BUILDING CODE- PD 1096

IMPLEMENTING RULES BY DPWH April 8, 2005

MINIMUM REQT FOR DWELLING

Footing .60 depth, .25 thk Stairs residential 0.75

Less than 50- 0.90 More than 50- 1.10 Dist bet landing 3.60 Handrails 0.80- 0.90

Winding 0.30 run

Circular 2.50 widths Courtyard 2.0min dist w/

passageway 1.20 Corner lot- 90% buildable area Inside lot- 80% buildable area CEILING HEIGHTS

ARTIFICIAL VENTILATION grnd flr 2.70

2nd flr 2.40 3rd flr 2.10

artificial vent- 2.40 min

natural vent- 2.70 min MEZZANINE-

Min height 1.8m above and below min for natural vent 2.70

185 sqm 2 stairway AIR CONDITIONING 68-74 F 2.13m height ARCHITECTURAL DOCUMENTS a) VICINITY MAP Residential ………. Half km radius Commercial ……… 2 km radius b) TITLE BLOCK

1. OFFICE OF THE BUILDING OFFICIAL 2. LAND USE AND ZONING

3. LINE AND GRADE 4. ARCHITECTURAL 5. CIVIL/ STRUCTURAL 6. ELECTRICAL 7. MECHANICAL 8. SANITARY 9. PLUMBING 10.ELECTRONICS 11.GEODETHIC ENGINEER c) PAPER SIZE PAPE R METRIC ENGLISH W L W L A0 841 1189 33 47 A1 594 841 23 33 A2 420 594 16.50 23 A3 297 420 11.50 16.50 NUMBER OF EXITS

More than10 2 exits

500-99 3 exits

1000 or more 4 exits

mezz greater than 185 sqm 2 exits

if there are only 2 exits 1/5 apart

dead end 6.00 min

(2)

Width 1/6 of right of way Roadway 2/3 of right of way planting strip 0.20 - 0.80 slope 1/6 max 9.0m RROW 1.20m ARCADES clear height 3.00 curb line to outermost 0.50 part of arcade

DRIVEWAY

Ramp 1/3 to ¼ slope

Sidewalk to ramp 1/8 slope ENTRANCE TO BUILDING

Ramp 1/10

Stairs- tread 0.30 Riser 0.10

Steps 2 min FIRE EXTINGUISHING SYSTEM

200 sqm or more

in every storey, basement or cellar used for habitation recreation, dining, study

or work & w/c has occupant load of morethan 20 morethan 30.00m from exit

next door of room , all dressing room, factories, rehersal w/ occupant load of morethan 10 or group H & Iw/ 500 occupant load

4 or more storeys dry stand pipe ELEVATORS

hoistway pit clearance 0.60

in one hoistway 4 elevators max hoisting rope 3 for traction elevators

2 for drum type

diameter of hoisting rope 30mm

24 hr elevator in 5 storey res 1 elevator Dumbwaiter 1.20- max height ESCALATORS angle of inclination 35° width 5.58 min 1.20 max Speed 38 mpm MINIMUM SPACE

Human habitation 6.00 sqm min dim- 2.00 m Kitchen 3.00 sqm min dim- 1.50 m Toilet 1.20 sqm min dim- 0.90 m AIR SPACE

Classroom 3.00 cum 1sqm per person

Offices 12.00 cum

Habitable space 14.00 sqm BOILERS

If bldg not made of fire resistive materials 3.00 distance

SEATS

Width - 0.45

(3)

PENTHOUSE/ TOWERS

if housed by elevators & tanks - 8.40 limit if not 1/3 of roof - 3.6

DRY STAND PIPE

every building 4 storey or more

1 dry stand pipe if 3rd floor & up is morethan 950 sqm inlet connection- 1.20 above floor

CUL DE SAC max run - 50 min radius - 9.15 ROW - 3.35 TURN COURT T max run - 50 width - 18.30 min access road - 3.00 TURN COURT L

max run - 50 & 9.15 width - 12.20

min access road - 3.00 ROAD NETWORK

a. 60m - national road in rural areas 30m or less - if populated

b. 15- 20m - provincial roads

c. 10m - municipality roads d. 10m - barangay road

CLEARANCE OF SERVICE DROPS 1. clearance over roof

1.50 min from highest point of roof 1.00- if voltage exceed 300V 2. clearance from ground - 3.00 min

3. horizontal clearance - 1.00 from window - 0.50 above window 4. when crossing a street - 5.50

* lines for 15 mts high bldg - 2.00- 2.50 m clear

BUILDING PERMIT REQUIREMENT 1. certified true copy of TCT 2. tax declaration

3. current real property tax

4. five sets of plans duly signed and sealed by licensed architect or civil engr, sanitary engr or master plumber, electrical engr, mechanical engr

