PROJECT MANAGER / CONSTRUCTION

From the first day I began managing Hundred millions Dirham construction projects in UAE, I have consistently realized my objective of bringing every single project in on time and under budget. However, I have never believed that meeting those criteria alone was good enough. If you agree that well-managed projects should satisfy the customers'

expectations in terms of quality and service, we should talk.

To help you learn more about my track record, I have enclosed my résumé. While it illustrates my experience and training, what it cannot communicate is my dedication to my craft. My professional creed includes:

•Pride in the quality of my work, and to remove project obstacles and get the job done.

•Skilled in building lasting relationships with Project's owners/Client, who frequently request project advice. •Excellent skills in guiding, motivating, training and mentoring other individuals in my team.

Based on my experience and strong commitment to my craft, I know I will add significant value to your team. I look forward to discussing my capabilities in more detail, and am available for a personal interview at your convenience. Please let me know if you wish to further discuss your requirements and my ability to meet them. Thank you for your time and consideration.

Sincerely,

(2)

Since November 2014

Project Manager / Construction

Mission: -Preserve Company Interests & Assets

-Complies and implements with Company policies and procedures (QMS and HSEMS) -Coordinates with the Area Manager

-Reviews and evaluates plans, time schedules and operating budgets -Organizes and distributes work tasks among site teams

-Monitors productivity

-Coordinates with procurement

-Request equipment according to site requirements.

-Coordinate with Administrative Department for staff requirements -Supervises sub-contractors

-Reviews, checks and approves sub-contractors periodic statements

-Coordinates and insures good work relationship with the client's representative on site -Coordinates with concerned parties for the eventual generation of the shop drawings -Meets on regular weekly basis with the site team

-Approves Program of Works and analyzes the weekly and monthly updates -Initiate and follow- up any Contractual matter

-Analyzes the site reports

-Issue the Payment Application to the Client -Reports to the HO as the project status

Means: 50 members team including project manager,construction managers, site

engineers,Planning Engineer,technical manager, QA/QC, Q/S Supervisors,Surveyor & Draughtsman.

As main Contractor working for:

- EOM, His Highness Sheikh Mansour Bin Zayed Al Nahyan Engineering office - as client - GAJ - Godwin Austen Johnson as consultant

Appraisal: AL Wathba Private Five Stars Desert Resort

(CONSTRUCTION OF A FIVE STARS DESERT RESORT & HOTEL IN AL WATHBA AREA -ABU DHABI) for 300 millions AED, consisting of:

-Main Hotel Building (6000 m2 underground Basement including Water Tank & kitchen, Cold store area & Car Parking

-Bedroom Villas (16 Nos) -Bedroom Blocks (6 Nos) -Dinning & Restaurants buildings -Infinity Swimming Pools -Talise Spa building -Desert Camp

-Staff Accommodation Building -Landscaping (Hard & Soft)

(3)

00971 Abu Dhabi United Arab Emirates May 2012

October 2014

Construction Manager

Mission: - Safeguards & preserve the company interests and assets.

- Complies & implements with company policies and procedures (QMS & HSEMS)

- Site Management teaming, planing of resources and distribution of work on site to go online with project schedule

- Follow-up & control subcontractors through the subordinate engineers to execute their works in accordance with subcontract agreement & per schedule

- Plan, direct, coordinate activities through subordinate supervisory personnel - Ensures quality control process is implemented and daily coordination is done - Study job specifications to determine appropriate construction methods

- Coordinates with the different project departments in order to prepare and finalize the method statement of the work

- Monitor progress of the project on a daily basis

- Prepare with the QA/QC manager the Project Quality plan - Ensure safety standards and procedures are implemented - Reports to Project Manager as required

- Shop Drawings preparation

Means: 20 members team including project manager,construction manager, site

engineers,Planning Engineer, QA/QC, Q/S Supervisors,Surveyor & Draughtsman. As main Contractor working for:

- DOT - Abu Dhabi department of Transport - as client - PARSONS as consultant & Project manager

