• No results found

07-DS Agile OI Overview - Rev G

N/A
N/A
Protected

Academic year: 2021

Share "07-DS Agile OI Overview - Rev G"

Copied!
21
0
0

Loading.... (view fulltext now)

Full text

(1)

GRID

GSE

DS Agile OI OVERVIEW

Global Systems Engineering

Global Systems Engineering

Global Systems Engineering

Global Systems Engineering

03/05/2012

DS Agile Training

DS Agile Training

DS Agile Training

(2)

Summary

1) DS Agile Operator Interface Features Page 3

(3)

1.1) DS Agile OI Basic Purpose

Basic Purpose :

Display business views

SCP : Substation Control Point Get data, Archive and logging

Which DS Agile element ? OI Client

Composition :

1) OI Server

IS main SBUS Client (also server of few System Info like Printer status) HAS Hard Disk for Archives (Historian SQL server)

HAS Printers (for SOE…) IS Server of All OI Client

2) OI Client

Subscribe to OI Server Display data

(4)

1.2) DS Agile OI Sub-components

What is, and how is composed DS Agile OI ?

SBUS Agency Ethernet SBUS Factory Link SCADA 2000 Communication Data Processing Alarm and Events Historian Trends Controls INFRASTRUCTURE OI Servers SQL Server OI Clients Internet

(5)

1.3) DS Agile OI Technical Data

Common DS Agile OI capabilities :

From

1

to

8

OI Client

(including remote and embedded OI client(s))

Up to

4

VDU on each OI Client

Multi-active OI server

(redundancy, twin servers)

Watchdog : DS Agile OI server application must be launched through

DS Agile

Watch

, so application can restart automatically in case of unexpected failure.

(continuity)

(available from V4.6.x)

Watchdog : DS Agile OI Client application must start using

DS Agile Client

(6)

1.4) DS Agile OI Hardware Composition

Hardware composition and required OS :

PC with :

- At least 3 GBytes RAM and 1.5 GHz processor (better if dual core)

- Up to 4 monitor screens Ethernet connection, Maximum resolution 3200*2400 - Windows XP SP3

- SQL Server (Personal Edition),(SQL2005, SQL2005 embedded)

Available from DS Agile 5.0.2:

Windows Seven Windows 2008 server Microsoft SQL server 2008

(7)

Summary

1) DS Agile Operator Interface Features Page 3

(8)

2.1) DS Agile OI Windows

1) Title

2) Tools

3) Mimic

4) Short Alarms

5)Navigator

(9)

2.2) Title Bar

ALSTOM logo animated by DS Agile OI Server State

Substation Name defined into the SCE

Connected OI server for this OI client

icon displaying SBUS coupling status between DS Agile OI Server and the SBUS agency

Mode status, Substation control mode.

•Remote substation driven from RCP.

•Local substation driven through DS Agile OI.

User and Profile names are updated after logging in or out.

Time and Date are given by PC synchronised by OI Server

(10)

2.3) Command Bar

Alternately Log in and Log off (default user profile). Short cut : F2

Stops the DS Agile OI Client.

Short cut : F10 Opens the Password

Utility dialog box.

Indicates if at least one memo is active in mimics. Launches Operator Station tools Launches DS Agile SMT HMI Prints : •full screen (F5)

•active mimic (Shift+F5) Stops audible

alarms Opens the User

(11)

2.4) Custom General View Mimic

General View Mimic : (Substation, Voltage Level, …)

Electrical controllable devices (Various representations : IEC, ANSI,

customised)

(12)

2.5) Custom Bay Mimic

Detailed Bay Mimic :

Electrical controllable devices (Various representations : IEC, ANSI,

customised)

(13)

2.6) Custom System View Mimic

System View Mimic :

DS Agile System devices (MiCOM Computers, DS Agile OI, DS Agile

Gateway,…)

IED (Protections, Measurement Centres, …)

(14)

2.7) Alarm Viewer

Browser (option) Alarm List

(15)

2.8) States Viewer

(16)

2.9) Events Viewer

(17)

2.10) Trend Viewer

(18)

2.11) Direct Control Pop-up

SPC one state

SPC

(19)

2.12) SBO FSS Control

Select Before Operate

SBO for

Synchronised CB

Force

Substitute

Suppress

(20)

2.13) Hot Redundancy for OI Server

1) On

DS Agile

, Hot redundancy is possible => no manual operations

1.1) OI Client is connected to

“preferred” OI Server

. If server not available it

will immediately try connect to the other one.

Client B

Client A Client C

IEC 61850 Station Bus

Server 1 Server 2

SQL database SQL database

1.2) Both OI server perform

DP acquisition simultaneously

. There is a

(21)

GRID

GSE

References

Related documents

Background: In this study, we investigated early maladap- tive schemas (EMS), schema modes and childhood traumas in patients suffering from obsessive-compulsive disorder (OCD)

Artykuł po więcony jest możliwo ciom jakie stoją przed programistami, którzy zdecydują się na pisanie aplikacji mobilnych przy pomocy JavaScript czy HTML w

Joseph Kosciusko Noble DeKalb Whitley Allen Adams Wells Huntington Wabash Miami Cass Grant Howard Tipton Madison Hamilton Blackford Jay Delaware Randolph Henry Wayne Hancock

Volume 35 No. Ferry of the University of Wisconsin will introduce D r.. Theories of Bulk Viscoelastic Behavior.. "A Fluctuation-Dissipation Theorem Approach to

demand equation, the employment level is linked positively to the capacity utilization rateo In other words, Vt varies along a short run labour demand schedule

Neverwhere is an Urban Fantasy set in the nineties London, affected by complex issues of the post-Thatcherite era, such as poverty, inequality, unem- ployment,

Coloca-se como objetivo geral da pesquisa a análise da presença de Pierre Bourdieu em periódicos especializados da Ciência da Informação (Library Information Science) na Web

NAMES OF THE RULERS OF JUDAH (all descendants of David with the exception of the illegitimate rule of # 7) DATE OF REIGN GOOD OR BAD RULE YEARS OF REIGN RELATION TO