• No results found

Tacit knowledge integration within the traditional construction procurement system

N/A
N/A
Protected

Academic year: 2020

Share "Tacit knowledge integration within the traditional construction procurement system"

Copied!
265
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Table 2.2– Definitions of Data, Information and Knowledge
Figure 2.2 – The Understanding Model of DIKW, (Rowley, 2007)
Figure 2.3 – Knowledge System (Faucher et al., 2008)
Figure 2.4 – Dimension of Tacit Knowledge (Alavi & Leidner, 2001)
+7

References

Related documents

Charging Station Data (ID/location, Type/make/rating) Usage pattern Grid Data Grid Model Network services Base demand (adapted to V2X scale) Infrastructure investment (street

Fig. Scanning electron microscopy images of leaf surfaces of narrow-leaved Ugandan species of Festuca. chodatiana from Namaganda 1567b.. section is terete, with 5 vascular bundles

troubleshooting as it arises. AFRRI found that modern ICTs, such as the ones outlined above, can help overcome radio’s fundamental challenge: It has traditionally been a

It forms the basis of the two strands of random- effects models that are potentially brought together in the combined models of Section 4: on the one hand, normal random effects can

This is a key leadership position reporting directly to the City Manager and is responsible for serving the public safety needs of a growing, diverse community.. Essential functions

Global Payroll for Japan provides rules, pages, processes, and reports that you use to prepare wage payment reports and summaries for municipalities, load inhabitant tax

Ms. Schroeder then reviewed the Engineer's Report, a copy of which is attached hereto. Schroeder then reported that BGE has completed the cathodic protection