  shipping  times  for  procurement.  Thus,  some  activities  may  need to start earlier based on the information provided by QC in the stage prior to award. 

 

SCI  will  perform  detailed  design  ensuring  that  all  process  related  activities  defined  in  the  project  requirements  will  be  undertaken  in  accordance  with  international  and  QC  standards  and  codes.  SCI’s experience of similar projects will enable a recognized and effective design. Once the detailed  design  is  substantially  completed  and  approved,  the  mechanical,  instrumentation  and  electrical  designs  will  commence  and  the  finalized  specifications  and  requisitions  completed.  Following  QC/DAR approval, the material and equipment will be tendered and purchased. 

 

Using the data obtained during the surveys and the finalized process drawings, the plot plans and  layout drawings will be developed for DAR approval. 

(12)

Q06024-IDCP-PLN-GT-001-REV A

- 12 -

The  piping  drawings  and  specifications  will  commence,  based  upon  the  approved  plot  plan  and  layout  drawings.  These  will  be  completed  once  finalized  vendor  data  is  received  and  approved.  Where  applicable  SCI/C.A.T.  will  check  for  compact  designs  with  simplicity  of  installation  but  which  retain  ease  of  access  for  operation  and  maintenance.  SCI/C.A.T.  will  ensure  that  the  plant  piping  is  laid  out  in  an  economical  and  effective  manner  to  suit  the  process  and  operability  requirements.  

 

SCI/C.A.T.  will  ensure  that  all  civil  engineering  will  be  detailed  with  due  regard  to  the  local  conditions  and  taking  into  account  the specificity  of the  area. SCI/C.A.T.  will  also  ensure that  full  consideration will be given to operational functionality, safety and aesthetic considerations. 

Based  upon  the  equipment  &  piping  arrangements  and  relevant  approved  vendor  data  the  mechanical, electrical and instrumentation drawings will be completed and final MTO’s established.  When  drawings  are  finalized  and  approved  by  QC/DAR  they  will  be  issued  as  Approved  for  Construction (AFC). 

 

The  construction  of  the  whole  project  will  be  performed  according  to  our  proposed  construction  schedule that gives the start and finish date of each activity.   

 

4.3. Construction of the Cooling Plant   

The  works  for  the  plant  and  administration  building  shall  cover  but  shall  not  be  limited  to  the  following:       ‐ Site clearing     ‐ Excavation and compaction  ‐ De watering   ‐ Water Proofing    ‐ Raft foundation & Building Concrete Works    ‐ Precast Concrete Works     ‐ Equipment foundations     ‐ Finishing Works    ‐ Equipment Works    ‐ Piping Works    ‐ Fabrication & Erection    ‐ Electrical & Instrumentation works    ‐ Landscape, Roads, curbstone and sidewalks    Site Clearing  We shall carry on all the necessary clearing, grubbing and soft landscaping in accordance with the  specifications  .Excavated  material  shall  be  removed  from  the  site  and  replaced  by  suitable  one  if  required, all as specified .We confirm that such works shall start after site possession and securing  the related approval and permits and agreeing to the levels. Site clearing will be performed partially  by C.A.T. and mainly by our excavation Sub Contractor. 

(13)

Q06024-IDCP-PLN-GT-001-REV A

- 13 -

Excavation for Foundation and Substructures 

The  building  shall  be  divided  into  4  Areas.  Areas  are  separated  by  construction  joints.  Each  area  might have a different excavation level. These levels will be calculated by SCI and agreed by DAR.  The  excavation  work  shall  be  executed,  by  our  Subcontractor  and  under  our  supervision,  in  accordance  with  drawings,  specifications  and  instructions.  Thus,  excavation  shall  be  done  to  the  lines  and  grades  or  elevation,  agreed  with  QC  &  DAR  during  concept  Design  evaluation  and  cleared  with  UDC.  Excavated  material  shall  be  used  for  backfilling  providing  it  passes  required  tests.  Unsuitable  material  shall  be  removed  when  encountered  and  replaced  by  suitable  one.  Permanent  works  blinding  concrete  membrane  or  such  other  protection  as  specified  on  the  drawings  shall  be  placed,  by  our  concrete  subcontractor,  following  completion  of  excavation  and  compaction  works,  clearing  the  soil  tests  with  DAR  and  as  soon  as  it  is  practical  .All  precedent  works is to be executed to DAR satisfaction.      Dewatering  Dewatering shall be done via submersible pumps in wells distributed around the perimeter of the  excavation. Water will be pumped to the near by sea. The pumps shall be fed from two Electrical  sources for redundancy. Dewatering shall be subcontracted to a Professional Specialist.    Water Proofing  Waterproofing shall be done by a Professional Specialist subcontractor using Material approved by  DAR.  The  water  proofing  activities  are  mainly  in  the  Foundation  stage,  wherever  the  concrete  touches surrounding soil and on the roof where we have the Cooling Towers.     Raft Foundations & Building Concrete works  The building shall be divided into 4 Areas. Areas are separated by construction joints and therefore  can follow different schedule of works once they reach the superstructure levels.   

