ADDENDUM No. 1 for

CONTRACT NO.: 2018-036

REHABILITATE TAXIWAYS B, C, D, J, L &

TAXIWAY A EAST RUN UP, PHASE II PROJECT at

CAPITAL CITY AIRPORT

IMPORTANT:

Bidders must acknowledge receipt of this Addendum. All documents must be fully executed at the time the Bid is submitted. All information contained herein, including:

Addendum to the Contract Forms; Addendum to Drawings; referenced attachments shall form a part of this Addendum.

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated 13 February 2022.

Addendum Date: 25 Feb 2022

Questions Due Date: 07 Mar 2022, 05:00 P.M local time Bid Due Date: 13 Mar 2022, 10:00 A.M. local time Bid Opening: 13 Mar 2022, 10:00 A.M. local time

This Addendum No. 1 consists of 2 pages and the following attachments:

1. Attachment No. 1 – Pre-Bid Meeting Minutes

ADDENDUM TO CONTRACT FORMS, BID FORMS and SPECIFICATIONS Contract Forms:

No Changes this addendum

Bid Forms:

Bid forms shall be adjusted to reflect the quantity changes in this addendum. Bid forms are not reissued with this addendum. Bid forms will be reissued with final addendum to capture all changes that may occur during bidding.

Technical Specifications:

No Changes this addendum

ADDENDUM TO DRAWINGS

General: Sheets with changes listed below and not reissued will be issued with the conformed documents to the successful bidder.

Sheet No. G.001:

1. Quantity sheet has been updated to reflect revised quantities as seen below:

(2)

RESPONSES TO CONTRACTORS’ QUESTIONS (From Pre-Bid Meeting)

Q1: Is the contractor responsible for construction layout?

R1: Yes, the plans provide horizontal and vertical control points for contractor’s use.

The design survey and grading files can be provided to awarded contractor for contractor’s field verification upon request.

Q2: Is GPS survey equipment permitted?

R2: Yes, access to the control will need to be coordinated. It was noted that leaving the unit within an operational pavement object free area is not permitted. Secondary control may be required of the contractor for certain work areas.

Q3: Can you explain the Taxiway C drainage item?

R3: This is a lump sum item that covers the demolition, excavation, backfill, pipe, structure and connections as outlined in the project specifications. The hot mix asphalt will be measured and paid separately under the unit price of asphalt.

Q4: Is there concrete paving work required?

R4: No, the concrete was highlighted to draw contractor’s attention to it for bidding/construction awareness.

Q5: The marking quantities seem to be off as there is more temporary than permanent.

R5: Will review the quantity take off, but there is some temporary marking and marking removal associated with the Taxiway C work areas that may be impacting that number.

See Addendum 1 for updates to the marking quantities.

Q6: Is the contractor responsible for acceptance testing?

R6: No, acceptance testing is the responsibility of the owner. The contractor is required to provide quality control testing in accordance with Item C-100 and P-401. It was noted that the contractor is responsible for pavement cores per P-401.

End of Contractor’s Questions

END OF ADDENDUM No. 1

(3)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

Page 1 of 8 8

A. Opening and Introductions

ADCI advised that this project will be following federal requirements for bidding and construction.

Attendees: K. Fritz & C. McErlean – ADCI, Jamie Sides, Andy Kerstetter and Arielle Lewis – SARAA, Matt Harlacher - Shiloh Paving B. Bidding Requirements

ADCI reviewed the bidding requirements for this project as follows:

1. Bids Accepted Until

Tuesday, March 15, 2022; 10:00 AM 2. Date, Time and Location of Bid Opening

Tuesday, March 15, 2022; 10:00 AM

Susquehanna Area Regional Airport Authority (SARAA) One Terminal Drive, Suite 300

Middletown, PA 17057

SARAA office is located on the 3rd floor of the HIA Terminal building 3. Bids Security

A Bid Bond or Certified Check in the amount of 10% of the Contractor’s Base Bid price must accompany the bid proposal.

4. Bids May Be Held 60 Calendar Days 5. Plans Availability

Plan Deposit: $0.00 electronic format.

ADCI advised that Contract Documents are available in electronic PDF format only.

Discussion Action/Response

(4)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

6. Bid Questions

Any questions or interpretations of the plans, specifications or documents must be submitted, in writing, no later than close of business on March 7, 2022, to Mr.

