• No results found

ON THE PROJECT MANAGEMENT SCHEDULING BASED ON AGENT TECHNOLOGY AND THEORY OF CONSTRAINT

N/A
N/A
Protected

Academic year: 2021

Share "ON THE PROJECT MANAGEMENT SCHEDULING BASED ON AGENT TECHNOLOGY AND THEORY OF CONSTRAINT"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Figure 1: Project management information platform  architecture
Figure 2: Overview of agents operation
Figure 3: Work structure of simulation project  4.3 Simulation Data Analysis
Table 1: Simulation results of project duration and total scheduling days (unit: day)

References

Related documents

The general assessment of facebook usage among Ethiopian University students in Ethiopia show that the highly engulfment of social media especially facebook bring both

The adverts were then grouped into five broad categories, namely: academic, archives and records management, information, library, and knowledge management

Purpose: The aim of this study was to evaluate the cost-effectiveness of ribociclib compared to palbociclib, both in combination with letrozole, in the first-line treatment

By formulating the video denoising problem to a low-rank matrix completion problem, our proposed algorithm does not assume any specific statistical properties

Graphs showing the percentage change in epithelial expression of the pro-apoptotic markers Bad and Bak; the anti-apoptotic marker Bcl-2; the death receptor Fas; the caspase

The national health priority areas are disease prevention, mitigation and control; health education, promotion, environmental health and nutrition; governance, coord-

3 Area under the curve for predicting nursing home placement using the American College of Surgeons National Surgical Quality Improvement Program surgical risk score and

Thresholds (i.e., at what density of a particular weed does yield loss warrant management?) thrsh. Cost/Benefit analyses (e.g., does non-target mortality to pollinators or