• No results found

Effect Of Pipe Roof Support On The Ground Settlement Induced By Shallow Tunnel Excavation

N/A
N/A
Protected

Academic year: 2021

Share "Effect Of Pipe Roof Support On The Ground Settlement Induced By Shallow Tunnel Excavation"

Copied!
24
0
0

Loading.... (view fulltext now)

Full text

(1)

EFFECT OF PIPE ROOF SUPPORT ON THE

GROUND SETTLEMENT INDUCED BY

SHALLOW TUNNEL EXCAVATION

MOHD FANDEY BIN ABDUL LATIF

UNIVERISITI SAINS MALAYSIA

2016

(2)

EFFECT OF PIPE ROOF SUPPORT ON THE GROUND SETTLEMENT INDUCED BY SHALLOW TUNNEL EXCAVATION

by

MOHD FANDEY BIN ABDUL LATIF

Thesis submitted in fulfilment of the requirements for the degree

of Master of Science

(3)

ii

ACKNOWLEDGEMENT

In the name of Allah, the Entirely Merciful and the Especially Merciful.

Alhamdulillah, all praises to Allah and salawat to Nabi Muhammad S.A.W. I am so grateful to Allah for all the time, the strength, the health and the convenience that had been given to me to in completing this thesis. First, I would like say my deepest love and gratitude to my parents for their unconditional prayers for my grateful achievement and successfulness. I would like to express my highest gratitude to my supervisor, Professor Ir. Dr. Mohammad Razip Selamat for all his sharing of knowledge, motivation, sincere comments and suggestions throughout the past years until the completion of this thesis. A great appreciation also goes to my co-supervisors, Dr. Mohd Ashraf Mohd Ismail and Dr. Muhd Harris Ramli for their dedication, active co-operation and passion in providing useful information and tools regarding the research. I also would like to express my gratitude Encik Bani Faidzzainami Baniyamin, Assistant Engineer of computer laboratory for his assistance during my presence at the lab. Last but not least, my beloved wife, Siti Asma Abd Latif for her support, love and patient.

-Mohd Fandey Abdul Latif, May 2014

(4)

-iii

TABLE OF CONTENTS

Page

ACKNOWLEDGEMENT ii

TABLE OF CONTENTS iii

LIST OF TABLES v

LIST OF FIGURES vii

LIST OF ABBREVIATIONS ix

LIST OF SYMBOLS x

ABSTRAK xiiii

ABSTRACT xiv

CHAPTER ONE: INTRODUCTION

1.1 Introduction to Shallow Tunnelling 1 1.2 Challenges in Shallow Tunnelling 2 1.3 Application of Pipe Roof System in Shallow Tunnelling 4 1.4 Problem Statement 8

1.5 Objectives 9

1.6 Scope of the Study 9 1.7 Organization of the Thesis 11

(5)

iv

2.1 Introduction 13

2.2 Pipe Roof System 144 2.3 Method of Construction 144 2.3.1 Auger system 177 2.3.2 Slurry system 188

2.3.3 Vacuum 188

2.3.4 Pilot tube 18

2.4 The Advantages of Pipe Roof System 20 2.5 The Effect of Shallow Tunneling on Settlement 21

2.5.1 Introduction 21

2.5.2 Settlement in Shallow Tunneling 21 2.5.3 Causes of Settlement in Tunneling 23 2.5.4 Settlement of Twin Tunnels 27 2.6 The Prediction of Settlement due to Shallow Tunneling 30

2.6.1 Introduction 30

2.6.2 Finite Element Method of the Settlement 31 2.6.3 Closed-Form Solution for Tunnel Deformations 33 2.7 Estimation of Rock Mass Using Hoek-Brown Failure Criterion 34

CHAPTER THREE: METHODOLOGY

3.1 Introduction 36

3.2 Finite Element Method with PHASE2 36 3.2.1 Boundary Condition of the Finite Element Model 40 3.2.2 Excavation Boundary 42 3.2.3 Stage Boundary VS Material Boundary 42

