• No results found

COMMUNITY DEVELOPMENT Planning Projects

N/A
N/A
Protected

Academic year: 2022

Share "COMMUNITY DEVELOPMENT Planning Projects"

Copied!
7
0
0

Loading.... (view fulltext now)

Full text

(1)

Planning Projects

Height/(Sto ries) Approval

Date

Affordable / Total Units /

Description Live/Work

Project Location Status Date Filed Zone

Developer

APN Planner

or Sq. Ft of Project Type

Commercial

Project: VOOV PROJ-03864 Apex Construction

1250 N Olive St Ventura, CA 93001 (805)643-2121

C-2 08/18/2000

4107 E Main St 9/12/2000 2-story office building. 28'(2.00) BR

079-0-280-255 All Planning

Approvals

Project: MARRIOTT-RESIDENCE INN PROJ-5616 Pacifica Seaward Llc

1770 Hancock St 200 San Diego, CA 92110 (619)296-9000

CTO 01/14/2013

770 S Seaward Av 2/13/2013 128 room hotel (4.00) IH

080-0-230-245 In Plan Check

Project: 1900 S Victoria - GHITTERMAN PROJ-04282 William Growdon

1230 E Thompson Bl Ventura, CA 93001 (805)766-9600

T4.9 03/26/2004

1900 S. Victoria Av 12/7/2004 2-story office building. 33'11"(2.00) VL

135-0-062-095 Under Construction

Project: VALERO PROJ-4627 Steve Bovee Drafting

1975 Maricopa Highway #11 Ojai, CA 93023

(805)649-9104

CTO 07/05/2012

2121 Harbor Bl 9/4/2012 Automatic carwash and canopy (1.00) ER

076-0-104-015 All Planning

Approvals

Industrial

Project: ALLIED BEVERAGE COMPANY PROJ-5097 C2G Architects

7306 Coldwater Canyon Av 12 North Hollywood, CA 91605 (818)764-2067

MPD 10/25/2012

Nicolle St (Between Seaborg Av &

Golf Course Dr)

Warehouse and Maintenance Building

2/5/2013 JR

134,797.00 sq. ft.

138-0-241-045 Under Construction

Project: FPA LAND DEV/VICTORIA CORP C PROJ-03617

(2)

Pacific Cornstone

4105 Sorrento Valley Boulevard San Diego, CA 92121 (858)677-9880

06/25/2008 MXD NEC of Victoria Ave & Olivas Park

Dr

8 industrial office buildings

1/7/2009 (1.00) JR

234,200.00 sq. ft.

138-0-220-045 All Planning

Approvals

Institutional

Project: CMH - NEW HOSPITAL PROJ-1678 Rasmussen & Associates

248 S Mills Rd Ventura, CA 93003 (805)644-7347

09/08/2010 South of Loma Vista Road, west of

Brent Street and north of Main Street

New hospital building (320,000 sq ft and 230 beds), adaptive reuse of existing hospital facilities (121,000 sq ft for non- essential hospital support services) and 104,000 sq ft for new backfill medical office reuse), new street extensions, a new public plaza, and new area landscaping.

12/6/2010

320,000.00 sq. ft.

077-0-011-250 Under Construction

Project: 4667 Telegraph Rd - Ventura College - Maintenance & Operations Master Plan PROJ-6576 Anderson Kulwiec Architects

854 E Main St 100 Santa Paula, CA 93060 (805)933-0225

R-1-7 10/09/2013

Ventura College Campus Ventura College Maintenance and

Operations renovation - demolishing 11,132 square feet and adding 14,418 square feet for a net increase of 3,286 square feet

11/5/2013 VL

3,286.00 sq. ft.

078-0-050-360 All Planning

Approvals

Mixed Use

Project: MAR-Y-CEL - FORMAL PROJ-6984 Darrell Becker, Ventura Coastal

Partners, Llc 40 S Ash St Ventura, CA 93001 (310)824-2200

T4.3 02/06/2014

NEC Thompson Bl and Ventura Av Mixed Use Development with 138 units 138 0

and 5,375 sq.ft. of commercial space

Not Approved IH

0.00 sq. ft.

073-0-114- 0 030/040/080/090 /100/115

In Planning Process

Project: CENTRAL COAST INVESTORS PROJ-02225 Central Coast Investors

1355 Del Norte Road Camarillo, CA 93010 (805)648-2394

RPD-8U 05/04/2007

1450/1490 N Ventura Av Mixed Use - Condominiums/4,500 sq.ft. 43 0

Commercial

12/2/2008 (3.00) BR

0.00 sq. ft.

