Comparing the total cost of ownership of building your own data center vs.

buying third-party colocation services

(2)

Executive Summary

As businesses grow, the need for reliable and scalable data center space to colocate IT

infrastructure also increases. Any data center or power downtime can have crippling effects on a business in the form of decreased productivity, customer churn and lost revenues. Successful businesses often outgrow their own in-house computer and telecom room quickly. They also require suitable environments to support software development, testing, QA and production applications. Furthermore, as businesses target enterprise customers, the need for industry compliance and security increases.

It is important to perform a comprehensive analysis of the costs, risks, and opportunities of building an in-house data center versus buying colocation services before expanding your data center.

Build vs. Buy Colocation

Uptime Institute’s 2015 Data Center Survey showed that colocation service providers are expanding more rapidly than enterprise data centers. The reason behind this is that many

enterprise data center workloads are migrating out of private, single-tenant data centers. More and more enterprise IT leaders are finding it easier to outsource their workloads to colocation and cloud providers.

74%

47%

58% receiving large spending increases

Enterprise

Colocation Providers

DATA CENTER SPENDING INCREASES (2014—2015)

(3)

Building an in-house data center is expensive. In addition to tenant improvements to raw space, a company must consider the cost of bringing in more utility power and new carriers into their own data center. Also, installing new uninterruptible power systems (UPS), DC battery plants, diesel generators and HVAC systems to cool the servers, storage and networking equipment can be prohibitively expensive. These capital expense (CapEx) costs can add up quickly. Finally, hiring experienced data center personnel adds to the expense and takes resources away from a company’s core business.

In today’s highly competitive and technology-driven environment, businesses are increasingly looking to either build or outsource their physical data center environments.

Renting space from a colocation provider may offer significant savings versus building a data center in-house, because a colocation provider has the economies of scale of serving multiple customers. Using a colocation provider can also be more cost-effective when a business needs to scale over time.

Colocation

Providers 45%

Colocation

Providers 59%

Enterprises 18%

Enterprises 31%

Have you built a dacenter in

the last 12 months?

Will your organization build a new

data center in the next 12 months?

NEW DATA CENTER CONSTRUCTION

Uptime Institute Tier Classifications

(4)

Tier 1: Composed of a single path for power and cooling distribution, without

redundant components, providing 99.671% availability.

Tier II: Composed of a single path for power and cooling distribution, with

redundant components, providing 99.741% availability.

Tier III: Composed of multiple active power and cooling distribution paths,

but only one path active, has redundant components, and is concurrently

maintainable, providing 99.982% availability.

Tier IV: Composed of multiple active power and cooling distribution paths, has

redundant components, and is fault tolerant, providing 99.995% availability.

The Uptime Institute’s research has also provided an estimation of the median costs of building facilities according to their tier structure. What transforms a raw space into a data center is the installation of utility power, redundant power systems and cooling. Data centers are often sized

by the amount of protected electrical capacity of the facility measured in kilowatts (kW). The space required for power and mechanical needs grows incrementally based on the Tier level you decide upon. For example, Tier I and Tier II data centers can require a ratio of 1 to 1 support space, reducing actual allowed space for IT footprint. A Tier IV data center can require up to 3 to 1 of the space required to facilitate the IT footprint. Below are the Uptime Institute’s cost estimates for building a data center broken down by three components:

The “kW” Cost Component by desired level of functionality Tier I: $11,500/kW of redundant UPS capacity for IT Tier II: $12,500/kW of redundant UPS capacity for IT Tier III: $23,000/kW of redundant UPS capacity for IT Tier IV: $25,000/kW of redundant UPS capacity for IT

Based on its research, the Uptime Institute has provided guidelines for Tier classifications and estimated the costs for building data centers. According to their research, the primary drivers of data center construction cost are the costs of power and cooling capacity to a data center.

(5)

Build vs. Buy Colocation Comparisons

Below we will compare the costs of 1) building a single tenant data center and 2) renting space from a retail colocation provider. The cost assumptions are based on matching the material, operations, and maintenance programs of a TIER II colocation provider. We also include the ongoing operational costs over a 5-year period. These comparisons assume a build option with the load at 40% of capacity with room for growth, utility costs of $.08 per kWh and a 2.0 Power Usage Effectiveness (PUE), and an average 5 mile local loop/fiber cost of $150 per mile per strand vs. cross connects. Note that while many colocation operators with deep expertise in power efficiency and management can maintain a PUE of 1.3 to 1.5, building a single-tenant facility that is relatively small will result in a higher PUE. We have chosen to be extremely conservative in using a PUE assumption of 2.0.

The “Computer Room” Component in all cases is $300/sq. ft. of computer floor and this

cost must be added to the “kW cost” shown above.

