Indus Basin Irrigation System

Indus Basin Irrigation System

1.History:

1.History:

The Indus Valley has been the host to one of the most ancient civilization of human history, the The Indus Valley has been the host to one of the most ancient civilization of human history, the Indus Valley Civilization. After the extinction of the Indus Civilization, new settlements Indus Valley Civilization. After the extinction of the Indus Civilization, new settlements especially

especially in doabs grew slin doabs grew slowowly. New irrigation sysly. New irrigation sys temtems ss starttarted to evolve. Inundated to evolve. Inundatiion canals andon canals and small dams were constructed and population grew all around this area. In order to reduce the small dams were constructed and population grew all around this area. In order to reduce the occurrence of low irrigation water supply the British authorities, towards the middle of the last occurrence of low irrigation water supply the British authorities, towards the middle of the last century, started modernizing and expanding the irrigation system of the Indus Basin.

century, started modernizing and expanding the irrigation system of the Indus Basin.

The Almighty Allah has gifted Pakistan with abundant water resources with water flowing down The Almighty Allah has gifted Pakistan with abundant water resources with water flowing down the Himalaya

the Himalayas s and Karrakurram hand Karrakurram heigeights from thhts from the world's le world's largest glacieargest glaciersrs, a , a free and unfree and uniqueique bounty of nature for this land of alluvial plains. As a result of this natural resource, today we bounty of nature for this land of alluvial plains. As a result of this natural resource, today we have the worlds marvelous and the largest contiguous irrigation system that currently irrigates have the worlds marvelous and the largest contiguous irrigation system that currently irrigates over 16 million hectares of land, out of 34 million hectares of cultivable lands available. This over 16 million hectares of land, out of 34 million hectares of cultivable lands available. This land lies within the plains formed by river Indus and its tributaries. Britishers started the land lies within the plains formed by river Indus and its tributaries. Britishers started the barrage irrigation system during 1930s. However, before that the residents of Punjab, Sindh, barrage irrigation system during 1930s. However, before that the residents of Punjab, Sindh, and Frontier had constructed a number of inundation canals to irrigate their lands. In the and Frontier had constructed a number of inundation canals to irrigate their lands. In the Punjab, 38 such canals had been taken out of Sutlej, Indus, and Chenab rivers to irrigate areas Punjab, 38 such canals had been taken out of Sutlej, Indus, and Chenab rivers to irrigate areas around Bari Doab Multan, Muzaffargarh, and Dera Ghazi Khan. In Sindh, water level of the around Bari Doab Multan, Muzaffargarh, and Dera Ghazi Khan. In Sindh, water level of the Indus during summer had always been higher than the surrounding lands, thus, 16 inundation Indus during summer had always been higher than the surrounding lands, thus, 16 inundation canals in this area had conveniently carried out the irrigation water during past century. canals in this area had conveniently carried out the irrigation water during past century. How

However, Britisever, British Army Engineerh Army Engineers s underundertook construction and improvement took construction and improvement of several of several irrigationirrigation canals in the sub- continent. Subsequently, remodeling/construction work on Bari Doab Canal; canals in the sub- continent. Subsequently, remodeling/construction work on Bari Doab Canal; Sidhnai Canal, Lower Sohag, Ramnagar Canal, Lower Jhelum Canal, Kabul Canal, and Lower Sidhnai Canal, Lower Sohag, Ramnagar Canal, Lower Jhelum Canal, Kabul Canal, and Lower Sawat were completed by the end of l9th century. However, at the time of independence Sawat were completed by the end of l9th century. However, at the time of independence country had 29 canals to provide regulated supply to an area of about 11 million hectares, country had 29 canals to provide regulated supply to an area of about 11 million hectares, beside an area of about 3.2 million hectares irrigated through inundation canals leading from beside an area of about 3.2 million hectares irrigated through inundation canals leading from Indus and its tributaries. These main inundation canals included Upper Sutlej, Lower Sutlej, Indus and its tributaries. These main inundation canals included Upper Sutlej, Lower Sutlej, Shahpur, and Chenab in Punjab; whereas, Rohri, Fuleli, Pinyari, and Kalri in Sindh. However, Shahpur, and Chenab in Punjab; whereas, Rohri, Fuleli, Pinyari, and Kalri in Sindh. However, after th

after the construction of barrages e construction of barrages these canalthese canals s are no mare no morore ie inundation canalnundation canals s but get regubut get regulatedlated water supply and some of them have become perennial while few are nonperennial.

water supply and some of them have become perennial while few are nonperennial.

2.Water Ability of the IBIS

2.Water Ability of the IBIS

There are three main sources of water availability in the Indus Basin: There are three main sources of water availability in the Indus Basin: 2.A .Surface Water.

2.A .Surface Water. The average annual flow of Western Rivers of Indus Basin is approximatelyThe average annual flow of Western Rivers of Indus Basin is approximately 142 million acre feet (MAF). About 105 MAF of this water is diverted for irrigation purposes and 142 million acre feet (MAF). About 105 MAF of this water is diverted for irrigation purposes and about 32 million acre feet outflows to the Arabian Sea.

(2)

2. B. Rain Water: 2. B. Rain Water:

Another source of water is the rain fall. Irrigated areas of Indus Basin receive on average 40 Another source of water is the rain fall. Irrigated areas of Indus Basin receive on average 40 million acres

million acres feet of water annfeet of water annually.ually. 2.C. Ground Water:

2.C. Ground Water:

The third source of water is the ground water. It provides approximately 40 percent of crop The third source of water is the ground water. It provides approximately 40 percent of crop water requirements of the country.

water requirements of the country.

