Summary of Resolution to Vendor Queries as provided in Responder(s) Conference on
“Expression of Interest for provision, implementation and
maintenance of IT Infrastructure at ICAI”
Page 1
SL.No. Vendor Query Response
1
CMC
Page 5, Clause 3.1 Guiding Principles, Point No.2- “Proposed Data Centre and DR solution should be Tier-III+ standards “- Can we propose hosting of entire solution on established Tier-III+ Data Centers through our partners which would be more economical & cost effective.
Data Center envisaged for the current requirement will be owned and maintained by ICAI only. Bidders are requested to adhere to the requirements specified in the tender
2 Page 12, Clause 6.3 Annexure B, Point No. II- “The main features of the proposed solution and any areas of financial, operational, development risks that are perceived”- Do we need to propose any specific solution or just a general understanding of their scope of work.
Bidder need to give the following details overview as part of their proposition:
1) Bidder's understanding of the requirement and 2) Bidder's proposition for the requirement based on the details made available in the EOI document. 3 Page 12, Clause 6.3 Annexure B, Point No. IV-
“Upgrade strategy for the proposed infrastructure components across servers, network and associated equipments”- The project duration as mentioned in the EOI document is 6 months implementation time plus 5 years support after go-live for which the bidder will provide FM services Hence, what is meant by upgrade strategy is not clear -does it refer to upgrade of existing IT infrastructure of ICAI?
As part of the bid response, bidder's need to give 1) The best practices adopt in the industry w.r.t to IT infrastructure, which includes the current and future technology.
2) Upgrade strategy is for the servers and its guiding technology within or beyond 5 years of the duration
4 Please, clarify whether only parties that submit the EOI response will be allowed to bid in further application/infrastructure tenders or it will be open to all.
As mentioned in the EOI. ICAI will retain the discretion to invite additional bidders if required for the RFP stage.
5
Ecole Solutions PVT Ltd
There is one section in the document that talks about Live Virtual Classes( Page 3). As a vendor , do we also have to provide the Solution for conducting Live Virtual Classes to the 5 regional offices, 125+ branch offices, 8 Decentralized offices (DCOs), 125+ stores and 150+ ITT training centers spread across India.
Yes, requirements for the solution to be gathered designed and developed. Further implementation and change management to sustain the same will be part of scope of work.
6
3i Infotech
4. Eligibility Criteria/Prequalification (S.No.5) The bidder shall not be under a declaration of
ineligibility or blacklisting with any of the Government/ Public sector unit agencies The bidder shall not be under a declaration of ineligibility or blacklisting in IT services with any of the Government/ Public sector unit agencies
Awaited inputs from ICAI Legal Department
7
HP
What is the extent and depth of solution expected the EOI stage?
It is expected from individual bidders to give a over view of their understanding of the requirement, based on the information provided in EOI. However, the detailed RFP for the requirement will be released subsequent to the selection of qualified bidders after the evaluation
Page 2
SL.No. Vendor Query Response
8 Do we also have to suggest any products /Brands/OEMs
Bidders are expected to propose technology and not the brands for EOI response
9 Will the bidders be evaluated basis the eligibility criteria cum Solution Proposed or it is only basis the eligibility criteria only.
Bidders will be primarily evaluated on the eligibility criteria and proposed solution (technology strength) of the firm
10 Can a bidder produce its international references also? We as HP being a global organization would have implemented projects of similar nature across the globe and can cross leverage our international
expertise for the benefit of ICAI.
Bidder can propose relevant implemented references across the globe
11
HCL
Page 8 , Point 2 under Eligibility criteria The bidder or in case of consortium at least
one company should have implemented at two data centre projects of Tier – III/IV supply, commissioning & maintenance of, servers, routers, switches, LAN, SAN, security solutions and facilities management in India during the past 3 years.
Facility Management of DC/DR support or Facility management of any other project for any organization, kindly clarify?
Bidder should have implemented at least 2 data centers projects of Tier-III/IV, with in India which includes Supply, commissioning and maintenance of servers, routers, LAN, SAN, security solutions, including facility management for the same during past 3 years
12 Page 8 , Point 2 under Eligibility criteria The bidder or each member in case of a consortium should have positive net worth and an annual turnover of more than INR 200 Crores or above for the last three Financial Years (FY’07-08,08-09, 09-10).
