Analysis and design of prestressed concrete

box girder bridge

Posted in Prestress Engineering, Project Reports, Research Papers | Email This Post |

By

Miss.P.R. Bhivgade

Abstract:- Bridge construction today has achieved a worldwide level of importance. Bridges are the key elements in any road network Use of box girder is gaining popularity in bridge engineering fraternity because of its better stability, serviceability, economy, aesthetic appearance and structural efficiency. The structural behavior of box girder is complicated, which is difficult to analyze in its actual conditions by conventional methods. In present study a two lane simply supported Box Girder Bridge made up of prestressed concrete which is analysis for moving loads as per Indian Road Congress (IRC:6) recommendations, Prestressed Code (IS: 1343) and also as per IRC: 18 specifications. The analyzed of box girder using SAP 2000 14 Bridge Wizard and prestressed with parabolic tendons in which utilize full section. The various span/ depth ratio considered to get the proportioning depth at which stresses criteria and deflection criteria get satisfied.

Keywords: Concrete Box Girder Bridge, Prestress Force, Eccentricity, Prestress Losses, Reinforcement, Flexure strength, shear strength, SAP Model. I. INTRODUCTION

Prestress concrete is ideally suited for the construction of medium and long span bridges. Ever since the development of prestressed concrete by Freyssinet in the early 1930s, the material has found extensive application in the construction of long-span bridges, gradually replacing steel which needs costly maintenance due to the inherent disadvantage of corrosion under aggressive environment conditions. One of the most commonly used forms of superstructure in concrete bridges is precast girders with cast-in-situ slab. This type of superstructure is generally used for spans between 20 to 40 m. T or I-girder bridges are the most common example under this category and are very popular because of their simple geometry, low fabrication cost, easy erection or casting and smaller dead loads. In this paper study the India Road Loading considered for design of bridges, also factor which are important to decide the preliminary sizes of concrete box girders. Also considered the IRC:18-2000 for “Prestressed Concrete Road Bridges” and “Code of Practice for Prestressed Concrete ” Indian Standard. Analyze the Concrete Box Girder Road Bridges for various spans, various depth and check the proportioning depth.

II. FORMULATION

A. Loading on Box Girder Bridge

The various type of loads, forces and stresses to be considered in the analysis and design of the various components of the bridge are given in IRC 6:2000(Section II. But the common forces are considered to design the model are as follows:

Dead Load(DL): The dead load carried by the girder or the member consists of its own weight and the portions of the weight of the superstructure and any fixed loads supported by the member. The dead load can be estimated fairly accurately during design and can be controlled during construction and service.

Superimposed Dead Load (SIDL): The weight of superimposed dead load includes footpaths, earth-fills, wearing course, stay-in -place forms, ballast, water-proofing, signs, architectural ornamentation, pipes, conduits, cables and any other immovable appurtenances installed on the structure.

Live Load(LL): Live loads are those caused by vehicles which pass over the bridge and are transient in nature. These loads cannot be estimated precisely, and the designer has very little control over them once the bridge is opened to traffic. However, hypothetical loadings which are reasonably realistic need to be evolved and specified to serve as design criteria. There are four types of standard loadings for which road bridges are designed.

i. IRC Class 70R loading ii. IRC Class AA loading iii. IRC Class A loading iv. IRC Class B loading

The model is design by considering IRC Class A loading, which is normally adopted on all roads on which permanent bridges and culverts are constructed. Total load is 554, the Fig.1 show the complete details of Class A.

(2)

Other information regarding Live load combination as per IRC:6 2000 Clause No.207.1 Note No.4 B. Thickness of Web

The thickness of the web shall not be less than d/36 plus twice the clear cover to the reinforcement plus diameter of the duct hole where‘d’ is the overall depth of the box girder measured from the top of the deck slab to the bottom of the soffit or 200 mm plus the diameter of duct holes, whichever is greater.

C. Thickness of Bottom Flange

The thickness of the bottom flange of box girder shall be not less than 1/20th of the clear web spacing at the junction with bottom flange or 200 mm whichever is more.

D. Thickness of Top Flange

The minimum thickness of the deck slab including that at cantilever tips be 200 mm. For top and bottom flange having prestressing cables, the thickness of such flange shall not be less than 150 mm plus diameter of duct hole.

