Industry Sector, Mobility Division

Integrated Services

Workshop Services

(2)

Page 2

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Our worldwide expertise

Skill Portfolio

ƒ

Project management

ƒ

Expert‘s report

ƒ

Consulting

ƒ

Engineering

ƒ

Mechanical and electrical installation

ƒ

Welding (engineers, experts, PT-examiner)

ƒ

Commissioning

We have the power of high-skilled personnel

providing solutions worldwide

(3)

Independent of the kind of material – the workshops

fulfill all quality requirements according to ISO 9001

Materials Aluminum Stainless steel Steel

ISO 9606 - 2

ISO 3834 - 2

ISO 14731

ISO 15614 P.1+2

qualification tests of welders

quality requirements

of welding works welding coordination welding procedures

ISO 9001 – Quality Management System

compliant with DIN 6700, now DIN EN 15085 - Welding of rail vehicles and components

Standards Content Certificates

Procedures MIG - metal inert gas MAG - metal active gas

(4)

Page 4

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

ƒ Complete solution from one hand

ƒ Repair of damaged vehicles in a Siemens or customer owned facility ƒ As consultant or as performer

ƒ Front, side crash or fire damage – all accidents ƒ Trams, metros or trains – all vehicles

ƒ Support to enhance the operational lifetime ƒ Restoration of historical cars

ƒ Modifications as a complete solution

ƒ Individual support like supervision, engineering or commissioning ƒ Qualified staff for overhauls

Crash & Accident Repair

Modernization

Workshop Services: In our own facilities, customer’s or partnered workshops

Workshop Services is active around the world in

(5)

Siemens offers complete services for crash and

accident repair including insurance processing

Crash and Accident Repair

Standard processes for crash and accident repair

Content

ƒ Expertise on site

ƒ Transport of vehicle or repair at customer facilities ƒ Technical and financial damage assessment ƒ Set-up of repair schedule

ƒ Engineering of mechanical/ electrical equipment

ƒ Execution of repair (disassembling, cut-off grinding, welding, truing, measurement, paintwork, assembly)

ƒ Commissioning and acceptance tests ƒ Complete repair documentation ƒ Loss adjustor/ insurance processing

Benefits

ƒ 8 years experiences on different types of damages ƒ Direct access to the complete original drawings

ƒ Mechanical and electrical engineering support from Siemens ƒ Full service package including all paperwork

ƒ Repair on site is a choice of customer ƒ Short repair times

Measuring device Levelling rack Welding Cut-off grinding Documentation Calculation

(6)

Page 6

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

No matter which crash or accident happened –

We are able to handle it

Desiro DMU Rumänien Combino Amsterdam Combino Melbourne Combino Amsterdam

ƒ Frontschaden Commuter

ƒ Frontschaden Light Rail Vehicle ƒ Seitenschaden

Light Rail Vehicle

ƒ Feuerschaden Light Rail Vehicle

Overview on crash & accident repair services

(7)

Crash repair of a front-damaged Desiro after a

heavy crash with a cement truck

Happened:

ƒ October 2007 in Romania

Damages:

ƒ Complete front section ƒ Front underframe ƒ GRP-Front mask ƒ Clutch

Challenge:

ƒ Repair on customer’s site ƒ Complex welding tasks

Activities:

ƒ Shipping of welding equipment and material ƒ Manufacturing of new front and under frame ƒ Welding on customer’s site

Duration of repair services:

ƒ May 2008 until August 2008

Crash repair at customers’ site

(8)

Page 8

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Crash repair of a front-damaged Desiro after a

heavy crash with a cement truck

(9)

Crash repair of a side-damage Combino after

derailment and collision with a catenary pole

Happened:

ƒ December 2007 in Amsterdam, Netherlands

Damages:

ƒ Heavy impact of sidewall and underframe

Challenge:

ƒ Local repair of sidewall

ƒ No stripping down of car body

ƒ Complete repair at a Siemens workshop ƒ New FEM-Calculation for repair section ƒ Fastest possible repair time was requested

Activities:

ƒ Using special welding procedures for repair section ƒ Using special welding jigs

Duration of repair services:

ƒ March 2008 until June 2008

Crash repair at Siemens facility

(10)

Page 10

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Crash repair of a side-damage Combino after

derailment and collision with a catenary pole

(11)

