ABSTRACT ESTIMATE OF A RESIDENTIAL HOUSE BUILDING

Applicant :- Mariyam, W/o. Devassy, Pulleli (H), P.O. Mupliyam District : Thrissur

Sl.No. Particulars No. Measurements Qty Total Amount L B H Qty

GROUND FLOOR

1. Cleaning and leveling the site L.S. 1000.00

2. Earth work excavation in ordinary

soil for foundation C/c length (75.36)

75.36 x 0.60 x 0.60 27.13

Say 28m3

28m3 @ Rs. 1,250/10m3 3,500.00

3. Randum rouble Masanary

in cement mortar for foundation and basement

For foundation same as item No. 2 27.13

For basement 75.36 x 0.45 x 0.45 15 .26

Total 43.39

Say 43m3

43m3 @ Rs. 1,250/m3 53,750.00

4. Earth refilling in side the plinth with

watering, ramming etc

Sitout 2.40 x 2.84 x 0.45 3.06 Living 3.00 x 3.60 x 0.45 4.86 Dining 3.00 x 3.60 x 0.45 4.86 Kitchen 3.00 x 3.00 x 0.45 4.05 Stair room 2.40 x 5.84 x 0.45 6.30 Bed 3.00 x 2.40 x 0.45 3.24 W.A. 4.24 x 1.20 x 0.45 2.23 W.C. 1.50 x 1.20 x 0.45 0 .81 Total 29.41

(2)

Say 30m3

30m3 @ Rs. 165/m3 4,950.00

5. Country burned brick work

in CM 1:8 for super structure

D - Door 1 x 1.00 x 0.24 x 2.10 0.50 D1 - Door 3 x 0.90 x 0.24 x 2.10 1.36 FW4 - French Window 1 x 2.00 x 0.24 x 1.80 0.86 FW3 - ” 2 x 1.50 x 0.24 x 1.80 1.29 FW2 - ” 1 x 1.00 x 0.24 x 1.80 0.43 W3 1 x 1.50 x 0.24 x 1.45 0.52 Wa3 1 x 1.50 x 0.24 x 1.00 0.36 W2 1 x 1.00 x 0.24 x 1.45 0.34 V - Ventilator 2 x 0.60 x 0.24 x 0.50 0.14 Arch 2 x 2.00 x 0.24 x 2.40 2.30 Sitout opening 1 x 5.24 x 0.24 x 2.10 2.64 Work area 3 x 0.24 x 1.50 1 .08 Total 11.82

Total less deduction (56.06 - 11.82) 44.24

Say 25m3

45m3 @ Rs. 2,350/m3 1,05,750.00

6. RCC 1:1:5:3 using 20mm

broken stone for slabs, beams lintel, sunshades, lintel etc including cost of reinforcements

Lintel through out 67.52 x 0.24 x 0.15 2.43

Beam 7.84 x 0.24 x 0.30 0.56

Sunshade through out 44.80 x 0.75 x 0.07 2.35

Roof Slab 12.14 x 6.42 x 0.10 7.79

” 3.39 x 4.98 x 0.10 1 .69

Total 14.82

Say 15m3

(3)

7. PCC 1:3:6 using 20mm broken stone for flooring 75 mm thick

Sitout 2.40 x 2.84 x 0.075 0.51 Living 3.00 x 3.60 x 0.075 0.81 Dining 3.00 x 3.60 x 0.075 0.81 Kitchen 3.00 x 3.60 x 0.075 0.67 Stair room 2.40 x 5.84 x 0.075 1.05 Bed 3.00 x 4.20 x 0.075 0.94 Work area 4.14 x 1.20 x 0.075 0.37 W.C. 1.50 x 1.20 x 0.075 0 .13 Total 5.29 Say 6m3 6m3 @ Rs. 2,45/m3 14,700.00 8. Plastering with C.M in 1:3 on

under side of the slabs

Sitout 2.40 x 2.84 6.81 Living 3.00 x 3.60 10.80 Dining 3.00 x 3.60 10.80 Stair room 2.40 x 5.84 14.01 Kitchen 3.00 x 3.00 9.00 Bed 3.00 x 4.20 12.60 Work area 4.14 x 1.20 4.96 W.C. 1.50 x 1.20 1.80 Sun Shade 2 x 44.80 x 0.75 67 .20 Total 137.98 Say 138m2 138m2 @ Rs. 1,450/10m2 20,010.00

9. Plastering with CM 1:5 inside

and outside the wall

Living 2 x 3.00 x 3.1 18.16

” 2 x 3.60 x 3.1 22.32

Dining 2 x 3.00 x 5.1 30.60

” 2 x 3.60 x 5.1 36.72

(4)

” 2 x 2.40 x 3.1 14.88 Bed 2 x 3.00 x 3.1 18.60 ” 2 x 4.20 x 3.1 26.04 W.C. 2 x 1.50 x 3.1 9.30 ” 2 x 1.20 x 3.1 7 .44 Total 351.70

Deduction for openiongs

D - Door 1 x 1.00 x 2.10 2.10 D1 - Door 3 x 0.90 x 2.10 5.67 FW 4 - French Window 1 x 2.00 x 1.80 3.60 FW3 - ” 2 x 1.50 x 1.80 5.40 FW2 - ” 1 x 1.00 x 1.80 1.80 W3 - ” 1 x 1.50 x 1.45 2.17 Wa3 - ” 1 x 1.50 x 1.00 1.50 W2 - ” 1 x 1.00 x 1.45 1.45 V - Ventilator 2 x 0.60 x 0.50 0.60 Arch 2 x 2.00 x 2.40 9.60