(6)

v

3.2.4 Mesh Generation 43 3.2.5 Element Types and Aspects 45 3.2.6 Field Stress Installation 47 3.2.7 Material Properties 48 3.3 The Review of Finite Element Method Installation Procedures 49 3.4 Conversion of Mohr-Coulomb Strength Parameter into Hoek-Brown 53

StrengthParameter

CHAPTER FOUR: RESULTS AND DISCUSSION

4.1 Introduction 55

4.2 Tunnel Depth and Spacing 55 4.2.1 Effect of Tunnel Depth and Spacing to Ground Settlement Trough in 56

Circular Twin Tunnel

4.2.2 Comparison of Settlement Profile between Different Tunnel Shapes 63 4.3 Tunnel Case Study 67

4.3.1 Introduction 67

4.3.2 Padang Rengas Pipe Roof Twin Tunnels 68 4.3.3 Two Dimensional Finite Element Analysis 70 4.3.4 Surface Settlement 722

CHAPTER FIVE: CONCLUSIONS AND RECOMMENDATIONS

5.1 Conclusions 75

5.2 Recommendations 76

REFERENCES 78

(7)

vi

LIST OF TABLES

Page

Table 2.1 Ground loss for cohesive soils (O’Reilly, 1988) 26 Table 2.2 Ground loss for cohesionless soils (O’Reilly, 1988) 27 Table 3.1 Specifications of the composite ‘beam’ 50

Table 3.2 Rock mass parameters for the composite ‘beam’ using 53 Hoek-Brown Failure Criterion

Table 3.3 Material Properties of the In-situ (Maxi, 2007) 52 Table 4.1 Result Summarization of Figure 4.1 58 Table 4.2 Tunnelling projects that have had analysis conducted on the 61

surface settlement based on the usage of Pipe Roof system

Table 4.3 Result Summarization of Figure 4.9 65

Table 4.4 Comparison of maximum settlement based on tunnel shape by 70 previous researches.

(8)

vii

LIST OF FIGURES

Page

Figure 1.1 The cross and longitudinal section of forepolling method 6 (Ocak, 2008)

Figure 1.2 Overview of forepolling method (Ocak, 2008) 6 Figure 1.3 Schematic view of pipe roof system 8 Figure 2.1 The cross-section of the arrangement of pipe roof system of 17

typical tunnel shape (Ahuja et al., 2008; Otani et al., 2003; Yao et al., 2004)

Figure 2.2 Five Separate Independent System of Microtunnelling 17 (Joon et al., 2005; Osgoui et al., 2011; Sofianos et al., 2004)

Figure 2.3 Schematic diagram of microtunnelling and pipe jacking 18 operation (Australian Society for Trenchless Technology, 2005)

Figure 2.4 A Normal Probability Distribution of Settlement of Tunnel 24 (Peck, 1969)

Figure 2.5 The simulation of ground loss that contributes to settlement 28 (Lee et al., 1992)

Figure 2.6 The Profile of Settlement after the Excavation of Right Tunnel 29 (Ercelebi etal., 2010)

Figure 2.7 The Profile of Settlement after the Excavation of Both Tunnels 30 (Ercelebi etal., 2010)

Figure 2.8 Combined Plastic Deformation Mechanism for Two Identical 31 Tunnel in Clay (Osman, 2010)

Figure 2.9 The Settlement Profile of Different Spacing between Tohid 32 Tunnels (Chakeri et al., 2011)

Figure 2.10 3D FE-Mesh (Left) and 2D FE-mesh (right) for Tunnel 34 (Yoo, 2009)

Figure 2.11 2D element mesh in two layered soils (Zhang et al., 2011) 33 Figure 3.1 Research activity flowchart 38 Figure 3.2 Basic structure of PHASE2 program 39 Figure 3.3 Boundary condition for twin-tunnel employed in the modeling 40 Figure 3.4 Boundary condition for single tunnel employed in the modeling 41

(9)

viii

Figure 3.5 Two and three layers excavated tunnel 42 Figure 3.6 Mesh type (Curran, 2013a) 44 Figure 3.7 3-noded triangle and 4-noded quadrilateral (Curran, 2013) 45 Figure 3.8 6-noded triangle and 8-noded quadrilateral (Curran, 2013) 46 Figure 3.9 Elements with good and bad aspects ratios (Curran, 2013) 46 Figure 3.10 The magnitude and orientation of initial stress (Möller, 2006) 47 Figure 3.11 Surface settlement trough for different K0values (Moller, 2006) 48

