Los Angeles World Airports is in the midst of a multi-billion dollar development program for Los Angeles Inter-national Airport (LAX). The centerpiece of the program is the New

Tom Bradley International Terminal

(TBIT) which includes new gate and concourse areas at LAX's premier international terminal totaling

675,019-square-feet

. The TBIT incorporated sustainable de-sign and construction guidelines developed by LAWA and the facility is more energy efficient and environmen-tally-friendly as a result and upon completion should achieve

LEED Silver Certification.

L A X — T o m B r a d l e y

I n t e r n a t i o n a l

T e r m i n a l

Los Angeles,

CA

Time of Sale P r o j e c t I n f o r m a t i o n

Description: 7 Level International Airport Terminal

Address: 380 World Way Los Angeles, CA. 90045 Owner: Los Angeles World Airports General Contractor:

Walsh Austin Joint Venture

8100 Westchester Parkway, Trailer #4 Los Angeles, CA 90045

(424) 646-4800 Architect:

Fentress Architects

6151 West Century Blvd., Suite 1200 Los Angeles, Ca. 90045

(424) 216-3070

N e w C o n s t r u c t i o n , P l a n & S p e c w / D e s i g n A s s i s t

(2)

Completed in June 2010, the USC Ronald Tutor Campus Center is a

151,000 square-foot

expansion of the current Student Bookstore and "Commons" Center. All Area Plumbing provided complete plumbing systems on this fast paced project for the entire building from underground to finish. The center includes:



9 Restaurants



Full Floor "prep kitchen"

for catering and internal food service for the entire campus,



Executive offices

for the university president and executive staff



Private Entertaining Area

for university fundraising events and "game day" festivities



Auditorium



Conference rooms



"Tommy Trojan" bar

This project was completed as a subcontractor to Tutor-Saliba Corporation, a leading contractor in Southern California.

U S C - R o n a l d T u t o r C a m p u s

Los Angeles,

CA

Time of Sale P r o j e c t I n f o r m a t i o n

Description: Commercial Office and Restaurants

Address: 3607 Trousdale Parkway Los Angeles, CA. 90089 Owner: University of Southern California General Manager:

Tutor Saliba Corporation 15901 Olden St. Sylmar, CA 91342 (818) 362-8391 Architect: AC Martin Associates 444 S. Flower St., Suite 1200 Los Angeles, Ca. 90071 (213) 683-1900

(3)

Design/Build

collaboration of an approximately

156,000-square-foot

pool complex with restrooms, changing rooms, staff offices, and storage and utility rooms; an outdoor recreational swimming pool; a shallow swimming pool with combined splash pad; and associated site improvements, including parking, walkways, fencing, landscaping, grading, and underground utilities. In addition, the project will include off-site road improvements, including construction of curb, sidewalk, and lighting along Castaic Road. The project is registered under LEED NC 2.2 and attempting to achieve

LEED Silver Certification.

C a s t a i c S p o r t s C o m p l e x

Castaic, CA

Time of Sale P r o j e c t I n f o r m a t i o n

Description: 1 Level Public Swimming Pool Complex

Address: 31230 Castaic Road Castaic, CA. 91384 Owner: County of Los Angeles General Contractor:

Perera Construction & Design Inc. 2890 Inland Empire Blvd, #102 Ontario, Ca. 91764

(909) 484-6350 Architect:

Langdon Wilson International 1055 Wilshire Blvd, #1500 Los Angeles, Ca. 90017 (213) 250-1186

(4)

The Red Building completes the Pacific Design Center, a

West Hollywood

landmark

that spans nearly 40 years of design and construction. With the ad-dition of the Red Building, the horizontal Blue Building and the chamfered Green Building are reinvented as elements in a new composition around the Pacific Design Center’s plaza. The building will add

400,000-square-feet

of office space and

parking

for

nearly

1,500 cars

.

P a c i f i c D e s i g n C e n t e r

R e d

B u i l d i n g

W

e

st

Holly

w

ood, CA

P r o j e c t I n f o r m a t i o n

Description: 8 Level Office Building 9 Level Parking

Address: 8700 Melrose Ave.