 Concrete  works  shall  be  executed  by  an  approved  Concrete  Subcontractor.  For  civil  method  statement list, refer to Appendix 7 

 

A QA/QC procedure covering all the activities related to the concrete works shall be submitted to  DAR  for  approval.  The  latter  provide  for  all  the  sampling  and  testing  activities  carried  out  in  the  field  and/or  in  the  laboratory.  Sources  of  material  i.e.  suppliers/manufacturers  and  material  to  be  used  shall  be  in  prior  approved  by  DAR  including  working  methods  and  delivery  conditions.  Transport, transport means, protection, delivery, storage and certification of cement shall be done in  accordance with specifications and approved procedures and to the satisfaction of DAR. 

 

A  bar  bending  schedule  shall  be  submitted  to  DAR  for  approval.  The  number,  size,  form  and  position of all steel reinforcing bars, ties, links, stirrups and other parts of the reinforcement are to  be  in  accordance  with  the  drawings  and  kept  in  the  correct  position  in  the  forms  without  displacement  during  the  process  of  vibrating,  tamping  and  ramming  the  concrete  in  place.  The  approved  spacers  shall  be  used  during  the  process.  The  concrete  cover  shall  not  exceed  tolerance  unless particularly otherwise specified. 

(14)

Q06024-IDCP-PLN-GT-001-REV A - 14 -   During the previously detailed activities, inspection and tests shall be conducted as required in the  specifications and to DAR satisfaction. Records shall be generated, maintained and kept for all the  duration  of  the  process.  Concrete  shall  be  placed  in  the  positions  and  sequences  indicated  on  the  drawings or in the specifications.  

 

Raft  foundations  shall  be  constructed  first,  after  watering  proofing  and  screeding  works  is  done.  Different  Rafts  sizes  will  be  constructed  for  different  areas.  Sizes  will  be  calculated  depending  on  loads  in  various  floors  and  equipment  vibrations.  Method  statements  shall  be  submitted  for  large  pouring areas. 

 

Backfilling  will  be  made  on  top  of  the  raft  foundations  to  bring  the  construction  to  the  required  levels, prior to proceeding with the different floor plans. 

 

Two  large  Tower  cranes  will  be  erected  to  cover  most  of  the  building  area  and  adjacent  steel  workshop. Mobile cranes will be used to cover the minor areas unreachable by Tower Cranes.     The work sequence will follow our schedule of works in order to match the delivery and installation  schedule of main equipment.    Civil crews shall be allocated to Foundations, Structures, and other crews to Buildings. The crews  shall  be  scheduled  in  accordance  with  the  Construction  Program.  Concrete  specified  in  the  documents  shall  be  obtained  from  approved  batching  plants.  For  workability  and  protection  of  concrete, admixtures shall be used, if needed. 

 

For  all  concrete  works,  ordinary  or  Medium  Sulfate  Portland  cement  shall  be  used.  Concrete  surfaces adjacent to soil shall be covered by bituminous paint. Slump control shall be executed and  samples  shall  be  taken  for  strength  control  during  the  placing  of  concrete.  Concrete  will  be  compacted with the use of a vibrator. Afterwards, the necessary curing will be done. 

 

Foundation,  column  and  concrete  wall  Formwork  shall  be  made  of  conventional  wooden  or  steel  formwork.  Formworks  shall  be  prepared  for  concrete  placing  after  the  control  of  axes,  elevation,  alignment  and  the  necessary  strengthening  have  been  carried  out.  All  formwork  systems  shall  be  strengthened by scaffoldings and working platforms. The client/PMC shall approve the completed  works. 

 

Precast Concrete works 

Precast  hollow  core  panels  and  beams  will  be  subcontracted  to  a  specialist  company,  following  approval by DAR. This company shall supply and erect the precast items with the assistance of the  Concrete  Subcontractors  and  CAT.  Some  of  the  works  will  be  erected  by  the  large  Tower  Cranes  and the rest with long reach, properly sized Mobile Cranes 

 

(15)

Q06024-IDCP-PLN-GT-001-REV A

- 15 -

 

A  QA/QC  procedure  covering  all  the  activities  related  to  the  precast  concrete  works  shall  be  submitted to DAR for approval.  

 

Equipment Foundations 

Once  Material  is  approved  and  shop  drawings  produced  and  approved,  Major  Equipment  foundations  shall  be  designed,  coordinated  with  concrete  works  and  constructed  on  site  in  accordance with Manufacturer recommendations. 

 

Finishing Works 

All  Sundry  and  finishing  works  shall  be  executed  by  C.A.T  and  by  different  approved  Subcontractors in accordance with approved finishing schedules and Material. 

 

Selection of Finishing Material will be based on the requirements of the Acoustic Study that caters  for  the  noise  requirement  of  the  Project  and  with  the  Aesthetic  requirements  of  the  specifications  detailed in our Alternative No. 2. 

 

Equipment Works 

Once  the  major  Equipment  and  Material  are  approved,  manufacturer  shop  drawings  will  be  coordinated  and  integrated  into  the  Shop  Drawings.  C.A.T.  shall  also  prepare  the  necessary  procedures /method statements for the mechanical material and equipment installation, prior to any  Installation. (See Appendix 8 for Mechanical Method Statement list). 

