ENGINEERS
ENGINEERS
INDIA LIMITED
INDIA LIMITED
EPC and Total Solutions
EPC and Total Solutions
Consultancy Organization
Consultancy Organization
Petroleum Refineries
Petrochemicals
Petrochemicals
Pipelines
Offshore Platforms
Gas Processing
Metallurgy
Metallurgy
Ports & Terminals
HEAD OFFICE
NEW DELHI
REGIONAL OFFICES
VADODARA, CHENNAI
EIL OFFICES
EIL OFFICES
REGIONAL OFFICES
VADODARA, CHENNAI
KOLKATA
PROCUREMENT OFFICES
MUMBAI
SITE OFFICES
29 LOCATIONS (INDIA)
9 LOCATIONS (OVERSEAS)
INSPECTION OFFICE
10 LOCATIONS
OVERSEAS OFFICES
LONDON, LIBYA ABU DHABI,
ITALY, SAUDI ARABIA , QATAR,
KUWAIT
PIPELINE DESIGN
PIPELINE DESIGN
SERVICES OFFERED BY EIL
Project Implementation Services
Feasibility Studies
Project Management
Specialist Services
Heat & Mass Transfer Equipment
Design
Project Management
Planning & Scheduling
Process Design
Detailed Engineering
Procurement Services
Construction Management
Design
Environment Engineering
Information Technology Services
Specialist Materials and
Maintenance Services
Plant Operation & Safety
Commissioning and Plant
Start-up Assistance
Risk Analysis
PIPELINE DESIGN
PIPELINE DESIGN
EIL EXPERIENCE
1975
First major project
Crude Oil Loop Line for Oil India Ltd.
1979
First major overseas project
150 km Multi Product Pipeline
for Abu Dhabi National Oil Company
1984
First major high pressure Gas Pipeline
Project - 1800 km Gas Transmission Network
for GAIL
PIPELINE DESIGN
PIPELINE DESIGN
DESCRIPTION
DESCRIPTION CLIENTCLIENT YEARYEAR SIZESIZE LENGTH LENGTH (KM) (KM) SERVICES SERVICES HAZIRA HAZIRA--BIJAIPUR BIJAIPUR--JAGDISHPUR (HBJ) JAGDISHPUR (HBJ) GAIL
GAIL 19891989 36“/30”/24”/18”36“/30”/24”/18” 18001800 NATURAL GASNATURAL GAS
Major Onshore Projects (Completed)
JAGDISHPUR (HBJ) JAGDISHPUR (HBJ)
MAQTA
MAQTA--ALAL--AIN PIPELINEAIN PIPELINE ADNOCADNOC 19921992 30 ”/12”30 ”/12” 166166 NATURAL GASNATURAL GAS KANDLA
KANDLA--BHATINDABHATINDA IOCLIOCL 19961996 22”/14”/10”22”/14”/10” 14431443 MULTIPRODUCTMULTIPRODUCT
GAS REHABILITATION & GAS REHABILITATION & EXPANSION PROJECT EXPANSION PROJECT (GREP)
(GREP)
GAIL
GAIL 19981998 36 ”36 ” 505505 NATURAL GASNATURAL GAS
MUMBAI
MUMBAI –– MANMADMANMAD BPCLBPCL 19981998 18 ”18 ” 260260 MULTIPRODUCTMULTIPRODUCT VIZAG
VIZAG--VIJAYWADAVIJAYWADA HPCLHPCL 19981998 18 ”18 ” 360360 MULTIPRODUCTMULTIPRODUCT VIZAG
VIZAG--VIJAYWADAVIJAYWADA HPCLHPCL 19981998 18 ”18 ” 360360 MULTIPRODUCTMULTIPRODUCT JAMNAGAR JAMNAGAR--LONI LPG LONI LPG PIPELINE PIPELINE GAIL GAIL 20012001 16”/14”/12”/8”/16”/14”/12”/8”/ 66 1235 1235 LPG (LIQUIFIED LPG (LIQUIFIED PETROLIUM GAS) PETROLIUM GAS) COCHIN
PIPELINE DESIGN
PIPELINE DESIGN
DESCRIPTION
DESCRIPTION CLIENTCLIENT YEARYEAR SIZESIZE LENGTH LENGTH (KM) (KM)
SERVICES SERVICES
VIZAG
VIZAG –– SECUNDERABAD LPG SECUNDERABAD LPG PIPELINE
PIPELINE
GAIL
GAIL 20022002 12”/10”12”/10” 600600 LPG (LEQUIFIED LPG (LEQUIFIED PETROLEUM GAS) PETROLEUM GAS)
Major Onshore Projects (..contd) (Completed)
MANMAD
MANMAD--MANGALAYA PIPELINEMANGALAYA PIPELINE BPCLBPCL 20032003 14 ”14 ” 358358 MULTIPRODUCTMULTIPRODUCT
MANGALORE
MANGALORE--BANGLOREBANGLORE HPCLHPCL 20032003 24 ”/20”24 ”/20” 364364 MULTIPRODUCTMULTIPRODUCT DAHEJ
DAHEJ –– VIJAIPUR PIPELINEVIJAIPUR PIPELINE GAILGAIL 20032003 42”42” 610610 REGASIFIED LNGREGASIFIED LNG
INTER REFINERIES PIPELINES INTER REFINERIES PIPELINES PROJECT, ABU DHABI
PROJECT, ABU DHABI TAKREERTAKREER 20042004
10” 10” 12” 12” 16” 16” 230 230 230 230 208 208 NAPHTHA, NAPHTHA, MULTIPRODUCT & SRR MULTIPRODUCT & SRR 16” 16” 208208 MANGALAYA MANGALAYA--BIJWASAN BIJWASAN PIPELINE PIPELINE BPCL BPCL 20062006 16”/8”16”/8” 775775 MULTIPRODUCTMULTIPRODUCT MUNDRA
DESCRIPTION