3.Schematic Diagram of IBIS:

3.Schematic Diagram of IBIS:

(3)

3.1 KEY FACTS AND FIGURES/ SALIENT FEATURES:

3.1 KEY FACTS AND FIGURES/ SALIENT FEATURES:

1.

1. No. major reservoirs: 3No. major reservoirs: 3

(Chashma, Mangla, and Tarbela) (Chashma, Mangla, and Tarbela) 2.

2. No. of Barrages:  16No. of Barrages:  16

(Sulemanki, Islam, Balloki, Marala, Trimmu, Punjnad, Sukkur, Kotri, Taunsa, Guddu, (Sulemanki, Islam, Balloki, Marala, Trimmu, Punjnad, Sukkur, Kotri, Taunsa, Guddu,

Chashma,Jinnah , Sidhn

Chashma,Jinnah , Sidhnai, ai, Rasul, QaRasul, Qadirabdirabad, and Marala)ad, and Marala) 3.

3. No.No. of Headwork’s: 2of Headwork’s: 2

(Mangla & Khanki Headwork’s) (Mangla & Khanki Headwork’s) 4.

4. No. oNo. of Interlink Caf Interlink Canal: 12nal: 12 5.

5. No. of Canal Irrigation System: 44No. of Canal Irrigation System: 44 6.

6. Water Diverted to Canals: 105 MAFWater Diverted to Canals: 105 MAF 7.

7. Water extracted from Ground: 42 MAFWater extracted from Ground: 42 MAF 8.

8. AverAverage age escapage to sea: 32 escapage to sea: 32 MAMAFF 9.

9. No. of waterNo. of waterccourses: ourses: 107,000107,000 10.

10. Length of Canals: 585000 KmLength of Canals: 585000 Km 11.

11. No. of Tube wells: >700000No. of Tube wells: >700000 12.

12. Canal Irrigated Area: 36 million AcreCanal Irrigated Area: 36 million Acre

4.B

4.Barrages in

arrages in Pakistan

Pakistan

An art

An artificiificial al bar orbar or obstructionobstruction placed in aplaced in a riverriver oror waterwater coursecourse toto increaseincrease thethe depthdepth of waterof water so that water can be diverted to canals is called barrage.

(4)
(5)

Key Data/ Salient Features:

Key Data/ Salient Features:

4.1

4.1JINNAH BARRAGE

JINNAH BARRAGE

Year

Year of of ComplCompletion etion 19461946 Location & River on which its co

Location & River on which its co nnstructedstructed Kalabagh, Indus riverKalabagh, Indus river

Design Discharge

Design Discharge 950,000 cusecs950,000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  11 Right  Right  --Length Length 3781 ft3781 ft No. of bays No. of bays 4242

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 678.0678.0 .P.D.P.D

4.2

4.2 GH

GHAZI BARRAGE

AZI BARRAGE

Year

Year of of ComplCompletion etion 20022002 Location & River on which its co

Location & River on which its co nnstructedstructed Ghazi, Indus riverGhazi, Indus river

Design Discharge

Design Discharge 500,000 cusecs500,000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  11 Right  Right  --Length Length --No. of bays No. of bays 2020

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 332.2332.2 mm

4.3 CHASHMA BARRAGE

4.3 CHASHMA BARRAGE

Year

Year of of ComplCompletion etion 19711971 Location & River on which its co

Location & River on which its co nnstructedstructed Chashma MianwaliChashma Mianwali, Indus river, Indus river

Design Discharge

Design Discharge 1.1 million cusecs1.1 million cusecs

No. off Taking Canals

No. off Taking Canals Left Left  11 Right  Right  11 Length Length 3556 ft3556 ft No. of bays No. of bays 5252

No. of under Sluices

No. of under Sluices 22

Crest level

(6)

4.4 TAUNSA BARRAGE

4.4 TAUNSA BARRAGE

Year

Year of of ComplCompletion etion 19591959 Location

Location & River on which its constructed& River on which its constructed Near Taunsa Sharif, Near Taunsa Sharif, InduIndus s riverriver

Design Discharge

Design Discharge 750000 cusecs750000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  22 Length Length 4346 ft4346 ft No. of bays No. of bays 5353

No. of under Sluices

No. of under Sluices 22

Crest level

Crest level 428.0428.0 .P.D.P.D

4.5

4.5 GUDDU BA

GUDDU BARRAGE

RRAGE

Year

Year of of ComplCompletion etion 19621962 Location

Location & River on which its constructed& River on which its constructed Kashmore, Indus riverKashmore, Indus river

Design Discharge

Design Discharge 1.2 million cus1.2 million cusecsecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  33 Length Length 4445 ft4445 ft No. of bays No. of bays 6464

No. of under Sluices

No. of under Sluices 22

Crest level

Crest level 236.0236.0 .P.D.P.D

4.6 SUKKUR BARRAGE

4.6 SUKKUR BARRAGE

Year

Year of of ComplCompletion etion 19321932 Location

Location & River on which its constructed& River on which its constructed Near Sukkur, Indus riverNear Sukkur, Indus river

Design Discharge

Design Discharge 1.5 million cus1.5 million cusecsecs

No. off Taking Canals

No. off Taking Canals Left Left  44 Right  Right  33 Length Length 4725 ft4725 ft No. of bays No. of bays 6666

No. of under Sluices

No. of under Sluices 22

Crest level

(7)