-Appraisal: Two phases Car Parking project

(CONSTRUCTION OF MULTI STOREY PARKING

STRUCTURE IN SECTOR E11) for 120 millions AED, consisting of:

-Phase-1 : 8,000 sqm plot as temporary steel structure parking (including existing service relocation and Traffic diversion circulation)

- Phase-2 : Underground multistory Parking for 8,400 sqm plot (including Relocation of existing services , Traffic Diversion circulation ,Enabling work for shoring excavation and piling & Construction scope for the building structure consisting of Base slab/Exterior retaining walls/ramps/precast Tee beams, I girder & columns)

(4)

January 2009 April 2012

Construction Manager

Group3 Engineers Contractors L.L.C

Mission: -Shop Drawings preparation (Supervising and Guiding draughtsman for Structural &

Architectural drawing's submittal & approval)

-Site Logistics management for better civil operation and site job achievement

-Direct site supervision with site engineers & supervisors to ensure completion of the assignment during the proper duration and according to the requested specifications and drawings

-Site inspection & consultant handing over on time with respect to the official project site plan -Assuring quality & code requirements regarding Field execution

-Direct support for manpower control and distribution of working groups and crews in situ to match the job criteria

-Coordination with Project Manager in order to reflect the job status and reporting as per site condition and requirements

Progress, Structural/Architectural & MEP meetings attendance with consultants and Client

Means: 20 members team including project manager, site engineers,Planning Engineer,

QA/QC, Supervisors,Surveyor & Draughtsman. As main Contractor working for:

-SinoGulf-UAE as Client

-Coffey-Abu Dhabi-UAE as Project manager -Woods Bagot/Connel Wagner-UAE as Consultant

Appraisal:

Developed Tower in Exhibition Center Area (ADNEC), Abu Dhabi for 350 millions AED, Consisting of:

-5000 m2 of 4 underground parking floors/basements -Ground floor with Parking & Retail area

-Three Podiums

-2000 m2 of 26 typical floors -Roof and upper roof top floors

(5)

00971 Abu Dhabi United Arab Emirates March 2007

December 2008

Project Engineer

PAULING MIDDLE EAST CO L.L.C, Dubai-UAE

Mission: -Direct site supervision & execution for all structural elements, finishes and general

civil works.

-Project coordination -Shop drawings submittal -Materials submittal

-Dealing with suppliers & manufacturers and follow up supply and fix all required project's items and ensuring the compliance of the products to the specifications & shop drawings

-Direct technical support & progress on site

-Attending the meetings with client’s representative and consultants

-Coordination & progress meetings with Client, Project manager & Consultant -Follow up & site coordination with subcontractors

-Direct reporting to the contractor's Project manager

Means: 25 members team including Project manager,Construction manager,Project

engineers,Site engineers,Planning Engineers,QA/QC,QS, Supervisors,Surveyors & Draughtsmen.

As main contractor working for: -NAKHEEL-DMC- Dubai-UAE as Client -Turner TCI, Dubai-UAE as Project manager -ECG, Dubai-UAE as Consultant

-DMC, Dubai-UAE as Client representative

Appraisal: Dubai Maritime City, Labor Accommodation

Complex-DMC-LAC-(Project amount: 400 million AED) Consisting of;

-Six Buildings (GF, 2 Podiums & 16 Floors each)for 12500 m2 plot limit -2500 m2 underground water tank

-Four stories building for Car park March 2006

March 2007

Project coordinator

PAULING MIDDLE EAST CO L.L.C, Dubai-UAE

Mission: -Project coordination

-Shop drawings submittal -Materials submittal -Technical support on site

-Meetings with client’s representative and consultants -Follow up & site coordination with subcontractors

-Direct supervision of the handing over operation including paper work and meeting attendance representing the main contractor

-Direct reporting to the Contractor's Project manager

Means: 30 members team including Project manager,Construction manager,Project

Coordinator,Project Engineers,Site engineers,Planning Engineer, QA/QC,QS, Supervisors,Surveyor & Draughtsman.