 

For  the  major  equipments  to  be  erected  by  C.A.T.  the  work  is  to  be  executed  under  the  direct  supervision  of  the  supplier  representative  when  required  and  in  accordance  with  provided  instructions  and  manuals.  All  necessary  measures  shall  be  taken  to  protect  and  preserve  the  supplied equipment. 

 

C.A.T shall execute the works with all necessary safety and security precautions.    

Having  the  concrete  foundations  properly  cured,  brush‐hammered  and  shimmed  to  the  right  elevation,  the  chillers,  RO  equipment,  and  other  mechanical  equipment  shall  be  installed  as  per  approved method statements on the respective foundations leveled and properly centered. 

 

For  pumps,  preliminary  alignment  shall  be  carried  out  before  grouting.  All  equipment  shall  be  installed as per QC/DAR requirements and vendor’s specifications and recommendations. 

 

Special  Platform  on  rail/track  system  will  be  manufactured  in  our  workshop  to  bring  the  chillers,  pumps  and  other  equipment  into  the  building  and  right  to  the  location  where  they  should  be  installed. Hydraulic jacks, telehandlers and special tools will be used to maneuver inside the plant  building.  Equipment  on  the  first  floor  can  be  brought  in  via  external platforms with  the  help  of  a  crane or from the inside in the ground floor with the use of electrical hoists. Equipment on the roof  will be installed using the tower cranes or telescopic external mobile cranes. Cooling Towers shall 

(16)

Q06024-IDCP-PLN-GT-001-REV A - 16 - be assembled by the manufacturer. All Major Equipment shall be started, tested and commissioned  by the manufacturers.     Piping Works  Shop Drawings for piping fabrication and erection will be prepared and utilized in the fabrication  shop  for  preparing  spools,  ready  to  be  erected.  All  works  shall  be  carried  out  in  line  with  above.  Piping erection shall commence when building is ready.    Fabrication and Erection  Pipe fabrication work shall start in the fabrication shop in the designated area on site.    An N.D.T. subcontractor will be carrying out the required N.D.T. for C.S. welds as per specifications  done in the fabrication shop so that any repairs are carried out before transporting the spools to site.   

Prior  to  fabrication,  field  checks  shall  be  carried  out  to  ensure  that  the  shop  drawings  are  compatible with the site conditions. 

 

Copies  of  the  shop  drawings  used  by  the  fabrication  crews  shall  be  given  to  the  erection  crews.  These copies shall show the numbers assigned to the welding joints and shall indicate which joints  were already tested in the fabrication shop. This shall enable the site crews to correctly identify and  mark  the  welds  performed  on  site.  This  shall  ensure  proper  reporting  and  assist  the  N.D.T.  crews/QC Inspectors to attend and control all the field welds. 

 

The QA/QC officer along with the foreman responsible for the fabrication will ensure that all welds  on  the  drawings  are  clearly  marked  to  distinguish  the  fabrication  welds  from  the  field  welds.  A  record  of  every  day  welds  and  N.D.T.  will  kept.  Once  fabrication,  welding  of  the  spools  are  complete,  the  spools  shall  be  transported  to  site  for  erection.  All  the  spools  to  be  tagged  properly  prior to transportation to site. 

 

All erection works shall be in accordance with the drawings and specifications.   

The  fabricated  spools  shall  be  transported  to  their  designated  area  one  day  ahead  of  the  start  of  erection to avoid any congestion in the existing facilities.    Once the spools belonging to the system are all erected, connected to the rest of erected pipes and  checked, the system will be punched out by us to ensure that installation was carried out as per the  drawings, field supports are all in position.    Once satisfied, all relevant paper work will be submitted to DAR and a request to start hydrostatic  testing will be put in.       

(17)

Q06024-IDCP-PLN-GT-001-REV A

- 17 -

Electrical & Instrumentation Works 

Upon  design  approval  and  in  accordance  with  material  specifications,  manufacturer  and  supplier  will  be  submitted  to  Client  for  approval,  orders  will  be  placed  upon  suppliers  and  weekly  status  reports will be requested to ensure timely delivery to site.    Transformers, switchboards, light fixtures and flood lights will all be installed as per manufacturer’s  recommendations. Vendor’s representatives will conduct the commissioning of the switchgears and  the transformers. (See Appendix 9 for Electrical Method Statement list).    All Electrical Switchgears and MCC’s will be delivered in sections and assembled on site by C.A.T.  except  for  the  3.3  KV  Switchgears  and  Soft  Starters  which  shall  be  assembled  by  the  Manufacturer/Supplier. 

Supervision  of  installation,  checking  of  Bus  Bars  jointing,  Testing  and  Commissioning  will  be  performed by the manufacturer. 

 

All Transformers will be delivered and installed on site by C.A.T. 

Supervision of installation, Testing and Commissioning will be performed by the manufacturer.   

All  raceways,  cables,  lighting,  electrical  accessories,  lo  current  systems  will  be  delivered  and  installed on site by C.A.T. 

 

Cable  terminations  will  be  made  by  C.A.T.  except  for  11  KV  cables  which  shall  be  made  by  approved and licensed subcontractor. 

 

Supervision of installation, Testing and Commissioning of Lo Current systems will be performed by  the Suppliers. 