E. Losses in Prestress

While assessing the stresses in concrete and steel during tensioning operations and later in service, due regard shall be paid to all losses and variations in stress resulting from creep of concrete, shrinkage of concrete, relaxation of steel, the shortening (elastic deformation) of concrete at transfer, and friction and slip of anchorage.

In computing the losses in prestress when untensioned reinforcement is present, the effect of the tensile stresses developed by the untensioned reinforcement due to shrinkage and creep shall be considered.

F. Calculation of Ultimate Strength

Ultimate moment resistance of sections, under these two alternative conditions of failure shall be calculated by the following formulae and the smaller of the two values shall be taken as the ultimate moment of resistance for design:

i. Failure by yield of steel (under-reinforced section) Mult = 0.9dbAsFp

Where,

As = the area of high tensile steel

Fp = the ultimate tensile strength for steel without definite yield point or yield stress or stress at 4 per centelongation whichever is higher for steel with a definite yield point.

db = the depth of the beam from the maximum compression edge to the centre of gravity of the steel tendons. ii. Failure by crushing concrete

Mult = 0.176 bdb2fck Where,

b = the width of rectangular section or web of beam fck= characteristics strength of concrete

G. Calculation of Section un- cracked in flexure

b = width in the case of rectangular member and width of the rib in the case of T, I and L beams d = overall depth of the member

(3)

III. ANALYSIS AND DESIGN OF POST-TENSIONED DECK TYPE BOX-GIRDER BRIDGE A post- tensioned deck type Box – Girder

Bridges of clear span 30m and width of roadway is 7.5m. Assume Live Load as per IRC: 6-2000 vehicle is passing over deck given in chapter 4 and table no. 4.2. The Bridge analysis for different L/d ratio starting from 15 to 20 and different L/d ratio considered are as follows:

Case 1 L/d= 19, d = 1.6 Case 2 L/d =18, d = 1.7 Case3 L/d = 17, d = 1.8 Case4 L/d= 16, d= 1.9 Case5 L/d= 15, d=2.0 Preliminary data Clear span = 30m Width of roadway = 7.5 m

Overhang from face of girder = 1.2m Deck thickness = 0.2 m

Bottom slab thickness = 0.2 m Girder thickness = 0.3 m

The tendon profile is considered as parabolic in nature. As per IRC:18-2000

fck= 50 Mpa, fci = 0.8fck = 40 Mpa,

fct = 0.5fci = 20 Mpa, fcw = 0.33fck = 16.5 Mpa ft = 1/10fct = 2.0 Mpa, ftw = 0 As per IS:1343-1980

Ec = 5700fck1/2 = 40.30 kN/m2

(4)

Validation of Resuts

The bending moment, shear force and deflection result obtained by SAP 2000. The bending moment and shear force are calculated by considering different loading condition such as dead load, live load and superimposed load. Same as deflection calculated. This results are the Case:1.

Table.1 Deflection Load Case DL + SIDL Live Load Prestressing Force Deflection (at midspan) 30.8 mm 25.2 mm -14.36 mm

Table.2 Bending Moment(t.m) Span (m) 0.0L 0.1L 0.2L 0.3L 0.4L 0.5L DL 0.00 353.56 628.56 824.98 942.84 982.12 LL 0.00 218.76 381.63 494.10 564.85 587.82 SIDL 0.00 53.46 95.04 124.74 142.56 148.50 Total 0.00 625.78 1105.23 1443.82 1650.26 1718.45

Table.3 Shear Force (t) Span

(5)

DL 130.9 104.7 78.57 52.4 26.3 0.0

LL 32.92 23.29 14.27 7.42 2.62 0.0

SIDL 19.80 15.84 11.88 7.92 3.90 0.0 Total 183.6 143.9 104.7 67.7 32.8 0.0

Table.4 Calculation of Prestress Force

Table.5 Calculation of Eccentricity Eccentricity

(mm)

Prestressing Force (kN)

The eccentricity which give minimum

prestressing force (e) = 731mm 440 21617.96 548 19380.69 650 17655.06 731 16489.15

Table.6 Calculation of Prestress Losses (As per IS:1343-1980) Span

(m)

^S ^C ^E ^A ^F ^R Total n

0.0L 0.0 0.0 0.0 0.0 90 90 0.95

(6)