*if applicant is not owner:

contract of lease, deed of absolute sale or

contract of sale

VALIDITY OF BUILDING PERMIT

15 years liability of architect/ engineers 15 days issuance of permit upon approval 1 year invalid after no use of 1 year 120 days work stop for more than 120 days 15 days for appeal

OCCUPANCY PERMIT 1. as built plans 2. Certificate of completion 3. Logbook BUILDING CODES A Residential Dwellings

B Residential Dwellings, Hotels & Apartments C Educational & Recreation

D Institution

(4)

F Industrial

G Storage and Hazardous H Assembly less than 1000 I Assembly more than 1000 J Accessory

TYPES OF CONSTRUCTION

TYPE I wood construction

TYPE II wood construction w/ fire resistive materials

TYPE III masonry and wood

TYPE IV steel, iron, concrete, masonry TYPE V 4hour fire resistive

steel, iron, concrete, masonry OCCUPANT LOAD

Unit per occupant 2 exits over

a. dwellings 28.0sq

10

b. hotels, apt, dorm 18.6sq

10

c. classroom 1.80sq

50

Conference, exhibit, gym 1.40sq

School shop, lab 4.60sq

d. hospitals 8.40sq 5

Nursing & children’s home 7.40sq 5 Home for the aged

-22 sqm for sleeping -11 sqm for treatment

Nurseries 3.25sq 6

e. retail stores

2.8sqm for basements 50

5.6 sqm for upper floors 10

offices 9.30sq 30 dining area 1.40sq 30 kitchen, parking 18.6sq 50, 30 aircraft hangars 46.5sq 10 f. warehouses 28.0sq 30 mechanical equip. 28.0sq 30 g. garages 9.30sq 10 h. auditorium 0.65sq 50 Theaters, churches, dance floor

Reviewing stands, stadia PARKING SPACES

Low income single detached housing - 1 slot/ 10 units Individual not more than 100sqm

Multi family living units 1 slot per up to 50 sqm/ unit 8 units

50 sqm-100 sqm/ unit 4 units 100 sqm & up 1 unit

hotels 10 rm

residential hotels & apartels 5 units

motel 1 unit

shopping center 100 sqm

markets 150 sqm

restaurants, fastfood, bars 30 sqm

night clubs 20 sqm

office buildings 125 sqm pension, boarding, lodging 20 beds other buildings in business coml zone 125 sqm public assembly buildings, theaters 50 sqm

(5)

schools elementary, highschool 10 classroom college & universities 5 classroom

hospitals 25 beds

recreational facilities

bowling 4 alleys

amusement center 50 sqm clubhouses, beach house 100 sqm factories, manufacturing, warehouse 1000 sqm tourist bus parking 2 slots/ hotel PARKING SPACE SIZE

Perpendicular & diagonal 2.40 x 5.00 Parallel 2.00 x 6.00 Bus & truck loading slot 3.60 x 12.00 PARKING COMPUTATION

• In mixed occupancy- 100% of dominant use 50% of non-dominant use • 50% on street parking maybe included in

computation

• if there are parking lots available within 200 meters- 20% parking requirement maybe provided

PARKING FOR BUILDINGS FOR USE OF HANDICAPPED

• 50- 100 slots- 1 slot for handicapped 1 slot for 100 slots

• wheel chair transfer area for every 2 slots • maximum distance of accessible parking from

facility- 60 mts

LOADING SLOT REQUIREMENT

Stores, mercantile 1 loading slot per 5,000 sqm. 1 truck loading slot

Hotels 1 truck loading slot

ACCESS STREET, ROADS & ALLEYS

6 units 3.00 m

7- 15 units 4.00 m .60 sidewalk 16- 25 units 5.00 m 1.20 sidewalk 26- 27 units 6.00 m 1.20 sidewalk 36 7.50 m 1.20 sidewalk OPEN SPACE REQUIREMENT

Residential- ABCD&J others

Interior lot 50% 25%

Inside lot 20% 15%

Corner & through lots 10% 5% Lot bounded by 3 or more lots 5% 5% YARDS YARD R1 R2-R3 R4 R5 FRON T 4.50 3.00 - 8.00 4.50 6.00 SIDE 2.00 2.00 2.00 3.00 REAR 2.00 2.00 2.00 3.00

FOR COMMERCIAL, INDUSTRIAL & INSTITUTIONAL

RROW FRONT SIDE REAR

30m above 8 5 5 25 – 29 6 3 3 20 – 24 5 3 3 10 – 19 5 2 2 Below 10 5 2 2

ASSESSMENT OF BUILDING PERMIT BASED ON: 1. type of occupancy or use of building

(6)

2. cost of construction 3. floor area

4. height

* is cost per sqm of floor area of building based on group classification

NON- ISSUANCE, SUSPENSION, REVOCATION OF BUILDING PERMIT

1. errors found in plans & specs 2. incorrect data in application 3. non compliance on conditions

4. failure to commence work after 360 days

5. suspension or abandonment of work within 120 days

6. unauthorized change in plans & specs

7. failure to hire architect or engineer to inspect during construction & to keep logbook.