Our financial year (2009-2010) ended on 30th June, 2010 and auditing for the same is still going on, so we request for the acceptance of turnover from the years 2006-07, 2007-08, 2008-09.
Bidder need to provide a provisional certificate on the turn over from certified Charted Account
13 Page 11, point 6.1
Have you attached the documents pertaining to 5 years of experience in IT field?
Kindly clarify the type of supporting document required.
Please refer to page 8/14, where bidder need to provide certification of incorporation or registration document under the companies act, 1956 stating that bidder's firm is having a 5 years of experience in the IT field
14
ESDS Software Solutions
Isolation transformer is required? Bidders should kindly note that, the current tender document floated is just an Expression of Interest. The detailed specifications of the requirement will be floated separately to the shortlisted vendors. This EOI is only to evaluate the capabilities of the firms to execute the envisaged project.
15 Power distribution for the data center will be in scope of supplier or not ?
16 Installation Transport and Commission of generator, cabling from generator to LT panel, cabling up to the panel, panel to UPS and other equipments will be in our scope? 17 How many number of ISP are to be
Page 3
SL.No. Vendor Query Response
18 Ideally there should be separate ISP room and USP room, where all the switches or other components of ISP are there and becomes easy to maintain. So is there provision we can get which is recommended as Tier III standards.
19 We assume the new hardware components is in our scope however is there specific brand that has been decided?
20 Procurement and installation of hardware, racks and cabling is in our scope?
21 What all monitoring features are required in the data center or level of monitoring or should we take as per Tier III?
22 General lighting apart from data center electrification is in vendors scope?
23 Humidity control is not specified, however as per Tier III it is required, we hope we can take it?
24 Earthing for data center equipments and UPS will be in our scope?
25 Can we get civil layout of the sites? 26 Should we consider the false ceiling? 27 What will be the built-up area for the DC site
and DR site?
28 What is the approximate load bearing capacity at DC and the DR site?
29 How many 42U racks will be deployed in the DC and DR site?
30 In case of consortium is it mandatory to have the annual turnover of more than INR 200 Crores or above for the last three Financial Years (FY’07-08,08-09, 09-10) for each party ?
Each member or party need to have the annual turnover of more than INR 200 Crores 31 What would be approximate budget for this
project ?
32
Reliance Communications LTD
Customer need to freeze on RTO & RPO for DR Kindly provide the inputs
As clarified above 33 On replication, please specify whether host
based replication or SAN based replication Kindly provide the inputs
As clarified above 34 Inhouse Data Centers built for commercial use
(Internet Data Centers) should be accepted under eligibility criteria
Kindly provide the inputs
As clarified above 35 Evaluation need to be considered on no of
project of DC build of TIER III level. Kindly provide the inputs
Proposed points on evaluation criteria are appreciated and well taken. However, the eligibility criteria and
evaluation parameters are defined and clearly mentioned in the EOI. Bidders are expected to adhere
Page 4
SL.No. Vendor Query Response
36 The bidder should have more than 2,00,000 sq.ft of operational datacenter raised floor space in India.
Kindly provide the inputs
37 The bidder should have experience of building and operating datacenters for more than six years.
Kindly provide the inputs
38 The bidder should have more than 300 datacenter professionals on company payroll. Kindly provide the inputs
39 The bidder should have a NOC dedicated to datacenter operations and this NOC should be of minimum 100 seats.
Kindly provide the inputs
40 The bidder should possess valid ISO 27001,ISO 9001 and ISO 20000 certificate for the datacenter operations.
Kindly provide the inputs
This is already part of eligibility criteria 41 In the EOI, there is a clause "Onsite support to
end user whenever required and resolve the problem to user satisfaction."
Please confirm scope of End User Support
Please elaborate the query as it is not clear 42 The proposing responder’s general
understanding of the project requirements and the proposed total solution
Does customer need solution from respondent along with EOI, pls clarify
Please elaborate the query as it is not clear
43 The main features of the proposed solution and any areas of financial, operational, development risks that are perceived Does customer need detail from respondent along with EOI, pls clarify
As clarified above
44 Upgrade strategy for the proposed infrastructure components across servers, network and associated equipments
Does customer need strategy from respondent along with EOI, pls clarify
As clarified above
45 Describe the strategy suggested for future upgrade of the supplied equipment and/or products and any impact this strategy may have on operation etc.