0.2L 8E-05 2.6 2.4 39 22 90 155.8 0.91 0.3L 2.6 2.4 26 36.7 90 157.7 0.91 0.4L 2.7 2.5 20 54.3 90 169.0 0.9 0.5L 9.1 8.3 16 171 90 294.0 0.85 Where, ^S = Shrinkage ^C= Creep ^E = Shortening of concrete ^A = Slip in anchorage ^F = Friction ^R = Relaxation n= Efficiency

After Losses, effective Prestressing Force (P) = P (1-Losses) = 14011.51 kN

Table.7 Calculation of Stresses at top and bottom fibre

Span (m)

At Transfer At Service Load Top Fibre Bottom fibre Top fibre Bottom Fibre 0.0L 4.16 4.16 4.16 4.16 0.1L 2.98 5.48 6.35 0.00 0.2L 1.91 6.67 8.37 0.00 0.3L 2.112 6.44 7.46 0.00 0.4L 2.24 6.29 6.88 0.00 0.5L 3.00 6.24 6.42 0.00 Compressive Stress at Transfer = 6.66 < 0.5 fcj = 20 mpa Service = 8.367 < 0.33 fck = 16.5 mpa Tensile stress at

Initial Stage = 2.979 < 3mpa (As per IS:1343 – 1980) Working Stage = No tensile stress

Table.8 Calculation of Ultimate Flexure Strength

Span (m) Ultimate Moment Mu = (1.5DL +2.5 LL) (kN.m) Failure by yielding of steel (kN.m) Failure by crushing of concrete (kN.m)

(7)

0.0L 0.00 340578.53 5970560 0.1L 11574.43 0.2L 20394.85 0.3L 26598.28 0.4L 30402.45 0.5L 31654.88

Table.9 Calculation of Ultimate Shear strength Span (m) Ultimate Moment Vu = (1.5DL +2.5 LL) (kN.m) Shear capacity Vcw (kN) Balance Shear (kN) Spacing (mm) 0.0L 3084.27 363.85 2720.43 55 0.1L 2391.35 419.97 1971.38 75 0.2L 1713.50 432.54 1280.96 100 0.3L 1089.90 470.56 619.34 200 0.4L 517.85 492.95 24.90 300 0.5L 0.00 0.00 0.00 0

Design of Reinforcement in Box Girder Bridge P =14011.51 kN, d = 1350 mm, bw = 200 mm

Assume 150 mm wide and 150 mm deep distribution plate, located concentrically at centre. ypo /y0 = 75/150 = 0.5 ,

As per IRC:18-2000, From table value of Fbst/ Pk = 0.17 and Fbst = 452.753 kN Using 12 mm diameter links, area of steel links are,

Ast = 1254 mm/2

Providing 24 bars of 12 mm dia, 750mm also bar of 12 mm dia @ 110 mm c/c horizontally to form mesh. Side Face Reinforcement

As per clause 18.6.3.3 of IS:1343-1980 Ast = 0.05 x 1350 x 300/100 = 202.5 mm/2 Provide 6 – 12 mm dia on each face of web Design of Deck Slab

Using M30 grade concrete and Fe415

Total moment due to DL+SIDL+LL = 1427.0 kN.m Depth required = 150.4 < 250 mm

Main Reinforcement Ast = 3192.6824 mm/2

Providing 16mmØ bars dia 100 mm c/c Design of Transverse Reinforcement M = 0.3ML + 0.2(MDL + MSIDL)

(8)

M = 324 kN.m Ast = 724.74 mm/2

Providing 12 mm dia bars @ 160 mm c/c

IV. COMPARSION OF RESULT FOR VARIOUS SPAN/ DEPTH RATIO

The comparison of prestress force, deflection and stresses values are obtained for various span/depth ratio ( table no. 10 & 11) for box girder bridge. The values are calculated as per IS:1343-1980.

Table.10 Comparison of Deflection for various span/depth ratio.