4.7

4.7 KOTRI BARRAGE (GHULAM MUH

KOTRI BARRAGE (GHULAM MUHAMMAD BARRAGE)

AMMAD BARRAGE)

Year

Year of of ComplCompletion etion 19551955 Location

Location & River on which its constructed& River on which its constructed Near Hydraabad Indus riverNear Hydraabad Indus river

Design Discharge

Design Discharge 875000 cusecs875000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  33 Right  Right  11 Length Length 2984 ft2984 ft No. of bays No. of bays 4444

No. of under Sluices

No. of under Sluices 22

Crest level

Crest level 48.048.0 .P.D.P.D

4.8 MARRALA BARRAGE

4.8 MARRALA BARRAGE

Year

Year of of ComplCompletion etion 19681968 Location

Location & River on which its constructed& River on which its constructed Sialkot, Chenab riverSialkot, Chenab river

Design Discharge

Design Discharge 1.1 million cusecs1.1 million cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 4472.33 ft4472.33 ft No. of bays No. of bays 6666

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 800.0800.0 .P.D.P.D

4.9

4.9 QU

QUADIRABAD BARRAGE

ADIRABAD BARRAGE

Year

Year of of ComplCompletion etion 19671967 Location

Location & River on which its constructed& River on which its constructed Hafizabad, CHafizabad, Chenhenab riverab river

Design Discharge

Design Discharge 900,000 cusecs900,000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  11 Right  Right  --Length Length 3373 ft3373 ft No. of bays No. of bays 5050

No. of under Sluices

No. of under Sluices 11

Crest level

(8)

4.10 TRIMMU BA

4.10 TRIMMU BARRAGE

RRAGE

Year

Year of of ComplCompletion etion 19391939 Location

Location & River on which its constructed& River on which its constructed Near Jhang, Chenab riverNear Jhang, Chenab river

Design Discharge

Design Discharge 645000 cusecs645000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  11 Length Length 3025 ft3025 ft No. of bays No. of bays 3737

No. of under Sluices

No. of under Sluices 22

Crest level

Crest level 477.50477.50 .P.D.P.D

4.11 PUNJNAD BARRAGE

4.11 PUNJNAD BARRAGE

Year

Year of of ComplCompletion etion 19321932 Location

Location & River on which its constructed& River on which its constructed Muzafffargarh, Chenab RiverMuzafffargarh, Chenab River

Design Discharge

Design Discharge 700000 cusecs700000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 3400 ft3400 ft No. of bays No. of bays 4747

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 325.0325.0 .P.D.P.D

4.12 RASUL BARRAGE

4.12 RASUL BARRAGE

Year

Year of of ComplCompletion etion 19671967 Location

Location & River on which its constructed& River on which its constructed Jhelum riverJhelum river

Design Discharge

Design Discharge 850000 cusecs850000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 3209 ft3209 ft No. of bays No. of bays 4242

No. of under Sluices

No. of under Sluices 11

Crest level

(9)

4.13 SULA

4.13 SULAIM

IMAN

ANKI BARR

KI BARRAGE

AGE

Year

Year of of ComplCompletion etion 19261926 Location

Location & River on which its constructed& River on which its constructed Sutlej riverSutlej river

Design Discharge

Design Discharge 325000 cusecs325000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  11 Length Length 2223 ft2223 ft No. of bays No. of bays 2424

No. of under Sluices

No. of under Sluices 22

Crest level

Crest level 560.0560.0 .P.D.P.D

4.14 ISLAM

4.14 ISLAM BARR

BARRAGE

AGE

Year

Year of of ComplCompletion etion 19271927 Location

Location & River on which its constructed& River on which its constructed HasilpurHasilpur,Sutlej ,Sutlej riverriver

Design Discharge

Design Discharge 300000 cusecs300000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 1621 ft1621 ft No. of bays No. of bays 2929

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 435.50435.50 –– 441.00 S.P.D441.00 S.P.D

4.15

4.15BALLOKI BARRAGE

BALLOKI BARRAGE

Year

Year of of ComplCompletion etion 19651965 Location

Location & River on which its constructed& River on which its constructed Ravi riverRavi river

Design Discharge

Design Discharge 225000 cusecs225000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 1646.5 ft1646.5 ft No. of bays No. of bays 3535

No. of under Sluices

No. of under Sluices 11

Crest level

(10)

4.16 SIDHNAI BARRAGE

4.16 SIDHNAI BARRAGE

Year

Year of of ComplCompletion etion 19651965 Location

Location & River on which its constructed& River on which its constructed Ravi riverRavi river

Design Discharge

Design Discharge 150000 cusecs150000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 712 ft712 ft No. of bays No. of bays 1515

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 454.0454.0 .P.D.P.D

4.17 MAILSI BARRAGE

4.17 MAILSI BARRAGE

Year

Year of of ComplCompletion etion 19641964 Location

Location & River on which its constructed& River on which its constructed Near Mailsi, Sutluj riverNear Mailsi, Sutluj river

Design Discharge

Design Discharge 429000 cusecs429000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  22 Right  Right  --Length Length 1601 ft1601 ft No. of bays No. of bays 2424

No. of under Sluices

No. of under Sluices 11

Crest level

Crest level 415.50415.50 S.P.DS.P.D

4.18 KHANKI HEAD

4.18 KHANKI HEAD W

WORKS

ORKS

Year

Year of of ComplCompletion etion 18911891 Location

Location & River on which its constructed& River on which its constructed Near Mailsi, Sutluj riverNear Mailsi, Sutluj river