Crash repair of front-damaged Combino after

collision of two light rail vehicles

Happened:

ƒ 24.09.2007 in Melbourne, Australia

Damages:

ƒ Complete front section ƒ Front underframe ƒ GRP-Front mask ƒ Clutch

Challenge:

ƒ Shipping of the vehicle to Germany ƒ Complete repair at a Siemens workshop

Activities:

ƒ Procurement of main components ƒ Transport to Germany

ƒ Construction and manufacturing of new aluminum under frame

ƒ Using special welding tools and jigs

Duration of repair services:

ƒ April 2008 unitl September 2008

Crash repair at Siemens facility

(12)

Page 12

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Crash repair of front-damaged Combino after

collision of two light rail vehicles

(13)

Accident repair after a fire-damaged Combino

caused by a broken catenary

Happened:

ƒ 2002 in Amsterdam, Netherlands

Damages:

ƒ Fire damage of the complete roof section ƒ Caused by broken catenary

ƒ Gutted traction container

Challenge:

ƒ Decontaminate of interior cabin equipment

ƒ Dismantling of complex roof and side wall bonding

Activities:

ƒ Decontaminate of complete interior ƒ Decontaminate of components ƒ Re-wiring

ƒ Construction of new roof section ƒ Complete electrical commissioning

Duration of repair services:

ƒ April 2003 until June 2003

Crash repair at Siemens facility

(14)

Page 14

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Accident repair after a fire-damaged Combino

caused by a broken catenary

(15)

ƒ Complete solution from one hand

ƒ Repair of damaged vehicles in a Siemens or customer owned facility ƒ As consultant or as performer

ƒ Front, side crash or fire damage – all accidents ƒ Trams, metros or trains – all vehicles

ƒ Support to enhance the operational lifetime ƒ Restoration of historical cars

ƒ Modifications as a complete solution

ƒ Individual support like supervision, engineering or commsioning ƒ Qualified staff for overhauls

Crash & Accident Repair

Modernization

Workshop Services: In our own facilities, customer‘s or partnered workshops

Workshop Services is active around the world in

(16)

Page 16

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

A second life or simply modification for rail

vehicles with modernization solutions of Siemens

Modernization

Overview on modernization services

Content

Modernization of complete fleets to enhance the operational lifetime as well as restoration of historical vehicles

ƒ Creation of retrofit concepts (technique, design, costs) ƒ Set-up of retrofit schedule

ƒ Engineering of components and software ƒ Procurement of new components

ƒ Execution of retrofit work (disassembly, new components, welding, painting, finishing)

ƒ Commissioning and acceptance tests ƒ Complete retrofit documentation Additional restoration activities

ƒ Assessment of condition of all components ƒ Cleaning of the vehicle

ƒ Restoration of components

Benefits

ƒ Customer specific solution on site or at our own facilities ƒ Modification of one vehicle or of a fleet

ƒ Complete order processing including logistics, engineering,

approval and documentation Underfloor retrofit

Interior retrofit

(17)

Modernization of Rolling Stock is multifaceted

Combino Budapest Metro Munich Locomotive BR 189

ƒ Installation of a new air conditioning system

ƒ Retrofitting of ATC systems for cross border operation (e.g. ETCS, ATB, SCMT) ƒ Syntegra prototype

including installation of traction converter & bogie

Examples for modernization

Desiro UK class 450

ƒ Change of interior alignment for upgrading passenger Capacity

(18)

Page 18

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Retrofit of an air conditioning system

for Combino Budapest

Example for installation of new components on site

Air condition system

Type of vehicle:

ƒ Air conditioning units

Customer requirements:

ƒ Demounting of the existing system for heating and ventilation ƒ Adaption of interfaces

ƒ Assembly of new air conditioning system

Activities:

ƒ Pre-assembly of cables and connectors

ƒ Disassembly of existing system and interior flaps

ƒ Mechanical works including drilling of holes and sealing ƒ Change of control cables and installation of new cabling ƒ Assembly of new air-conditioning unit

ƒ Installation of a separate DC/DC converter ƒ Check of insulation and water tightness ƒ Commissioning including check of functions

ƒ Type test to confirm the technical data and cooling power

Duration of modernization service

ƒ February 2008 until June 2008

Amount:

ƒ 120 at 40 Combino trams

(19)

Retrofit of an air conditioning system

for Combino Budapest

(20)

Page 20

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Syntegra – Complete retrofitting of a Munich metro

train with a new traction system and bogie

Type of vehicle:

ƒ Munich metro train

Customer requirements:

ƒ Disassembly of existing traction system and bogies ƒ Mechanical and electrical adaption for new systems ƒ Engineering, welding, commissioning and documentation

Activities:

ƒ Transport of end car to Siemens workshop ƒ Mechanical and electrical disassembly ƒ Engineering and calculation

ƒ Mechanical adaption for new traction system and bogie including welding, drilling, painting, cablings etc.

ƒ Assembly of new components and connection of bogie, traction, cooling, braking and other electrical systems ƒ Check of insulation and commissioning

ƒ Documentation of works

Duration of modernization service

ƒ June 2005 until January 2006

Syntegra prototype modification

Upgrade Syntegra

Amount:

(21)

Syntegra – Complete retrofitting of a Munich metro

train with a new traction system and bogie

(22)

Page 22

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

Type of vehicle:

ƒ Locomotives BR 189 (Mitsui)

Customer requirements:

ƒ Disassembly of existing ATC-systems

ƒ Adaption of mechanical and electrical interfaces ƒ Installation of new components

Activities:

ƒ Transport of locomotives into Siemens workshop ƒ Mechanical and electrical disassembly

ƒ Mechanical adaption for new ATC-components

ƒ Assembly of new components and connection of cables (e.g. displays, sensors, electrical cabinets, antennas) ƒ Assembly of new pantograph

ƒ Check of insulation

ƒ Commissioning including driving tests ƒ Documentation of works

Duration of modernization service

ƒ December 2007 until end of 2010

The new requirements regarding cross border

operation can be fulfilled with an ETCS upgrade

ETCS upgrade

ETCS-Upgrade

Amount:

(23)

The new requirements regarding cross border

operation can be fulfilled with an ETCS upgrade

(24)

Page 24

Copyright © Siemens AG 2009. All rights reserved.

Sector Industry – Mobility Division I MO RS IS

The ‘High Capacity’ project for

Desiro trains class 450 at Bournemouth depot

Interior modification

High capacity modification

Type of vehicle:

ƒ Desiro class 450

Customer requirements:

ƒ Interior retrofit to improve the transport capacity ƒ Planning of new outline for several types of cars ƒ Execution of works at Bournemouth depot

Activities:

ƒ Disassembly of the existing seat modules (3 seats) ƒ Remove of big litter bins, tables and curtains ƒ Mechanical works on the floor (e.g. holes, carpet) ƒ Installation of new seat modules (2 seats)

ƒ Assembly of new side handrails ƒ Reworking of interior doors

ƒ Installation of small litter bins behind glass divider ƒ Sealing of holes that are no longer used

ƒ Repair of carpet

Duration of modernization service

ƒ August 2007 until July 2008

Amount:

(25)

The ‘High Capacity’ project for

Desiro trains class 450 at Bournemouth depot

Interior modification

(26)

Copyright © Siemens AG 2009. All rights reserved.

The greater the challenge, the better we get –

We keep rail systems running

References

Related documents

We will couple the predictive power of simulation models with mathematical results from applying optimal control theory, elevating abstract mathematical results into

The massive skarn bodies were subdivided into a dominant brown garnet skarn, a distal green pyroxene – epidote skarn, and two quartz-rich varieties, a blue-green garnet skarn and

The results describe the user experience with different types of music discovery services, showing that the most positive user experience related comments concern the

Critics of democratic socialism or of left-liberalism have often used the association of communism with Soviet- style politics to tar the political left with the perceived crimes

From the HSLVRGH RI ³,QGRQHVLD /DZ\HUV &OXE´ in focus, the writer found that the conversation was dominated by a high capacity of turn-taking irregularities, either

Understanding the specifications of each story takes a lot of back-and-forth during the week between the Labs team members, portfolio companies, the senior point

In the Contacts pane, click a contact with voice mail (in the Group/Enterprise or Favorites directory) and then click VM for that contact1. To transfer the call to your own

The fraction of liver-related mortality attributable to chronic HCV infection was calculated relative to that in monoinfected PLWH using the equation