Span/Depth Prestress Force (kN) Eccentricity (mm) Deflection DL-Prestress Force DL +LL – Prestress Force

(9)

1.6 16.48 731 11.2 36.4

1.7 15.66 777 11.4 33.6

1.8 14.83 829 9 30

1.9 14.02 886 6.6 26.6

2.0 13.20 950 5.6 25.3

Note: All dimension in tonnes and mm. • Permissible (DL-Prestress Force) = 12 mm • Permissible (DL-LL-Prestress Force)= 85.7 mm

Table.11 Comparison of stress for various span/depth ratio

Span/ Depth Prestress Force (tonne) Eccen Tricity (mm)

Stress at mid span (N/mm2)

At Transfer WorkingAt

Top Bottom Top

1.6 16.48 731 3.0 4.1 6.74

1.7 15.66 777 2.8 3.8 6.33

1.8 14.83 829 2.6 3.6 5.91

1.9 14.02 886 2.4 3.4 5.48

2.0 13.20 950 2.2 3.2 5.08

Note: Stress at mid span at working bottom = 0 V. CONCLUSION

This paper gives basic principles for portioning of concrete box girder to help designer to start with project. Box girder shows better resistance to the torsion of superstructure. The various trail of L/d ratio are carried out for Box Girder Bridges, deflection and stress criteria satisfied the well within permissible limits. As the depth increases, the prestressing force decreases and the no. of cables decrease. Because of prestressing the more strength of concrete is utilized and also well governs serviceability.

VI. REFERENCES

1. IRC: 18 – 2000 “ DESIGN CRITERIA FOR PRESTRESSED CONCRETE ROAD BRIDGES (POST – TENSIONED CONCRETE)” THE INDIAN ROADS CONGRESS.

2. IRC: 6- 2000 “STANDARD SPECIFICATIONS AND CODE OF PRACTICE FOR ROAD BRIDGES”THE ROAD CONGRESS. 3. IS: 1343 – 1980 “ CODE OF PRACTICE FOR PRESTRESSED CONCRETE” INDIAN STANDARD.

4. Andre Picard and Bruno Massicotte, Member “SERVICEABILITY DESIGN OF PRESTRESSED CONCRETE BRIDGES” JOURNAL OF BRIDGE ENGINEERING / FEBRUARY 1999

5. Ferhat Akgul and Dan M. Frangopol “Lifetime Performance Analysis of Existing Prestressed Concrete Bridge Superstructures” JOURNAL OF STRUCTURAL ENGINEERING © ASCE / DECEMBER 2004

6. James H. Loper,1 Eugene L. Marquis,2 Members and Edward J. Rhomberg Fellow. “PRECAST PRESTRESSED LONG-SPAN BRIDGES” JOURNAL OF STRUCTURAL ENGINEERING © ASCE

7. John R. Fowler, P.Eng, Bob Stofko, P.Eng. “Precast Options for Bridge Superstructure Design” Economical and Social Linkages Session of the 2007 Annual Conference of the Transportation Association of Canada Saskatoon, Saskatchewan.

(10)

9. Prof. Dr.-Ing. G. Rombach “Concepts for prestressed concrete bridges Segmental box girder bridges with external prestressing” Technical University, Hamburg-Harburg, Germany.

10. Tushar V. Ugale, Bhavesh A. Patel and H. V. Mojidra (2006).

We at engineeringcivil.com are thankful to Er. Priyanka Bhivgade for submitting her research on “Analysis and design of prestressed concrete box girder bridge” to us. We are hopeful that this will be of great use to all civil engineers who are willing to understand the design of prestressed concrete box girder.

More Entries :

How do engineer determine the number of cells for concrete box girder bridges?

Which type of multiple-cell box girder is better, cells connected by top flanges or cells connected both by top and bottom flanges?

Why does the presence of tension reinforcement lead to increasing deflection in concrete structures?

What are the functions of different reinforcement in a typical pile cap? Plate Girder In Buildings

What are the limitations of grillage analysis?

What is the effect of shear lag in a typical box-girder bridge?

In the construction of a two-span bridge (span length = L) by using span-by-span construction, why is a length of about 1.25L bridge segment is constructed in the first phase of construction?

Comments

Hameed Ajmal Sheikh May 7, 2013 at 12:47 am

It is very useful information for design engineers especially Bridge Design engineer.I shall be thankful if you could send me the Excel sheets for this design as I intend to use it in near future.Thanks and regards

Engr. Hameed A Sheikh

ReplyLinkQuote

Yoseph Asrat July 9, 2013 at 5:19 am

I got more information from the documents about bridge design.If u send me more other information about bridge design or other related documents I develop my knowledge for the future. Thanks for your cooperation.

Eng. Yoseph Asrat.

ReplyLinkQuote

Sharma RL September 6, 2013 at 11:10 am I find it very interesting and knowledgeable.

