4950
1/5/2009
Aaron van Duerm
480-792-7778
No
Description:
Old Rev:
New Rev:
Affected Documents
Product
Document Number:
PRODUCT TREE, PICKIT 3 DEBUG EXPRESS 1 2
DV164131
14-00842Reason for Change:
Added the 13-00842-2 test procedure documentation to the Product tree.
Also revised the ECO page to include the 13-00842R1B document to use for testing the PICKit 3 Programmer.
Description of Change:
Test procedure documentation was needed for testing the 44-pin demo board.
Material Disposition:
Tempe:
You will need to reprogram the first 100 boards from Burnon to correct the previous firmware revison. Please erase the PIC24FJ256GB106 device using a RealICE and
reprogram the uniots using the test fixture and the 13-00842R1B test procedure. Please run the 13-00842-2 test procedure for the demo board after the units have been
reprogrammed with the correct firmware.
CM:
Please rework existing stock by erasing the part, and reprogramming the PICKit 3 using the 13-00842R1B test procedure. We found an issue in the previous revision that we
sent and we want to ensure that this is fixed before it becomes a major problem.
Implement testing the demo board using test procedure and the 13-00842-2R1 test procedure documentation into process using MPLAB 8.15.11 for the initial build.
Document Control: Please ensure that the test procedure 13-00842 is Rev 1B when it is finalized to avoid confusion for our Tempe test team and our CM.
1/7/2009
1/7/2009
HW Engineering SW Engineering
Marketing
Documentation
RMA/TEST
Quality
Production
BaaN
Originator
Revs were updated
Description of change was implemented
Packlist is correct
Part Number Rev Type Description 12-00842 1 BQ FINAL ASSY, PICKIT 3 DEBUG EXPRESS
10-00424 1 B ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 10-00424-D 1 B ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER 09-00227-D 1 D MECH PART DWG, PICkit 2 ENCLOSURE TOP
09-00228-D 1 D MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM 02-02038 C B PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 02-02038-D C D PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER 03-02038 C D SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMER 04-02038 C D PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMER 08-00126 6 LBL LABEL, NEED HELP WITH ASSY/SERIAL
02-01924-03 1 B PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 02-01924-D 2.2 D PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD
03-01924 2.1 D SCHEMATIC, PICkit 2 44-PIN DEMO BOARD 04-01924 2.2 D PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD 05-01924 2.2 DISK PCB ARTWORK, PICkit 2 44-PIN DEMO BOARD 08-00126 6 LBL LABEL, NEED HELP WITH ASSY/SERIAL
08-00237 3 LBL LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL 13-00842 * TEST TEST PROCEDURE, PICKIT 3 MICROCONTROLLER PROGRAM 13-00842-2 * TEST TEST PROCEDURE, Pickit 3 Debug Express 44-pin Demo Board