Design Discharge

Design Discharge 800000 cusecs800000 cusecs

No. off Taking Canals

No. off Taking Canals Left Left  11 Right  Right  --Length Length 4600 ft4600 ft No. of bays No. of bays 66

No. of under Sluices

No. of under Sluices 11

Crest level

(11)

5.S

5.Salient Feature of of

alient Feature of off- taking canals f

f- taking canals from barrages

rom barrages

5.1

5.1BA

BALLOK

LLOKI SULMANKI LINK CANAL (B

I SULMANKI LINK CANAL (BS LINK CAN

S LINK CANAL)

AL)

Year of Completion

Year of Completion 19511951

Design Discharge

Design Discharge 18500 cusecs18500 cusecs

Length Length Off-t

Off-taking aking locationlocation Left bank canal (Balloki Barrage)Left bank canal (Balloki Barrage)

Link 

Link  Ravi to SutlujRavi to Sutluj

Locati

Location of on of areaarea District pDistrict pakpatakpattan,Depalpur etctan,Depalpur etc

5.2

5.2LOWER BARI DOAB CANAL (LBDC CANAL)

LOWER BARI DOAB CANAL (LBDC CANAL)

Year of Completion

Year of Completion 18591859

Design Discharge

Design Discharge 7000 cusecs7000 cusecs

Length

Length 804.6 CM804.6 CM

Off 

Off ––takitaking Lng Locationocation Left bank canal (Balloki Barrage)Left bank canal (Balloki Barrage)

Area

Area to be ito be irrigatedrrigated 659000acres 659000acres 0.27 0.27 mHamHa

Locati

Location of on of areaarea Sahiwal, Multan Sahiwal, Multan DistDisttt

5.3

5.3SIDHNAI CANAL

SIDHNAI CANAL

Year of Completion

Year of Completion 18861886

Design Discharge

Design Discharge 4005 cusecs4005 cusecs

Length

Length 36.4CM36.4CM

Off-taking Location

Off-taking Location Left Left bank canal (sidhnai Bbank canal (sidhnai Barrage)arrage)

Area

Area to be ito be irrigatedrrigated 10170001017000acres acres 0.41 0.41 mHamHa

Locati

(12)

5.4

5.4SIDHNAI MAILS

SIDHNAI MAILSI BAHAWAL LINK CAN

I BAHAWAL LINK CANAL

AL

Year of Completion

Year of Completion 19651965

Design Discharge

Design Discharge 10100cusecs10100cusecs

Length

Length 60CM60CM

Off-t

Off-taking aking locationlocation Left Left bank canal (sidhnai Barrabank canal (sidhnai Barrage)ge)

Link 

Link  Ravi to SutlujRavi to Sutluj

Locati

Location of on of areaarea District BahDistrict Bahawalpuawalpur,Lor,Lodharandharan

5.5

5.5 UPPER CHENAB CANAL (UCC)

UPPER CHENAB CANAL (UCC)

Year of Completion

Year of Completion 19121912

Design Discharge

Design Discharge 16500cusecs16500cusecs

Length

Length 42.8CM42.8CM

Off-t

Off-taking aking locationlocation Left bank canal (Marala Barrage)Left bank canal (Marala Barrage)

Area

Area to be ito be irrigatedrrigated 14410001441000acres acres 0.58 0.58 mHamHa

Locati

Location of on of areaarea Sialkot, Sialkot, GujGujranwala, Shranwala, Sheieikhupura Distt.khupura Distt.

5.6

5.6MARALA RAVI LINK CANAL (MR LINK CANNAL)

MARALA RAVI LINK CANAL (MR LINK CANNAL)

Year of Completion

Year of Completion 19561956

Design Discharge

Design Discharge 22000cusecs22000cusecs

Length

Length 189.9CM189.9CM

Off-t

Off-taking aking locationlocation Left bank canal (Marala Barrage)Left bank canal (Marala Barrage)

Link 

Link  Chenab to RaviChenab to Ravi

Locati

Location of on of areaarea Sialkot,Narowall, Lahore etcSialkot,Narowall, Lahore etc

5.7

5.7LOWER CHENAB CANAL (LCC)

LOWER CHENAB CANAL (LCC)

Year of Completion

Year of Completion 18921892

Design Discharge

Design Discharge 11727 cusecs11727 cusecs

Length

Length 155.9C155.9CM (canM (canal mile)al mile)

Off-t

Off-taking aking locationlocation Left Left bank canabank canal (Khanki headworks)l (Khanki headworks)

Area

Area to be ito be irrigatedrrigated 3054000 3054000 acres acres 1.24 1.24 mHamHa

Locati

(13)

5.8

5.8QUADIRABAD BALLOKI LINK CANAL

QUADIRABAD BALLOKI LINK CANAL (QB LINK CANAL)

(QB LINK CANAL)

Year of Completion

Year of Completion 19671967

Design Discharge

Design Discharge 18600cusecs18600cusecs

Length

Length 104CM104CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Qul (Quadiraadirabad Barrbad Barrage)age)

Link 

Link  Chenab to RaviChenab to Ravi

Locati

Location of on of areaarea Gujranwala, Sheikhupura, Faisalabad Distt.Gujranwala, Sheikhupura, Faisalabad Distt.