DESCRIPTION CLIENTCLIENT YEARYEAR SIZESIZE LENGTH LENGTH (KM) (KM)
SERVICES SERVICES
PUNE SOLAPUR PIPELINE
PUNE SOLAPUR PIPELINE HPCLHPCL 20072007 14 ”/ 12”14 ”/ 12” 182 / 161182 / 161 MULTIPRODUCTMULTIPRODUCT
PIPELINE DESIGN
PIPELINE DESIGN
Major Onshore Projects (7contd)
(Completed)
DABHOL PANVEL PIPELINE DABHOL PANVEL PIPELINE PROJECT (PH
PROJECT (PH--I)I)
GAIL
GAIL 20072007 30”30” 187187 REGASIFIED LNGREGASIFIED LNG
DABHOL PANVEL PIPELINE DABHOL PANVEL PIPELINE PROJECT (PH
PROJECT (PH--II)II)
GAIL
DESCRIPTION
DESCRIPTION CLIENTCLIENT YEARYEAR SIZESIZE LENGTH LENGTH (KM) (KM)
SERVICES SERVICES
BOMBAY HIGH URAN TRUNKLINE BOMBAY HIGH URAN TRUNKLINE (BUT)
(BUT)
ONGC
ONGC 19791979 30”/26”30”/26” 200 x 2200 x 2 CRUDE, GASCRUDE, GAS
PIPELINE DESIGN
PIPELINE DESIGN
Major Offshore Projects
Major Offshore Projects
(Completed)
(BUT) (BUT)
SOUTH BASSEIN HAZIRA SOUTH BASSEIN HAZIRA TRUNKLINE
TRUNKLINE
ONGC
ONGC 19861986 36”36” 220220 GASGAS
HEERA
HEERA--URAN TRUNK LINEURAN TRUNK LINE ONGCONGC 19961996 26 ”/24 ”26 ”/24 ” 85 x 285 x 2 CRUDE, GASCRUDE, GAS
ICP
ICP -- HEERA TRUNKLINEHEERA TRUNKLINE ONGCONGC 19961996 30”/22”30”/22” 145145 CRUDECRUDE
SECOND BASSEIN HAZIRA SECOND BASSEIN HAZIRA TRUNKLINE
TRUNKLINE
ONGC
ONGC 19951995 42”42” 245245 GASGAS TRUNKLINE
TRUNKLINE
MUMBAI HIGH URAN TRUNKLINE MUMBAI HIGH URAN TRUNKLINE (MUT) (MUT) ONGC ONGC 20052005 30”/28”30”/28” 12” to 22” 12” to 22” 205 x 2 205 x 2 100 100 CRUDE, GAS CRUDE, GAS
DESCRIPTION
DESCRIPTION CLIENTCLIENT YEARYEAR SIZESIZE LENGTH LENGTH (KM) (KM)
SERVICES SERVICES
VIJIPUR DADRI BAWANA PIPELINE VIJIPUR DADRI BAWANA PIPELINE (VDBPL) (VDBPL) GAIL GAIL 20092009 48”/ 36”/ 48”/ 36”/ 20” 20” 500/ 38/ 55 500/ 38/ 55 REGASIFIED LNGREGASIFIED LNG
PIPELINE DESIGN
PIPELINE DESIGN
Major Onshore Projects
Major Onshore Projects
(Current)
(VDBPL)
(VDBPL) 20”20”
MUNDRA BATHINDA PIPELINE MUNDRA BATHINDA PIPELINE (MBPL)
(MBPL)
HMPL
HMPL 20092009 28”/ 30”28”/ 30” 424/ 590424/ 590 CRUDE OILCRUDE OIL
BINA KOTA PIPELINE
BINA KOTA PIPELINE BPCLBPCL 20092009 18”18” 257257 MULTI PRODUCTMULTI PRODUCT
VADINAR BINA PIPELINE
VADINAR BINA PIPELINE BORLBORL 20092009 24”24” 935935 CRUDE OILCRUDE OIL
NUMALIGARH SILIGURI PIPELINE
NUMALIGARH SILIGURI PIPELINE OILOIL 20092009 16”16” 400400 MULTI PRODUCTMULTI PRODUCT
COMPRESSOR STATIONS
COMPRESSOR STATIONS GAILGAIL ------ ------ ------ REGASIFIED LNGREGASIFIED LNG
PIPELINE DESIGN
PIPELINE DESIGN
SECTION-1
INTRODUCTION
INTRODUCTION
PIPELINE DESIGN
PIPELINE DESIGN
CONTENTS
INTRODUCTION
Modes of Transportation
Benefits of Pipelines
Benefits of Pipelines
PIPELINE DESIGN
Stages of Pipeline Project
Codes and Standards
Design
Installation, Testing & Commissioning
Installation, Testing & Commissioning
PIPELINE DESIGN
PIPELINE DESIGN
Oil and Gas Production in India
OIL
33 MMTPA
OIL
33 MMTPA
(ONGC, OIL, CAIRN, RIL)
GAS
115 MMSCMD
Refining Scenario- India
302 300 350Capacity - 2006-07
NOC – 105.5 MMT
Others- 43.5 MMT
PIPELINE DESIGN
PIPELINE DESIGN
70 149 235 100 150 200 250 300(M
M
T
)
0 50 1998-99 2006-07 2011-12 2016-17(Actual)
Year
PIPELINE DESIGN
PIPELINE DESIGN
Modes of Hydrocarbon Transportation - India
30% 35%
Pipelines
32%
Road Tankers
32%
Rail Tankers
26%
Water Carriers
10%
0% 5% 10% 15% 20% 25% 30% % Share Pipelines Road Tankers Rail Tankers Water Carriers % SharePIPELINE DESIGN
PIPELINE DESIGN
Benefits of Transportation by Pipelines
Safer mode of transportation
Environment friendly
Environment friendly
Least energy requirement
Lowest maintenance costs
Minimal impact on land use pattern
Negligible loss of product in transit
High reliability
High reliability
PIPELINE DESIGN
PIPELINE DESIGN
Energy Savings