 

All  electrical  cables  shall  be  laid  according  to  the  cable  schedules  and  adhering  to  the  following  steps: 

 

Prior  to  cable  installation,  a  cable  cutting  schedule  detailing  the  cable  number,  type,  size,  length,  and  cable  drum  number  shall  be  established  to  avoid  and  minimize  any  wastage  as  much  as  possible. The said schedules shall be based on the following data: 

‐ Actual individual cable length.  ‐ Cable length on the drum 

‐ Place on installation to minimize double handling   

Cable  drums  shall  be  transported  to  their  respective  site.  Actual  length  of  the  cable  shall  be  measured on site and a record of each cable number type and length shall be made. 

 

All  distribution  boards  (lighting,  small  power),  Push  button  Control  station,  and  marshalling  box  will  be  connected  in  accordance  with  Electrical  Installation  Specification,  attached  schedules  and 

(18)

Q06024-IDCP-PLN-GT-001-REV A - 18 - drawings. All lightning and grounding shall be done as per specification and with relevance to the  applicable drawings.   

Electrical  systems  will  be  tested  as  per  relevant  test  procedures  that  will  be  submitted  during  the  course of the project. 

 

Instrumentation  and  control  will  be  subcontracted  to  a  nominated  subcontractor  and  system  integrator.    Instrumentation and Control Subcontractor will install all Controls and Instrumentation as per his  approved Method Statement. He shall also install and terminate the instrument cables as per C.A.T.  Method Statement.    Absolutely no pre‐commissioning shall start until the grounding system is completed and tested.    Landscape, Roads, Curbstone and Sidewalks Works  Once the building is erected and main Equipment installed and the need for large mobile cranes is  over, the above work shall start, noting that the final area to be landscaped is subject to QC/UDC  approval.    4.4 Construction of the HEX Building & ETS ’s    Construction of all Heat Exchangers buildings and ETS’s will be similar to methodology to the once  of the plant.    Close coordination will be made with other contractors, via DAR, in order to possess sites of HEX’s  and to coordinate works for ETS’s.    4.5 Calibration   

Qualified  technicians  will  be  utilized  to  carry  out  the  calibration  of  the  instruments.  Records  documenting  the  calibration  will  be  kept  in  our  Document  Control  Department.  All  instruments  used for calibration shall be certified by a Third party. A team shall be assigned to remove the skid‐ mounted instruments and their re‐installation along with the field instruments.    Dedicated instrument fitters will be responsible for the installation of the tubing on site under the  supervision of the instrument and instrument supervisor. The fitters will proceed with the testing of  the tubing after completion the installation.   

After  complete  installation  of  the  tubing,  instruments,  instrument  cables  and  all  required  testing,  loop checking shall start according to loop sheets previously prepared by the instrument engineer  and approved by the Client. 

(19)

Q06024-IDCP-PLN-GT-001-REV A

- 19 -

4.6 Testing and Pre‐Commissioning    

Upon  the  completion  of  construction  of  an  individual  system,  a  testing  /  pre‐commissioning crew  shall  be  assigned  to  carry  out  the  final  inspection  before  offering  the  system  to  the  Employer  for  final inspection.  This crew shall be responsible:  ‐ Ensuring that the installation was carried out as per the project’s specifications.  ‐ Make certain that all the required testing had been carried out successfully.  ‐ Confirm that all the related documentation is in order   

During  the  construction  phase  the  QA/QC  engineer  along  with  the  discipline  engineers  shall  be  responsible  for  maintaining  the  quality  and  ensuring  that  the  supervisors  are  carrying  out  the  installation as per the drawings and specifications.    The inspection facilities utilized on this project shall include:    ‐ Hydrostatic testing  A schedule shall be made and submitted to the client approval. This schedule shall indicate the date  and the location in the field of the proposed hydro test. Pipe flushing and cleaning to be included.    ‐     Loop Checking 

The  loop  sheets  shall  be  prepared  and  submitted  to  the  client  for  approval.  A  schedule  of  loop  checking shall be made and agreed with the client to avoid any disruptions and ensure the smooth  continuity of work.  ‐ Testing and inspection procedures  Detailed testing and inspection procedures shall be prepared at the beginning of the project. These  procedures shall cover all the aspects of the works and be implemented throughout the execution of  the project.  On every successful test completion, results shall be transcribed onto formats, copies of which shall  be submitted to the company for their records.    4.7 Commissioning     C.A.T. is considering employing a subcontractor for the Testing and commissioning activities. This  subcontractor  shall  check  the  design  drawings  at  the  design  stage.  Commissioning  will  be  performed following on approved Method Statement which shall be submitted during the course of  the project providing electricity and other services are available.    4.8   Training    C.A.T. through its subcontractors and suppliers will provide training services for QC personnel as  specified in our proposal. The training program will be set up for managers, supervisors, operators  and maintenance personnel. 

(20)

Q06024-IDCP-PLN-GT-001-REV A

- 20 -

A  full  program  will  be  developed  in  detail  and  in  close  cooperation  with  QC.  Such  a  service  is  considered  one  of  the  most  important  steps  for  a  successful  execution  of  the  project  including  commissioning and maintenance.    The foreseen Training Aids are but not limited to:  ‐ Training Manual, prepared for this specific purpose.  ‐  Operation Manual.  ‐  Maintenance Manual.  ‐  Safety Manual.     

