• No results found

Oil Industry Safety Directorate

N/A
N/A
Protected

Academic year: 2021

Share "Oil Industry Safety Directorate"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

(1)

LIST OF OISD STANDARDS (April 2016)

Sr. No. OISDStandard/GDN/RP

No STANDARD NAME

CURRENT EDITION  IN VOGUE

1 OISD­STD­105 Work Permit System Sep­04

2 OISD­STD­106 Pressure Relief & Disposal System Oct­10 3 OISD­RP­108 Recommended Practices on Oil Storage and Handling Jul­97

4 OISD­STD­109 Process  Design  and  Operating  Philosophies  on  BlowDown & sewer system Jan­15

5 OISD­RP­110 Recommended Practices on Static Electricity Aug­99

6 OISD­STD­111 Process  Design  &  Operating  Philosophies  on  FiredProcess Furnace April­2016

7 OISD­STD­112 Safe Handling of Air Hydrocarbon Mixtures & Pyrophoric

Substances Oct­02

8 OISD­STD­113 Classification  of  Area  for  Electrical  Installations  atHydrocarbon Processing & Handling Facilities Oct­13

9 OISD­STD­114 Safe Handling of Hazardous Chemicals Oct­10

10 OISD­GDN­115 Guidelines on Fire Fighting Equipment and Appliances inPetroleum Industry Jul­00

11 OISD­STD­116 Fire  Protection  Facilities  for  Petroleum  Refineries  and

Oil/Gas Processing Plants Jul­12

12 OISD­STD­117 Fire  Protection  Facilities  for  Petroleum  Depots,Terminals, Pipeline Installations & Lube oil installations Jul­12

13 OISD­STD­118 Layouts for Oil and Gas Installations Jul­08 14 OISD­STD­119 Selection, Operation and Maintenance of Pumps Jul­08 15 OISD­STD­120 Selection, Operation and Maintenance of Compressors Jul­08

16 OISD­STD­121 Selection, Operation Inspection & Maintenance of Steam& Gas Turbines Oct­10

17 OISD­RP­122 Selection, Operation and Maintenance of Fans, Blowers,Gear Boxes, Agitators & Mixers Jul­08

18 OISD­RP­123 Selection,  Operation  and  Maintenance  of  Rotary

Equipment Components Jul­08

19 OISD­RP­124 Predictive Maintenance Practices Aug­07

20 OISD­STD­125 Inspection & Maintenance of Mechanical Seals Aug­07

21 OISD­RP­126 Specific  practices  for  installations  and  maintenance  ofRotating Equipment Aug­07

22 OISD­STD­127 Selection, Operation, Inspection & Maintenance of DieselEngines Oct­10

(2)

24 OISD­STD­129 Inspection of Storage Tanks Nov­06

25 OISD­STD­130 Inspection of Piping Systems Jul­08

26 OISD­STD­131 Inspection of Boilers Aug­99

27 OISD­STD­132 Inspection of Pressure Relieving devices Jul­12

28 OISD­STD­133 Inspection of Fired Heaters April­16

29 OISD­STD­134 Inspection of Heat Exchangers Oct­10

30 OISD­STD­135 Inspection  of  Loading  &  Unloading  hoses  for  PetroleumProducts Sep­01

31 OISD­STD­137 Inspection of Electrical Equipment April­16

32 OISD­STD­139 Inspection of pipelines Offshore Sep­01(UnderRevision)

33 OISD­STD­140 Inspection of jetty pipelines Sep­01

34 OISD­STD­141 Design  and  Construction  requirements  for  cross  countryhydrocarbon pipelines Jul­12

35 OISD­STD­142 Inspection of fire fighting equipments and systems Feb­96 36 OISD­STD­144 Liquefied Petroleum Gas (LPG) Installations Jul­08

37 OISD­GDN­145 Guidelines  on  Internal  Safety  Audits  (Procedures  and

Checklist) Sep­01

38 OISD­RP­146 Preservation of idle electrical equipment Aug­00 39 OISD­RP­147 Inspection & safe practices during electrical installations Oct­02

40 OISD­RP­148 Inspection  &  safe  practices  during  overhauling  electrical

equipment Aug­00

41 OISD­RP­149 Design aspects for safety in electrical systems Oct­13

42 OISD­STD­150 Design  and  Safety  Requirements  For  LiquefiedPetroleum Gas Mounded Storage Facility Jul­08

43 OISD­STD­151 Safety in Design, Fabrication and Fittings : Propane TankTrucks Jul­99

44 OISD­STD­152 Safety  Instrumentation  for  Process  System  in

Hydrocarbon Industry Oct­10

45 OISD­STD­153 Maintenance  &  inspection  of  safety  instrumentation  inhydrocarbon industry Jan ­15

46 OISD­STD­154 Safety aspects in Functional Training Sep­01

47 OISD­STD­155

(Part I) (Part­I Non Respiratory Equipment) Oct­10

47 OISD­STD­155

(Part II) (Part II Respiratory Equipment) Jul­95

48 OISD­STD­156 Fire HydrocarbonsProtection  Facilities  for  Ports  Handling Oct­05

(3)