069-0-091-015, 0 205

All Planning Approvals

Project: ANASTASI DEV. PROJ-00756 David Armstrong

1940 E Linda Vista St Ventura, CA 93001 (310)600-6682

CMXD 05/07/2009

Southwest corner of Seaward Av and Harbor Bl

0 Mixed Use - 138

Residential/20,230 sq.ft. Commercial

11/16/2010 (3.00) iholt

0.00 sq. ft.

076-0-010-235; 20 081-0-054-030

All Planning Approvals

Project: V2V VENTURES PROJ-01520 V2V Ventures

2212 Elise Wy

Santa Barbara, CA 93109 (805)901-8021

T4.5 10/30/1987

1570 E Thompson Bl Mixed Use - Condominiums/2,500 sq.ft. 29 5

Commercial

9/18/2006 (3.00) JR

0.00 sq. ft.

075-0-070-040, 0 050

All Planning Approvals

Project: CANNERY ROW LLC PROJ-03743

(3)

Ventura Cannery Apartments 1849 Sawtelle Bl

Los Angeles, CA (213)321-9689

T5.1 09/03/2008

130 N Garden St Mixed Use - Condominiums/2,156 sq.ft. 78 0

Commercial

6/2/2009 46.6'(4.00) IH

0.00 sq. ft.

12

071-0-260-375 Under Construction

Project: LOGUE FAMILY PROJ-1200 Logue Family

40 S Ash St Ventura, CA 93001 (805)653-6794

M-2 06/21/2010

2055 N Ventura Av Mixed Use - Condominiums/7,300 sq.ft. 105 0

Commercial

2/7/2012 (2.00) JR

0.00 sq. ft.

16

068-0-060-210 All Planning

Approvals

Project: RAVELLO HOLDINGS - Northbank & Johnso - Formal PROJ-6811 Philip Ram Ravello Holdings, Inc.

12121 Wilshire Blvd, Suite 512 Los Angeles, CA 90025 (310)261-2114

CPD 12/10/2013

Johnson Drive at Northbank Drive 10,000 sq.ft. of retail space and 306 306 0

apartments

Not Approved IH

0.00 sq. ft.

0

132-0-080-275 In Planning

Process

Project: MEHDIANI PROJ-4608 Bruce Mehdiani

5412 Lindley Av Encino, CA 91316 (512)916-0041

T4.5 06/14/2012

1926 E Thompson Bl Mixed Use - Apartments/4,200 sq.ft. 4 0

Commercial

Not Approved (2.00) ER

0.00 sq. ft.

0

075-0-081-090 In Planning

Process

Project: V2V VENTURES - PALM & SANTA CLARA PROJ-03614 V2V Ventures

2212 Elise Wy

Santa Barbara, CA 93109 (805)901-8021

DC 05/11/1998

300 E. SANTA CLARA Mixed Use - 34 4

Condominiums/6,175 sq.ft. Commercial

12/18/2007 48'(4.00) BR

0.00 sq. ft.

5 073-0-123-250,

260, 270

All Planning Approvals

Project: CASTILLO DEL SOL - 3005 E MAIN ST - HOUSING AUTHORITY PROJ-6187 Housing Authority Of The City Of

Ventura 995 Riverside St Ventura, CA 93001 (805)648-5008

T4.5 04/29/2013

3005 E Main St Affordable housing for special needs 40 0

residents, an on-site manager’s unit and supportive services.

6/26/2013 IH

0.00 sq. ft.

39 077-0-072-010,

060

All Planning Approvals

Project: SONDERMANN-RING - AMENDMENT PROJ-6237 Michael Sondermann,

Sondermann Ring Partners CA

HC 05/20/2013

Ventura Harbor adjacent to Anchors Way & Navigator Drive

30 300 apartment units 300

21,000 square-feet of commercial retail/office area

private indoor and outdoor recreational facilities including a 2.44-acre park and waterfront promenade

7/1/2013 (3.00) BR

0.00 sq. ft.

080-0-240-125, 17 245

All Planning Approvals

Project: CAFE SCOOP - STAJEN PROJ-00687 Stagen Properties

4478 Market Street #4A Ventura, CA 93003 (805)654-6977

T4.5 10/04/1985

2170 E Main St 11/14/2005 Mixed Use - Condominiums/Commercial 10 0 (3.00) BR

0.00 sq. ft.