Figure 3.12 Details of Composite Beam (Hefny et al., 2004) 52 Figure 4.1 Two-Dimensional FE-Mesh for Circular Twin Tunnel with 58

Pipe Roof

Figure 4.2 Settlement Profile at Different Depth for Circular Non-Pipe 59 Roof and Pipe Roof Twin Tunnel

Figure 4.3 Settlement Profile between Different Tunnel Shapes 65 Figure 4.4 Overview Plan of Berapit Tunnel 69 Figure 4.5 Location of different tunnelling methods of Berapit Tunnel 69 Figure 4.6 Cross Section Details of the Pipe Roof System 70 Figure 4.7 A Simple Representation of Soil Profile of the Padang Rengas 73

Pipe Roof Twin Tunnels

Figure 4.8 The Location of Monitoring Point of N, M and S 73 Figure 4.9 The Comparison between monitored datas and 2D finite 76

(10)

ix

LIST OF ABBREVIATIONS

2D Two-dimensional CCTV Close-circuit television ELS Electronic laser system EPB Earth pressure balance FE Finite element

FEM Finite element model

HDD Horizontal Directional Drilling MT Microtunnelling

MTBM Microtunnelling boring machine NATM New Australian Tunnelling Method PLUS Projek Lebuhraya Utara-Selatan PTMT Pilot tube microtunnelling RCP Reinforcement concrete pipe TBM Tunnel boring machine

(11)

x

LIST OF SYMBOLS

a Tunnel radius

c Cohesion

cu Undrained shear strength

d Tunnel diameter

E Young’s modulus

g Gap parameter

GP Spacing between tunnel crown and lining

h Vertical distance from the ground surface to the center of tunnel

i Inflection point

i Value of y-axis corresponding to point of inflection of Gaussian trough

n Number of dimension

Ø Angle of friction

p0 Initial total vertical stress

pi Uniform tunnel pressure

R Radius of volume loss

r Distance from center of tunnel

Smax Maximum settlement

Sp Spacing between two identical tunnels

Sz Vertical displacement

U3D A spatial elastic-plastic deformation which contribute to the

(12)

xi

Vexc Volume of excavated soil

Vs Volume of Gaussian settlement trough per meter length

w Vertical deflection

wmax Maximum settlement

x Horizontal distance

Z Vertical distance

Z0 Vertical distance from the undeformed surface to tunnel

axis

Z0 Ground level

α Exponent for volumetric compressibility

γ Unit weight of soil

δ Ovalization effect

ε Uniform radial displacement

σ Normal stress

σ0 Effective overburden stress

τ Shear stress

(13)

xii

KESAN PENGGUNAAN PENYOKONG ATAP PAIP TERHADAP MENDAPAN PERMUKAAN TANAH OLEH PENGGALIAN TEROWONG

CETEK

ABSTRAK

Masa kini, ruang bawah tanah telah menjadi bahagain penting di dalam kemajuan manusia yang melibatkan ekonomi, sosial dan keperluan. Sesetengah kawasan yang membangun amat memerlukan penyelesaian yang lebih baik untuk sistem pengangkutan yang effisien. Terowong cetek biasanya dibina di bawah jalanraya yang sedia ada dan di bawah kawasan yang mempunyai ruang yang terhad. Dalam kajian ini, penyokong atap paip telah dikaji untuk mendapatkan fungsi optimum sistem tersebut yang bertindak sebagai penyokong sementara bagi membolehkan kerja penggalian terowong dijalankan dengan selamat. Atap paip penyokong tersebut dibina dengan memasang serta menyusun beberapa cerucuk konkrit di bahagian atas terowong dengan menggunakan mesin penggali terowong mikro (MTBM). Analisis tersebut telah dijalankan dalam beberapa kes yang berasingan dengna menggunakan model 2D-Finite Element. Model-model tersebut telah dibandingkan berdasarkan tiga bentuk terowong iaitu bulat, ladam kuda, dan empat segi sama. Setiap bentuk terowong telah menjalani beberapa analisa seperti kesan penggunaan penyokong atap pain terhadap kedalaman (0.0d, 0.5d, 1.0d and 2.0d) dan jarak di antara dua terowong berkembar (0.0d, 0.5d, 1.0d and 2.0d). Bahagian terakhir analisa adalah mengenai pembuktian magnitud mendapan hasil ke atas projek yang menggunakan system penyokong atap paip di Padang Rengas, Perak. Berdasarkan analisis yang telah dijalankan, keputusan menunjukkan bahawa mendapan telah berkurang sehingga 90% dengan pemasangan atap paip penyokong tersebut. Magnitud mendapan telah berkurang sehingga 60% apabila kedalaman