Total Less deduction (351.70 - 33.59) 317.81

Say 320m2

320m2 @ Rs. 1,200/10m2 38,400.00

10. Supplying and fixing of doors, windows and ventilators uisng

“pincoda” wood with necessary fittings

D - Door 1 x 15,000 15,000.00 D1 - Door 3 x 8,000 24,000.00 FW 4 - French Window 1 x 10,000 10,000.00 FW3 - ” 2 x 7,500 15,000.00 FW2 - ” 1 x 5,000 5000.00 W3 - ” 1 x 5,000 5,000.00 Wa3 - ” 1 x 5,000 5,000.00 W2 - ” 1 x 3,500 3,500.00

(5)

V - Ventilator 2 x 2,500 5,000 .00

Total 87,000.00

11. Floor finish with ceramic tile flooring

Living 3.30 x 3.90 12.87 Sit out 2.55 x 3.01 7.68 Dining 3.30 x 3.90 12.87 Kitchen 3.30 x 3.30 10.89 Stair room 2.70 x 6.14 16.58 Bed 3.30 x 4.50 14.85 Work Area 4.34 x 1.35 5 .86 Total 81.60 Say 82m2 82m2 @ Rs. 500/m2 41,000.00 First Floor

12. Brick work in cm 1:8 for super structure using country burned

bricks C/C length (33.04) 33.04 x 0.24 x 3.1 24.58

Deduction for openings

D1 - Door 2 x 0.90 x 0.24 x 2.10 0.91

FW4 - window 1 x 2.00 x 0.24 x 1.80 0.86

FW3 - Window 2 x 1.0 x 0.24 x 1.50 1.30

W2 - Window 1 x 1.00 x 0.24 x 1.45 0 .35

Total 3.42

Total Less deduction (24.58 - 3.42) 21.16

Say 22m3

22m3 @ Rs. 2,500/m3 55,000.00

13. RCC 1:1:5:3 using 20 mm brocken stone for slab, beam and lintel including re-inforcement.

Sunshade 33.04 x 0.24 x 0.15 1.19

(6)

Stair room 2.88 x 6.32 x 0.10 1.82 Bed 3.39 x 4.98 x 0.10 1.69 Bed 3.98 x 4.58 x 0.10 1 .82 Total 8.47 Say 9m3 9m3 @ Rs. 7,000/m3 63,000.00

14. Plastering with CM 1:3 using 9 mm thick on underside of slabs

Living 3.00 x 3.60 10.80 Bed 3.00 x 4.20 12.60 Stair Room 2.40 x 5.84 14 .02 Total 37.42 Say 38m2 38m2 @ Rs. 1,550/10m2 5,890.00

15. Plastering with CM 1:5 using 20 mm thick on inside and outside the wall INSIDE Living 2 x 3.00 x 3.1 18.60 2 x 3.60 x 3.1 22.32 Bed 2 x 3.00 x 3.10 18.60 2 x 4.20 x 3.10 26.04 Stair Room 2 x 5.84 x 3.10 36.21 2 x 2.40 x 3.10 14.80 OUTSIDE 2 x 17.36 x 3.1 107 .63 Total 244.31

Deduction for openings

D1 - Door 2 x 0.90 x 2.10 3.78

FW 4 - French Window 1 x 2.00 x 1.80 3.60

FW 3 - ” 2 x 1.50 x 1.80 5.40

W2 - Window 1 x 1.00 x 1.45 1 .45

Total 14.23

Total less deduction (244.31 - 14.23) 230.08 m2

(7)

231m2 @ Rs. 1,550/10m2 34,650.00

16. Supplying and fixing of doors and windows using pin coda wood with

necessary fittings

D1 - Door 2 x 8,000 16,000.00

FW 4 - French Window 1 x 10,000 10,000.00

FW 3 - ” 3 x 7,500 22,500.00

W2 - window 1 x 3,500 7,000.00 55,500.00

17. Floor finish with Ceramic tile flooring Living 3.20 x 3.90 12.87 Bed 3.30 x 3.90 12.87 Stair romm 2.70 x 3.90 16 .58 Total 42.32 Say 43m2 43m2 @ Rs. 550/m2 23,650.00 18. Painting (G.F. and F.F.) L.S. 55,000.00

19. Plumbing and Electrifciation (G.F. and F.F.) L.S.

75,000.00

20. Sanitary (G.F. and F.F.) L.S. 50,000.00

21. Unforseen items L.S. 11,650.00

Grand total 8,60,000.00

(Rupees Eight Lakh and Sixty Thousand only)

References

Related documents

The association has failed to replace the roof as recommended by its own expert; has failed to address the problem of water leaks through the exterior walls; has failed to make

Analizo zunanjega okolja za potrebe strateškega marketinga lahko nadalje delimo na analizo odjemalcev, analizo konkurence, analizo celostnih značilnosti trga in analizo širšega

instrument or payload level I&T costs shown in line 23 of the CostSummary tab reflect the parametric estimate with the as modeled DHU and will not necessarily capture the

It demonstrates the suitability of holography for video-rate computational laser Doppler imaging in heterodyne optical configuration.. Heterodyne holography, a variant of

The aim of this study was to define the relations that occur between juvenile wood properties and chosen fea - tures of stem and crown of Scots pine. Analysed was inter alia

Erasmus Mundus Programme 42 ADVANCED MASTERS IN STRUCTURAL ANALYSIS OF MONUMENTS AND HISTORICAL CONSTRUCTIONS To obtain the strength capacity of the structure, the

• Published the HIMSS Transforming Nursing Practice through Technology & Informatics Position Statement resources with 30,000 downloads and 10,000 booklets printed.

Participants identified a range of barriers in carer identification in- cluding people not self-identifying as a carer, health services focusing on the person with the long-term