5.9

5.9TRIMMU SIDHNAI LINK CANAL (TS LIN

TRIMMU SIDHNAI LINK CANAL (TS LINK C

K CANAL)

ANAL)

Year of Completion

Year of Completion 19651965

Design Discharge

Design Discharge 11000 cusecs11000 cusecs

Length

Length 44CM44CM

Off-t

Off-taking aking locationlocation Left bank canal (Trimmu Barrage)Left bank canal (Trimmu Barrage)

Link 

Link  Chenab to RaviChenab to Ravi

Locati

Location of on of areaarea Muzaffargarh, Jhang, Multan Distt.Muzaffargarh, Jhang, Multan Distt.

5.10 HAVALI CANAL

5.10 HAVALI CANAL

Year of Completion

Year of Completion 19391939

Design Discharge

Design Discharge 5242cusecs5242cusecs

Length

Length 36.4CM36.4CM

Off-t

Off-taking aking locationlocation Left bank canal (Trimmu Barrage)Left bank canal (Trimmu Barrage)

Area

Area to be ito be irrigatedrrigated 11660001166000acres acres 0.47 0.47 mHamHa

Locati

Location of on of areaarea Muzaffargarh, Jhang, Multan Distt.Muzaffargarh, Jhang, Multan Distt.

5.11 RANGPUR CANAL

5.11 RANGPUR CANAL

Year of Completion

Year of Completion 19391939

Design Discharge

Design Discharge 2710 cusecs2710 cusecs

Length

Length 138.2CM138.2CM

Off-t

Off-taking aking locationlocation Righ t Righ t bank cabank canal nal (Trimmu Barrage)(Trimmu Barrage)

Area

Area to be ito be irrigatedrrigated 345000acres 345000acres 0.14 0.14 mHamHa

Locati

(14)

5.12 PUNJNAD CANAL

5.12 PUNJNAD CANAL

Year of Completion

Year of Completion 19291929

Design Discharge

Design Discharge 9567 cusecs9567 cusecs

Length

Length 57.2 CM57.2 CM

Off-t

Off-taking aking locationlocation Left Left bank canal (Punjbank canal (Punjnad nad BarraBarrage)ge)

Area

Area to be ito be irrigatedrrigated 1355000acres 1355000acres 0.55mHa0.55mHa

Locati

Location of on of areaarea Bahawalnagar, Rahim Yar Bahawalnagar, Rahim Yar Khan DistrictsKhan Districts

5.13

5.13ABBASIA  CANAL

ABBASIA  CANAL

Year of Completion

Year of Completion 19291929

Design Discharge

Design Discharge 1064cusecs1064cusecs

Length

Length 25.7 CM25.7 CM

Off-t

Off-taking aking locationlocation Left bank canal (Trimmu Barrage)Left bank canal (Trimmu Barrage)

Area

Area to be ito be irrigatedrrigated 154000acres 154000acres 62323 62323 HaHa

Locati

Location of on of areaarea Rahim yRahim yar khan,sadiar khan,sadiqa abadqa abad

5.14

5.14ESTERAN SIADIQIA CANAL

ESTERAN SIADIQIA CANAL

Year of Completion

Year of Completion 19261926

Design Discharge

Design Discharge 4917 cusecs4917 cusecs

Length

Length 49 CM49 CM

Off-t

Off-taking aking locationlocation Left bank canal (Sulmanki Barrage)Left bank canal (Sulmanki Barrage)

Area

Area to be ito be irrigatedrrigated 10520001052000acres acres 0.43 0.43 mHamHa

Locati

Location of on of areaarea Bahawalnager, Multan, Sahiwal DistrictsBahawalnager, Multan, Sahiwal Districts

5.15 F

5.15 FORDW

ORDWAH CANAL

AH CANAL

Year of Completion

Year of Completion 19271927

Design Discharge

Design Discharge 3366 cusecs3366 cusecs

Length

Length 9.2 CM9.2 CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Sulmanki Barrage)l (Sulmanki Barrage)

Area

Area to be ito be irrigatedrrigated 428000acres 428000acres 0.17 0.17 mHamHa

Locati

(15)

5.16 PA

5.16 PAKP

KPATTAN CANAL

ATTAN CANAL

Year of Completion

Year of Completion 19271927

Design Discharge

Design Discharge 6950 cusecs6950 cusecs

Length

Length 183.1CM183.1CM

Off-t

Off-taking aking locationlocation Right bRight baank canal (Sulmanki Barrage)nk canal (Sulmanki Barrage)

Area

Area to be ito be irrigatedrrigated 10490001049000acres acres 0.42 0.42 mHamHa

Locati

Location of on of areaarea Bahawalpur, Multan, Sahiwal DistrictsBahawalpur, Multan, Sahiwal Districts

5.16

5.16QAIM CANAL

QAIM CANAL

Year of Completion

Year of Completion 19271927

Design Discharge

Design Discharge 538 cusecs538 cusecs

Length

Length 33CM33CM

Off-t

Off-taking aking locationlocation Left bank canal (Islam Barrage)Left bank canal (Islam Barrage)

Area

Area to be ito be irrigatedrrigated 10360001036000acres acres 0.42 0.42 mHamHa

Locati

Location of on of areaarea BahawalpurBahawalpur, , Mailsi Mailsi and Vehari Districtsand Vehari Districts

5.17

5.17BAHAWAL CANAL

BAHAWAL CANAL

Year of Completion

Year of Completion 19271927

Design Discharge

Design Discharge 5400cusecs5400cusecs

Length

Length 17.9CM17.9CM

Off-t

Off-taking aking locationlocation Left bLeft baank canal (Islam Barrage)nk canal (Islam Barrage)

