• No results found

CAPITAL PROGRAM MANAGEMENT

N/A
N/A
Protected

Academic year: 2021

Share "CAPITAL PROGRAM MANAGEMENT"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

CAPITAL PROGRAM MANAGEMENT

SEALED BID NO.: 5408 DATE: 9/28/21

PROJECT: SANFORD COURTYARD TIME: 2:00 P.M.

PROJECT DELIVERY METHOD: INFORMAL ESTIMATED CONSTRUCTION COST: $400,000

CONTRACTOR'S NAME LUMP SUM

CITY - TIME REC'D BID YES NO BASE BID Align Builders, Inc.

Carlsbad, CA 1:54 P.M.

McCarthy Building Companies, Inc.

Newport Beach, CA 1:54 P.M.

Reynolds Contracting, Inc.

San Diego, CA 1:55 P.M.

Alternate No. 1 - Spiral Paving – Add Stainless Steel Strip as indicated on Detail 2 Spiral Paving – Add Alternate, Sheet L1.4 Hardscape Details.

X

TOTAL

$869,790

$814,633 $2,200 X 10 $22,000

ALTERNATE NO. 1

$33,157

PREQUALIFIED DAILY RATE OF COMPENSATION

X 10 MULTIPLIER

X 10 $0 $0

$500 X

X

10 $5,000 $55,000 $833,000

X $498,777 $1 X 10 $10 $25,252 $524,039

X $773,000

(2)

5408 SANFORD COURTYARD

UNIVERSITY OF CALIFORNIA SAN DIEGO

July 17, 2017 Bid Form

(UCSD REV 12-18-17)

IF-BF 5

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY’S NAME: __________________________________

Bidder will use Subcontractors for the Work:

Yes No

If “yes”, provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Subcontractor Portion of the Work

Activity (e.g.

electrical, mechanical,

concrete)

Name of Business Location of Business (City)

License No. DIR Registration No.

(Note: Add additional pages if required.)

McCarthy Building Companies, Inc

X

Demolition & Earthwork Paul Hansen Equipment,

Inc. El Cajon 426459 1000006341

Site Utilities West-Tech Contracting,

Inc. Escondido 639761 1000004276

Site Concrete Minegar Concrete, Inc. Vista 1002276 1000029244

Landscape & Site Furnishings

Dreamscape Landscape

& Maintenance, Inc. El Cajon 715757 1000015056

Signage Clear Sign & Design, Inc. San Marcos 745954 1000008174

Electrical Cacy Electric El Cajon 780158 1000001728

(3)

5408 SANFORD COURTYARD

UNIVERSITY OF CALIFORNIA SAN DIEGO

July 17, 2017 Bid Form

(UCSD REV 12-18-17)

IF-BF 6

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES BIDDING COMPANY’S NAME: __________________________________

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 percent of prime contractor’s total bid.

Subcontractor Alternate

No.

Portion of the Work Activity (e.g. electrical,

mechanical, concrete)

Name Location

(City)

License No. DIR Registration No.

(Note: Add additional pages if required.)

McCarthy Building Companies, Inc

1 N/A N/A N/A N/A N/A

(4)

Reynolds Contracting Inc.

X

ELECTRICAL Neal Electric Vista 802588 1000003595

LANDSCAPING Marina Landscape Orange County 492862 1000000079

DEMO Cement Cutting Inc. San Diego 335661 1000003102

SIGNAGE Clear Signs San Diego 745954 1000008174

CONCRETE / U.G TC Construction Santee 402459 1000003132

(5)

Reynolds Contracting Inc.

N/A

(6)

5408 SANFORD COURTYARD

UNIVERSITY OF CALIFORNIA SAN DIEGO

July 17, 2017 Bid Form

(UCSD REV 12-18-17)

IF-BF 5

9.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY’S NAME: __________________________________

Bidder will use Subcontractors for the Work:

Yes No

If “yes”, provide in the spaces below (a) the name, the location of the place of business, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Subcontractor Portion of the Work

Activity (e.g.

electrical, mechanical,

concrete)

Name of Business Location of Business (City)

License No. DIR Registration No.

(Note: Add additional pages if required.) Align Builders. Inc.

x

Earthwork/Demo Sierra Pacific West Encinitas 597852 1000003683

Electrical Cacy El Cajon 780158 1000001728

Concrete CCI San Diego 969781 1000008633

Site Utilities HPS Mechanical San Diego 793014 1000001107

Signage Clear Sign San Marcos 745954 1000008174

Landscape Weiland El Cajon 1006898 1000042557

(7)

5408 SANFORD COURTYARD

UNIVERSITY OF CALIFORNIA SAN DIEGO

July 17, 2017 Bid Form

(UCSD REV 12-18-17)

IF-BF 6

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES BIDDING COMPANY’S NAME: __________________________________

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of one-half of 1 percent of prime contractor’s total bid.

Subcontractor Alternate

No.

Portion of the Work Activity (e.g. electrical,

mechanical, concrete)

Name Location

(City)

License No. DIR Registration No.

(Note: Add additional pages if required.) Align Builders, Inc.

References

Related documents

4.1 The Select Committee is asked to consider the proposed development of the Customer Service Function, the recommended service delivery option and the investment required8. It

H1: SMEs representing individual clusters (based on the use of marketing communication tools and their intended use) in terms of selected attributes (enterprise size,

• Follow up with your employer each reporting period to ensure your hours are reported on a regular basis?. • Discuss your progress with

The main optimization of antichain-based algorithms [1] for checking language inclusion of automata over finite alphabets is that product states that are subsets of already

National Conference on Technical Vocational Education, Training and Skills Development: A Roadmap for Empowerment (Dec. 2008): Ministry of Human Resource Development, Department

Marie Laure Suites (Self Catering) Self Catering 14 Mr. Richard Naya Mahe Belombre 2516591 [email protected] 61 Metcalfe Villas Self Catering 6 Ms Loulou Metcalfe

The corona radiata consists of one or more layers of follicular cells that surround the zona pellucida, the polar body, and the secondary oocyte.. The corona radiata is dispersed

This condensed interim financial information does not contain all the information required for the preparation of the annual financial statements, and should be read in conjunction