West Hollywood, CA 90069 Owner: Pacific Red LLC

Construction Manager: Jones & Jones

8687 Melrose Ave, Suite M66 Los Angeles, CA 90069 (310) 289-6532 Design Architect:

Pelli Clarke Pelli Architects 1056 Chapel St.

N e w C o n s t r u c t i o n , P l a n & S p e c w / D e s i g n A s s i s t

(5)

A regenerative medicine and stem cell research facility housing eleven research teams and four core laboratories.

92,075-square-foot

expansion including the following systems:

Los Angeles

,

CA

P r o j e c t I n f o r m a t i o n

Description: 1 Level Regenerative Medicine and Stem Cell Lab

Address: 1425 San Pablo Street Los Angeles, Ca. 90033

Owner: University of Southern California General Contractor:

Morley Construction Company 2901 28th Street

Santa Monica, Ca. 90405 (310) 566-9362

Architect:

Zimmer Gunsul Frasca Architects LLP 515 South Flower Street #3700 Los Angeles, Ca. 90071 (213) 617-1901

T h e E L I a n d E D Y T H E

B r o a d C I R M C e n t e r

 LCW (Lab Cold Water)  AWS (Animal Watering System)

 LHW (Lab Hot Water)  DCW (Domestic Cold Water)

 LW (Lab Waste)  O2 (Oxygen)

 LV (Lab Vent)  CO2 (Carbon Dioxide)

(6)

The Seaver South Biology Building reopened in Janu-ary 2009 after a

50,070-square-foot

extensive renovation, it now houses classrooms, teaching laboratories, and academic staff offices for biology and neuro-science. Assisting in the projects

LEED Silver

certification, the

3-story renovation

included the following systems:

Clar

emont, CA

P r o j e c t I n f o r m a t i o n

Description: 3 Level Science Laboratory Address: 609 North College Avenue

Claremont, Ca. 91711

Owner: Pomona College

General Contractor:

Whiting - Turner Contracting Company 3 Corporate Park Suite 100

Irvine, Ca. 92606 (949) 863-0800 Architect:

Brian R. Bloom Architect 350 S. Milliken Avenue Suite G Ontario, Ca. 91761

S e a v e r S c i e n c e C e n t e r

P o m o n a C o l l e g e

 W&V (Sanitary Waste & Vent)  ICW (Industrial Cold Water)

 AW & AV (Acid Waste & Vent)  IHW (Industrial Hot Water)

 CW (Domestic Cold Water)  G (Natural Gas)

 HW (Domestic Hot Water)  LA (Lab Air)

 VAC (Underground Vacuum)  PW (Purified Water) R e n o v a t i o n , P l a n & S p e c

(7)

The tower provides

120

state-of-the-art

ICU patient rooms

and

30

monitored

medical/surgical patent rooms

. The tower also housed the following specialty departments:

Los Angeles

,

CA

P r o j e c t I n f o r m a t i o n

Description: 1 Level OSHPD Admin Office Suite & Medical Departments Address: 8720 Beverly Blvd.

Los Angeles, Ca. 90048 Owner: Cedar Sinai Medical Center General Contractor:

Tower General Contractors 10923 Randall St., Suite E Sun Valley, Ca. 91352 (818) 768-3530 Architect:

RTKL Associates, Inc. 333 S. Hope St, C-200 Los Angeles, Ca. 90071 (213) 633-6000

C e d a r S i n a i M e d i c a l C e n t e r

S a p e r s t e i n C r i t i c a l C a r e T o w e r

 Cardiothoracic  Pulmonary  Radiation Therapy  Cath Lab

The

systems

installed include

the following:

 O2 (Oxygen)

 MA (Medical Air)

 CW (Domestic Cold Water)

 HWS&R (Domestic Hot Water)

 SD&OD (Storm Drain)

 W&V (Waste & Vent)

(8)

19,987-square-foot

Co-Generation Plant was an addition to the

Marine Corps Air Ground Combat Center located in Twentynine

Palms. The facility was certified as

LEED Gold

under USGBC LEED NC v3.0. All Area Plumbing had a mechanical and plumbing scope that included the following systems:

T

w

ent

y

nine

Palms, CA

P r o j e c t I n f o r m a t i o n

Description: 1 Level Facility Complex to House Co-Generation Plant

Address: MCAGCC

Twentynine Palms, Ca.