Area

Area to be ito be irrigatedrrigated 730000acres 730000acres 0.30 0.30 mHamHa

Locati

Location of on of areaarea Mailsi and Vehari DistrictsMailsi and Vehari Districts

5.18

5.18UPPER JEHLAM

UPPER JEHLAM CA

CANAL (UJC)

NAL (UJC)

Year of Completion

Year of Completion 19151915

Design Discharge

Design Discharge 7800cusecs7800cusecs

Length

Length 88CM88CM

Off-t

Off-taking aking locationlocation Left bank canal (Mangla headworks)Left bank canal (Mangla headworks)

Area

Area to be ito be irrigatedrrigated 544000 544000 acres acres 0.22 0.22 mHamHa

Locati

(16)

5.19

5.19RAS

RASUL QU

UL QUADIRABAD LINK CANAL

ADIRABAD LINK CANAL (RQ Link Canal)

(RQ Link Canal)

Year of Completion

Year of Completion 19671967

Design Discharge

Design Discharge 19000cusecs19000cusecs

Length

Length 30CM30CM

Off-t

Off-taking aking locationlocation Left bLeft baank canal (Rasul Barrage)nk canal (Rasul Barrage)

Link 

Link  Jehlum to chenabJehlum to chenab

Locati

Location of on of areaarea Sargodha, Gujrat DisttSargodha, Gujrat Distt

5.20

5.20LOWER JEHLUM CANAL (LJC)

LOWER JEHLUM CANAL (LJC)

Year of Completion

Year of Completion 19011901

Design Discharge

Design Discharge 6600cusecs6600cusecs

Length

Length 39.4CM39.4CM

Off-t

Off-taking aking locationlocation Left bLeft baank canal (Rasul Barrage)nk canal (Rasul Barrage)

Area

Area to be ito be irrigatedrrigated 15180001518000acres acres 0.61 0.61 mHamHa

Locati

Location of on of areaarea SargoSargodha, Gujrat Disdha, Gujrat Dis tttt

5.21

5.21GHAZI

GHAZI BROTH

BROTHA

A POWE

POWER CANAL

R CANAL

Year of Completion

Year of Completion 20022002

Design Discharge

Design Discharge 75000cusecs75000cusecs

Length

Length 52km52km

Off-t

Off-taking aking locationlocation Left Left bank canabank canal (Ghl (Ghazi Barraazi Barrage)ge)

Locati

Location of on of areaarea GhaziGhazi

5.22

5.22THAL CANAL

THAL CANAL

Year of Completion

Year of Completion 19471947

Design Discharge

Design Discharge 8500cusecs8500cusecs

Length

Length 31.5CM31.5CM

Off-t

Off-taking aking locationlocation Left bank canal (Jinnah Barrage)Left bank canal (Jinnah Barrage)

Area

Area to be ito be irrigatedrrigated 19120001912000acres acres 0.77 0.77 mHamHa

Locati

Location of on of areaarea Mianwali, Muzaffargarh, Khushab, Bhakkar,Mianwali, Muzaffargarh, Khushab, Bhakkar,

Leiah Distt. Leiah Distt.

(17)

5.23

5.23CHASHMA JEHLAM LINK CANAL (CJ LINK CANAL)

CHASHMA JEHLAM LINK CANAL (CJ LINK CANAL)

Year of Completion

Year of Completion 19701970

Design Discharge

Design Discharge 21700cusecs21700cusecs

Length

Length 63CM63CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Chashma l (Chashma BBarrage)arrage)

Link 

Link  Indus to JehlamIndus to Jehlam

Locati

Location of on of areaarea D. I. Khan, Provide water for Jehlum river.D. I. Khan, Provide water for Jehlum river.

5.24

5.24CHASHMA RIGHT BANK CANAL

CHASHMA RIGHT BANK CANAL

Year of Completion

Year of Completion 19901990

Design Discharge

Design Discharge 5000 cusecs5000 cusecs

Length

Length 90CM90CM

Off-t

Off-taking aking locationlocation Right bank canal (Chashma Barrage)Right bank canal (Chashma Barrage)

Area

Area to be irrigatto be irrigateded 0.23 mHa0.23 mHa

Locati

Location of on of areaarea D. G. Khan .D. G. Khan .

5.25

5.25KACHHI CANAL

KACHHI CANAL

Year of Completion

Year of Completion Under Under constructconstructionion Design Discharge

Design Discharge 6000 cusecs6000 cusecs

Length

Length 313CM313CM

Off-t

Off-taking aking locationlocation Right bank canal (Taunsa Barrage)Right bank canal (Taunsa Barrage)

Area

Area to be ito be irrigatedrrigated 0.29mHa 0.29mHa 713000acres713000acres

Locati

Location of on of areaarea BalochishtianBalochishtian

5.26

5.26MUZAFFARGA

MUZAFFARGARH

RH CANAL

CANAL

Year of Completion

Year of Completion 19581958

Design Discharge

Design Discharge 8301cusecs8301cusecs

Length

Length 74.2CM74.2CM

Off-t

Off-taking aking locationlocation Left  bank canal (Taunsa BLeft  bank canal (Taunsa Barrage)arrage)

Area

Area to be ito be irrigatedrrigated 820000acres 820000acres 0.33 0.33 mHamHa

Locati

(18)

5.27

5.27TAUNSA PUNJNAD LINK CANAL (TP LINK CANAL)

TAUNSA PUNJNAD LINK CANAL (TP LINK CANAL)