(14)

xiii

terowong ditingkatkan. Bagi terowong berkembar, mendapan telah bertambah daripada sehingga 70% di terowong kedua kesan daripada penggalian yang dilakukan di terowong yang pertama yang menyebabkan gangguan terhadap kekuatan tanah.

(15)

xiv

EFFECT OF PIPE ROOF SUPPORT ON THE GROUND SETTLEMENT INDUCED BY SHALLOW TUNNEL EXCAVATION

ABSTRACT

Nowadays, underground space has become an important part of human development involving economics, social and needs. Some areas especially in the urbanized surroundings are in need of a better solution for an efficient transportation system. Shallow tunnel usually constructed beneath an existing highway or an area with limited spaces to improve transportation network. In the present study, pipe roof support was analyzed to determine the optimum function of its system that acts as a temporary support. The pipe roof is formed by installing a number of horizontal concrete piles at the crown of the tunnel by using microtunnelling boring machine (MTBM). The analyses were done in a few separate cases by using 2D-Finite Element modeling. The models were differentiated according to three tunnel shapes which are circular, horseshoe and square. Each tunnel had been analyzed according to the effect of the pipe roof tunnel to depth (0.0d, 0.5d, 1.0d and 2.0d) and spacing between twin tunnels (0.0d, 0.5d, 1.0d and 2.0d). The last part of the analyses is the verification study on a pipe roof tunnel project at Padang Rengas, Perak. A simple ground profile of the tunnel project had been created by using the information gathered from the bore log of the in-situ. Based on the analyses, the results had shown that the settlement has been reduced up to 90% with the installation of pipe roof system. As the tunnel depth increase, the magnitude of settlement above the tunnel has reduced up to 60%. Meanwhile, for the twin tunnels, the magnitude of settlement has increased up to 70% at the second tunnel due to the excavation of the first tunnel that cause disturbance to the soil strength. The magnitude of settlement

(16)

xv

of a twin tunnels also reduced from up to 58% when the spacing between the tunnels increase.

(17)

1

CHAPTER ONE INTRODUCTION

1.1 Introduction to Shallow Tunnelling

The underground engineering nowadays is very crucial especially when dealing with a limited space. It is part of the infrastructure that influences the lifestyle of the modern society and had been applied for a wide range of services such as highways, railways, subways, material storage, sewage and water transport (Hashash et al., 2001). For the last century, the worldwide development has shown the conflict between the demand and supply. The increasing in demand will simultaneously increase in supply. In urban areas, the acquired consciousness of preservation of building and environment together with the requirement of life improvement has raised many issues and difficulty in executing a tunnelling project.

This recent, many issues regarding settlement of building and highways have gained the attention of the engineering world. The settlement does not only produce hazard to the structure around the vicinity, but it also will increase the risk of accident in the tunnel. There are few reasons that contribute to this problem such as poor geotechnical condition of the ground, the presence of water table or aquifer, and the shallow depth of tunnel excavation. Shallow tunnel are usually excavated by using delicate method to avoid excessive vibration such as hydraulic rock splitter where a number of holes will be drilled before the hydraulic splitter takes place inside the drilled holes to create fracture in the rock mass. This method is able to replace the drill and blast method that normally produce a high impact of vibration. However, by performing such a method will not guarantee that settlement will not occur. There are methods that can be incorporated in order to minimize the effect of

(18)

2

settlement during the tunnel construction. In this thesis, the author will focus on the effect of pipe roof application system to the ground surface settlement. Pipe roof system is a temporary support that helps contractor to hold the overburden while performing the tunnel excavation work.