5.

  Quality Assurance (QA) 

 

We  confirm  that  all  QC  requirements  and  recommendations  shall  be  adhered  to  and  put  into  application.  The  QA  Plan  for  IDCP  has  been  issued  to  meet  the  Employer  and  C.A.T.  QA  system  requirements. 

   

6.

Health, Safety and Environment (HSE) 

 

C.A.T.  ensures  that  all  construction  employees  are  aware  of  and  adhere  to  all  safety  rules  and  regulations. C.A.T. ensures the promotion of safety, health, and environment protection as a mutual  objective  for  management  and  employees  at  all  levels,  including  subcontractors.  We  will  give  detailed safety and security instructions to each subcontractor prior to the commencement of work  and during the construction period. 

 

We  confirm  that  all  QC  requirements  and  recommendations  shall  be  adhered  to  and  put  into  application. The HSE Plan for IDCP has been issued to meet the Employer and C.A.T. requirements.    List of Appendixes:    Appendix 1 – PROJECT CHART  Appendix 2 – ORGANIZATION CHART  Appendix 3 – LONG LEAD ITEMS LIST  Appendix 4 – PROJECT KEY MILESTONE  Appendix 5 – TEMPORARY FACILITIES  Appendix 6 – LIST OF SUBCONTRACTORS  Appendix 7 – CIVIL METHOD STATEMENT LIST      Appendix 8 – MECHANICAL METHOD STATEMENT LIST  Appendix 9 – E & I METHOD STATEMENT LIST  Appendix 10 – DESIGN INTENT REPORT

       

      

(21)

                   

 

 

       

              

PMC DAR AL HANDASAH CONTRACTOR C.A.T. INTERNATIONAL QATAR W.L.L DESIGN TEAM STANLEY CONSULTANTS INC. EMPLOYER QATAR COOL APPENDIX 1

PROJECT CHART

RELATIONS:

FORMAL AUTHORITY / COMMUNICATIONS / REPORTING COORDINATION LIMITED AUTHORITY

(22)

E&I Foreman -HEX & ETS

B. Shamshad E. Syaiaozy

E&I Engineer -HEX & ETS

G.Faraj

Engineer - HEX & ETS

R. Ragih

Mech. Foreman -HEX & ETS

A. Farhoud Civil Gen. F/M -HEX G. Kodoor Civil Foreman -HEX Civil Foreman -HEX QA / QC Engineer N. Agtarap QA / QC Inspector - HEX A. Kumaraswamy QA / QC Inspector - HEX B. Mahendran Ass. Safety Engineer - HEX &

ETS

Safety Inspector -HEX & ETS

A. Mohd Mech. services Eng. Y. Hamdani M. Wehbeh Bldg. Mech. Foreman Bldg. Mech. Foreman A. El-Khoury Piping Eng. D. Hanna E. Engalia Piping Foreman A. Kirubana J. Olvida R. Mantilla S.ST.F/M B. Sayyah Instrument Eng. A.A Hajjar E&I Supervisor F. Nassar E&I Foreman J. Espadelia S. Paniker S. Nassar J. Tiakarajan Cons. Mang. Mech. Z.Nazzal Deputy PM -Cons. Mngr M,E&I P. Natrajan Civil Foreman -B. Fetiluna Civil Foreman -Civil Engineer K. Wehbe Cons. Mngr. Civil N. Saba S/C NDT Ins/Pain Civil Gen. F/M N. Bou Daher N. Reghupathy R. Babu Proc.Coordintor A. Pacedio (**) Local Purch. I.A. Kadir Sr. Eng. Coord. F. Takieddine (**) Engineering S/C M/S Stanley Shop Drawing S/C M/S DEP QA/QC Eng. D. Mankikis (*)

QA/QC Insp. Civil

A. Perona S. George M. Kumar QA/QC Insp. Mech. R. Marquez A. Mejorada J. Obaob

QA/QC Insp. E&I.

F. Medina U. Maheshwaran V. Chinnasamy Sr. Safety Eng. R. Seyouri Safety Supervisor G. Felix Safety Off. A. Tiro J. Page G. Saliba Scaff. F/M Scaff. F/M Ass. Str. Keeper T. Botros Store Keeper Time Keeper A. Majeed A. Jackson M. Ahmed S. Riyas Wages Clerk A. Kannan K. Lal C. Imp. Holder J. Kantinal M. Samuel Accountant A. Sarkis Ins. Off. G. Tabet Office Boy A. Devasia A. Khan S. Selvaraj Sec / Typist J. Mathew V. M. Nair A. Prasadan S. Ali Transp. Off P. Bala. PR/Passport R. Koshy S. Moolya Admin. Mngr. M. Saadeh Campboss N. Asaad Watchman Watchman Project Manager Nazih Ghazi Cost Eng / Plann Eng C. Ashkouti D. Dahwan Contract Eng. F. Bustani QS G. Gobatan Project Coord. Mohan M.G. Sr. Planning Eng. N.A. Nahed Sr. ELEC. Eng. R. Prasad Equip. Eng. H. Rahhal P. Sarudar Equip. Foreman R. Prabhu E. E. Elrizz G. Vijayaku Fabr. F/M A. Atem S/ Contractors ELEC. Eng. N. Faysal AREA PROC. UNIT C.A.T. H.O C.O.O M. El Hajjar Surveyor Z. Daher

Ass. Eng. - HEX & ETS

G. Bitar

T&C - Mech. Eng.