Year of Completion

Year of Completion 19591959

Design Discharge

Design Discharge 14000 cusecs14000 cusecs

Length

Length 38CM38CM

Off-t

Off-taking aking locationlocation Left  bLeft  bank canal (Taunsa Barraank canal (Taunsa Barrage)ge)

Link 

Link  Indus to Indus to ChenChenabab

Locati

Location of on of areaarea Muzaffargarh DisttMuzaffargarh Distt

5.28 DERA GHAZI KHAN CANAL

5.28 DERA GHAZI KHAN CANAL

Year of Completion

Year of Completion 19581958

Design Discharge

Design Discharge 8790 cusecs8790 cusecs

Length

Length 69CM69CM

Off-t

Off-taking aking locationlocation Right bank canal (Taunsa Barrage)Right bank canal (Taunsa Barrage)

Area

Area to be ito be irrigatedrrigated 906000acres 906000acres 0.37 0.37 mHamHa

Locati

Location of on of areaarea Muzaffargarh DisttMuzaffargarh Distt

5.29

5.29PAT FEEDER/CA

PAT FEEDER/CANA

NALL

Year of Completion

Year of Completion 19621962

Design Discharge

Design Discharge 3176 cusecs3176 cusecs

Length

Length 106CM106CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Guddu Barrage)l (Guddu Barrage)

Area

Area to be ito be irrigatedrrigated 380827acres 380827acres 0.15mHa0.15mHa

Locati

Location of on of areaarea Nasirabad and Jafarabad districts of Nasirabad and Jafarabad districts of 

Balochistan Balochistan..

5.30

5.30DESERT FEEDER/CANAL

DESERT FEEDER/CANAL

Year of Completion

Year of Completion 19621962

Design Discharge

Design Discharge 12945 cusecs12945 cusecs

Length Length Off-t

Off-taking aking locationlocation Right bRight bank canal (Guddu Barrage)ank canal (Guddu Barrage)

Area

Area to be ito be irrigatedrrigated Locati

(19)

5.31

5.31BEGARI SINDH FEEDER

BEGARI SINDH FEEDER

Year of Completion

Year of Completion 19621962

Design Discharge

Design Discharge 15494 cusecs15494 cusecs

Length Length Off-t

Off-taking aking locationlocation Right bRight bank canal (Guddu Barrage)ank canal (Guddu Barrage)

Area

Area to be ito be irrigatedrrigated 958857acres 958857acres 0.39mHa0.39mHa

Locati

Location of on of areaarea SukSukkar, Mirpur, kar, Mirpur, RohrRohri, i, Kalat DiKalat Distt.stt.

5.32

5.32GHOTKI FEEDER/CANAL

GHOTKI FEEDER/CANAL

Year of Completion

Year of Completion 19621962

Design Discharge

Design Discharge 8490 cusecs8490 cusecs

Length Length Off-t

Off-taking aking locationlocation Left bank canal (Guddu Barrage)Left bank canal (Guddu Barrage)

Area

Area to be ito be irrigatedrrigated 855231acres 855231acres 0.35mHa0.35mHa

Locati

Location of on of areaarea SukSukkar, Mirpur, kar, Mirpur, RohrRohri, i, Kalat DiKalat Distt.stt.

5.33

5.33EAST NARA CANAL

EAST NARA CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 13649cusecs13649cusecs

Length

Length 226CM226CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Sukkur Barrage)l (Sukkur Barrage)

Area

Area to be ito be irrigatedrrigated 2240186acres 2240186acres 0.91mHa0.91mHa

Locati

Location of on of areaarea Hyderabad, Sanghar Distt.Hyderabad, Sanghar Distt.

5.34 EAST KHAIRPUR CANAL

5.34 EAST KHAIRPUR CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 2096cusecs2096cusecs

Length

Length 10CM10CM

Off-t

Off-taking aking locationlocation Left bLeft bank canaank canal (Sukkur Barrl (Sukkur Barrage)age)

Area to be

Area to be irirrigatedrigated 369596acres 369596acres 0.15mHa0.15mHa

Locati

(20)

5.35 ROHRI CANAL

5.35 ROHRI CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 10883cusecs10883cusecs

Length Length Off-t

Off-taking aking locationlocation Left Left bank canal (Sukkur Barrage)bank canal (Sukkur Barrage)

Area to be

Area to be irirrigatedrigated 26001213acres 26001213acres 1.1mHa1.1mHa

Locati

Location of on of areaarea Hyderabad, Sanghar Distt.Hyderabad, Sanghar Distt.

5.36

5.36DADU CANAL

DADU CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 3150cusecs3150cusecs

Length

Length 131.1CM131.1CM

Off-t

Off-taking aking locationlocation Right bRight baank canal (Sukkur nk canal (Sukkur BarraBarrage)ge)

Area

Area to be ito be irrigatedrrigated 550963acres 550963acres 0.22mHa0.22mHa

Locati

Location of on of areaarea Hyderabad, Sanghar Distt.Hyderabad, Sanghar Distt.

5.37 RICE CANAL

5.37 RICE CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 10658cusecs10658cusecs

Length

Length 81CM81CM

Off-t

Off-taking aking locationlocation Right bRight baank canal (Sukkur nk canal (Sukkur BarraBarrage)ge)

Area

Area to be ito be irrigatedrrigated 519660acres 519660acres 0.21mHa0.21mHa

Locati

Location of on of areaarea Hyderabad, Sanghar Distt.Hyderabad, Sanghar Distt.