Owner: NAVFAC Southwest

General Contractor:

TB Penick & Sons, Inc. 15435 Innovation Dr., Suite 100 San Diego, Ca. 92128

(858) 558-1800 Architect: Delawie 2265 India St.

2 9 - P a l m s

C o - G e n e r a t i o n P l a n t

 W&V (Waste & Vent)  HHWR&S (Heating Hot Water)

 CD (Condensate)  CHWR&S (Chilled Water)

 DCW (Domestic Cold Water)  CD (Condensate)

 DHW (Domestic Hot Water)

PLUMBING MECHANICAL

 THW (Tempered Hot Water)

References

Related documents

This study discusses European Commission’s recent proposal to combat VAT fraud by taxing intra-Community supplies at a common rate of 15%, accompanied by the internal correction

The key identifying assumption for estimation of the α parameters in equations (13) and (14) is that, absent the program, occupational choices respond to children demographics and

High-traffic and high-touch areas such as locker rooms, the employee dining/break room, restrooms, offices, kitchens and equipment will be sanitized on an hourly basis. The person

The dressing rooms, shower rooms and pool areas of the swimming hall are intended only for changing clothes, washing and water exercise.. A high level of hygiene is an

Bradley West Terminal 4 Connector Los Angeles International Airport?. Our Airport Lounges Airport Lounge Finder by

TEIM Suppliers – Largest Sources of Revenue (1) Company Name Largest Source of Revenue BPO BPO Maintenance and implementation BPO SaaS 2 nd Largest Source of Revenue Projects

To stimulate the development of more environmentally friendly turbine technology, DOE researchers work with industry members to test new generation turbines for efficiency

Keywords: COVID-19, Coronavirus, Case Fatality Ratio (CFR), Recession, Doomsday Syndrome, China

Blog as flight from tom bradley map showing which terminal because she entered an opinion and this month all the details in your airline terminals or does the airport!. Getting

2003 – 2013 Head of the Organic Chemistry Department/ University of Alicante/ Spain 2007 – 2014 Vicepresident of the Organic Chemistry Division/ Spanish Royal Society

Abstract: This paper outlines the implementation and review of an eLearning environment within the PebblePad ePortfolio platform aimed at the development

Connecting the Mondopad to your secure network via its built-in WiFi allows any authorized user to connect to the network through the display and share, view and control

Manual control shaft set screw Sprag rod support bolts Idler shaft lock plate bolt Bearing retainer bolts.. Oil assembly mounting bolts pump Converter

Private patios with sports columnist with you agree to the many properties from the rooms with las vegas hotel table and plunge pool are covered here.?. Sorry, Wolfgang Puck,

– The Silesian Voivodeship itself is sharply differentiated: the conurbation, Częstochowa, Rybnik’s coal mining district and Bielsko-Biała are three disparate poles within a

The assembly shall sing the Philippine national anthem, accompanied by a band, r available, and at the first note, the flag shall be raised briskly2. The same procedure shall

Operating expenses and property taxes are based on the cost per unit, room, square foot, or square meter and the total area or units/rooms.. In more complex models, you also have

With unique and expansive outdoor spaces, epic views and flexible indoor spaces — including a 14,000 square-foot Grand Ballroom, two mid-sized ballrooms with breakout rooms or

When this pattern of variance was examined at species level a post-hoc Tukey test revealed significantly higher SOM550 in the mono for Clover, Plantain and Birdsfoot (P<0.001)

Jacey Pierson, senior Cooperative Education, Williamsburg; Roger Thornberry, senior Automo- tive Service Technology, Williamsburg; Marissa Planck, senior Culinary Careers,

Across the dataset, neoantigens and non-immunogenic mutations exhibited similar changes in cancer cell fractions between initial and recurrent tumors indicating a lack

A rare gem- this center includes an approximately 50’ x 40’ event spaces Offices, storage rooms, a computer room with a raised floor and bathrooms making it a beautiful and