50 OISD­RP­158 Recommended  Practices  on  Storage  and  Handling  ofBulk Liquefied Petroleum Gas Aug­00

51 OISD­STD­159 LPG  Tank  Trucks  ­  Requirements  of  Safety  onDesign/Fabrication & Fittings Oct­02

52 OISD­STD­160 Protection to fittings mounted on existing LPG tank trucks Aug­93 53 OISD­GDN­161 LPG Tank Truck Incidents : Rescue & Relief Operations Mar­03

54 OISD­STD­162 Safety in installation and maintenance of LPG CylindersManifold Jul­95

55 OISD­STD­163 Process Control Room Safety Sep­04

56 OISD­STD­164 Fire Proofing of Steel Supporting Structures in Oil & GasIndustry Jul­12

57 OISD­GDN­165 Guidelines for Rescue & Relief Operations for POL TankTruck Accident Jul­99

58 OISD­GDN­166 Guidelines for Occupational Health Monitoring in Oil andGas Industry Jul­12

59 OISD­RP­167 POL Tank lorry Design & Safety Jul­97

60 OISD­GDN­168 Emergency  Preparedness  Plan  for  Marketing  Locationsof Oil Industry Jul­97

61 OISD­GDN­169 OISD  Guidelines  on  Small  LPG  Bottling  Plants  (Designand Fire Protection facilities) Jul­08

62 OISD­STD­170 Inspection,  Maintenance,  Repairs  &  Rehabilitation  ofFoundations & Structures Jul­97

63 OISD­STD­171 Preservation  of  Idle  Static  &  Rotary  MechanicalEquipment Jul­98

64 OISD­STD­173 Fire  Prevention  and  Protection  System  for  Electrical

Installations Sep­03

65 OISD­RP­174 Well Control April­16

66 OISD­STD­175 Cementing Operations Jan­15

67 OISD­STD­176 Safety Health & Environment Training For Exploration &

Production (Upstream) Personnel Sep­03

68 OISD­STD­177 Inspection & Maintenance of Thermal Insulation Jun­98 69 OISD­GDN­178 Guidelines on Management Of Change Jul­99

70 OISD­STD­179 Safety  Requirements  On  Compression,  Storage,Handling & Refueling Of Natural Gas (CNG) For Use In Automotive Sector.

April­16

71 OISD­GDN­180 Lightning Protection Jul­99

72 OISD­STD­181 Geophysical Operations Oct­10

73 OISD­GDN­182 Safe  Practices  for  Workover  and  Well  Stimulation

Operations Oct­10

(4)

75 OISD­STD­184 Standard  on  Replacement  of  Personal  ProtectiveEquipment & Life Saving Appliances Aug­00

76 OISD­STD­185 Wire Line Operations Oct­02

77 OISD­GDN­186 Simultaneous Operations in E&P Industry 2008

78 OISD­STD­187 Care And Use Of Wire Rope Aug­00

79 OISD­STD­188 Corrosion Monitoring Of Offshore & Onshore Pipelines Aug­00

80 OISD­STD­189 Standard  On  Fire  Fighting  Equipment  For  Drilling  Rigs,Work Over Rigs And Production Installations Jul­12

81 OISD­STD­190 Derrick  Floor  Operations  (Onshore  Drilling  /  WorkoverRigs) Jan­15

82 OISD­STD­191 Oil Field Explosive Safety Aug­00

83 OISD­GDN­192 Safety Practices during Construction April­16 84 OISD­GDN­193 Guidelines for Gas Lift Operations & Maintenance Sep­01

85 OISD­STD­194 Standard  for  Unloading,  Storage  And  Regasification  OfLiquefied Natural Gas (LNG) April­16

86 OISD­STD­195 Safety in Design, Operation, Inspection and Maintenanceof Hydrocarbon Gas Compressor Stations and Terminals Sep­01