NON- ISSUANCE OR REVOCATION OF OCCUPANCY PERMIT

1. unauthorized change in plans, specs & type of construction

2. failure to hire an architect or engineer who will inspect & keep logbook

3. failure of architect or engineer to submit logbook, certificate of completion, as built plans, specs & building inspection sheet & fire safety inspection certificate duly signed & sealed

ISSUANCE OF WORK STOPPAGE 1. non compliance w/ permit 2. without permit

3. unauthorized change

4. failure to hire an architect or engineer who will inspect & keep logbook

ISSUANCE OF DISCONTINUANCE USE OR OCCUPANCY

1. dangerous building

2. occupancy without permit

3. change of occupancy without certificate DANGEROUS BUILDINGS

1. structural hazard 2. fire hazard

3. hazardous wiring

4. hazardous mechanical inst

5. inadequate sanitation and health facilities 6. improper occupancy and architectural eyesore 7. improper location

8. illegal construction PRE CONSTRUCTION

1. upon receipt of application for building permit, official shall refer to chief or local fire service for evaluation & shall submit certificate after 5 days 2. after 5 days the official shall within 15 days issue

building permit

3. after payment of fees the building official shall within 15 days issue building permit

CONSTRUCTION

1. upon issuance of permit, the official shall endorse copy to chief of local fire service to inspect

building construction

2. upon submission of certificate of completion, the clfs shall inspect within 5 days for final inspection POST CONSTRUCTION

1. building official shall conduct annual inspection KEY HOUSING AGENCIES

National Housing Authority (NHA)

Sole government agency engaged in direct shelter production

(7)

National Home Mortgage & Finance Corporation (NHMFC)

major government home mortgage institution Housing & Land use Regulatory Board (HLURB)

Regulatory board for human settlement

Home Insurance & Guarantee Corporation (HIGC) assist private developers to undertake low & middle income mass housing production

SUPPORT AGENCY

Home Development Mutual Fund (HDMF)

Administers PAG-IBIG, administer contributions collected from government agencies

Social Security System (SSS)

Primary provider of funds for long term housing mortgages for low and middle income earners of private sector

Government Insurance System (GSIS)

Shall be the primary provider of funds for low- term housing mortgages for low and middle income

government employees

National Housing Corporation (NHC) Mass producing building materials

Housing & Urban Development Coordinating Council (HUDCC)

- supervise government housing agencies Administration & Enforcement:

DPWH

Local Building Official

Human Settlement Regulatory Commission (HSRC)

Zoning & Land Use

National Housing Authority (NHA)

Subdivision & Residential Condominium

National Pollution Control Commission (NPCC) Industrial SUPPORT AGENCIES DOF DPWH DBM NEDA PMS DBP

PRIVATE SECTOR REPRESENTATIVES Developers Urban Poor Bankers Professionals Contractors Brokers

MAXIMUM HEIGHT OF BUILDINGS

TYPE OF STRUCTURE STOREYS HEIGHT(M) RESIDENTIAL R1 3 10 R2 5 15 R3 12 36 R4 3 10 R5 18 54 COMMERCIAL C1 5 15

(8)

C2 6 18 C3 60 180 INDUSTRIAL I-1 15 I-2 21 I-3 21 INSTITUTIONAL 15 CULTURAL 30 Utility, transportation, RROW, Services, Parks, Open Recreational and Entertainment Space, Agricultural, Agro Industrial, Tourism 15

EASEMENT ALONG A BODY OF WATER

LOCATION BASEMENT

Urban 3.00m per side of waterways Agricultural 20.00m per side of waterways

References

Related documents

catarrhal fever virus shedding by infected cattle. The demonstration of cell-free malignant catarrhal fever herpesvirus in wildebeest nasal secretions. Studies in bovine

If nothing comes out of this survey data then at the very least 171 students who before would not have known where to go if they needed counseling now have the contact for Bud

Com- bining cropping systems and conservation tillage practices, such as no-tillage, strip-tillage, or ridge-tillage, are proven to be very effective in improving soil organic

Ingredients Certificate or Analysis Fumigation Certificate Fisheries Certificate Halal Certificate Phytosanitary Certificate Radiation Certificate Inspection Certificates

Analysis of such projects has to be done with reference to the social costs and benefits since they cannot be expected to yield an adequate commercial rate of return on the

When construction is complete, and after the final building inspection, you must contact the Planning & Zoning Office to obtain a Certificate of Zoning Compliance. For

Submit Demand Draft in the name of 'The Registrar, IIT Bombay' along with signed Tender document, Inspection Certificate & Bidding Form.. 3.2 IIT Bombay reserve the rights to

Conditions of Application Page 5 - 6 Fire Alarm Inspection and Servicing Certificate Page 7 - 8 Certificate of Inspection for Fire Fighting Equipment Page 9 - 10 Certificate