Shallow tunnelling is not the first priority when dealing with underground subway. But sometimes it can be the option to solve many problems that might be the getaway to bigger improvements that influence the human lifestyle and economy. One of the closest examples of today shallow tunnelling advantage is the construction of SMART system in Kuala Lumpur. The 13 km long tunnel was built for a multiple functions both as an underground road for traffic deviation to reduce traffic congestion and storm-water diversion duct to mitigate the high risk to flooding in the center of the city. Thanks to the underground technology that we have today, we are able to excavate tunnels under small overburden to solve this kind of problem that usually bring deteriorate effect to the local economy and properties.

1.2 Challenges in Shallow Tunnelling

The challenge in shallow tunnelling is not only related to the technique of construction, but also the level of sustainability that need to be achieved. The construction of shallow tunnel either in urban and rural area must abide the law and regulation of construction and environment. The disturbance created during the tunnel construction will cause discomfort to the local community as well as interruption to the integrity of building structure. The interruption that occurs above the surface has to be handled and analyzed wisely. This includes the appropriate traffic management on the involved area, well site arrangement, an efficient noise and dust control, and high safety alert. As an engineer, this is a challenge that needs

(19)

3

to be considered so that the disturbance can be reduced to lowest level as possible and at the same time providing a quality work within the cost and time.

The poor quality of the ground condition is one of the important elements that need to be considered in the design and construction method of shallow tunnel. Shallow depth usually consists of loose material of soils such as pit soil that contains high organic concentration with a very low bearing capacity. The depth of topsoil can extend until a few millimeters into the ground until the subsoil layer. Without an appropriate surface treatment, it can be easily washed away by rain and prone to erosion. An area consists of a man made fill usually brings other kind of difficulty such as the unwanted of an unknown material that buried under the filled area that somehow need to be cleared up. This will indirectly increase the amount of cost and time of the project. On top of that, the remaining of historical relic that exists in the ground must be handled by the right authorities before the project can begin. The existing underground cables and services at urban area must be assessed and identified. Perhaps the risk and possibility of damage caused by the settlement that induced during the tunnelling process will allows the engineer to think again for rerouting the tunnel advancement.

Surface settlement due to shallow tunnel excavation is inevitable. Even under a strict monitoring and control, settlement will always occur due to many factors. The factors usually related to the quality of ground condition, workmanship, the application of support pressure during tunnelling, the level of ground water table and the water flow in aquifer. The stratification of soil due to the process of transportation and deposition has created a multiple layers of soil that has low

(20)

4

residual strength. The lack of experience and the incapability to propose a technical solution for the settlement issue which consistent to the risk reduction slowly will put the project into jeopardize. This involves the selection of tunnelling method and the monitoring system that had been imposed to observe the level of settlement.

Besides the tunnelling method, the other factor that must be given attention is the internal support pressure that must be greater than the critical support pressure. This depends on the type of ground that will influence the principal and operational criteria of the temporary support during the tunnelling such as pipe roof system, lining system, shotcrete, rock bolts and steel girder. Pipe roof system is currently a system that utilized steel pipe which contains grout to reinforce the crown of the tunnel before excavation can be preceded. This system will be thoroughly highlighted later throughout this thesis as the main focus. Therefore, the effort to reduce the settlement to the minimum level as possible must be conducted conscientiously as one the important elements in reducing further problem that supposedly can be well predicted.

1.3 Application of Pipe Roof System in Shallow Tunnelling

Pipe roof system generally divided into two which are forepolling method and pipe arch method. Both methods provide the function as a temporary support for tunnelling. These methods use the same idea of reducing settlement during the tunnelling process. Nowadays pipe roof is widely used for tunnel construction especially in urban area to reduce the settlement that affecting the adjacent structure. Pipe roof method serves by using trenchless technique which used to build the underground passage to cross highways, railways and airport runaway. It has been

(21)

5

proven to have a good effects in underground construction engineering such as in Asia as well as Europe (Ge, 2005).