L S R
10-00424 1 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER Y B
1 1
02-01924-03 1 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) Y B
2 1
CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft PART
Red cable
Y 3 1
RoHS Compliant
DELPHI 15431480-030 DIGIKEY 167-1012-ND Avail: JUL-06 RoHS Compliant
HIROSE ELECTR UX40-MB-5PA-1000-2003(01) Avail:
DS30030 * DOC, WARRANTY/REGISTRATION CARD Y DOC
4 1
DS30210 * DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION Y DOC 5 1
DS51123 * SOFTWARE, MPLAB CDROM Y DOC
6 1
DS51792 * DOC, USING PICKIT 3 POSTER Y DOC
7 1
09-00217 PACKAGING, PICkit DEBUG EXPRESS CLAMSHELL PART
8 1
DS51782 * DOC, PICkit 3 DEBUG EXPRESS PACKAGING FILLER DOC
9 1
08-00237 3 LABEL, PRODUCT, FINAL ASSY, SERIAL NO. OPTIONAL LBL
L S R
10-00424-D 1 ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER B
1 1
09-00227 1 MECH PART, PICkit 3 ENCLOSURE TOP PART
2 1
09-00228 1 MECH PART, PICkit 3 ENCLOSURE BOTTOM PART
3 1
02-02038 C PCB ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER B
4 1
08-00126 6 LABEL, NEED HELP WITH ASSY/SERIAL LBL
L S R
09-00228-D 1 MECH PART DWG, PICkit 2 ENCLOSURE BOTTOM D
L S R
09-00227-D 1 MECH PART DWG, PICkit 2 ENCLOSURE TOP D
1 1
DS51772 * MECH PART ART, PICkit 3 TOP ENCLOSURE DESIGN DOC
L S R
02-02038-D C PCB ASSY DWG, PICkit 3 MICROCONTROLLER PROGRAMMER D
1 1
03-02038 C SCHEMATIC, PICkit 3 MICROCONTROLLER PROGRAMMER D
2 1
04-02038 C PCB FABRICATION, PICkit 3 MICROCONTROLLER PROGRAMMER D
3 1
MIC0272 IC SMT, MCP1525T-I/TT, 3L SOT-23 Y PART
U10 4 1
RoHS Compliant
MICROCHIP MCP1525T-I/TT A7BQ1TCQXA00 Avail:
RoHS Compliant
MICROCHIP MCP1525T-I/TT A7BQ1TC6XA00 Avail:
MIC0430 IC SMT, ANALOG OP-AMP, SNGL SUPPLY R-R, MCP601 SOT-23-5 Y PART
U5 5 1
RoHS Compliant
MICROCHIP MCP601T-I/OT AB009TC7XA00 Avail:
MIC0506 IC SMT, MCP1727T-3302E/MF, 1.5A, LOW VOLTAGE, LDO REG 8P DFN Y PART U7
6 1
RoHS Compliant MICROCHIP MCP1727T-3302E/MF GEAG1YA7XA33 Avail:
MIC0401 IC SMT, 25LC256, 128K/256K-BIT SPI SERIAL EEPROM 8L SOIC Y PART
U3 7 1
RoHS Compliant
MICROCHIP 25LC256-I/SN D5AH17C2XA00 Avail:
MIC0526 IC SMT, PIC24FJ256GB106-I/PT MICROCONTROLLER 64L TQFP 10x10 Y PART U1
8 1
RoHS Compliant
MICROCHIP PIC24FJ256GB106-I/PT Avail:
CAP0005 CAP SMT, 0.01uF 0603 CER 50V 20% X7R Y PART
C17 9 1
RoHS Compliant
KEMET C0603C103M5RAC Avail:
RoHS Compliant
NIC COMPONEN NMC0603X7R103K50TRPF Avail:
RoHS Compliant
CAL-CHIP GMC10X7R103K5NTLF Avail:
RoHS Compliant PANASONIC ECJ-1VF1H103Z DIGIKEY PCC1801CT-ND Avail:
L S R
CAP0012 CAP SMT, 0.1uF 0603 CER 25V +80/-20% Y5V Y PART
C3, C8, C12, C13, C14, C16, C19, C20, C21, C24, C25, C26, C28, C29, C30, C31, C32, C33, C34
10 19
RoHS Compliant PANASONIC ECJ-1VF1E104Z DIGIKEY PCC1794TR-ND Avail:
