ITP for Pvc Conduits

N/A
N/A
Protected

Academic year: 2021

Share "ITP for Pvc Conduits"

Copied!
6
0
0

Loading.... (view fulltext now)

Full text

(1)

Project:

Project:

Client

Client

Doc No :Doc No :

Date : Date :

Consultant

Consultant

 Logo

 Logo

Main Contractor  Main Contractor 

Logo

Logo

Sub-Contractor  Sub-Contractor 

Logo

Logo

Title:

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITSINSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

Activi

ty No:

ty No:

Ac

Acti

tivi

vity

ty De

Desc

scri

ript

ptio

ion

n

F

Frreq

eque

uenc

ncy o

y off

inspection

inspection

A

Ac

cc

ce

ep

ptta

an

nc

ce

e c

crriitte

erriia

a

V

Ve

erriiffy

yiin

ng

g

Documents

Documents

Inspection Verication

Inspection Verication

S

Su

ub

b C

Co

on

n

a

aiin

n

Con

Con

Co

Co

n

n

1 1..00 DDOOCCUUMMEENNTT REVIEW REVIEW • • Method ofMethod of Stateent Stateent •

• Sho! Dra"in#$Sho! Dra"in#$

• Materia%Materia%

Subitta%$ Subitta%$

• &CS Sec. '1(&CS Sec. '1(

)art * C%au$e )art * C%au$e *.1.+ , *.1.+ ,

• )roect S!ec.)roect S!ec.

• • !!ro/ed !!ro/ed Materia% Materia% Subitta% Subitta% • • !!ro/ed !!ro/ed Method Method Stateent Stateent •

• !!ro/ed Sho! !!ro/ed Sho!

Dra"in#$ Dra"in#$ efore Wor efore Wor Coenceent Coenceent •

•  $ !er C%ient Statu$ Code $ !er C%ient Statu$ Code

• Re/ie" of Subitta%$ if it i$ inRe/ie" of Subitta%$ if it i$ in

 !!ro/ed code   !!ro/ed code  or or 

• Re$ubit for the $ubitta%Re$ubit for the $ubitta%

that ha$ a code (  2 that ha$ a code (  2 CC incor!orate a%% con$u%tant incor!orate a%% con$u%tant coent. coent. • •  !!ro/ed !!ro/ed Docuent$ Docuent$ b3 the b3 the con$u%tant con$u%tant 4 4 44 44

45 4o%d )oint5 Written notification re6uired. Contractor a3 not

(2)

Project:

Client

Doc No : Date :

Consultant

 Logo

Main Contractor 

Logo

Sub-Contractor 

Logo

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

ty No:

Activity Description

Frequency of

inspection

Acceptance criteria

Verifying

Documents

Inspection Verication

Sub Con

ain

Con

Co

n

'.0 De%i/er3( Stora#e and 4and%in# of Materia%$5 • &CS Sec. '1( )art * C%au$e$ *.1. 2 *.' • )roect S!ec. • !!ro/ed Materia% Subitta% • !!ro/ed Method Stateent •  !!ro/ed Each De%i/er3

•En$ure that the )VC conduit$

and it$ acce$$orie$ are carefu%%3 off%oaded at $ite u$in# !ro!er e6ui!ent to a/oid daa#e$.

•En$ure that the ateria%$ ha/e

been in$!ected at off%oadin# !oint for an3 !h3$ica% daa#e and co!%etene$$.

• %$o en$ure that the ateria%$

are $tored a$ !er

anufacturer:$ in$truction$ • De%i/er  3 note •  !!ro/ed Materia% Subitta% 8;ront Sheet9 • Materia% In$!ection re!ort 8$ !er ttached Sa!%e9 4 W<R S<R

45 4o%d )oint5 Written notification re6uired. Contractor a3 not !roceed be3ond thi$ !oint "ithout "ritten confiration of the en#ineer.

W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification Re6uired.

R - Re/ie" Record 8 Docuent$ Re/ie"9

(3)

Project:

Client

Doc No : Date :

Consultant

 Logo

Main Contractor 

Logo

Sub-Contractor 

Logo

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

ty No:

Activity Description

Frequency of

inspection

Acceptance criteria

Verifying

Documents

Inspection Verication

Sub Con

ain

Con

Co

n

Sho!

Dra"in#$

(4)

Project:

Client

Doc No : Date :

Consultant

 Logo

Main Contractor 

Logo

Sub-Contractor 

Logo

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

ty No:

Activity Description

Frequency of

inspection

Acceptance criteria

Verifying

Documents

Inspection Verication

Sub Con

ain

Con

Co

n

=.0 In$ta%%ation of )VC < U)VC Conduit( bo>e$ and acce$$orie$. • &CS Sec. '1( )art * C%au$e$ *.1. 2 *.' • )roect S!ec. • !!ro/ed Materia% Subitta% • !!ro/ed Method Stateent  !!ro/ed Sho! Dra"in#$ •  fter In$ta%%ation of )VC Conduit$ 2 cce$$orie$ • In$ta%%ation of )VC

Conduit$ and acce$$orie$ $hou%d be a$ !er a!!ro/ed $ho! dra"in#.

• To $e#re#ate different

$er/ice$ %ie %o" current( MS( %i#htin#( !o"er etc. 2 !o"er "irin# in at %ea$t ',  conduit.

• Durin# %a3in# a%% conduit$

care $ha%% be taen to !re/ent an3 forei#n atter  enterin# in the !i!e. %% o!en end$ $ha%% be ca!!ed "ith a!!ro!riate ca!!in#

• ?ee! conduit at %ea$t 100

 a"a3 fro the !i!e$ or  other non e%ectrica% $er/ice$.

• Tae a!!ro/a% !rior to

•  !!ro/ed Sho! Dra"in# •  !!ro/ed Materia% Subitta% 8;ront Sheet9 • R;IT Re6ue$t for In$!ection < Te$tin# 8$ !er attached $a!%e9 4 W W

45 4o%d )oint5 Written notification re6uired. Contractor a3 not !roceed be3ond thi$ !oint "ithout "ritten confiration of the en#ineer.

W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification Re6uired.

R - Re/ie" Record 8 Docuent$ Re/ie"9

(5)

Project:

Client

Doc No : Date :

Consultant

 Logo

Main Contractor 

Logo

Sub-Contractor 

Logo

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

ty No:

Activity Description

Frequency of

inspection

Acceptance criteria

Verifying

Documents

Inspection Verication

Sub Con

ain

Con

Co

n

concrete for the conduit

in$ta%%ation.

(6)

Project:

Client

Doc No : Date :

Consultant

 Logo

Main Contractor 

Logo

Sub-Contractor 

Logo

Title: INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Activi

ty No:

Activity Description

Frequency of

inspection

Acceptance criteria

Verifying

Documents

Inspection Verication

Sub Con

ain

Con

Co

n

45 4o%d )oint5 Written notification re6uired. Contractor a3 not !roceed be3ond thi$ !oint "ithout "ritten confiration of the en#ineer.

W5 Witne$$ In$!ection S 7 Sur/ei%%ance 7 Notification Re6uired.

R - Re/ie" Record 8 Docuent$ Re/ie"9