Keith Fritz of ADCI. Questions can be submitted via email to kfritz@adci- corp.com

7. Instructions to Bidders`

a. It is the intent of the OWNER to award a Contract to the lowest responsible Bidder providing the Bid has been submitted in accordance with the requirements of the Bidding Documents and does not exceed the funds available. The OWNER shall have the right to waive informalities or irregularities in a Bid received and to accept the Bid which, in the OWNER's judgment, is in the OWNER's best interest.

b. The OWNER shall have the right to accept Additives in the order included in the documents,

C. Contract Documents 1. Bid Forms

a. The Proposal form must be completed in its entirety. One (1) original and one (1) copy shall be submitted with the bid.

b. All Addendums must be noted on the proposal in paragraph (f) c. All Subcontractors must be listed on the Proposal in paragraph (g) d. Certificate of Buy American Compliance for Manufactured Products –

completed and signed

e. Bid Bond – completed and signed

f. Consent of Surety – completed and signed

g. Resolution of Board of Directors – completed and signed h. Non-Collusion Affidavit of Prime Bidder – completed and signed

i. Equal Employment Opportunity Report Statement – completed and signed

(5)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

Page 3 of 8 8

j. Bidders Experience – completed k. References – completed

l. Certificate of Non-Segregated Facilities – completed and signed m. Bid Submission Checklist – completed and initialed

n. HIA DBE-1 form – May be submitted with bid. Required to be submitted by low bidder and 2nd low bidder with 24 hours of bid opening.

2. Bid Bond/Bid Security

a. Carefully read and comply with the requirements set forth in the General Instructions for Bid Bonds.

b. Bid Bond shall be in the amount of ten (10%) percent of the Base Bid.

3. Contract Forms

a. The successful Bidder will execute the Agreement contained in this section with the Owner and return it within 20 calendar days of Notice of Intent to Award.

b. The PennDOT Bureau of Aviation may check the Prime and all Subcontractors for debarment from work in Pennsylvania, and the Federal Aviation Administration may check the Federal SAMS list.

c. Lobbying Certification Form – completed and signed d. Waiver of Lien Form – completed and signed

4. Performance Bond

a. The successful Bidder will execute the Bond contained in this section with the Owner for an amount equal to 100% of the amount awarded for Performance and Payment.

b. This Bond shall remain in effect for a period of two (2) years after the date of final payment.

5. Labor and Material Payment Bond

a. The successful Bidder will execute the Bond contained in this section with the Owner for an amount equal to 100% of the amount awarded.

(6)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

b. This Bond shall remain in effect for a period of two (2) year after the date of final payment.

6. Statutes and Regulations Required by SARAA

a. This section of the Project Manual contains information regarding acts/laws that are required by the federal/state/locality where the project is located.

7. SARAA General and Supplementary Conditions

a. General Conditions – This section contains SARAA General Conditions. It was noted that the insurance requirements may be different than standard DOT projects, the contractor should review in detail.

b. Supplementary Conditions- This section contains the Supplementary Conditions

• DBE Goal – Nine and nine tenths percent (9.9%) of the original contract amount. No Subgoals are included.

• Contractor will be required to submit Form HIA DBE-1 within 24 hours of bid opening.

• Monthly Status Report, Forms A, B, and C will need to be submitted with each application for payment. The airport noted they can assist at the onset as some of these forms may be more than contractor is accustomed to filling out.

• Davis Bacon Wage Rates apply to the work on this Project.

8. FAA General Provisions a. General Provisions

This section of the Project Manual contains the FAA Standard General Provisions required for all contracts on airports involving Airport Improvement Program (AIP) Funding.

9. Division 1 – General Requirements a. Special Provisions

To tailor the Project for local conditions and requirements, this section also contains Special Provisions.

b. Items for consideration

• Items that increase or decrease by less than 25% can be approved by a change order with proper justification and approval before work begins.

• Pay quantities shall be based on measured field quantities.

(7)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

Page 5 of 8 8

SARAA. Included with each pay app will be all DBE forms required per SARAA Supplementary Conditions and certified payrolls. Contractor’s and Sub-Contractor’s first and last payrolls must be notarized and original hard copy provided.

▪ Contractor is responsible for construction layout. The Engineer shall establish necessary horizontal and vertical control.

• Project Bulletin Board – Post immediately including wage rates, wage rate posters, and EEO policies. Information may be maintained in a project binder. Details will be determined at Pre-Construction meeting.

• Contractor shall maintain As-Built Drawings that shall be provided to the Engineer at completion of the project. Retainage will not be released until the as-built drawings are received.

10. Technical Specifications

a. Aviation Technical Specifications have been prepared in accordance with FAA Advisory Circular (AC) 150/5370-10H, Standards for Specifying Construction of Airports.

b. ADCI advised the Contractor to review each item carefully in regards to what is incidental, what is being measured and how items are being paid for as required.

c. Availability of Advisory Circulars (AC’s). Current copies of FAA ACs applicable to a project are available to prospective bidders, on the FAA Website at www.faa.gov.

(8)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

D. General Project Scope

ADCI provided an overview of the general project scope as follows:

1. Base Bid

The Captial City Airport Rehabilitate Taxiways project is a taxiway rehabilitation project. The base bid consists of the rehabilitation of existing Taxiway’s B and C. The rehabilitation will include the conversion of the existing w section taxiways into crowned taxiways. Proposed rehab will also include the adjustment of existing inlets to match newly proposed grades and proposed marking in accordance with FAA standards.

2. Additive No. One (1)

This portion of the project includes a mill and overlay of the existing Taxiway A East Run Up Pad. This will consist of a 2 inch Mill and 2 inch Overlay of the existing pad, and replacement of existing marking.