0

075-0-012-225 All Planning

Approvals

Project: NEW URBAN VENTURES PROJ-04182

(4)

New Urban Ventures 7811 Marlin Lane Ventura, CA 93004 (805)647-8428

MXD 06/18/2003

1995 N Ventura Av Mixed Use - Condominiums/1,779 sq.ft. 80 0

Commercial

10/12/2009 (3.00) JR

0.00 sq. ft.

2 068-0-070-015,

035

All Planning Approvals

Project: RENAISSANCE HOLDINGS PROJ-04543 Jensen

790 E Santa Clara St 107 Ventura, CA 93001 (805)633-2240

T4.5 09/07/2006

2200 E Main St Mixed Use - Condominiums/3,582 sq.ft. 25 0

Commercial

9/4/2007 44'(3.00) BR

0.00 sq. ft.

3

075-0-013-100 All Planning

Approvals

Project: PALM & POLI ASSOC PROJ-03676 Palm & Poli Assoc

750 W Gonzales Road #110 Oxnard, CA 93036 (805)639-0350

T6.1 12/10/1998

Southwest corner of Palm and Poli St

0 16

Mixed Use - Condominiums/1,200 sq.ft.

Commercial

3/26/2007 (4.00)

0.00 sq. ft.

3

071-0-194-405 All Planning

Approvals

Project: WORLD OIL - 1571 E MAIN ST - FORMAL PROJ-6018 World Oil Marketing Co

9302 S Garfield Av South Gate, CA 90280 (562)928-0100

T4.5 03/01/2013

1571 E Main St Mixed Use - 3 0

Apartments/2,438 sq.ft. Commercial

Not Approved 28' 11"(2.00) ER

0.00 sq. ft.

0

073-0-072-090 In Planning

Process

Residential

Project: JENVEN VILLAGE SP AMENDMENT Village SP AMEND; TRACT NO. 5801 PROJ-1857 Jenven Village, Llc

1672 Donlon Street Ventura, CA 93003 (805)654-6977

MXD 01/11/2011

Southeast of Well Road and Darling Road

0 51

51 unit condominium development on a portion of 4.38 acres located in the Saticoy Village Specific Plan

10/10/2012 5 IH

090-0-280-175;

185, 195, 205, 215

All Planning Approvals

Project: WESTSIDE RENAISSANCE - DYER SHEEHAN PROJ-4677 Dyer Shehhan Group Inc

808 E Santa Clara St A Ventura, CA 93001 (805)653-8100

RPD 07/23/2012

2686 N Ventura Avenue Not Approved 50 Affordable senior apartments 50 50 0 (2.00)

069-0-020-050 In Planning

Process

Project: CENTEX PROJ-04154 Dyer Shehhan Group Inc

808 E Santa Clara St A Ventura, CA 93001 (805)653-8100

RPD-8 04/28/2003

2686 N. Ventura Av 120 Single Family Residence, 36 156 0

Condominiums

6/18/2007 0 3(3.00) IH

069-0-020-050 All Planning

Approvals

Project: PARKLANDS APARTMENTS PROJ-4222 Westwood Communities Corp.

1263 Westwood Bl 210 Los Angeles, CA 90024 (310)477-3321

T4.6 05/21/2012

Southwest corner of Telegraph &

Wells Rd

0 173

173 Apartments with Community Building

9/5/2012 0 (3.00) IH

089-0-012- 140/200

All Planning Approvals

Project: SANTA CLARA APTS - 1254 & 1263 E SANTA CLARA ST PROJ-6263 Darryl Kysar

4855 Oceanaire St Oxnard, CA 93035 (818)472-0877

T4.1 06/06/2013

1254 & 1268 E Santa Clara St Not Approved 8 Apartments 8 0 0 JR

073-0-154-030 In Planning

Process

(5)

Project: WESTWOOD/PARKLANDS PROJ-03829 Westwood Communities

1263 Westwood Boulevard #120 Los Angles, CA 90024

(310)477-3321

T3.1; T3.2 04/28/2000

Southwest corner of Wells and Telegraph Rd

0 326

216 detached homes; 110 attached homes

8/3/2009 44 43'8"(3.00) IH

069-0-012-045 All Planning

Approvals

Project: HEMLOCK APARTMENTS PROJ-1126 Buena Property Management

627 Monte Vista Av Ventura, CA 93003

T4.1 04/28/2010

264/274 S Hemlock St 5/11/2011 23 Apartments 23 0 0 JR

073-0-162-210 In Plan Check

Project: MATLIJA INVESTMENT GROUP - 11 S ASH PROJ-04315 Matilija Investment Prop Llc