5.38

5.38WEST  KHAIRPUR CANAL

WEST  KHAIRPUR CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 1940cusecs1940cusecs

Length

Length 24CM24CM

Off-t

Off-taking aking locationlocation Left Left bank canal (Sukkur Barrage)bank canal (Sukkur Barrage)

Area to be

Area to be irirrigatedrigated 322000acres 322000acres 0.13mHa0.13mHa

Locati

(21)

5.39

5.39NORTH WEST CANAL

NORTH WEST CANAL

Year of Completion

Year of Completion 19321932

Design Discharge

Design Discharge 5152cusecs5152cusecs

Length

Length 36CM36CM

Off-t

Off-taking aking locationlocation Right bRight baank canal (Sukkur nk canal (Sukkur BarraBarrage)ge)

Area to be

Area to be irirrigatedrigated 940014acres 940014acres 0.38mHa0.38mHa

Locati

Location of on of areaarea Hyderabad, Sanghar Distt.Hyderabad, Sanghar Distt.

5.40

5.40KALRI

KALRI BAGHA

BAGHAR CANAL

R CANAL (FEEDER)

(FEEDER)

Year of Completion

Year of Completion 19551955

Design Discharge

Design Discharge 9075 cusecs9075 cusecs

Length

Length 5761m5761m

Off-t

Off-taking aking locationlocation Right bank canal (Kotri Barrage)Right bank canal (Kotri Barrage)

Area

Area to be ito be irrigatedrrigated 603741acres 603741acres 0.24mHa0.24mHa

Locati

Location of on of areaarea Hyderabad, Sanghar, Nawabshah, Badin,Hyderabad, Sanghar, Nawabshah, Badin,

Mirpur Distt. Mirpur Distt.

5.41

5.41PHUELLELI CANAL

PHUELLELI CANAL (FEEDE

(FEEDER)

R)

Year of Completion

Year of Completion 19551955

Design Discharge

Design Discharge 14350cusecs14350cusecs

Length Length Off-t

Off-taking aking locationlocation Left Left bank canabank canal (Kotri Barrage)l (Kotri Barrage)

Area

Area to be ito be irrigatedrrigated 929358acres 929358acres 0.38mHa0.38mHa

Locati

Location of on of areaarea Hyderabad, Sanghar, Nawabshah, Badin,Hyderabad, Sanghar, Nawabshah, Badin,

Mirpur Distt. Mirpur Distt.

5.42

5.42PINYARI CANAL (FEEDER)

PINYARI CANAL (FEEDER)

Year of Completion

Year of Completion 19551955

Design Discharge

Design Discharge 13000 cusecs13000 cusecs

Length Length Off-t

Off-taking aking locationlocation Left Left bank canabank canal (Kotri Barrage)l (Kotri Barrage)

Area

Area to be ito be irrigatedrrigated 786353acres 786353acres 0.32mHa0.32mHa

Locati

Location of on of areaarea Hyderabad, Sanghar, Nawabshah, Badin,Hyderabad, Sanghar, Nawabshah, Badin,

Mirpur Distt. Mirpur Distt.

(22)

5.43

5.43AKRAM WAH CANAL (FEEDER)

AKRAM WAH CANAL (FEEDER)

Year of Completion

Year of Completion 19551955

Design Discharge

Design Discharge 4100cusecs4100cusecs

Length Length Off-t

Off-taking aking locationlocation Left bank canal (Kotri Barrage)Left bank canal (Kotri Barrage)

Area

Area to be ito be irrigatedrrigated 487347acres 487347acres 0.20mHa0.20mHa

Locati

Location of on of areaarea Hyderabad, Sanghar, Nawabshah, Badin,Hyderabad, Sanghar, Nawabshah, Badin,

Mirpur Distt. Mirpur Distt.

(23)

References:

References:

I.

I. Barrages & Dams in PakistanBarrages & Dams in Pakistan

By DR. Izharul Haq

By DR. Izharul Haq (Secret(Secretary Pak. Engg. Congress)ary Pak. Engg. Congress) II.

II. www.southasianmedia.netwww.southasianmedia.net III.

III. wwwww.scribd.com/doc/2w.scribd.com/doc/25280380/Irrigation-Engineering-Part5280380/Irrigation-Engineering-Part-3-3 IV.

IV. www.pakistaniat.com/2006/10/30/punjab-link-canal-irrigation/www.pakistaniat.com/2006/10/30/punjab-link-canal-irrigation/ V.

V. wwwww.magazine.comw.magazine.com.pk/travel/pakistan.php.pk/travel/pakistan.php?ss=&page=?ss=&page=irrigationirrigation VI.

VI. wwwww.sida.orw.sida.org.pk/areawaterboardg.pk/areawaterboard/default.asp/default.asp VII.

References

Related documents

• Under a FIT based tari ff, which is suitable for widespread PV adoption, we investigate the poten- tial for a boom in residential battery adoption by investigating at which

Seasonal variation of the filterable residue and total residual contents of waters from Balalu Wewa, Left Bank Canal and at the begin- ning of ID1 Channel O F Bloclc

In this article, an experimental and analytical analysis are developed to predict the maximum de flection of RC slabs with EBR under blast loads and to investigate the e ffect of

Population Served People/Families with People of Developmental Disabilities Elderly

In this study, the panel data method was used to investigate the effects of refugee inflows on economic growth, inflation and government expenditures in OECD countries.. First,

ventricles, and central canal of the spinal cord.. Ventricles and Location of the Ventricles and Location

The ratio of the number of days the canal has actually been kept open to the number of days the canal was designed to remain open during the base period is known as time factor..

[r]