H. Jumao A. Basak

T&C - Elec. Eng.

Subramanian K. T&C Sub Contractors Doc. Control D. Ramos Deepak E.P. Expedition / IT Admin R. Geryes Acc. Clerk J. Khan CAD Operator T. Thomas Weld. F/M W.A. Rish

(*) QA/QC Engineer has the full right to Contact the Area Manager and the Group QA/QC Manager in case he feels a non cooperation om site or he sees a matter that reflects on the Group's global QA/QC system

(**) The Sr. Eng. Coordinator & The Procurement Coordinator communicate & interact directly with the Area Procurement office for Design/Procurement related matters. Qatar Area Manager M. Matar Qatar Cool N.El- Saadi PMC - DAR K. Salman Civil Engineer -HEX Bldgs E. Harb Inst & Cntrl S/C M/S CIMAC Civil Gen. F/M J. Chalitta Civil F/M N. Maccagerr J. Lukose T. Ahmad Excavation Dewatering Concrete Precast S/C Tes./Bal.

HEX BLDGS & ETS's

APPENDIX 2 ORGANIZATION CHART

(23)

APPENDIX 3

LONG LEAD ITEMS LIST

Item Description Manufactures/Supplier Name

1. HV/MV Switchgears Siemens/ABB/Schneider/ Transformers & Starters Ben Shaw or Approved Equal 2. Chillers Trane/York or Approved Equal 3. Cooling Towers Hamon/BAC or Approved Equal

4. Pumps Goulds/Weir/Flowserve or Approved Equal 5. Heat Exchangers Alfa Laval or Approved Equal

(24)
(25)
(26)
(27)

APPENDIX 6

LIST OF SUB CONTRACTORS

C.A.T. International Qatar W.L.L proposes to subcontract parts of the works and to

supply principal items of the plants as follows:

Work Description

SubContractor Address

1. Site Investigation

ACTS

P.O.Box 22159, Doha, Qatar

2. Excavation & Backfilling

ACI

P.O.Box 20040, Doha, Qatar

3. Dewatering

United Equipment

P.O.Box 5673, Doha, Qatar

4. Water Proofing

BMC Qatar

P.O. Box 24407, Doha, Qatar

5. Concrete Works Somac Group P.O. Box 7098, Doha, Qatar

6. Pre Cast Concrete Slabs

United

Precast

Doha,

Qatar

7. Doors,

Windows,&

Louvres

8. False Ceiling

9. Raised

Flooring

10. Painting

Hempel/Jotun

Doha, Qatar

11. Elevator

12. Roads & Pavement

13. NDT

Qatar Inspection Services

Doha, Qatar

14. Controls & SCADA

Cimac Or Approved Equal

Dubai, U.A.E

N

ote: the above names are only for reference. Other Subcontractors will

be submitted as applicable. Selection will be based on Compliance to

specifications and Milestones

(28)

Reference No

1 Preconstruction Survey Q06024-IDCP-MOS-CI-001

2 Excavation & Backfilling Q06024-IDCP-MOS-CI-002

3 Reinforcement Q06024-IDCP-MOS-CI-003

4 Concrete Receiving, Testing, Placing & Curing Q06024-IDCP-MOS-CI-004

5 Sub-Structure Waterproofing Q06024-IDCP-MOS-CI-005

6 Major Concrete Placement for Area (3) Raft Foundation Q06024-IDCP-MOS-CI-006

7 Erection of Pre-Stressed Beams & Hollow Core Slabs Q06024-IDCP-MOS-CI-007

APPENDIX 7

Structural / Civil

(29)