87 OISD­GDN­196 Guidelines  for  Seeking  Environmental  Clearance  ofDevelopment Projects in Petroleum Industry Sep­01

88 OISD­GDN­197 Guidelines for Environmental Impact Assessment Sep­01

89 OISD­GDN­199 Guidelines  For  Conducting  Environmental  Audit  InUpstream Petroleum Sector (Onland) Aug­00

90 OISD­GDN­200 Guidelines  For  Preparation  Of  Oil  Spill  ResponseContingency Plan Oct­02

91 OISD­RP­201 Environment Management in E&P Sector Jul­08

92 OISD­GDN­202 Inspection  of  Drilling  and  Workover  Rig  Mast  /  Sub­Structure Jan­15

93 OISD­GDN­203 Operation,  Maintenance  &  Inspection  Of  HoistingEquipment Sep­03

94 OISD­GDN­204 Medical  Requirements,  Emergency  Evacuation  AndFacilities (for Upstream) Sep­01

95 OISD­RP­205 Crane Operation, Maintenance & Testing (for Upstream) Oct­02

96 OISD­GDN­206 Guidelines on Safety Management System in PetroleumIndustry Sep­01

97 OISD­GDN­207 Contractor Safety April­16

98 OISD­STD­210 Storage,  Handling  and  Refueling  of  LPG  for  automotiveuse Oct­10

99 OISD­GDN­211 Safety in Petroleum Laboratories Sep­03

(5)

Petroleum Sector

101 OISD­STD­214 Cross Country LPG Pipelines Oct­13

102 OISD­STD­216 Electrical Safety in Onshore Drilling & Workover Rigs Jan­15

103 OISD­GDN­218 Guidelines For Safe Rig­ Up & Rig­ Down Of Drilling AndWork­Over Rigs Oct­04

104 OISD­GDN­219 Guidelines  on  Field  Inspection,  Handling  &  Testing  of

Casing Pipe & Tubing Oct­04

105 OISD­GDN­224 Monitoring  &  Control  of  Volatile  Organic  CompoundsEmission Nov­06

106 OISD­STD­225 Storage,  Handling  &  Dispensing  at  Petroleum  RetailOutlets Oct­10

107 OISD­STD­226 Natural  Gas  Transmission  Pipelines  and  City  GasDistribution Networks Oct­13

108 OISD­GDN­227 Emergency  Response  and  Preparedness  in  E&PIndustry Aug­07

109 OISD­GDN­228 Selection,  Training  &  Placement  of  Fire  Operators  inHydrocarbon & Petrochemical Industry Jul­08

110 OISD­STD­230 Unlined  Underground  Rock  Cavern  Storage  forPetroleum & Liquefied Petroleum Gas Jul­08

111 OISD­STD­231 Sucker Rod Pumping Units July­08

112 OISD­GDN­232 Identification  of  hazards  and  control  measures  in  E&Pindustry Oct­13

113 OISD­GDN­233 Guidelines on inspection of Nonpiggable pipelines. Oct­13

114 OISD­STD­244 Storage  and  handling  of  Petroleum  Products  at  depotsand  terminals  including  standalone  crude  oil  storage facilities

Jan­15

115 OISD­STD­237 Layout,  Design  consideration,  Safety,  Operation  andMaintenance  of  Lube/  Grease  manufacturing  and  filling plants

Jan­15

116 OISD­STD­234 Electrical  Safety  in  Onshore  Production  Installations  inE&P Sector Jan­15

117 OISD­STD­235 Storage, Handling, Refuelling and Fire fighting at aviationfuelling stations Jan­15

118 OISD­STD­236 Design, Refrigerated LPG StorageLayout,  Operation  &  Maintenance  of Jan­15

119 OISD­RP­238 WELL INTEGRITY April­16

References

Related documents

The second potential source for the longer duration position- matching task may be due a difference in the sensitivity of or resolution of the visual feedback to detect fluctuations

Virtual Server – Traducción de Direcciones IP BIG-IP LTM realiza la traducción de direcciones de red a la dirección real de los servidores, de tal modo que todas las maquinas

The set of all undominated efficient allocations is called the undominated set, and we show, indeed, that for balanced games this set coincides with the core and for antibalanced

Using a phylogenetic tree of Bantu languages, we then test the prominent hypothe- sis that structured variation in systems of cousin terminology has co-evolved alongside adaptive

In our animal study, implants treated with a fiber laser had a mean BIC and a mean removal torque value that were significantly higher than other laser treated zirconia

Of the 12 local endemic ant species in Samoa (Table 3), 10 are known only from Samoa and two are known only from Samoa and one neighboring island group: Vollenhovia samoensis Mayr

Thors Cove is just east of Desolation Sound Marine Provincial Park, a world famous boating destination.. Thors Cove is easily accessible by water, only taking 15 minutes

As a first approximation choose a cell size that is at least double the mass of the sample. This guideline applies to samples that require pretreatment such as dispersion with