3. Additive No. Two (2)

This portion of the project includes a mill and overlay of existing Taxiway J. This will consist of a 2 inch Mill and 2 inch Overlay of the existing pad, with leveling course proposed where necessary to maintain the existing crowned profile.

4. Additive No. Three (3)

This portion of the project includes a mill and overlay of existing Taxiway D. This will consist of a 2 inch Mill and 2 inch Overlay of the existing pad, and replacement of existing marking.

5. Additive No. Four (4)

This portion of the project includes a mill and overlay of existing Taxiway L. This will consist of a 2 inch Mill and 2 inch Overlay of the existing pad, and replacement of existing marking.

E. Anticipated Project Schedule 1. Contract Time

Mobilization: 30 Calendar Days Work Area One (1): 16 Calendar Days Work Area Two (2): 17 Calendar Days

(9)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

Page 7 of 8 8

Work Area Four (4): 6 Calendar Days Work Area Five (5): 4 Calendar Days Work Area Six (6): 4 Calendar Days Substantial Completion: 30 Calendar Days Punchlist/Final Completion: 5 Calendar Days Total Contract Time: 116 Calendar Days 2. Anticipated Schedule

03/07/2022 Last Day for Questions 03/08/2022 Final Addendum Issued

03/15/2022 Bid Opening in SARAA Board Room (No Virtual) April Submit Grant Application to FAA

August Construction Grant Executed / Notice of Award*

summer 2022 Pre-Construction Conference*

summer 2022 Issue Construction NTP*

fall 2022 Start Construction*

fall 2022 Substantial Completion*

* Potential to slide if grant isn’t in place or spring 2023 is preferred by all parties.

F. Project Funding/Estimate 1. Anticipated Funding

Federal Aviation Administration (FAA): 90%

PENNDOT Bureau of Aviation (BOA): 5%

Susquehanna Area Regional Airport Authority (SARAA): 5%

2. Engineer Opinion of Probable Cost Range Per SARAA and FAA rules, the cost is not shared.

G. Operational Safety/Phasing

1. Construction Safety and Phasing Plan (CSSP)

a. Engineer advised that the operational safety requirements included will be in accordance with FAA requirements (AC 150/5370-2G) and covered in

(10)

Meeting Minutes

Airport: Capital City Airport (CXY) Project Nos. 3-042-0038-038-2020

(FAA AIP – Design) 2018-036 (SARAA) Meeting Date: February 23, 2022 Meeting Time: 11:00 am

Project:

Subject:

Rehabilitate Taxiways B, C, D, J, L & TW A East Run Up, Phase II

Pre-Bid Meeting (Minutes 2/24)

Construction Safety and Phasing Plan contained in bid book that has been submitted to the FAA for approval.

2. Safety Plan Compliance Document (SPCD)

a. Pursuant to the requirements set forth in Federal Aviation Administration (FAA) Advisory Circular 150/5370-2G, an SPCD for this project shall be submitted to the Owner, Engineer, FAA and PENNDOT Bureau of Aviation (BOA) for review and approval.

3. General Operational Safety/Phasing Requirements

a. Engineer provided a brief overview of the Airport Operational Safety and Phasing Plans.

b. Staging areas – identified on plans.

c. Haul routes – identified on plans.

H. Open Discussion and Questions

Several questions were posed at the meeting and the Engineer advised that the questions and their responses would be included in Addendum No. 1 as part of the minutes. Please see addendum 1 (dated 2/25/2022) for responses to questions from the prebid meeting.

I. Site Visit

1. Site visit should be coordinated through SARAA; Mr. Jamie Sides, Project Manager, 717-525-1171.

These notes are prepared to express the facts and to summarize the accomplishments, other highlights, and specific actions to be taken- not necessarily in the sequence in which each occurred. Any desiring additions or corrections to these notes should do so in writing within five (5) days of distribution.

Name: Keith M Fritz, PE Title: Senior Engineer, ADCI

References

Related documents

The key segments in the mattress industry in India are; Natural latex foam, Memory foam, PU foam, Inner spring and Rubberized coir.. Natural Latex mattresses are

A number of different types of institutions make con- sumer instalment loans; the main ones are industrial banking companies, commercial banks, personal finance companies, sales

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,

The PROMs questionnaire used in the national programme, contains several elements; the EQ-5D measure, which forms the basis for all individual procedure

• Speed of weaning: induction requires care, but is relatively quick; subsequent taper is slow • Monitoring: Urinary drug screen, pain behaviors, drug use and seeking,

Proprietary Schools are referred to as those classified nonpublic, which sell or offer for sale mostly post- secondary instruction which leads to an occupation..

Semantic types are used to identify drug concepts from MEDLINE citations, and UMLS semantic rela- tionships, such as hypernymy, are used to cluster drugs that share an

Online community: A group of people using social media tools and sites on the Internet OpenID: Is a single sign-on system that allows Internet users to log on to many different.