Ene rgy Inte nsity for Various M ode s
4 E n e rg y C o n s u m p ti o n i n % o f e n e rg y 0.8 0.5 1 3.2 0.8 1.1 2 0 0.5 1 1.5 2 2.5 3 3.5 4 E n e rg y C o n s u m p ti o n i n % o f e n e rg y T ra n s p o rt e d 0 Liquid-Pipelines Liquid-Coastal Liquid-Trains Liquid-Trucks Coal-Trains Coal-Coastal N.Gas-Pipelines E n e rg y C o n s u m p ti o n i n % o f e n e rg y
ECONOMICS OF PIPELINE TRANSPORTATION
ECONOMICS OF PIPELINE TRANSPORTATION
Transmission losses
Losses During Transportation
Pipelines Rail/Road
0 0.1 0.2 0.3 0.4 0.5
% Loss of Total Volum e Transported
PIPELINE DESIGN
PIPELINE DESIGN
Products Transported
Crude Oil
Petroleum Products (MS, HSD, ATF, SKO)
Petroleum Products (MS, HSD, ATF, SKO)
Water & Effluents
LPG
Natural Gas
PIPELINE DESIGN
PIPELINE DESIGN
Types of Pipelines
ONSHORE (LAND) & OFFSHORE
(SUBMARINE) PIPELINES
(SUBMARINE) PIPELINES
Trunk Pipelines
Spur/ Branch Pipelines
PIPELINE DESIGN
PIPELINE DESIGN
Capital cost: Typical breakup
Liqui d Li ne s Gas Line s
1 Su rv e y , RO W & Co mp e n s a tio n 2 % 1 %
Ite m D e s criptio n
S r o.
P e r c e ntag e of C a p ita l C os t.
1 Su rv e y , RO W & Co mp e n s a tio n 2 % 1 %
2 Lin e Pip e Ste e l Co s t 3 3 % 4 5 %
3 M a in lin e ma te ria ls 2 % 3 %
4 Co a tin g o f Pip e s 1 1 % 6 %
5 M a in lin e Co n s tru c tio n 3 3 % 2 5 %
6 Ca th o d ic Pro te c tio n 1 % 1 %
7 T e le c o mmu n ic a tio n , SCA D A a n d RCPs 5 % 2 %
8 Pu mp / Co mp re s s o r Sta tio n s 5 % 1 2 %
9 D e liv e ry T e rmin a l fa c ilitie s 2 % 1 %
10 Pro je c t M a n a g e me n t 5 % 4 %
1 1 S ubTotal 1 0 0 % 1 0 0 %
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
UTTAR PRADESH
N
HBJ GAS PIPELINE NETWORK
KEY PLAN
RAJASTHAN DADRI JAGDISHPUR ANOLA SHAHJAHANPUR AURAIYA BABRALA ANTA BIJAIPURINDIA
GUJARAT DELHI N GADEPANLEGEND
MADHYA PRADESH JHABUACOMPRESSOR STATION
RECEIVING TERMINAL
DESPATCH STATION
HAZIRA ARABIAN SEAPIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Pipeline Construction Video
PIPELINE DESIGN
PIPELINE DESIGN
SECTION-2
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Stages of Pipeline Project
Conceptualization
Conceptualization
Establish Requirement
Establish Requirement
Establish Requirement
Establish Requirement
Evaluate Alternatives
Evaluate Alternatives
Finalize the Concept
Finalize the Concept
Feasibility Study
Feasibility Study
Pipeline Route Study and Selection
Pipeline Route Study and Selection
Hydraulic Studies and Optimization
Hydraulic Studies and Optimization
Establish Project Cost
Establish Project Cost
Establish Project Cost
Establish Project Cost
Project Implementation Scheme
Project Implementation Scheme
PIPELINE DESIGN
PIPELINE DESIGN
Stages of Pipeline Project
Basic Engineering
Basic Engineering
Process Design and Sizing
Process Design and Sizing
Process Design and Sizing
Process Design and Sizing
Optimization Studies
Optimization Studies
Route Surveys and Investigations
Route Surveys and Investigations
Detailed Engineering
Detailed Engineering
Engineering Design Basis
Engineering Design Basis
Route Engineering and Engineering Analysis
Route Engineering and Engineering Analysis
Specifications and Job Standards
Specifications and Job Standards
Specifications and Job Standards
Specifications and Job Standards
Engineering for Procurement
Engineering for Procurement
PIPELINE DESIGN
PIPELINE DESIGN
Major Codes & Standards
Code/Standard
Code/Standard
Title
Title
ASME B 31.8 (2003)
ASME B 31.8 (2003) Gas Transportation and Distribution Piping SystemsGas Transportation and Distribution Piping Systems
ASME B 31.4 (2006)