Forepolling method or also known as umbrella arch method (Ocak, 2008) consists of series of steel or fiber glass pipe that had been arranged parallel to the tunnel axis or at a certain angle. The inserted pipe will be injected with grout to create a stiffer reinforcement to allow safe excavation to be conducted in the tunnel. The function is to maintain the exact ground profile and stabilize the rockmass. It is functioned as a temporary support and will be added with permanent support such as bolts and shotcrete (Kontothanassis et al., 2005). It is typically in areas with sandy or silty soil, squeezing and fragmented rock. Forepolling is also frequently used in sections of insufficient rock cover for example at the tunnel entrance area where the jointed roc mass may lack of the horizontal stresses required to keep the rock block intact (Osgoui et al., 2011). Figure 1.1 shows the cross and longitudinal section of the forepolling method.

(22)

6

Figure 1.1: The cross and longitudinal section of forepolling method (Ocak, 2008)

Figure 1.2: Overview of forepolling method (Ocak, 2008)

The pipes were normally installed at the crown of the tunnel. The diameter of the pipe usually ranged between 60mm to 200mm with a wall thickness of 4mm to

(23)

7

8mm. The length of the pipe are generally depends on the inclination of its angle where it must consider the depth of the tunnel. The depth of the tunnel usually ranges between 6m to 12m. The overlapping length usually exists between previous installed pipe and the next installed pipe as shown in Figure 1.1 and Figure 1.2.

In the other hand, pipe arch method is utilized by installing a series of pipe which parallel to the tunnels axis. It consists of series of steel pipes that installed horizontally according to the tunnel axis. Steel pipe are used in this method by drilling them around the tunnel periphery towards the tunnel axis before excavation and later supplemented with grouting which inserted through the pipes to form pipe roof structure to strengthen the surrounding ground (Yang et al., 2008). Sometimes interlocking steel pipes are being used to strengthen the link between the steel pipes. The diameter usually ranged between 0.5m to 1.0m. The application of pipe roof system is normally suitable for a large diameter of shallow tunnel on short distance. This system is an alternative to cut and cover method where sometimes a certain infrastructure such as highway needs to be maintained on the location of the shallow tunnel construction. Further information and details will be given on this system in the next chapters as the main focus of this thesis. Figure 1.3 shows the schematic view of the pipe roof system.

(24)

8

Figure 1.3: Schematic view of pipe roof system

1.4 Problem Statement

The usage of land has been intensified since many centuries ago for the purpose of living such as providing human residence and agricultural medium. These elements are important to provide a better life environment condition. The equal attention must be given in this respect to the increasing demand by the local communities to have more areas free of road traffic (Leca et al., 2007). Based on this matter, the requirement of undertaking the underground construction is almost inevitable to merge the demand for services and facilities. In order to realize the demand, the possible effects to the adjacent structures and underground services must be considered.

Currently, the tunneling induced ground settlement has become one of the major issues especially in urban tunnel construction. Urban tunneling usually involves an underground construction with low overburden and shallow depths up to less than 4m (Osgoui et al., 2011). Pipe roof system has been used in many projects

References

Related documents

The Philadelphia law imposes the same general prohibitions on an employer requiring an applicant to disclose prior salary history or conditioning consideration for employment on such

Additionally, though the West Side boasts the highest rate of educational attainment, its poverty rate nearly mirrors the East Side, and its unemployment rate remains about the

The most important data sources for securities statistics are the Norwegian Central Securities Depository, domestic issuers of bonds and commercial papers abroad,

The type of atmospheric conditions is used for the selection of a pressure, temper- ature, water vapor and ozone profiles. The atmospheric condition types vary with latitude and

know the specimen is under pressure when the membrane appears to be in intimate contact with the specimen. 10) Release the piston by loosening the locking screw in the top of

Reach Altitude status in 2017 based on the number of Altitude Qualifying Miles (AQM) or Altitude Qualifying Segments (AQS) earned on eligible flights operated by Air Canada and

The data used was found to be non-stationary hence runing the first deference, the study found out that a decreasing proportion of incremental income was transferred to the

Organizations can begin by harnessing the internal intelligence that is collected by their security technologies and correlating it with global threat intelligence, developing