Does customer need strategy for future upgrade from respondent along with EOI, pls clarify
Page 5
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
46
TCS
Section 4, Pt#2
The bidder or in case of consortium at least one company should have implemented at two data centre projects of Tier – III/IV supply, commissioning & maintenance of, servers, routers, switches, LAN, SAN, security solutions and facilities management in India during the past 3 years
Data Centre projects of Tier III/IV are stringent and not many companies have certified Tier III/IV Data Centres. Is this criteria essential?
Bidder is advised to adhere
to the RFP requirements
47 Section 4, Pt#2
Individual companies bidding in specific areas must provide documentary evidence for the applicable areas of work certified by a practicing Chartered Accountant
Which are the other independent bodies whose certificates will be acceptable
Certified CA and Indian Govt. agencies certifications are acceptable 48 Section-3(a), Scope of Work
Data Centre (DC) setup to host all the envisaged applications
Kindly share the desired environments for ERP
implementation at the Data Centres (DC & DR) - Production, Test & Development, etc.
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
49
Section-3(a), Scope of Work
Disaster recovery setup as a fallback option in-case of a disaster: This should be near capacity of DC
TCS understanding is that DR shall be 100% of DC infrastructure (in terms of
processing power). i) Is DR required for both Business
critical applications and supporting
applications. ii) Is HA and Redundancy etc is also
required at DR site. As stated above 50 Section-3(b), Scope of Work
Disaster recovery setup as a fallback option in-case of a disaster:-should be capable of replicating the complete hosted business applications in DC.
Pls share the existing Replication
method As stated above 51
Section-3(b), Scope of Work
Disaster recovery setup as a fallback option in-case of a disaster: should be capable of replicating the complete hosted business applications in DC
Kindly share the desired figures for RPO (Recovery Point Objective) and RTO (Recovery Time Objective).
As stated above 52 Section 3(c), Scope of Work Scope of Work
What is the existing Infrastructure setup and connectivity available at all locations? As stated above 53 Section 3(c), Scope of Work
Connectivity at various ICAI offices including the head office, 5 regional offices, 125+ branch offices, Decentralized offices - 8
What is the preferred mode of connectivity required for
Decentralized offices, stores and ITT training centres
Whether redundancy in connectivity is required
Page 6
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
54
Section 3(c), Scope of Work
Connectivity
What is the Scope in terms of Monitoring & Management from a NMS perspective
What are the Peripherals required at Stores and ITT training centres
As stated above
55
Section 3.c, Scope of Work
Connectivity - Internet Links
Whether separate internet links are required other than MPLS VPN connectivity at DC, DR and other offices? If so, pls specify the locations.
As stated above
56
Section 3.1, Guiding Principles
Solution proposed should be Scalable, Modular and Redundant and Highly Available
Whether locations other than DC & DR ,also requires redundancy in terms of N/w and security devices? Kindly clarify on the Modular aspect, with respect to Computing hardware.
As stated above
57
Section-3.1, Guiding Principles
Proposed solution should adhere to all the best practices and standards followed by the IT industry
Please share your views on the desired IT industry standard & practices for adherence.
Bidder is expected to propose the best practices adopted within its organization, as a part of solution.
58 Section
3.2.1.1 IT Infrastructure Setup
Whether centralized management and monitoring of application, n/w and security devices are required
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender 59 Section-3.2.1.1, IT Infrastructure Setup
Design of servers, networking equipments and deployment topology
For existing applications (if any)-
Please share hardware requirements for the existing applications (business critical & supporting).
As stated above 60 Section-3.2.1.1, IT Infrastructure Setup
Design of servers, networking equipments and deployment topology
For new application - Please share
the User details for Hardware sizing (User base, Internal & External user classification with numbers, Concurrency, desired utilization etc) for business critical & supporting applications.
Page 7
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
61
Section-3.2.1.1, IT Infrastructure Setup
It is responsibility of the bidder to bring out all the necessary inputs that are required to design and to deploy the same
Please share the hardware landscape for Application deployment with
following inputs. 1. Desired scalability (Vertical &
Horizontal). 2. High Availability (Redundancy &
Load balancing) 3. Fault Tolerance (Clustering)
4. Processor. Memory, disk requirement for each server with SAN
connectivity requirement. 5. Network I/O requirement for each
server etc
(Application Vendor has to share all the hardware requirements for deployment)
As stated above
62 Section 3.2.2 IT Security Deployment
Whether Users at Data centre and other locations would require browsing of Internet, Is a Proxy solution required?