As main Contractor working for: -NAKHEEL, Dubai-UAE as Client

-HILL International, Dubai-UAE as Project manager -KEO, Dubai-UAE as Consultant

-CDG, Dubai-UAE as Client representative

Appraisal: Palm Jumeirah Island, 131 Villas on Frond O, for 140 million AED

consisting of:

(6)

September 2004 February 2006

Section Engineer

ARCANE INTERIOR DECORATION, Abu Dhabi-UAE

Mission: -Tendering

-Preparing shop drawings -Site execution and follow up

Payments certificates for subcontractors

-Supervision of technical and procurement departments.

Means: 5 to 10 members team including Site engineers and Supervisors

As Sub-Contractor working for:

-ADCO-Abu Dhabi company for onshore oil operations, Abu Dhabi, Dabiiya .ADCO, Abu Dhabi-UAE (Client)

·ACG, Abu Dhabi-UAE (Consultant)

·TARGET ENGINEERING, Abu Dhabi-UAE (Main contractor) -Marina Mall Extension, Abu Dhabi-UAE

-and multiple of projects in Abu Dhabi city for False Ceiling, Joinery & Flooring

Appraisal: -NEB-PHASE 1 (Accommodations & administrations buildings for ADCO-Abu Dhabi

company for onshore oil operations), Abu Dhabi, Dabiia-UAE

-Villa Bin Hermel, Villa Al Sayegh & multiple of villas in Abu Dhabi-UAE -Marina Mall Extension, Abu Dhabi-UAE

August 2003 August 2004

Structural Engineer

TECG consultancy group, Lebanon, Beirut

Mission: -Structural design and modeling for school building

-Shop drawing preparation

-Site representative for consultant, providing technical support as resident engineer to ensure structural execution as per designs, specifications and shop drawings

Means: 5 members of structural and architectural engineers for consultancy group responsible

of full building design consisting of 4 basements underground and 12 floors for mixed structure (Pre-stressed beams and hollow core slabs)

Including full technical support on site and supervision for the contractor team June 2001

September 2001

Trainee

Dar Al-Handasah - Shair & Partners (Beirut, Lebanon)

Mission: Training in the Geotechnical Department

Diplomas and education

September 1998

July 2003

Lebanese University , Faculty Of Engineering, Civil Department

Civil Engineering Master Degree Major Courses are :

-Structures

-Reinforced Concrete (ACI / BAEL codes) -Prestressed/Post tensioned Concrete -Soil Mechanics

-Highway and Road Design -Hydraulics

(7)

00971 Abu Dhabi United Arab Emirates

Computing skills

Software

Softwares:

Microsoft Office (Word, Excel, PowerPoint) AutoCAD 2007, Modeling Programs: Arche-Effel CBS/Robot Millennium v.16 ArcView Planing Programs: Primavera

Languages

Pascal.

Language skills

English

Speaking competence: Fluent, Written competence: Fluent

French

Speaking competence: Intermediate, Written competence: Intermediate

Arabic

Speaking competence: Native speaker, Written competence: Native speaker

Various

Sports

Swimming

Driving Licenses

References

Related documents

Based on the fact that the grain cart is primarily responsible for unloading grains, we explore the problem of motion planning and scheduling for an autonomous grain cart that

The day-of-the-week effect, usually named as the Monday effect or the weekend effect, because the lowest and simultaneously negative returns met on Mondays according to the

In tumor cells exposed to DNA damaging therapy, p53 appears to be essential for senescence induction as tumor cell lines harboring mutant p53 failed to become senescent and

Note: If the laboratory director (LD) is the only individual testing and reporting test results, (s)he must establish and document a minimal level of proficiency in order to

1498 DUNCAN, Robert F., "'Fairway," 16 Woodhall Park Mount, Stanningley, Pudsey, LS 28 7TE, Yorkshire, England (Gener~lll Collectoo- all issues 19th and 20th century.

" Now you can start drawing generation for main positions by clicking the button Apply (in the dialog window Automatic < Outputs on the right

customers and potential customers) will help you get into the mindset that is driving the shift to content marketing, web content strategy, and ongoing content creation. Tapping

The result of wound healing percentage analysis using LSD test showed no statistically significant difference (p>0,05) between each intervention