The “Empty Space” Component is added to the “kW cost” above at $190/sq. ft. Cost Examples of Building a Data Center In-house

Based on the Uptime Institute benchmark costs, building data centers can be expensive. For example:

Tier II level facility with 160 racks at 5.0 kW/rack (800 kW of UPS-protected power) @ 5.0kW/rack. (5,000 sq. ft. X $300/sq. ft.) + (800 kW x $12,500/kW) = $11.5 million

Tier III level facility, with 160 racks at 10.0 kW/rack (1,600 kW of UPS-protected power) @ 10.0kW/rack. (5,000 sq. ft. X $300/sq. ft.) + (1,600 kW x $23,000/kW) = $38.3 million

Small Data Center (1,000 square feet)

Tier II level facility with 32 racks at 5.0 kW/rack (160 kW of UPS-protected power) @ 5.0kW/rack. (1,000 sq. ft. X $300/sq. ft.) + (160 kW x $12,500/kW) = $2.3 million

Tier III level facility, with 32 racks at 10.0 kW/rack (320 kW of UPS-protected power) @ 10.0kW/rack. (1,000 sq. ft. X $300/sq. ft.) + (320 kW x $23,000/kW) = $7.7 million

Large “Telco Room” (500 square feet)

Tier II level facility with 16 racks at 5.0 kW/rack (80 kW of UPS-protected power) @ 5.0kW/ rack. (500 sq. ft. X $300/sq. ft.) + (80 kW x $12,500/kW) = $1.2 million

Tier III level facility, with 16 racks at 10.0 kW/rack (160 kW of UPS-protected power) @ 10.0kW/rack. (500 sq. ft. X $300/sq. ft.) + (160 kW x $23,000/kW) = $3.8 million

(6)

Example A: 3 Cabinets @ 3kW per cab = 9 kW Load @30

kW Total Power Capacity

Costs to Build Data Center In-House

Architectural, Engineering, and Permitting Description

Engineering

Permits, Prep, and Demo

Material $ $ Labor $ 14,625.00 $ 5,435.50 Total $ 14,625.00 $ 5,435.50 Power Construction Description Utility Improvements

Electrical Panels Switch Gear Transfer Switches

N+1 UPS Systems TVSS System

Generator & Enclosures

Generator Conduit and Cabling Data Center Lighting

Lighting Protection Room PDUs Material $ 5,427.50 $ 29,250.00 $ 21,125.00 $ 58,500.00 $ 362.37 $ 46,800.00 $ 1,449.47 $ 1,521.94 $ 543.55 $ 16,250.00 Labor $ 2,355.39 $ 13,325.00 $ 1,811.84 $ 13,000.00 $ 362.37 $ 9,421.55 $ 1,449.47 $ 1,304.52 $ 181.18 $ 13,000.00 Total $ 7,782.89 $ 42,575.00 $ 22,936.84 $ 71,500.00 $ 724.73 $ 56,221.55 $ 2,898.94 $ 2,826.47 $ 724.73 $ 29,250.00 Material $ 20,150.00 $ 2,826.47 $ 289.89 $ 869.68 $ 6,142.50 Labor $ 14,494.69 $ 4,348.41 $ 289.89 $ 173.94 $ 2,174.20 Total $ 34,644.69 $ 7,174.87 $ 579.79 $ 1,043.62 $ 8,316.70 Environmental Controls Description

Facility Management System CCTV

Building Access System

Material $ 2,174.20 $ 1,087.10 $ 1,072.50 Labor $ 362.37 $ 181.18 $ 181.18 Total $ 2,536.57 $ 1,268.29 $ 1,253.68

Total Build Estimate

$314,319.86

Environmental Controls Description

HVAC Assets

(7)

Example B: 8 Cabinets @ 3kW per cab = 24 kW Load @70

kW Total Power Capacity

Costs to Build Data Center In-House

Total Colocation Cost of Ownership Build vs. Buy Comparison over 5 years

Constructions Costs

Floor Space 500 sq. ft. @ $12 sq. ft. Annually Utility Electricity Cost @ 2.0

Electrical Maintenance Costs HVAC Maintenance Costs All Other System Maintenance

Internet, Fiber, and Local Loop Charges

Colocation Svcs. 9kW@$350/kW/mo + $10k NRC Build In-house $314,320.00 $ 30,000.00 $ 63,072.00 $ 23,855.00 $ 26,786.00 $ 26,786.00 $180,000.00 $ 0.00

Buy Colocation Services

$ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 30,000.00 $ 199,000.00

Total

$640,354.00

$229,000.00

64% Cost Savings of Buying Colocation vs. Building In-House

Architectural, Engineering, and Permitting Description

Engineering

Permits, Prep, and Demo

Material $ $ Labor $ 20,250.00 $ 7,526.10 Total $ 20,250.00 $ 5,435.50 Power Construction Description Utility Improvements