Reference No

1 Rigging ,installation and pipe connection of chillers Q06024-IDCP-MOS-ME-001

2 Rigging , erection and pipe connection of cooling towers Q06024-IDCP-MOS-ME-002

3 Rigging , installation and pipe connection of chilled water pumps Q06024-IDCP-MOS-ME-003

4 Rigging , installation and connection of condenser water vertical turbine pumps Q06024-IDCP-MOS-ME-004

5 Rigging ,installation and connection of plate heat exchangers Q06024-IDCP-MOS-ME-005

6 Installation and connection of tertiary pumps Q06024-IDCP-MOS-ME-006

7 Rigging , installation and connection of expansion tanks Q06024-IDCP-MOS-ME-007

8 Installation and connection of pressurization units Q06024-IDCP-MOS-ME-008

9 Installation and connection of in line centrifugal solid separators on first floor Q06024-IDCP-MOS-ME-009

10 Installation and connection of refrigerant silencers on roof Q06024-IDCP-MOS-ME-010

11 Installation of condenser tube cleaning system including 4 way valves Q06024-IDCP-MOS-ME-011

Reference No

12 Installation of sluice gate valves in cooling tower basins Q06024-IDCP-MOS-ME-012

13 Installation of process valves Q06024-IDCP-MOS-ME-013

Reference No

14 Rigging , installation and pipe connection of RO system Q06024-IDCP-MOS-ME-014

15 Installation and connection of transfer pumps Q06024-IDCP-MOS-ME-015

Reference No

16 Installation of inserts (pipe connections) in concrete tanks and cooling tower

basins Q06024-IDCP-MOS-ME-016

17 Installation of Overhead cranes Q06024-IDCP-MOS-ME-017

18 Tagging and labelling of pipe,duct and equipment Q06024-IDCP-MOS-ME-018

19 Installation of Antivortex fittings in concrete tanks Q06024-IDCP-MOS-ME-019

20 Pipe handling and storage Q06024-IDCP-MOS-ME-020

21 Installation of process ,HVAC and domestic water pipes Q06024-IDCP-MOS-ME-021

22 Insulation of Process , HVAC and domestic water pipes Q06024-IDCP-MOS-ME-022

23 Jacketing of pipes Q06024-IDCP-MOS-ME-023

24 Fabrication and installation of pipe supports Q06024-IDCP-MOS-ME-024

25 Painting of pipes and supports Q06024-IDCP-MOS-ME-025

26 Hydrotesting of pipes Q06024-IDCP-MOS-ME-026

27 Installation and connection of diesel tanks Q06024-IDCP-MOS-ME-027

28 Introducing new equipment into the system at different stages Q06024-IDCP-MOS-ME-028

Reference No

29 SMAW Welding Q06024-IDCP-MOS-ME-029

30 Installation and soldering of copper pipes Q06024-IDCP-MOS-ME-030

Reference No

1 Installation and pipe connection of electric water heaters ( admin part ) Q06024-IDCP-MOS-PL-001

2 Installation of cast iron storm water and drainage pipes . Q06024-IDCP-MOS-PL-002

3 Installation of frames for drainge gratings and manhole covers Q06024-IDCP-MOS-PL-003

4 Installation of floor drains , roof drains and flower bed drains Q06024-IDCP-MOS-PL-004

5 Installation of sanitary fixtures , toilet mixers and accessories ( admin part ) Q06024-IDCP-MOS-PL-005

6 Installation of oil interceptors Q06024-IDCP-MOS-PL-006

7 Installation and pipe connection of submersible pumps in basement Q06024-IDCP-MOS-PL-007

APPENDIX 8

ME Equipment

MECHANICAL METHOD STATEMENT LIST

Valves

RO System

Common to all Systems

Welding and Soldering

(30)

Reference No

1 Rigging , Installation and connection of fire pump room equipment and

components Q06024-IDCP-MOS-FP-001

2 Installation of preaction ,deluge , alarm zone valves and siamese connections Q06024-IDCP-MOS-FP-002

3 Installation of fire hose cabinets Q06024-IDCP-MOS-FP-003

4 Installation of fire fighting grooved pipes and fittings ( vertical and horizontal ) Q06024-IDCP-MOS-FP-004

5 Installation of diesel pump exhaust with supports up to roof Q06024-IDCP-MOS-FP-005

6 Installation of FM-200 fire fighting system Q06024-IDCP-MOS-FP-006

Reference No

1 Installation of chemical treatment systems Q06024-IDCP-MOS-WTR-001

2 Chemical cleaning of pipes Q06024-IDCP-MOS-WTR-002

Reference No

1 Rigging , installation and pipe connection of Air handling units Q06024-IDCP-MOS-AC-001

2 Installation and pipe connection of fan coil units Q06024-IDCP-MOS-AC-002

3 Installation and duct connection of fresh and exhaust fans Q06024-IDCP-MOS-AC-003

4 Galvanised duct and accessories fabrication and installation Q06024-IDCP-MOS-AC-004

5 Internal and external Insulation of galvanised sheet metal duct Q06024-IDCP-MOS-AC-005

6 Jacketing of galvanised sheet metal duct Q06024-IDCP-MOS-AC-006

7 Installation of grilles , diffusers , louvers ,dampers sand trap louvers Q06024-IDCP-MOS-AC-007

Fire Fighting Systems

Chemical Treatment

(31)

Reference No

1 11KV Switchgear Q06024-IDCP-MOS-EL-001

2 3.3KV MCC & Soft Starter Q06024-IDCP-MOS-EL-002

3 415V MCC & VFD Q06024-IDCP-MOS-EL-003

4 11KV/3.3KV Transformer Q06024-IDCP-MOS-EL-004

5 11KV/415V Transformer Q06024-IDCP-MOS-EL-005

6 Emergency Generator Q06024-IDCP-MOS-EL-006

7 Battery Charger & UPS Q06024-IDCP-MOS-EL-007

8 Panel Board & Junction box Q06024-IDCP-MOS-EL-008

9 Earthing System Q06024-IDCP-MOS-EL-009

10 Lightning Protection System Q06024-IDCP-MOS-EL-010

11 Wiring Accessories & Small Power Devices Q06024-IDCP-MOS-EL-011

12 Interior / Exterior & Emergency Lighting Q06024-IDCP-MOS-EL-012

13 Wires & Cables Q06024-IDCP-MOS-EL-013

14 Cable Terminations Q06024-IDCP-MOS-EL-014

15 Raceways Q06024-IDCP-MOS-EL-015

Reference No

1 Voice & Data System Q06024-IDCP-MOS-LC-001

2 Security Access Control System Q06024-IDCP-MOS-LC-002

3 CCTV System Q06024-IDCP-MOS-LC-003

4 Fire Alarm System Q06024-IDCP-MOS-LC-004

Reference No

1 Instuments Q06024-IDCP-MOS-IC-001

2 PLC / SCADA System Q06024-IDCP-MOS-IC-002

APPENDIX 9

A- HV & MV ELECTRICAL SYSTEM

B- LOW CURRENT SYSTEMS

C- INSTRUMENTATION

(32)

Integrated District Cooling Plant at The Pearl, Qatar

Design Intent Report

-Conceptual Design Edition

Project Number: Q06024 - IDCP

FINAL REPORT

September 2006

C.A.T. Qatar International W.L.L.