Kindly send more information,Excel sheets and other relevant details Thanks

Sharma RL

ReplyLinkQuote

Post a comment Name Email Website

Post your comment

Share Information

Submit Content Ask An Expert

What is Civil Engineering

Civil Engineering Home Civil Engineering Disciplines

Pile Testing Systems

www.piletest.com

Robust piling QA systems. See what our users say...

Damp Patches On Your Wall

Electronic Weigh Bridge

Road & Pavement Profiler

(11)

Civil Engineering History

Journals Books And Softwares

Free Civil Engineering Magazines and White Papers Civil Engineering Books

Civil Engineering Journals Civil Engineering Softwares

Branches Of Civil Engineering

Building Bridge Engineering Concrete Engineering Highway Engineering Hydraulics Marine Engineering Piles Engineering Prestress Engineering Soil Engineering Steelworks Surveying Timber Engineering

Civil Engineering Jobs

Civil Engineering Jobs

Knowledge Center

Construction Equipments Civil Engineering Disasters Civil Engineering Events Civil Engineering Facts Civil Engineering Information

Civil Engineering Notes From Universities Civil Engineering Presentations

Civil Engineering Quotes Civil Engineering Videos Civil Engineering Wonders Construction Terms Famous Civil Engineers Interviews

Material and Site Testing Measurement Units Mix Design Project Reports Research Papers Student Corner Help Others

Civil Engineering Universities/Events

Civil Engineering Universities

Shanghai International Green Wooden Residential Exhibition 2013 TTUS 2014

Advertise Your Event Here

Gallery - Civil Engineering Pictures

Bridges

Civil Engineers And Workers Construction Equipments Construction Site

(12)

Roads And Highways Skyscrapers

Search

Search

Author

The Best Creator Next To God Is A Civil Engineer.

Top Contributors

You can list yourself here by submitting civil engineering related topics to us.

Er. Harpal Aujla Er. Raj M. Khan Er. Vikrant Ramasesh Iyer Er. Kaushal Kishore Vincent T. H. CHU

Yahoo Group - Civil Engineering Portal

Subscribe to EngineeringCivil.com Enter email address

Powered by groups.yahoo.com

Recently Added

Feasibility study of Sky Bus Metro Linking Cities in Himalaya Region From Sediment Dredging to Island Making

Mechanical Properties Of Recycled Aggregates Concrete

List of Projects Related to Earthquake Engineering

Fort Lauderdale-Hollywood International Airport: Construction of South Runway Project—Aerial View of the Retaining Wall 4th China International Trenchless Exhibition TTUS 2014

Glass Fibre Reinforced Concrete

The 5 Shanghai International Green Wooden Residential Exhibition Carbon Fibre As A Recent Material Use In Construction Stone Mastic Asphalt

Continuously Reinforced Concrete Pavement Submerged Floating Tunnel

Seismic Pounding Effects In Buildings Automated Construction By Contour Crafting

Excel Sheet For Sieve Analysis Of Aggregate And To Calculate Fineness Modulus

Civil Engineering Links

(13)

The Bigger

Civil Engr. Software Database Impressive Buildings Civil Engineering Links

About Us | Contact Us | Disclaimer | Copyright Policy | Privacy Policy | Media | Testimonials

References

Related documents

By delay in time, adoption costs are discounted while the firm prepares for prod- uct introduction by reducing capacities on the established market which increases the marginal value

Objective: The aim of this study was to describe the spatial temporal distribution of dengue fever cases in Kota Bharu and to determine the association between

FMECA are generally completed in two parts: First, identify failure modes and their effects - failure mode and effect analysis (FMEA); second, according to the Severity and

Thus, when performing supervised learning with SACL, the Adaptation Mechanism has to associate the adequate label to the current state of the environ- ment, in other words, to

Návrh na exekúciu súd zamietne, ak zistí, že uznesenie nie je doposiaľ vykonateľné a nie sú splnené podmienky pre nariadenie exekúcie. Doba vydania uznesenia

Japanese Private Companies Government Supplier (Japanese) JBIC Government GHG Emission Reduction Project JCF Credit Participation Participation, Information Carbon Credits

To order the Production Edition program package via an upgrade, specify the program number as 5765-E89, and feature numbers 9001 for asset registration, 5819 for the media, and 0003

 GMWB - Guaranteed Minimum Withdrawal Benefit: guarantee similar to the income benefit, but that doesn't require annuitising.. The policyholder has the right to withdraw up to