Electrical Panels Switch Gear Transfer Switches

N+1 UPS Systems TVSS System

Generator & Enclosures

Generator Conduit and Cabling Data Center Lighting

(8)

Material $ 27,900.00 $ 3,913.57 $ 401.39 $ 1,204.17 $ 8,505.00 Labor $ 20,069.57 $ 6,020.87 $ 401.39 $ 240.83 $ 3,010.44 Total $ 47,969.57 $ 9,934.44 $ 802.78 $ 1,445.01 $ 11,515.44 Environmental Controls Description

Facility Management System CCTV

Building Access System

Material $ 3,010.44 $ 1,505.22 $ 1,485.00 Labor $ 501.74 $ 250.87 $ 250.87 Total $ 3,512.18 $ 1,756.09 $ 1,735.87

Total Build Estimate

$435,212.15

Environmental Controls Description

HVAC Assets

Raised Plenum Floor Condensate Drains Leak Detection Fire Suppression

Total Colocation Cost of Ownership Build vs. Buy Comparison over 5 years

Constructions Costs

Floor Space 500 sq. ft. @ $12 sq. ft. Annually Utility Electricity Cost @ 2.0

Electrical Maintenance Costs HVAC Maintenance Costs All Other System Maintenance

Internet, Fiber, and Local Loop Charges

Colocation Svcs. 9kW@$350/kW/mo + $10k NRC Build In-house $ 435,212.00 $ 60,000.00 $ 168,192.00 $ 23,855.00 $ 35,714.00 $ 2,321.00 $180,000.00 $ 0.00

Buy Colocation Services

$ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 30,000.00 $529,000.00

Total

$905,294.00

$559,000.00

(9)

Example C: 20 Cabinets @ 3kW per cab = 60 kW Load

@150 kW Total Power Capacity

Costs to Build Data Center In-House

Architectural, Engineering, and Permitting Description

Engineering

Permits, Prep, and Demo

Material $ $ Labor $ 46,125.00 $ 17,142.76 Total $ 46,125.00 $ 17,142.76 Power Construction Description Utility Improvements

Electrical Panels Switch Gear Transfer Switches

N+1 UPS Systems TVSS System

Generator & Enclosures

Generator Conduit and Cabling Data Center Lighting

Lighting Protection Room PDUs Material $ 17,142.76 $ 92,250.00 $ 66,625.00 $ 184,500.00 $ 1,142.85 $ 147,600.00 $ 4,571.40 $ 4,799.97 $ 1,714.28 $ 51,250.00 Labor $ 7,428.53 $ 42,025.00 $ 42,025.00 $ 41,000.00 $ 1,142.85 $ 29,714.12 $ 4,571.40 $ 4,114.26 $ 571.43 $ 41,000.00 Total $ 24,546.03 $ 134,275.00 $ 72,339.25 $225,500.00 $ 2,285.70 $ 177,314.12 $ 9,142.81 $ 8,914.24 $ 2,285.70 $ 92,250.00 Material $ 63,550.00 $ 8,914.24 $ 914.28 $ 2,742.84 $ 19,372.50 Total $109,264.03 $ 22,628.45 $ 1,828.56 $ 3,291.41 $ 26,229.60 Environmental Controls Description

Facility Management System CCTV

Building Access System

Material $ 6,857.10 $ 3,428.55 $ 3,382.50 Total $ 7,999.96 $ 3,999.98 $ 3,953.93

Total Build Estimate

$991,316.53

Environmental Controls Description

HVAC Assets

(10)

Construction

Through the phases of planning, engineering, building, and completion, a typical data

center for single tenant use could take 12-24 months to be move in ready. Existing

colocation providers can have spaces move in ready within weeks, a much shorter time

frame to manage.

Core Business and Staffing

Building a data center means a company will need to shift time, knowledge, expertise, and

additional personnel resources away from their core business to understand the specialized

needs in a data center such as power, cooling, fire suppression, security, maintenance and

local/environmental codes.

Costs to Build In-House Data Center

Building your own in-house data center is not a walk in the park. You need to make an

informed decision about the feasibility of building one versus colocating your workloads

to a colocation provider. An in-depth analysis of the costs, risks, and opportunities

corresponding to each option helps uncover hidden costs:

Total Cost of Ownership over 5 years

Constructions Costs

Floor Space 500 sq. ft. @ $12 sq. ft. Annually Utility Electricity Cost @ 2.0

Electrical Maintenance Costs HVAC Maintenance Costs All Other System Maintenance

Internet, Fiber, and Local Loop Charges

Colocation Svcs. 9kW@$350/kW/mo + $10k NRC DIY $ 991,317.00 $ 150,000.00 $420,480.00 $ 54,337.00 $ 44,643.00 $ 5,287.00 $180,000.00 $ 0.00 TIER II Colocation $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 30,000.00 $ 1,460,000.00

Total

$1,846,064.00

$1,490,000.00

(11)

Ongoing Support

Businesses must also consider not only the initial startup costs involved with construction

and acquisition of real estate, but also the ongoing costs of power, heating and air

conditioning, along with the security and maintenance of these physical assets.