Doha, Qatar

(33)

Q06024-IDCP-RPT-GT-001-REV 3

Integrated District Cooling Plant

at The Pearl, Qatar

Q06024-IDCP-RPT-GT-001-REV 3

Design Intent Report

C.A.T. Qatar International W.L.L.

Doha, Qatar

Conceptual Design Edition

(34)

Q06024-IDCP-RPT-CI-001-REV 3 i Stanley Consultants

Table of Contents

Section 1 - Project Description ...1-1 Section 2 - Civil Engineering and Landscaping Design Statement ...2-1 General...2-1 Compliance Statement ...2-1 Traffic Control ...2-2 Paving ...2-2 Drainage...2-2 Landscaping ...2-2 Section 3 - Architectural Design Statement ...3-1 General...3-1 Compliance Statement ...3-1 Building Exterior ...3-1 Accessibility and Maintenance ...3-2 Containment Requirements...3-2 Building Interior ...3-3 Occupancy ...3-3 Section 4 - Structural Design Statement ...4-1 General...4-1 Compliance Statement ...4-1 Design Criteria ...4-1 Codes and Standards ...4-1 Design Loads ...4-2 Material Properties...4-3 Concrete Design...4-3 Structural Steel Design ...4-3 Material ...4-3 Structural System ...4-4

(35)

Q06024-IDCP-RPT-CI-001-REV 3 ii Stanley Consultants

Section 5 - Mechanical Design Statement ...5-1 General...5-1 Compliance Statement ...5-1 Chilled Water Plant Process...5-3 Codes and Standards ...5-3 General...5-4 Chillers...5-4 Cooling Towers...5-6 Chilled Water Pumping Scheme ...5-8 Condenser Water Pumping Scheme...5-8 Piping System ...5-9 Chemical Treatment System ...5-9 Miscellaneous ...5-10 Reverse Osmosis (R.O.) System ...5-10 Energy Transfer Stations...5-11 Heating, Ventilating, and Air-Conditioning ...5-11 Standards and Codes ...5-11 Outdoor Design Conditions ...5-12 Indoor Design Conditions ...5-12 Minimum Ventilation Requirements ...5-12 System Description ...5-13 Plumbing ...5-13 Codes and Standards ...5-13 Water Supply Network ...5-14 Waste Water Drainage ...5-15 Waste Water Drainage ...5-15 Compressed Air ...5-16 Standards and Codes ...5-16 Service Air ...5-16 Fire Suppression System...5-16 Codes and Standards ...5-16 Fire Suppression System...5-16 Section 6 - Electrical Design Statement...6-1 General...6-1 Compliance Statement ...6-1 Extra Low Voltage...6-2 Applicable Codes and Standards and Basic Design Criteria ...6-2 Ambient Conditions ...6-3 Electrical Power Distribution...6-3 Overall System Description ...6-3 Emergency Engine Generators ...6-4 415/240-Volt Distribution Network...6-4 Uninterruptible power Supply UPS ...6-4 Lighting and Emergency Lighting ...6-4 Boards ...6-5 Circuit Breakers, Residual Current Interrupters, Contactors and Disconnect Switches ...6-5 Cables and Wires ...6-6 Raceways ...6-6 Earthing Network...6-6 Lightning Protection ...6-7

(36)

Q06024-IDCP-RPT-CI-001-REV 3 iii Stanley Consultants

Extra Low Voltage...6-7 Fire Alarm System ...6-7 Voice and Data System ...6-8 Q-Tel GSM Station ...6-8 Closed Circuit Television System (CCTV) ...6-8 Access Control and Door Status System...6-9 Section 7 - Control System Design Statement ...7-1 General...7-1 Compliance Statement ...7-1 Control Philosophy ...7-2 Chilled Water System ...7-5 Cooling Towers...7-6 Make-Up Water System...7-6 Blowdown System ...7-6 Electrical System ...7-6 Instrumentation ...7-6 Field Instruments ...7-6 Section 8 - Utility Services Design Statement ...8-1 General...8-1 Compliance Statement ...8-1 Chilled Water ...8-1 Codes and Standards ...8-1 System Description ...8-2 Potable Water...8-2 Codes and Standards ...8-2 System Description ...8-2 Sanitary Sewer ...8-2 Codes and Standards ...8-2 System Description ...8-2 Storm Sewer...8-2 Codes and Standards ...8-2 System Description ...8-3 Section 9 - Maintenance and Accessibility ...9-1 General...9-1 Compliance Statement ...9-1 Maintenance and Accessibility ...9-1

References

Related documents