ASME B 31.4 (2006) Pipeline Transportation Systems for Liquid Hydrocarbons and other Pipeline Transportation Systems for Liquid Hydrocarbons and other
Liquids Liquids OISD
OISD--141 (2003)141 (2003) Design and Construction Requirements for CrossDesign and Construction Requirements for Cross--Country Country
Hydrocarbon Pipelines Hydrocarbon Pipelines OISD
OISD--214 (2006)214 (2006) CrossCross--Country LPG PipelinesCountry LPG Pipelines
OISD
OISD--226 (2007)226 (2007) Natural Gas Transmission Pipelines and City Gas Distribution Natural Gas Transmission Pipelines and City Gas Distribution
Networks Networks API 5L / ISO 3183 : 2007
API 5L / ISO 3183 : 2007 Specification for Line PipeSpecification for Line Pipe
API RP1102
API RP1102 Recommended practice for Rail and Highway crossingsRecommended practice for Rail and Highway crossings
API 1104
API 1104 Standard for welding pipeline and related facilitiesStandard for welding pipeline and related facilities
API 6D / ISO 14313
API 6D / ISO 14313 Pipeline ValvesPipeline Valves
DNV OS
DNV OS--F101F101 Submarine pipeline systemsSubmarine pipeline systems
Other References
Other References Applicable Standards / Specs of ASME, API, NACE, MSS, BS and Applicable Standards / Specs of ASME, API, NACE, MSS, BS and
DIN DIN
PIPELINE DESIGN
PIPELINE DESIGN
Major Codes & Standards
Type of Crossing
Type of Crossing
Approval Authority
Approval Authority
ROU & Land Acquisition
ROU & Land Acquisition
Central/State Govt. as applicable
Central/State Govt. as applicable
(As per PMP Act 1962)
(As per PMP Act 1962)
(As per PMP Act 1962)
(As per PMP Act 1962)
National Highway Crossings
National Highway Crossings
NHAI
NHAI
SH/ MDR/ ODR Crossings
SH/ MDR/ ODR Crossings
PWD
PWD
Railway Track crossings
Railway Track crossings
Indian Railways
Indian Railways
Crossing through Forest land
Crossing through Forest land
Forest Authority
Forest Authority
River/Canal crossings
CAESAR
CAESAR--II
II
AUTOPIPE
AUTOPIPE
LIST OF SOFTWARES USED IN PIPELINE
ENGINEERING
PIPELINE STUDIO
PIPELINE STUDIO
AUTOPIPE
AUTOPIPE
IPMCS
IPMCS
MRPACK
MRPACK
SORPS
SORPS
PIPECALC
PIPECALC
OFFPIPE
OFFPIPE
TGNET
TGNET
TLNET
TLNET
HYSIS
HYSIS
OFFPIPE
OFFPIPE
PRISE
PRISE
PIPECROSS
PIPECROSS
Optimal sizes of various capacities
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Route Selection
Routing Considerations
Pipeline length
Obstructions & Sensitive areas
Obstructions & Sensitive areas
Installation Limitations
Crossings
Surveys
Topographical
Geo-technical
Geo-technical
Population Density Index
Soil Resistivity
BHATINDA
Ch. 1012.67 km
PIPELINE DESIGN
PIPELINE DESIGN
Typical Pipeline Route Map
LEGEND: PROPOSED PIPELINE JUD Ch. 593.88 km RANSISAR Ch. 855.01 km GAILAWAS Ch. 527.87 km IPS-F IPS-2
IP-1 & IPS-F
1. PIPELINE ROUTE SHOWN IS INDICATIVE ONLY.
LEGEND:
PROPOSED MUNDRA-BHATINDA PIPELINE (28" NB)
RECEIPT TERMINAL
DESPATCH TERMINAL AND PUMPING STATION
NOTES:
INTERMEDIATE PIGGING STATION (IP) INTERMEDIATE PUMPING STATION (IPS)
IPS-F Ch. 226.72 km JORAWARPURA Ch. 313.63 km MUNDRA Ch. 0.00 km
2. CHAINAGES INDICATED ARE APPROXIMATE. JHEKDA
IPS-1
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Material Selection & Corrosion Control
Assessment
Nature of the Product
Materials
Carbon Steel (CS)
Design Life
Product Temperature
Corrosion Protection
Material Chemistry
Internal Coatings
NACE Carbon Steel
CRA Clad CS
CS with internal
Coatings
Non-Metallic
Materials
Product Conditioning
Corrosion inhibitors
Corrosion Allowance
Materials
PIPELINE DESIGN
PIPELINE DESIGN
Design and Analysis
Wall Thickness Calculations
Anti-Buoyancy Measures
Piping Stress Analysis
Buried Pipeline Analysis
Crossing Design
PIPELINE DESIGN
PIPELINE DESIGN
Steel Pipe Wall Thickness Calculation