RoHS Compliant
ROHM MCH182FN104ZK Avail:
RoHS Compliant
CAL-CHIP GMC10Y5V104Z25NTLF Avail:
RoHS Compliant
NIC COMPONEN NMC0603Y5V104Z25TRPF Avail:
CAP0425 CAP SMT, 2.2uF 0805 CER 25V 10% X5R Y PART
C9, C15 11 2
RoHS Compliant PANASONIC ECJ-2FB1E225K DIGIKEY PCC2320TR-ND Avail:
CAP0117 CAP SMT, 47pF 0603 CER 50V 5% NP0 Y PART
C22 12 1
RoHS Compliant KEMET C0603C470J5GACTU DIGIKEY 399-1056-1-ND Avail:
RoHS Compliant PANASONIC ECJ-1VC1H470J DIGIKEY PCC470ACVTR-ND Avail:
CAP0200 CAP SMT, 27pF 0603 CER 50V 5% NP0 Y PART
C4, C5 13 2
RoHS Compliant PANASONIC ECJ-1VC1H270J DIGIKEY PCC270ACVTR-ND Avail:
CAP0265 CAP SMT, 1.0uF 0603 CER 16V 10% X5R Y PART
C2, C6, C7, C27 14 4
RoHS Compliant AVX CORP 0603YD105KAT2A DIGIKEY 478-1249-1-ND Avail:
RoHS Compliant MURATA ELECT GRM185R61C105KE44D DIGIKEY 490-3894-1-ND Avail:
RoHS Compliant MURATA ELECT GRM188R61C105KA93D DIGIKEY 490-1536-1-ND Avail:
RoHS Compliant PANASONIC ECJ-1VB1C105K DIGIKEY PCC2224CT-ND Avail:
RoHS Compliant TAIYO YUDEN EMK107BJ105KA-T DIGIKEY 587-1251-1-ND Avail:
CAP0306 CAP SMT, 10uF 3216 (A) TANT 10V 20% PART
C10, C11, C18 15 3
RoHS Compliant NICHICON F931A106MAA DIGIKEY 493-2351-1-ND Avail:
RoHS Compliant
KEMET T491A106M010AG Avail:
RoHS Compliant
L S R
CAP0311 CAP SMT, 47uF 7343 (D) TANT 20V 10% PART
C23 16 1
RoHS Compliant
KEMET T491D476K020AG Avail:
RoHS Compliant KEMET T491D476K020AS DIGIKEY 399-1619-2-ND Avail:
RoHS Compliant
KEMET T491D476K020AT Avail:
CAP0372 CAP SMT, 10uF 0805 CER 10V 10% , X5R Y PART
C1 17 1
RoHS Compliant TAIYO YUDEN LMK212BJ106KD-T DIGIKEY 587-1299-1-ND Avail:
CON0170 CONN, RECPT, 1x6 PIN .025 SQ, RA. (0.100") PART
J4 18 1
RoHS Compliant
SAMTEC SSW-106-02-G-S-RA Avail:
RoHS Compliant
MILL-MAX 801-13-006-20-001000 Avail:
CON0276 CONN SMT, RECPT, USB 2.0 MINI 5POS PART
J1 19 1
RoHS Compliant HIROSE ELECTR UX60-MB-5ST DIGIKEY H2959TR-ND Avail:
DIODE0101 DIODE SMT, SCHOTTKY BAT54C 30V 200MA SOT-23 PART
D3 20 1
RoHS Compliant FAIRCHILD BAT54C DIGIKEY BAT54CFSTR-ND Avail:
DIODE0104 DIODE SMT, SCHOTTKY 40V 1A SOT-23 PART
D1 21 1
RoHS Compliant ZETEX ZHCS1000TA DIGIKEY ZHCS1000TR-ND Avail:
DIODE0116 DIODE SMT, SCHOTTKY 20V 0.5A SOD-123 PART
D8 22 1
RoHS Compliant FAIRCHILD SEMI MBR0520L DIGIKEY MBR0520LCT-ND Avail:
DIODE0121 DIODE SMT, ZENER 5V 1.5W SMA PART
TR1, TR2, TR3 23 3
RoHS Compliant ON SEMI 1SMA5918BT3G DIGIKEY 1SMA5918BT3GOS Avail:
FUSE0019 FUSE SMT, POLYSWITCH 0.05A 30V RESETTABLE (0.135" x 0.110" x 0.025") PART PTC2, PTC3, PTC4
24 3
RoHS Compliant
TYCO/RAYCHEM MICROSMD005 Avail:
RoHS Compliant
L S R
FUSE0026 FUSE SMT, POLYSWITCH 0.5A 13.2V RESETTABLE (0.135" x 0.110" x 0.025") PART PTC1
25 1
RoHS Compliant TYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FTR Avail:
RoHS Compliant TYCO/RAYCHEM MICROSMD050F-2 DIGIKEY MICROSMD050FCT Avail:
IC00270 IC SMT, 74LVC1T45 1BIT DUAL BUS TXRX SOT23-6 PART
U8, U9, U11 26 3
RoHS Compliant
TEXAS INSTRU SN74LVC1T45DBVR DIGIKEY 296-16843-2-ND Avail: APR-05
IC00393 IC SMT, 74AHC1G125, SOT-23-5 Y PART
U12 27 1
RoHS Compliant Texas Instrument SN74AHC1G125DBVR DIGIKEY 296-8744-2-ND Avail:
IC00408 IC SMT, AT25DF041A, 4M-BIT SPI FLASH SERIAL EEPROM 8L SOIC Y PART U4
28 1
RoHS Compliant ATMEL AT25DF041A-SH-B DIGIKEY AT25DF041A-SH-B- Avail:
RoHS Compliant ATMEL AT25DF041A-SSH-B DIGIKEY AT25DF041A-SSH- Avail:
IND0024 INDUCTOR SMT, 680uH, 50mA 30-OHM 5% 1812 PART
L1 29 1
RoHS Compliant
COILCRAFT 1812LS-684XJLB Avail:
RoHS Compliant JW MILLER PM1812-681J DIGIKEY M6078TR-ND Avail:
RoHS Compliant
JW MILLER PM1812-681J-RC Avail:
LED0034 LED SMT, 0805 GREEN CLEAR 2x1.25mm PART
D2 30 1
RoHS Compliant
KINGBRIGHT APT2012QGC-F01 Avail:
RoHS Compliant LITE-ON LTST-C170GKT DIGIKEY 160-1179-2-ND Avail:
RoHS Compliant
KINGBRIGHT APT2012QGC Avail:
RoHS Compliant CHICAGO MINAT 7012X5 DIGIKEY L61105TR-ND Avail:
RoHS Compliant LITE-ON LTST-C170GKT DIGIKEY 160-1179-1-ND Avail:
LED0046 LED SMT, 3x2.5mm BI-COLOR RED/GREEN, LOW POWER PART
D4 31 1
RoHS Compliant
KINGBRIGHT APB3025ESGC NEUMANN Avail:
RoHS Compliant
L S R
LED0059 LED SMT, 0805 BLUE CLEAR 2x1.25mm PART
D5 32 1
RoHS Compliant LITE-ON LTST-C170TBKT DIGI-KEY 160-1579-2-ND Avail:
OSC0087 OSC SMT, 12.000MHz CRYSTAL 18PF FUND SMD (HC49) PART
Y1 33 1
RoHS Compliant ABRACON COR ABLS-12.000MHZ-B2-T DIGIKEY 535-9067-1-ND Avail:
RSMT0001 RES SMT, 0-OHM 0603 PART
R59, R60 34 2
RoHS Compliant PANASONIC ERJ-3GSY0R00V DIGIKEY P0.0GTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GEY0R00V DIGIKEY P0.0GTR-ND Avail:
RoHS Compliant
NIC COMPONEN NRC06Z0TRF Avail:
RoHS Compliant
SEI RMCF 1/16 0 5% R Avail:
RSMT0022 RES SMT, 100-OHM 1/10W 5% 0603 Y PART
R16, R26, R42, R43, R45 35 5 RoHS Compliant SEI RMCF1/161005%R Avail: RoHS Compliant NIC NRC06J101TRF Avail: RoHS Compliant ROHM MCR03FZHJ1000 Avail: RoHS Compliant PANASONIC ERJ-3GEYJ101V DIGIKEY P100GTR-ND Avail:
RSMT0026 RES SMT, 100K-OHM 1/10W 5% 0603 Y PART
R37 36 1
RoHS Compliant PANASONIC ERJ-3GSYJ104V DIGIKEY P100KGTR-ND Avail:
RoHS Compliant
KOA RK73B1JTTD104J Avail:
RoHS Compliant
SEI RMCF 1/16 100K 5% R Avail:
RoHS Compliant ROHM MCR03EZPJ104 DIGIKEY RHM100KGTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GEYJ104V DIGIKEY P100KGTR-ND Avail:
L S R
RSMT0034 RES SMT, 10K-OHM 1/10W 5% 0603 Y PART
R1, R6, R8, R9, R10, R12, R13, R15, R21, R27, R28, R32, R35, R38, R39, R47, R56, R57 37 18
RoHS Compliant
ROHM MCR03FZHJ1002 Avail:
RoHS Compliant PANASONIC ERJ-3GSYJ103V DIGIKEY P10KGTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GEYJ103V DIGIKEY P10KGTR-ND Avail:
RoHS Compliant
NIC COMPONEN NRC06J103TRF Avail:
RoHS Compliant
SEI RMCF 1/16 10K 5% R Avail:
RoHS Compliant YAGEO RC0603JR-0710KL DIGIKEY 311-10KGRTR-ND Avail:
RSMT0052 RES SMT, 2.2K-OHM 1/10W 5% 0603 Y PART
R22, R25, R33, R34, R55 38 5
RoHS Compliant PANASONIC ERJ-3GSYJ222V DIGIKEY P2.2KGTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GEYJ222V DIGIKEY P2.2KGTR-ND Avail:
RoHS Compliant
NIC NRO6J222TRF Avail:
RoHS Compliant
SEI RMCF1/162.2K5%R Avail:
RSMT0058 RES SMT, 2.7K-OHM 1/10W 5% 0603 Y PART
R14, R17 39 2
RoHS Compliant PANASONIC ERJ-3GEYJ272V DIGIKEY P2.7KGTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GSYJ272V DIGIKEY P2.7KGTR-ND Avail:
RoHS Compliant
ROHM MCR03EZHJ2.7K Avail:
RSMT0092 RES SMT, 4.7K-OHM 1/10W 5% 0603 Y PART
R36, R49, R50 40 3 RoHS Compliant SEI RMCF 1/16 4.7K 5% R Avail: RoHS Compliant KOA RK73B1JTTD472J Avail: RoHS Compliant YAGEO/PHYCO 9C06031A4701JLHFT DIGIKEY 311-4.7KGTR-ND Avail:
RoHS Compliant PANASONIC ERJ-3GEYJ472V DIGIKEY P4.7KGTR-ND Avail:
RoHS Compliant
ROHM MCR03EZHJ4.7K Avail:
RoHS Compliant
L S R
RSMT0138 RES SMT, 1.0K-OHM 1/10W 1% 0603 Y PART
R7, R18, R23, R54, R58 41 5
RoHS Compliant VISHAY DALE CRCW06031K00FKEA NEWARK 52K8015 Avail:
RoHS Compliant PANASONIC ERJ-3EKF1001V DIGIKEY P1.00KHTR-ND Avail:
RoHS Compliant ROHM MCR03EZPFX1001 DIGIKEY RHM1.00KHCT-ND Avail:
RSMT0166 RES SMT, 330-OHM 1/10W 5% 0603 Y PART
R2, R5, R24, R29, R30, R31, R44, R46, R51, R52 42 10 RoHS Compliant KOA RK73B1JTTD331J Avail: RoHS Compliant SEI RMCF 1/16 330 5% R Avail: RoHS Compliant PANASONIC ERJ-3GEYJ331V DIGIKEY P330GTR-ND Avail:
RSMT0189 RES SMT, 33-OHM 1/10W 5% 0603 PART
R48 43 1
RoHS Compliant PANASONIC ERJ-3GEYJ330V DIGIKEY P33GTR-ND Avail:
RoHS Compliant
YAGEO/PHYCO RC0603JR-0733RL Avail:
RoHS Compliant YAGEO/PHYCO 9C06031A33R0JLHFT DIGIKEY 311-33GTR-ND Avail:
RoHS Compliant
YAGEO/PHYCO 9C06031A33R0JLPFT Avail:
RoHS Compliant
KOA RK73B1JTTD330J Avail:
RoHS Compliant
SEI RMCF 1/16 33 5%TR Avail:
RSMT0209 RES SMT, 200K-OHM 1/16W 5% 0603 Y PART
R3, R4, R19 44 3
RoHS Compliant PANASONIC ERJ-3GEYJ204V DIGIKEY P200KGTR-ND Avail:
RSMT0382 RES SMT, 2.00K-OHM 1/16W 1% 0603 Y PART
R40, R41 45 2
RoHS Compliant PANASONIC ERJ-3EKF2001V DIGIKEY P2.00KHTR-ND Avail:
RSMT0561 RES SMT, 3.9K OHM 1/10W 5% 0603 Y PART
R20 46 1
RoHS Compliant KOA SPEER RK73B1JTTD392J MOUSER 660-RK73B1JTTD3 Avail:
L S R
RSMT0098 RES SMT, 470-OHM 1/10W 5% 0603 PART
R53 47 1
RoHS Compliant PANASONIC ERJ-3GEYJ471V DIGIKEY P470GTR-ND Avail:
RoHS Compliant
SEI RMCF1/164705%R Avail:
RoHS Compliant
NIC NRC06J471TRF Avail:
SWITCH0059 SWITCH, PUSH BUTTON MOM 6mm LIGHT TOUCH, BLACK 7mm 260gF Y PART S1
48 1
RoHS Compliant PANASONIC EVQ-22707K DIGIKEY P12230SCT-ND Avail:
RoHS Compliant PANASONIC EVQ-11U07K DIGIKEY P8084STB-ND Avail:
TRA0010 TRANS SMT, NPN, 2N2222A, SOT-23 Y PART
Q3 49 1
RoHS Compliant
ON SEMI MMBT2222ALT1G Avail:
RoHS Compliant
FAIRCHILD SEMI MMBT2222A_NL Avail:
RoHS Compliant
ZETEK UFMMT2222A Avail:
RoHS Compliant ZETEK FMMT2222ATA DIGIKEY FMMT2222ATR-ND Avail:
RoHS Compliant FAIRCHILD SEMI MMBT2222A DIGIKEY MMBT2222AFSTR- Avail:
RoHS Compliant ON SEMI MMBT2222ALT1 DIGIKEY MMBT2222ALT1OS Avail:
RoHS Compliant DIODES INC MMBT2222A-7-F DIGIKEY MMBT2222A-FDITR Avail:
TRA0035 TRANS SMT, NPN, 2N3904, SOT-23 Y PART
Q2, Q5, Q7 50 3 RoHS Compliant ON SEMI MMBT3904 Avail: RoHS Compliant ON SEMI MMBT3904LT1G Avail: RoHS Compliant
FAIRCHILD SEMI MMBT3904_NL Avail:
RoHS Compliant FAIRCHILD SEMI MMBT3904 DIGIKEY MMBT3904FSTR-N Avail:
TRA0048 TRANS SMT, HEX/MOS P-CH -20V -3.7A SOT-23 PART
Q1 51 1
RoHS Compliant INTERNATIONAL IRLML6402TR DIGIKEY IRLML6402TR-ND Avail:
RoHS Compliant INTERNATIONAL IRLML6402TRPBF DIGIKEY IRLML6402PBFTR- Avail:
TRA0049 TRANS SMT, MOSFET N/P-CH 20V, SSOT-6 PART
U6 52 1
L S R
TRA0066 TRANS, SMT PNP 20V 4A MED PWR SOT-23 PART
Q4 53 1
RoHS Compliant ZETEX ZXTP25020CFH DIGIKEY ZXTP25020CFHTR- Avail:
TRA0068 TRANS SMT, PNP, 2N3906, SOT-23 PART
Q6 54 1
RoHS Compliant FAIRCHILD SEMI MMBT3906 DIGIKEY MMBT3906FSTR-N Avail:
RoHS Compliant ON SEMI MMBT3906LT1G DIGIKEY MMBT3906LT1GOS Avail:
-JUMPER- -JUMPER- PART
(24 AWG BARE WIRE SOLID) @ R11 55 1
RoHS Compliant
WIRE-BW-22-1/2 Avail:
-SPARE- -SPARE- LOCATION DO NOT INSTALL PART
DB0, DB1, J2, R61, R62, SCK, SDI, SDO, TB, TP1-TP6, TP9-TP10, TP12-TP15, VBUS 56 22
L S R
02-01924-D 2.2 PCB ASSY DWG, PICkit 2 44-PIN DEMO BOARD D
1 1
03-01924 2.1 SCHEMATIC, PICkit 2 44-PIN DEMO BOARD D
2 1
04-01924 2.2 PCB FABRICATION, PICkit 2 44-PIN DEMO BOARD D
3 1
08-00126 6 LABEL, NEED HELP WITH ASSY/SERIAL LBL
bottom side of board 4 1
MIC0587 IC SMT, PIC18F45K20 44 TQFP (REV A4 OR LATER) Y PART
U1 6 1
RoHS Compliant MICROCHIP PIC18F45K20-I/PT LEAB17T4XB04 Avail:
CAP0013 CAP SMT, 0.1uF 0805 CER 50V 10% X7R PART
C1, C2, C3 7 3
RoHS Compliant TAIYO UMK212BJ104KG-T DIGIKEY 587-1279-2-ND Avail:
RoHS Compliant KEMET C0805C104K5RACTU DIGIKEY 399-1170-1-ND Avail:
RoHS Compliant
CAL-CHIP GMC21X7R104K50NTLF Avail:
RoHS Compliant
KEMET C0805C104M5RAC Avail:
RoHS Compliant
NIC COMPONEN NMC0805X7R104K50TRPF Avail:
RoHS Compliant KEMET C0805C104M5RACTU DIGIKEY 399-1169-1-ND Avail:
RoHS Compliant
XICON CC501B104K MOUSER Avail:
RoHS Compliant PANASONIC ECJ-2YB1H104K DIGIKEY PCC1840TR-ND Avail:
RoHS Compliant
KEMET C0805C104M5RAC Avail:
RoHS Compliant YAGEO 08052R104K9B20D DIGIKEY 311-1140-2-ND Avail:
RSMT0444 RES SMT, 750-OHM 1/8W 5% 0805 PART
R5-R12 8 8
RoHS Compliant YAGEO RC0805JR-07750RL DIGIKEY 311-750ARTR-ND Avail:
RoHS Compliant VISHAY/DALE CRCW0805750RJNEA DIGIKEY 541-750ATR-ND Avail:
RoHS Compliant PANASONIC ERJ-6GEYJ751V DIGIKEY P750ATR-ND Avail:
RoHS Compliant ROHM MCR10EZPJ751 DIGIKEY RHM750ARTR-ND Avail:
L S R
RSMT0008 RES SMT, 1.0K-OHM 1/8W 5% 0805 PART