As stated above
63 Section 3.2.2
Automation of Business centres and other offices. To supply and deploy all the necessary equipments, like workstations, laptops, networking equipments (switches, routers, modems and necessary cables) where upgrades are identified by ICAI as warranted
What are N/w, security devices and other peripherals available currently and requires upgradation?
As stated above
64 Section 3.2.2 Automation of Business centres and other offices
What are the minimum Peripherals
required at new offices As stated above 65 Section 3.2.3 Managed services
Pls share details of type of Managed services ICAI is looking for post go-live? Whether insource, outsource or co-source model?
As stated above 66 3.2.2 New offices Pl specify how many new offices are
in line for five yrs period As stated above 67
Section-3.2.3 , Managed Services
Bidder need to undertake the following
Backup management activities o Onsite/Offsite backup
For existing applications (if any) -
Kindly share details about the existing backup plan - onsite/offsite for scope clarity. As stated above 68 Section-3.2.3 , Managed Services
Bidder need to undertake the following
Backup management activities o Onsite/Offsite backup
For new application - Kindly share
requirements for the desired backup plan - onsite/offsite for scope clarity.
Page 8
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
69
Section-3.2.3 , Managed Services
Bidder need to undertake the following
Backup management activities o Onsite/Offsite backup
Kindly clarify on the bidder scope on IT/Non-IT requirement for offsite backup. As stated above 70 Section-3.2.3 , Managed Services
Establishment of help desk support in doing the following activities
Pls share current call volumes,
expected growth y-o-y As stated above 71
Section-3.1, Guiding Principles
Proposed Data Centre and DR solution should be Tier-III+ standards
Kindly clarify on the DC & DR scope - whether this includes Non-IT part also (like Civil, electrical, Cabling etc).
As stated above Section
3.2.1.3 IT Physical Infrastructure Civil Related 72 TCS
Please elaborate the scope of the complete Physical Infra. Does this include the areas listed below:
Section
3.2.1.3 IT Physical Infrastructure Civil, HVAC, ,SDS etc 73
TCS
Please advice on the Floor area being designated for the Physical build activity.
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
74 Please advice on which floor of the building the DC would be located
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
75
Please advice on the floor strength /load bearing capacity of the floor on which the DC is to be built
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
76
Please advice on the minimum floor area that can be segregated for the DC built purpose
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
77
Please advice on the height available on the floor ( space between the Floor and the ceiling)
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
Section
3.2.1.3 IT Physical Infrastructure Electrical Related 78
TCS
Please advice on the 2 separate Power distribution company from which the power is being drawn in the building
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
79
Please advice where the Power is getting terminated within the Building. Is it in the HT panel or not.
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
Page 9
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
80
Please advice on the capacity of the main cable from which the Power is being drawn
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
81
Please advice whether the proposed DC location has got a separate LT Panel and Bus Bar
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
82 Please advice if the building/Floor will have its own dedicated Earth pit
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
83
Please advice on the Power conditioning at the DC location ( Single Phase/3 Phase)
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
84
Please advice on the Power Backup arrangements available at Data Centre location ( generator/ alternate Generation Company)
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
85 Please advice on the availability of Power (Frequency of Failure, etc)
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
86 Section
3.2.1.3 IT Physical Infrastructure HVAC Related 87
TCS
Please advice on the Temperature conditions in the premise - Max Temperature in Summer - Minimum Temperature in Winter
Detailed RFP stating the requirement will be published after the selection of bidders from EOI tender
88 Is the building/Floor having a Centralized Air-conditioning 89 Are there any Windows/Doors on the
fore walls of the DC area 90 Are any of the windows/doors SUN
facing Section
3.2.1.3 IT Physical Infrastructure Security & Safety Related 91
TCS
Are there any major security issues in around the DC area?