LIQUID PIPELINE (ASME B 31.4, Cl. 404.1.2) GAS PIPELINE (ASME B 31.8, Cl. 841.11)
t = P
iD
2.S
where
P
iInternal design pressure
S
allowable stress
= 0.72 x E x SMYS
D
Outside Diameter of pipe
t
pressure
design
wall
thickness
P = 2St FET
D
where
P
Design pressure
S
Specified
minimum
yield
strength
D
Nominal OD of pipe
t
Nominal wall thickness
F
Design factor
thickness
E
Weld joint factor
F
Design factor
E
Longitudinal joint factor
PIPELINE DESIGN
PIPELINE DESIGN
Basic Design Factor for Gas Pipelines
LOCATION CLASS
DESIGN FACTOR, F
Location Class 1
0.72
Location Class 2
0.60
Location Class 2
0.60
Location Class 3
0.50
Location Class 4
0.40
Location Class Classification
Location Class 1 :
≤
≤
≤
≤ 10 buildings
Location Class 2 :
> 10 and < 46 buildings
Location Class 3 :
≥
≥
≥
≥ 46 buildings
Location Class 3 :
≥
≥
≥
≥ 46 buildings
PIPELINE DESIGN
PIPELINE DESIGN
Line Pipe Selection
Line Pipe Selection Parameters
Thickness and Grade
Type of Line Pipes
Type of Line Pipes
Seamless
Seamless
Thickness and Grade
Selection
Handling and
Transportation (d/t ratio)
Type of LinePipe
Installation Requirements
Seamless
Seamless
Electric Welded
Electric Welded
Longitudinal Seam
Longitudinal Seam
Submerged
Submerged--Arc Welded
Arc Welded
(LSAW)
(LSAW)
Helical Seam Submerged
Helical Seam
Submerged--
Installation Requirements
Arc Welded
Arc Welded
(HSAW)
PIPELINE DESIGN
PIPELINE DESIGN
Line Pipe Application
Submarine Pipelines
Onshore Pipelines
Seamless Pipes
(upto & including 16”)
LSAW Pipes
(18” & above)
Seamless Pipes
(upto & including 8”)
LSAW Pipes
(16” & above)
HSAW Pipes
(18” & above)
EW Pipes
EW Pipes
(4” - 18”)
Manufacturing of Helical Pipes
Manufacturing of Helical Pipes
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Anti-corrosive Coatings
Coal Tar Enamel Coating (BS 4164, AWWA C203)
Coal Tar Enamel Coating (BS 4164, AWWA C203)
Primer
Primer
Two layers of coal tar enamel & glass fibre Inner wrap
Two layers of coal tar enamel & glass fibre Inner wrap
One layer of coal tar impregnated outer wrap
One layer of coal tar impregnated outer wrap
One layer of coal tar impregnated outer wrap
One layer of coal tar impregnated outer wrap
Coating thickness 4.7mm
Coating thickness 4.7mm
3 Layer PE/ PP Coating (DIN 30670)
3 Layer PE/ PP Coating (DIN 30670)
First layer of Fusion bonded epoxy
First layer of Fusion bonded epoxy
Second layer of extruded adhesive
Second layer of extruded adhesive
Third layer of extruded PE/ PP
Third layer of extruded PE/ PP
Coating thickness 2.0 to 3.7 mm
Coating thickness 2.0 to 3.7 mm
Fusion Bonded Epoxy Coating (CSA Z245.20)
Fusion Bonded Epoxy Coating (CSA Z245.20)
350
350--500 micron thick single layer coating
500 micron thick single layer coating
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Major Pipeline Components
Line Pipe & Coatings
Line Pipe & Coatings
Scraper Traps & Pig Signallers
Scraper Traps & Pig Signallers
Scraper Traps & Pig Signallers
Scraper Traps & Pig Signallers
Long Radius (LR) Bends
Long Radius (LR) Bends
Insulating Joints
Insulating Joints
Flow Tees
Flow Tees
Sectionalizing Valves
Sectionalizing Valves
Pumps / Compressors
Pumps / Compressors
Pumps / Compressors
Pumps / Compressors
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Sectionalizing Valve
Spacing
Spacing
ASME B 31.8 for Gas
pipelines
Gas Pipelines
Location Class 1
32 km (20 miles)
Location Class 2
24 km (15 miles)
pipelines
ASME B 31.4 for Liquid
Pipelines
Location
Location
Pollution Concerns
Statutory Requirements
Prevention of Inventory
Loss
Location Class 2
24 km (15 miles)
Location Class 3
16 km (10 miles)
Location Class 4
8 km (5 miles)