R1, R3 9 2
RoHS Compliant YAGEO/PHYCO 9C08052A1001JLHFT DIGIKEY 311-1.0KACT-ND Avail:
RoHS Compliant
KOA RK73B2ATTD102J Avail:
RoHS Compliant
SEI RMCF 1/10 1k 5% TR Avail: NOW
RoHS Compliant PANASONIC ERJ-6GEYJ102V DIGIKEY P1.0KATR-ND Avail:
RoHS Compliant
YAGEO/PHYCO 9C08052A1001JLPFT Avail:
RSMT0027 RES SMT, 10K-OHM 1/8W 5% 0805 PART
R2 10 1
RoHS Compliant
ROHM MCR10EZHJW10K Avail:
RoHS Compliant YAGEO/PHYCO 9C08052A1002JLHFT DIGIKEY 311-10KATR-ND Avail:
RoHS Compliant PANASONIC ERJ-6GEYJ103V DIGIKEY P10KACT-ND Avail:
RoHS Compliant
SEI RMCF 1/10 10k 5% TR Avail: NOW
RoHS Compliant
KOA RK73B2ATTD103J Avail:
RoHS Compliant YAGEO/PHYCO RC0805JR-0710KL DIGIKEY 311-10KARTR-ND Avail:
RoHS Compliant
YAGEO/PHYCO 9C08052A1002JLPFT Avail:
RPOT0019 RES POT, 10K-OHM THUMBWH CERM ST PART
RP1 11 1
RoHS Compliant
BOURNS 3352E-1-103LF Avail:
RoHS Compliant BOURNS 3352E-1-103 DIGIKEY 3352E-103-ND Avail:
LED0033 LED SMT, 0805 RED CLEAR 2x1.25mm PART
DS1-DS8 12 8
RoHS Compliant LITE-ON LTST-C170CKT DIGIKEY 160-1176-1-ND Avail:
RoHS Compliant LITE-ON LTST-C170EKT DIGIKEY 160-1178-2-ND Avail:
RoHS Compliant CHICAGO MINAT 7012X1 DIGIKEY L61101TR-ND Avail:
L S R
SWITCH0003 SWITCH SMT, PUSH BUTTON SPST MOM 6MM 160GF/230GF PART
SW1 13 1
RoHS Compliant
OMRON B3S-1002 DIGIKEY SW416-ND Avail:
RoHS Compliant E-SWITCH TL3301NF260QG/TR DIGIKEY EG1868CT-ND Avail:
RoHS Compliant E-SWITCH TL3301NF260QG DIGIKEY EG1868TR-ND Avail:
RoHS Compliant E-SWITCH TL3301NF160QG/TR DIGIKEY EG1867CT-ND Avail:
RoHS Compliant
OMRON B3S-1000 DIGIKEY SW415-ND Avail:
CON0107 CONN, HDR, 1x6 BREAKAWAY, 0.100" PITCH, 0.025 SQ, RA, (0.230/0.090) PART P1
14 1
RoHS Compliant AMP/TYCO 9-103325-0-06 DIGIKEY A32702-06-ND Avail:
RoHS Compliant MILL-MAX 800-40-006-20-001000 Avail: RoHS Compliant MILL-MAX 800-10-006-20-001000 Avail: RoHS Compliant TYCO/AMP 103765-6 Avail: RoHS Compliant
SAMTEC HTSW-106-08-G-S-RA Avail:
RoHS Compliant
JAMECO 677548 Avail:
CON0149 CONN, HDR, 1x2 BREAKAWAY, 0.100" PITCH, 0.025 SQ POST (0.100"/0.230") PART JP1 15 1 RoHS Compliant SAMTEC TSW-102-07-S-S Avail: RoHS Compliant SAMTEC TSW-102-07-G-S Avail:
CON0084 CONN, SHUNT, 2-PIN SHORTING SHUNT (.100" SPACING) PART
@JP1 16 1
RoHS Compliant
SAMTEC SNT-100-BK-G Avail:
RoHS Compliant
HARWIN M7567-05 FARNELL 150410 Avail:
RoHS Compliant
TYCO/AMP 382811-6 DIGIKEY A26227-ND Avail:
RoHS Compliant
SULLINS SSC02SYAN DIGIKEY S9002-ND Avail:
MISC0041 MISC, RUBBER FEET, 0.40 SQ x 0.1 THK BLACK PART
place on bottom side of board 17 4
RoHS Compliant
3M SJ-5007 DIGIKEY SJ5007-0-ND Avail:
-SPARE- -SPARE- LOCATION DO NOT INSTALL PART
AUX, C4-C7, Cext, P2, Rext, Rf, X1, X2 18 11
12-00842 FINAL ASSY, PICKIT 3 DEBUG EXPRESS
Part Number Description
Qty
Rev: 1
DS51792 DOC, USING PICKIT 3 POSTER 1
DS51123 SOFTWARE, MPLAB CDROM 1