P O Box 23277 Ventura, CA 93002

T4.1 06/04/2004

11 S Ash St 3/26/2007 15 Condonimiums 15 2 2 (4.00) BR

073-0-046-050, 060

In Plan Check

Project: RISI PROJ-04110 Joe Risi

1224 Coast Village Ci #20 Montecito, CA 93108 (805)565-2288

T4.3 12/12/2002

809 E. Front Street 10/27/2005 6 Condominiums 6 0 0 3(3.00)

073-0-142-270 All Planning

Approvals

Project: REXFORD PROJ-03198 Faulconer & Associates

0 394 E Main St #C Ventura, CA 93001 (805) 648-2394

T4.4 01/18/2007

918 E. Thompson 7/17/2007 25 Condominiums 25 3 0 3(3.00) BR

073-0-144-170 All Planning

Approvals

Project: BROOME (THE GROVE) PROJ-00723 Moss & Associates

3319 Telegraph Rd Rd 201 Ventura, CA 93003-3319 (805)339-0613

RPD-1 08/11/2005

Vacant land between Copland &

Telephone Rd, between the 126 and 101 Freeways

0 250

198-250 townhouse, apartment, courtyard, stacked units

Not Approved 38 2.5(2.50) IH

079-0-240-035 In Planning

Process

Project: LA BARRANCA - 5533 Foothill Road PROJ-6098 Mikebadner, Wh La Barranca 9

Llc

21080 Centre Pointe Pkwy Santa Clarita, CA 91350 (661)222-9207

RPD-2U 03/25/2013

5533 Foothill Rd Not Approved 9 Single Family Residences 9 0 0 IH

067-0-060-120 In Planning

Process

Project: SANTA CLARA ST URBAN RENEWAL PROJ-04263 Mainstreet Architects

422 E Main St Ventura, CA 93001 (805)652-2115

T4.3 02/13/2004

72 W Santa Clara St 9/6/2005 21 Condominiums 21 3 0 43'(4.00)

073-0-111-160 In Plan Check

Project: VENTURA DOWNTOWN HOUSING PROJ-5085 Sasn Corp.

1263 Westwood Bl, Ste 210 Los Angeles, CA 90024 (310)477-3321

T4.3 10/18/2012

120 E Santa Clara St Not Approved 260 Apartments 255 0 0 66'(5.00) IH

073-0-116-010 In Planning

Process

(6)

Project: CHAPMAN, MIKE PROJ-04691 Michael Chapman

95 E Ramona Av Ventura, CA 93001 (805)656-5072

R-3-5 12/04/2008

95 E Ramona St 12/17/2009 7 Apartments 7 0 0 (2.00)

071-0-032-230 Under Construction

Project: ENCLAVE AT NORTHBANK - WATT COMMUNITIES PROJ-4184 Watt Communities Llc

2716 Ocean Park Boulevard 2025 Santa Monica, CA 90405 (310)314-5074

T4.10 04/27/2012

SOUTHEAST CORNER OF SATICOY AV & NORTHBANK DR

0 91

91 Single Family Homes

6/3/2013 8 JR

128-0-040-285;

128-0-050-555

All Planning Approvals

Project: GOLDBERG PROJ-04296 Gary Goldberg

5008 Pacific Village Dr Carpinteria, CA 93013 (805)653-5071

T4.5 04/30/2004

1837 E. Thompson Blvd. 7/3/2007 5 Condominiums 5 0 0 3 stories(3.00)

073-0-214-110 All Planning

Approvals

Project: HUGHES PROJ-04590 Douglas J Hughes

516 E Main St Ventura, CA 93001

RPD-20 07/12/2007

1511 Vista Del Mar Dr 8/5/2008 3 Condominiums 3 0 0 (2.00) IH

076-0-021-050 All Planning

Approvals

Project: MATILIJA PROJ-03865 Matilija Investment Prop Llc

P O Box 23277 Ventura, CA 93002

T4.3 08/25/2000

221 N. Garden St 7/18/2006 28 Condominiums 28 0 4 3(3.00) BR

071-0-180-170, 180

All Planning Approvals

Project: CITY VENTURES - ORCHARD COLLECTION - CITRUS PLACE PROJ-6355 Bill Mcreynolds, City Ventures

Homebuilding, Llc 1900 Quail Street Newport Beach, CA 92660 (562)230-9874

RPD-8U 07/19/2013

Citrus & Peach 59 Single Family 119 0

60 Townhomes

8/14/2013 0 JR

090-0-310-015, 025

In Plan Check

Project: ISLAND VIEW APARTMENTS - WESTWOOD COMMUNITIES PROJ-2008 Westwood Communities Corp.