LPG Pipelines
Industrial,
12 km (7.5 miles)
Commercial &
Loss
Approachability of Valve
Station
Residential Areas
PIPELINE DESIGN
PIPELINE DESIGN
Type of Valves
Full Bore Ball Valves
Through Conduit Gate
Valves
Plug and Check Valves
Valve Standard :
API 6D/ISO14313
Other Valve Standards:
API 600, API 602, BS EN
ISO 17292:2004, BS EN
ISO 15761:2002, BS 5353
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Major Engineering Deliverables
Design Reports
Design Reports
Design Basis
Design Basis
Drawings
Drawings
Route Map
Route Map
Design Basis
Design Basis
Route Selection Report
Route Selection Report
Wall Thickness Report
Wall Thickness Report
Seismic Design Report
Seismic Design Report
Crossing Design Report
Crossing Design Report
Route Map
Route Map
Pipeline Schematic
Pipeline Schematic
Alignment Sheets
Alignment Sheets
SV Station Layout
SV Station Layout
Equipment Layout
Equipment Layout
Piping General
Piping General
Piping General
Piping General
Arrangement Drawings
Arrangement Drawings
PIPELINE DESIGN
PIPELINE DESIGN
Typical Pipeline Alignment Sheet
INTERSECTION POINTS(IP/TP) DEFLECTION ANGLE STATE , DISTRICT AND MANDAL
DISTANCE AS PER GROUND PROFILE 38°4'58''(R) TP50IP50/1 29°8'20''(L) TP51 IP51/1 5°18'55''(R) TP52 8°2'3''(L) TP53 37°0'54''(L) TP54 13°54'57''(R) TP55 11°25'7''(L) TP56 1°21'55''(L) TP57 8°24'45''(R) TP58 IP58/1 2°8'32''(L) TP59 14°0'19''(R) TP60 8°30'18''(L) TP61 IP61/1 15°2'57''(L) TP62 10°4'42''(L) TP63 10°25'50''(L) TP64 IP64/1 5°18'12''(R) TP65 CH. 10620.558m CH.1 0664 .710m CH. 10797.803m IP50/1 CH. 10687.604m TP51 CH. 10712.803m IP51/1 TP50 TP58 TP60 CH. 13741.534m TP63 TP65 CH. 14134.896m CH. 13979.211m TP64 IP64/1 CH.14044.732m TBM W40 (RL 37.514m) TBM W57(RL 42.533m) RAIWADA LEFT CANAL
(UNLINED) CH. 10691.604m TO PEND A A MRITA PUR AM T O PEN D A AM RU TH APUR A M EARTHEN EMBANKMENT LOW LYING AREA
EARTHEN EMBANKMENT M A T C H L IN E F O R C O N T . R E F E R D W G N O .4 5 2 9 -1 0 -1 6 -7 1-9 0 0 5 METALLED ROAD(ASPHALTIC) CH.14115.309m TO ST ATE H IGHW AY-SA BBAV ARAM TO IRUVADA ELEC. LINE 440V CH.14132.231m TELEPHONE LINE CH.14134.896m
DISTANCE BETWEEN TP & IP's(m) 67.046 67.049 25.199 25.200 85.000 85.284 187.855 187.993 76.544 76.618 339.096 339.126 176.463 176.478 38.749 38.853 322.708 322.772 141.760 141.845 45.000 45.093 104.113 104.624 224.969 225.022 393.395 393.407 218.000 218.014 348.437 348.444 326.642 326.679 237.677 237.707 65.521 65.728 90.164 90.390 SCALE: HORIZONTAL 1:5000 VERTICAL 1: 500 21 23 25 27 29 31 33 35 37 39 41 43 45 1 0 .6 2 1 3 7 .3 2 5 3 3 .3 6 6 3 5 .4 1 1 3 3 .5 6 0 3 2 .5 8 7 3 1 .4 9 6 3 0 .3 0 0 2 9 .8 1 5 2 7 .3 7 0 2 5 .3 6 2 2 7 .9 0 4 2 4 .8 5 8 2 5 .1 3 8 2 4 .3 4 1 2 4 .6 7 5 2 4 .8 2 8 2 4 .6 0 4 2 3 .6 6 7 2 2 .1 7 5 2 5 .8 8 4 3 0 .5 5 7 2 9 .2 1 9 2 9 .1 3 5 2 8 .9 3 5 3 0 .8 9 3 3 2 .4 4 4 3 3 .6 2 2 3 7 .2 1 9 4 0 .8 1 6 3 9 .7 4 1 4 2 .4 9 1 4 3 .6 8 4 4 3 .0 3 4 D R A IN C H 1 06 6 4 .7 1m /R L 3 3 .3 6 6 m C A N A L C H 1 0 6 9 1.6 m /R L 3 5 .4 1 1 m R O A D C H 1 0 7 8 7 .0 2 m /R L 3 2.5 8 7 m D R A IN C H 1 1 8 2 4 .6 3 m /R L 2 4.3 4 1 m R O A D C H 1 2 0 6 0.8 8 m /R L 2 4 .6 0 4m D R A IN C H 1 21 1 5 .3 4 m /R L 2 2 .1 7 5 m C A R T T R A C K C H 1 3 4 9 2.6 1 m /R L 3 3 .6 2 2 m C A N A L C H 1 40 2 7 .7 3 m /R L 3 9 .7 4 1 m R O A D C H 1 4 0 40 .2 7 m /R L 4 2 .4 9 1m C A R T T R A C K C H 1 4 1 1 5 .3 1 m /R L 4 3 .6 8 4 m CH. 12848.455m HIGH TENSION LINE TP57 C H.11 848.88 m E LECT R IC L INE C H .1 1 8 24 .6 2 9 m CH. 11062.202m CH. 11401.298m TP54 CH.11018.117m ELECTRIC LINE 440V CH.12115.344m CH. 11577.761m TP55 TP56 CH. 11616.510m CH.12060.877m GRAVEL ROAD CH. 11939.218m D R A IN DRAIN CH.12747.397m M A T C H L IN E F O R C O N T . R E FE R D W G N O .4 5 2 9 -1 0 -1 6 -7 1 -9 0 0 3 DRAI N CH.1 0664 .710m CH. 10985.658m GRAVEL ROAD CH.10787.022m TP52 TP53 CH. 12080.978m TP58 CH. 12455.060m TP60 CH. 12230.091m TP59 DRAIN CH.12903.743m CH.13492.606m CART TRACK TP61 TP62 CH. 13414.892m CH.14027.732m RAIWADA LEFT CANAL IP58/1