DS30210 DOC, "IMPORTANT INFORMATION" MICROCHIP INFORMATION 1
DS30030 DOC, WARRANTY/REGISTRATION CARD 1
CAB0019 CABLE, USB, A TO MINI-B, 1.8m/6ft 1
02-01924-03 PCB ASSY, PICkit 3 44-PIN DEMO BOARD (PIC18F45K20) 1
10-00424 ASSY, PICkit 3 MICROCONTROLLER PROGRAMMER 1
Label Information
Label Size: 0.5” x 2.0”
Text Size
Need Help? (8pt, Bold)
Assembly Number, Serial Number, Revision: (7pt)
Graphics
Microchip Logo provided as a true type font. (~24pt)
Label Data
Need Help? (10pt, Bold, Centered)
http://support.microchip.com (7.5pt, centered)
Assy# (7-9pt, Left)
Serial# (7-9pt, Right)
Part Number
Part Number of the assembly that calls out the label
Revision
R1 - Revision of the assembly that calls out the label
Serial Number:
JIT- Manufacturer ID
95 - Year (95....)
28 - Work week product shipped (01-52)
1 – Lot number (0-9)
0001 - Sequence Piece Number (0001 - 9999) Starts over with each new lot number.
Location
(1T)
JIT070120001
Label not to scale
Label Information Text (Not Formatted Bold)
Label Size: Customize to fit packaging Font: Arial (or other Sans Serif font)
Min Label Dimensions: 1” x 3” (ex. Brady: THT-18-423-3) Size: Customize font size to fit label Max Label Dimensions: 1-5/6” x 3-1/6” (ex. Avery: 5199) Min Font Size: 8 pt (Label identifier min 6pt)
Color: White Max Font Size: 12 pt
Label should, for the most part, contain information in the following order: Product Description: MPLAB ICD 2 IN-CIRCUIT DEBUGGER
Part Number Identifier: (1P) – Precedes Part Number. Not included in bar code. Smaller font than Part Number. Part Number: DV164005
Country Code: US
Date Code Identifier: (1T) – Precedes Serial Number. Not included in bar code. Smaller font than Serial Number.
Serial Number: JIT070190001 – For non-serialized/bulk product such as cables and accessories, this field is intentionally left blank.
Product Description and Part Number are listed in the Bill of Materials (BOM) provided by Product Engineering. Graphics Country Code:
CE Logo (if necessary) US United States
Filename: CE-Logo.jpg CN China
China ‘e’ label TH Thailand
Filename: RoHS-China.jpg Serial Number:
JIT – Manufacturer ID (designated by Microchip Development Systems)
0701 – Date Code: Last two digits of year and two digits of work week (01-52) (underlined) 2 – Lot number. This digit indicates the lot # (0-9).
0001 – Sequence Piece Number (0001 - 9999) Starts over with each new lot number. Barcode Information:
Barcode is Code 39 format (3 of 9)
Barcode Height: size to fit label (provided it is still scannable) Min Ratio is 1:1
Max Ratio is 2.5:1
Font: Arial (or other Sans Serif font) Location:
This label is attached to the outside of the product case.
Vendor to insure that the serial number corresponds to the serial number assigned to the main electro-mechanical assembly contained in this product case.