Any other nearby areas? 92
Please advice on any specific area related requirements ( discussion room , strong room etc.) 93 Please arrange to share the Floor
Page 10
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
Section
3.2.1.1 IT Infrastructure setup Server Related 94
TCS
Please advice on the Application architecture
95
Please advice on the Application deployment model being envisaged (Centralized/Decentralized) 96
Please advice on different set of Applications(ERP, other business ,Administrative, Educational related application ) for which server and storage infrastructure is required 97
Please advice on the total number type of servers required for each Application modules (DB, Web, App, Reporting etc)
98
Please advice on the detailed configuration for each of the servers(CPU, RAM, HDD etc) 99 Please advice on the preferred
Hardware Platform (RISC / CISC) 100 Please advice on the preferred OS for
each of the server ( RHEL, MS) 101
Please define the High availability/ redundancy requirement for each of the servers
102
Please also suggest which of the servers require Load Balancing (Web, App etc)
103
Please advice on the different environments required within the DC ( Production, Test, Development , Training)
104
Please advice on the zone wise deployment architecture (DMZ, MZ etc.)
Section
3.2.1.4 IT Infrastructure Applications Mail and Messaging related 105
TCS
Please advice if there is an existing mailing solution in place 106
Any preference on the mailing solution architecture in terms of Centralized or Decentralized 107 Please advice on Preferred mail and
Messaging solution 108
Please advice on any specific features required in the mail and messaging (Chat, Calendar, Meeting etc.)
Page 11
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
109 Please advice on the number of mail users
110 Please advice on the mail box size per user
Section
3.2.1.4 IT Infrastructure Applications Antivirus related 111
TCS
Please advice on any preference with regards to the antivirus
solution(centralized/de centralized) 112 Please advice on the total number of
desktop users and laptop users Section
3.2.1.4 IT Infrastructure Applications Domain controller 113
TCS
How many internal users
114 What is the desired AD architecture (Centralized/ decentralized) 115 Whether AD need to be integrated
with Proxy or not Section
3.2.1.4 IT Infrastructure Applications RSA 116
TCS
Whether single sign on is required 117 Is two factor authentication a
requirement Section
3.2.1.1 IT Infrastructure Setup Storage and Backup related 118
TCS
Please advice on the nature and type of Data to be stored in the storage area (Design files, data files) 119
Please advice as to which all servers would have an external storage requirement (DB , APP)
120 Please advice on the total storage requirement (RAW, Usable) 121
Please advice on the duration for which the data needs to be stored in the storage area for quick retrieval 122
Please advice the duration after which the data should be send to the archival area
123 Please advice on year on year growth in the storage area.
124
Please advice on Tape Backup related requirement ( Data to be backed up on Tape etc)
Section 3 (c ) Scope of Work Local Area Network at DC
125 TCS Please advice on total number of nodes/users at the DC
Page 12
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
126 How far are these nodes located from the Data Centre
127
Please arrange to share the site Layout plan(Blueprint) clearly indicating the:
- Nodal Location(Building wise, floor wise)
- Distances
- Demarcations in terms of roads in the Plant/campus area
Section 3 (c ) Scope of Work Location IT & Non IT requirement
128
Please advice if the each location will have its own server room (Client Application or Offline operations ) 129
Please advice on the server (Web, DB, App etc.) storage details at each location
130
Please advice on the space and environment conditions( Power, Earthing , HVAC etc.) at each of the locations
131 Please advice on total number of nodes/users at each location 132
Please advice on the Printer and Peripheral requirement at each location with detailed specification 133 Please advice if the devices required
have to be network ready
134 How far are these nodes located from the Server room
135
Please arrange to share the site Layout plan(Blueprint) clearly indicating the:
- Nodal Location(Building wise, floor wise)
- Distances
- Demarcations in terms of roads in the Plant/campus area
Section 3 (d) Scope of Work WAN related
136
TCS
Please advice whether internet/ MPLS users will access the application through common Router 137
Please advice on the bandwidth requirement for Internet and MPLS users
138 Is redundancy to be envisaged for these users
139
Please advice on the criticality of the link to be provided for each of these users/locations
Page 13
Sl. No Vendor RFP
Reference(s) Content of RFP requiring Clarification Points of Clarification Required Response
140
Pleas advice as to who will provision for the WAN infrastructure at locations
141 Please advice who will bear the one time /recurring bandwidth cost 142
Please advice on the number of extranet users/ locations from where these users will get connected 143
Please advice whether these users will access the Application through their own infrastructure /bandwidth