1263 Westwood Bl 210 Los Angeles, CA 90024 (310)477-3321

T5.3 04/11/2011

Alameda at 8th St. behind Montalvo Square

0 154

154 Apartments

11/19/2012 0 53'(4.00) IH

136-0-020-625 All Planning

Approvals

Project: CITRUS APTS - VINCE DALY PROJ-5211 Daly Group, Inc.

1691 El Dorado Dr Thousand Oaks, CA 93021 (805)407-3400

T4.10 11/28/2012

North side of Citrus Drive, 500 east of Wells Road

0 54

A proposed 54-unit apartment development including an exception for parking placement on a vacant 1.7 acre lot located on the north side of

Citrus Drive, 500 feet east of Wells Road;

T4.10 zone; PROJ-5211.

4/10/2013 0 40'(3.00) JR

090-0-250-335 Under Construction

Project: UC HANSEN TRUST SP PROJ-03826

(7)

Dyer Sheehan 808 Santa Clara St Ventura, CA 93001 (805)653-8100

T4.3 04/27/2000

Southeast corner Saticoy and Telegraph

0 189

131 Single family; 34 Condominiums; 24 farmworker apartments

8/19/2008 24 2.5(2.50)

089-0-012-110 All Planning

Approvals

Project: NORTHBANK - VINCE DALY PROJ-6270 Daly Group, Inc.

1691 El Dorado Dr Thousand Oaks, CA 93021 (805)407-3400

T4.10 06/10/2013

Eastern terminus of North Bank Drive

0 198

117 Single Family

31 Affordalbe for sale triplex/quadplex 50 apartments

Not Approved 30 JR

128-0-060-125, 135, 145, 255

In Planning Process

Project: EAST VILLAGE RESIDENTIAL - CEDC PROJ-4154 Cabrillo Economic Development

Corp

702 County Square Dr Ventura, CA 93003 (805)672-2567

MXD 04/18/2012

Snapdragon & Los Angeles Av 12/10/2012 50 Low Income Apartments 50 50 0 ER

090-0-280-255, 275, 285

In Plan Check

STATUS (DEFINED):

IN PLANNING PROCESS - Project application has been filed for one or more discretionary planning approvals. Residential projects of fewer than four units are not included unless Planning Commission approval is required, nor are non-residential projects that do not result in new development.

ALL PLANNING APPROVALS - The project has received all major discretionary and planning approvals from the City, with no appeals pending.

IN PLAN CHECK - The project has received all planning approvals; final plans have been submitted Building & Safety.

UNDER CONSTRUCTION - The project has received all planning approvals; final plans approved; building and other permits have been issued; may be under

construction.

References

Related documents

Nakon izraˇ cuna rashladnog optere´ cenja pojedninih komora, sva optere´ cenja se zbra- jaju i ˇ cine ukupno rashladno optere´ cenje cijelog sustava. S obzirom da su ukupna

Our hearing protection rule, 1910.95, Occupational noise exposure, requires your workplace to have a hearing-conservation program if your employees are exposed to noise levels

Similarly, clinicians evaluating sexual abuse risk reduction strategies for children with disabilities recommend that future research be focused on evaluation models that assess

Except for some administrative welfare services, social work support is not clearly available for ger residents who have a mixed sense of belonging, as professional social

We had no concerns that the included participants and setting, the conduct and interpretation of the index test, and the target condition (as defined by the reference standard) in

Se ha analizado también la posibilidad de que el suministro eléctrico sea realizado mediante energía solar fotovoltaica como apoyo al consumo de energía: es mejor ambientalmente y

As part of organizing the project groups it is necessary to develop a Project Organisation document which details all stakeholders, steering committee members, project team members,

 IMC Objectives:  Awareness:  Designed to revolutionize the view of baby care products  Every mother is a superwoman and Dove takes care of both  The way Dove adult skin