Scalability

A life cycle of 10 or more years is expected when building a single tenant data center. This

may lead to initial overbuilds that adds to the bill: additional capital, infrastructure, and

energy consumption costs. If the data center is too big, the cost of each rack will be higher.

If the data center is too small, the business will run out of space too soon and lose the

cost-saving benefits through economies of scale. Colocation leases can be made for much

shorter time frames, and allow a business to grow or reduce their footprint as needed.

Colocation options typically allow capacity to be added or removed quickly and cost

effectively.

Shared Cost Structure

In a single tenant data center, all of the costs of the space, power, and environmental

infrastructure are absorbed by the user. A colocation service provider allows its clients to

share in the lower fixed costs of facility management, maintenance, security and costs of

infrastructure.

Connectivity

Building a single tenant data center can add additional costs of connectivity from carriers

and ISPs by adding fiber and local loop charges. This can also extend the timeline for the

facility to become fully operational. Colocation providers typically have carrier pops located

within their premises that provide redundancy and access to their networks without

(12)

Certifications

Another cost that needs to be accounted for is the cost of certifications as well as the

requirements and processes that need to be in place for certifications such as SSAE16 and

HIPAA.

Colocate with 365 Data Centers

365 Data Centers provides the flexibility to scale quickly and cost-effectively, allowing

customers to start small and grow rapidly. With a variety of colocation options, short

installation intervals, and temporary colocation alternatives, we provide colocation services

across 14 U.S. facilities located in tier 1 and 2 cities. Our services are highly secure and

reliable. All of our facilities meet the compliance standards of HIPAA, PCI, SSAE 16 and ISAE

3402. With more than ten years of 100% uptime track record, 365 Data Centers has proven

to be an industry leader in managed colocation services.

Conclusion

Building an in-house data center is an expensive undertaking especially when you consider

the total cost of ownership over the next five years. Buying colocation services from

a third-party service provider is more cost-effective than building your own. Based on

estimates by the Uptime Institute, colocating can be 19%—64% more cost-effective than

building an in-house Tier 2 data center.

References

Uptime Institute Website: http://uptimeinstitute.com/about-us

Uptime Institute White Paper: Dollars per kW plus Dollars per Square Foot of Computer Floor: http://www.level8group.com/uploads/CostModelDollarsperk-WPlusDollars.pdf

Uptime Institute White Paper: Data Center Site Infrastructure Tier Standard: Topology: http://www.gpxglobal.net/wp-content/uploads/2012/10/TIERSTAN-DARD_Topology_120801.pdf

(13)

San Jose Emeryville Phoenix St. Louis Chicago Indianapolis Nashville Cleveland Pittsburgh Philadelphia New York Detroit Tampa Data Center and Customer Service Center Data Center and Headquarters

About 365 Data Centers

365 Data Centers is the leading data center solutions provider for cloud, content, carriers, and enterprises in tier 2 markets. We operate 14 U.S. data centers and help hundreds of businesses to improve user experience, reduce cost, and speed innovation by leveraging our secure, carrier-neutral, and reliable edge colocation services. With 100% uptime and industry compliance, 365 Data Centers ensures that mission-critical application infrastructure is highly available and conveniently accessible.

References

Related documents

A closed-loop supply chain Distribution Reseller or Customer Sales Manufacturing Raw Matls Overstocks Refurbished product (Secondary Market) Return Stream Returns Evaluation

Two related factors are essential for governments to create constituencies for reform and deal with the credible commitment problem, as well as pro- vide a predictable, stable

• Equipment racks & cabinets • Data Cabling & containment • Labeling & Administration • Grounding, bonding, the signal.

classification model is focused on the Availability of the facility itself, and is driven by the infrastructure to power and cool the data processing environment.. Data Center

Risk factors for spontaneous and provider- initiated preterm delivery in high and low Human Development Index countries: a secondary analysis of the World Health

Meniere's disease is a disorder of the inner ear which causes episodes of vertigo, ringing in the ears (tinnitus), a feeling of fullness or pressure in the ear, and fluctuating

Both DCF and EDCA are able to provide an acceptable level of QoS for real-time NCSs under light NCS tra ffic conditions.. As the network load increases, DCF suffers deadline misses

Workshop Research Integrity at PSI, Data Management 2013 Seite 8 Data life cycle and research integrity4. fabrication, falisification,theft safety