CH. 12125.978m CH. 13066.455m IP61/1
KAJU GARDEN RICE FIELDS
VILLAGE BOUNDARY AMRUTAPURAM IRUVADA TBM W49 (RL 25.138m) TEMP. HUT ON C/L HPCL CH. 15.00Km HPCL CH. 16.00Km HPCL CH. 17.00Km TO CHINTA GUTLA SV-1 OF GAIL CH.11960.218 m T O PEN D A AM RU TH APUR A M TO AMRUTHAP URAM K K
OPEN WELL 6m DIA 7.648m FROM C/L CH.11648.136m OPEN WELL 6m DIA 8m FROM C/L CH 11577.761m PUMP HOUSE 4m FROM C/L
12.2m HIGH & 550KV K (UNLINED) GRAVEL ROAD CH.14040.275m M A T C H L IN E F O R C O N T . R E F E R D W G N O .4 5 2 9 -1 0 -1 6 -7 1-9 0 0 5 TO ST ATE H IGHW AY-SA BBAV ARAM 1 0 .6 6 5 44 .1 5 2 1 0 .6 9 2 2 6 .8 9 4 1 0 .7 1 3 2 1 .1 9 9 1 0 .7 8 7 74 .2 1 9 1 0 .9 8 6 19 8 .6 3 6 1 1 .0 2 5 39 .3 6 9 1 1 .0 6 2 37 .1 7 5 1 1 .2 5 9 19 6 .9 6 2 1 1 .4 0 1 14 2 .1 3 4 1 1 .5 7 8 17 6 .4 6 3 1 1 .6 1 7 38 .7 4 9 1 1 .7 5 8 14 1 .5 2 2 1 1 .8 2 5 66 .5 9 7 1 1 .8 4 9 24 .2 4 6 1 1 .9 3 9 90 .3 4 2 1 2 .0 6 1 12 1 .6 6 0 1 2 .0 8 1 20 .1 0 1 1 2 .1 1 5 34 .3 6 6 1 2 .2 3 0 11 4 .7 4 7 1 2 .4 5 5 22 4 .9 6 9 1 2 .7 5 4 29 9 .2 5 4 1 2 .8 4 8 94 .1 4 1 1 3 .0 6 6 21 7 .5 3 9 1 3 .2 4 8 18 2 .1 1 7 1 3 .4 1 5 16 6 .7 8 0 1 3 .4 9 3 77 .7 1 4 1 3 .7 4 2 24 8 .9 2 9 1 3 .9 7 9 23 7 .6 7 6 1 4 .0 2 8 48 .5 2 1 1 4 .0 4 0 12 .5 4 3 1 4 .1 1 5 75 .0 3 4 1 4 .1 3 5 19 .5 8 8 10 .6 2 1 10 .6 6 5 10 .6 9 2 10 .7 1 3 10 .7 8 7 10 .9 8 6 11 .0 2 5 11 .0 6 2 11 .2 5 9 11 .4 0 1 11 .5 7 8 11 .6 1 7 11 .7 5 8 11 .8 2 5 11 .8 4 9 11 .9 3 9 12 .0 6 1 12 .0 8 1 12 .1 1 5 12 .2 3 0 12 .4 5 5 12 .7 5 4 12 .8 4 8 13 .0 6 6 13 .2 4 8 13 .4 1 5 13 .4 9 3 13 .7 4 2 13 .9 7 9 14 .0 2 8 14 .0 4 0 14 .1 1 5 14 .1 3 5 1 1 .9 6 0 1 1 .9 7 2 1 1 .9 8 4
Typical P&ID
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Major Engineering Deliverables
Tenders
Tenders
Survey Tender
Survey Tender
Pipe Coating Tender
Pipe Coating Tender
Pipeline Installation Tender
Pipeline Installation Tender
Material Procurement
Material Procurement
Line Pipes
Line Pipes
Valves & Actuators
Valves & Actuators
Scraper Traps, QOEC, Pig
Scraper Traps, QOEC, Pig Signallers
Signallers
Flow Tees & Insulating Joints
Flow Tees & Insulating Joints
Flow Tees & Insulating Joints
Flow Tees & Insulating Joints
Induction Bends
Induction Bends
Flow meters
Flow meters
Pumps & Compressors
Pumps & Compressors
PIPELINE DESIGN
PIPELINE DESIGN
Installation, Testing & Commissioning
PIPELINE DESIGN
PIPELINE DESIGN
Installation, Testing & Commissioning
Welding & NDT :
Edge Preparation
Internal / External Line-up Clamps
Internal / External Line-up Clamps
Manual / Automatic Welding
PIPELINE DESIGN
PIPELINE DESIGN
Installation, Testing & Commissioning
Field Joint Coating Lowering & Backfilling
Heat Shrink Sleeves
Cold applied tapes
PIPELINE DESIGN
PIPELINE DESIGN
Pipeline Crossings
Crossing Installation
Crossings
Crossings
River, Canal, Road & Rail
Utility Crossing
Methodologies
Open-Cut Method
Trench-less Method
Horizontal
Directional Drilling
Directional Drilling
Jacking and Boring
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Pipeline Installation using Micro-tunnelling
MICRO-TUNNELLING:
Micro Tunneling process uses a Micro Tunnel Boring Machine
(MTBM) combined with pipe jacking technique.
Pipe jacking from launch shaft to reception shaft.
Pipe jacking from launch shaft to reception shaft.
Hydraulic Jacks used to push Jacking pipes behind a tunnel boring
machine
Carrier pipe inserted in jacking pipe
ADVANTAGES:
Micro-tunnelling can be used wherever HDD cannot be done
Crossing of Rivers with gravels, cobbles & boulders
Installation of more than one pipe in the tunnel
Installation of more than one pipe in the tunnel
Precise installation and Minimum space at both ends
PIPELINE DESIGN
PIPELINE DESIGN
Schematic Diagram
Schematic Diagram
PIPELINE DESIGN
PIPELINE DESIGN
Pipeline Installation using Micro-tunnelling
Long Distance Micro Tunnelling
Long Distance Micro Tunnelling
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
PIPELINE DESIGN
Testing & Commissioning
TESTING
Gauging and Pigging
Test Pressure
Test Medium
DRYING
Swabbing
Methanol Drying
Test Medium
TEST PRESSURE
LIQUID PIPELINES
Ref. ASME B 31.4 : 437.4.1
1.25 times design pressure
GAS PIPELINES
Methanol Drying
Super Dry Air
Method
Vacuum Drying
COMMISSIONING
Nitrogen Purging
Product Charging
GAS PIPELINES
Ref. ASME B 31.8 : Table 841.322(f)
Class 1 and 2: 1.25 * des pr
Class 3 and 4: 1.4 * des pr
PIPELINE DESIGN
PIPELINE DESIGN
Pigging
Requirements
Pipeline Cleaning
Displacement
Types of Pigs
Brush pigs
Gauge Pigs
Displacement
Internal Inspection
Batching
Gauge Pigs
Spheres
Intelligent Pigs
Cleaning pigs
Gauge Pigs
Spheres
Intelligent Pig
(MFL)
PIPELINE DESIGN
PIPELINE DESIGN
RECENT DEVELOPMENTS
TECHNICAL IMPROVEMENTS
TECHNICAL IMPROVEMENTS
Automatic Welding & Automatic UT
Automatic Welding & Automatic UT
Automatic Welding & Automatic UT
Automatic Welding & Automatic UT
Micro
Micro--Tunneling for pipeline construction
Tunneling for pipeline construction
Internal flow coating on line pipes for gas pipelines
Internal flow coating on line pipes for gas pipelines
PIPELINE DESIGN
PIPELINE DESIGN
Comparison of LSAW & HSAW Pipes
Description
Description
LSAW
LSAW
HSAW
HSAW
Method of Method of Manufacture Manufacture
UOE/COE/JCO/3 roll bending
UOE/COE/JCO/3 roll bending Formed by Twisting of CoilFormed by Twisting of Coil Weld Length
Weld Length Equal to pipe joint lengthEqual to pipe joint length Approximately 1.5 to 2 times the Approximately 1.5 to 2 times the Weld Length
Weld Length Equal to pipe joint lengthEqual to pipe joint length Approximately 1.5 to 2 times the Approximately 1.5 to 2 times the length of pipe joint
length of pipe joint Position of weld
Position of weld Longitudinal Longitudinal –– positioned in positioned in upper quadrant during
upper quadrant during construction
construction
Spiral
Spiral –– present all around the present all around the pipe
pipe Corrosion Coating
Corrosion Coating Specified thickness throughout Specified thickness throughout entire body.
entire body.
Weld seam is tracked to ensure Weld seam is tracked to ensure coating thickness on weld seam coating thickness on weld seam
Thickness normally increased all Thickness normally increased all over the body, resulting in
over the body, resulting in
proportional increase in coating proportional increase in coating cost by 15
cost by 15--20%20% Geometry
Geometry Controlled to the desired level Controlled to the desired level with cold expansion
with cold expansion
Controlled during forming only Controlled during forming only and no cold expansion is carried and no cold expansion is carried out
PIPELINE DESIGN
PIPELINE DESIGN
CTE
CTE
3LPE
3LPE
3LPP
3LPP
FBE
FBE
Coating Comparison
CTE
CTE
3LPE
3LPE
3LPP
3LPP
FBE
FBE
Service Conditions Service Conditions
Temperature,
Temperature, oo CC Upto 45Upto 45 Upto 65Upto 65 Upto 110Upto 110 Upto 110Upto 110
Anti
Anti--corrosion Propertiescorrosion Properties
Resistance to Moisture
Resistance to Moisture GoodGood Very GoodVery Good ExcellentExcellent GoodGood
Cathodic Disbondment
Cathodic Disbondment FairFair GoodGood GoodGood GoodGood Cathodic Disbondment
Cathodic Disbondment FairFair GoodGood GoodGood GoodGood
Electrical Properties Electrical Properties
Coating Resistance
PIPELINE DESIGN
PIPELINE DESIGN
CTE
CTE
3LPE
3LPE
3LPP
3LPP
FBE
FBE
Cathodic Protection Design Cathodic Protection Design
Coating Comparison
Cathodic Protection Design Cathodic Protection Design
Current Density
Current Density HighHigh LowLow LowLow LowLow
Mechanical Properties Mechanical Properties
Resistance to Impact
Resistance to Impact FairFair ExcellentExcellent Superior to PESuperior to PE FairFair
Resistance to Resistance to Indentation Indentation
Poor
Poor Very GoodVery Good ExcellentExcellent FairFair
Resistance to Peel
Resistance to Peel FairFair ExcellentExcellent Superior than PESuperior than PE --Resistance to Peel
Resistance to Peel FairFair ExcellentExcellent Superior than PESuperior than PE
--Resistance to Soil Resistance to Soil Stresses
Stresses
Fair
Fair ExcellentExcellent ExcellentExcellent ExcellentExcellent
Elongation
--PIPELINE DESIGN
PIPELINE DESIGN
CTE
CTE
3LPE
3LPE
3LPP
3LPP
FBE
FBE
Long Term Ageing Long Term Ageing
Coating Comparison
Long Term Ageing Long Term Ageing
Heat & Light Ageing
Heat & Light Ageing FairFair Very GoodVery Good Very GoodVery Good Very GoodVery Good
Application & Field Repair Application & Field Repair
Ease of Application
Ease of Application Easy Easy Relatively difficultRelatively difficult Relatively difficultRelatively difficult Relatively difficultRelatively difficult
Damages during Damages during handling & handling & transportation transportation High
High LowLow LowLow HighHigh
transportation transportation
Ease of Field Repair
Ease of Field Repair DifficultDifficult Easy for small repair,Easy for small repair, Cumbersome for Cumbersome for
larger repair larger repair
Easy for small repair, Easy for small repair,
Cumbersome for Cumbersome for
larger repair larger repair
Easy for small repair, Easy for small repair,
Cumbersome for Cumbersome for
larger repair larger repair