Copied!
14
0
0

Loading.... (view fulltext now)

Full text

(1)

REV

E

-

0

0

3

-

-

0

0

3

0

1

2008

NUMBER OF SHEETS OF THIS DOCUMENT

C

-ROLTA PROJECT NUMBER

ENG – 1

DOCUMENT NUMBER

DATE

CLIENT

INDIAN OIL TANKING LIMITED

PROJECT

OIL TERMINAL DETAIL ENGINEERING

LOCATION:

MUMBAI, INDIA

ENGINEERED

BY

ROLTA INDIA LIMITED

EDS : Engineering Design Services

TITLE :

LIGHTING CALCULATIONS

ROLTA INDIA LIMITED

ROLTA TOWER 'B', ROLTA TECHNOLOGY PARK, MIDC – MAROL , ANDHERI (EAST), MUMBAI – 400 093

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

Page 1 of 14

(2)

C

-

E

-

0

0

3

-

-LIGHTING CALCULATIONS

SM/TB/VK/MS

DESCRIPTION

PREPARED

Document Number

REVISION HISTORY

JRT

VKS/RA

REV

DATE

0

3/1/2008

TITLE :

LIGHTING CALCULATIONS

CHECKED

APPROVED

ROLTA INDIA LIMITED

ROLTA TOWER 'B', ROLTA TECHNOLOGY PARK, MIDC – MAROL , ANDHERI (EAST), MUMBAI – 400 093

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(3)

CONTENTS

Cover page

Index

1.0

Scope & purpose

2.0

Design inputs

3.0

Assumptions

4.0

Methodology

5.0

Calculations

6.0

Results

7.0

References

8.0

Attachments

0

MUMBAI – 400 093

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

Page 3 of 14

(4)

SCOPE &

PURPOSE:-The calculations are done for the following purposes :

The purpose of this calculation is to determine the proper number of

lighting fixtures for the required lux level.Yhe calculations have been done using

CG Lux lighting software developed by Crompton Greaves Ltd.

PRESCRIBED LUX

LEVELS:-SL NO.

Area

Average Illumination level

(Lux)

1

Switchgear Room

200

2

Control Room/DAS Room

450

3

Control Equipment Room

300

4

Pump House

150

5

Staircase ,Corridor,Toilets etc

70

6

Outdoor Area Street lighting

20

7

Cable Cellar

70

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

0

MUMBAI – 400 093

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(5)

Design Inputs :

Length

Width

Height

1

Canteen Area

10.33

7.51

3.5

2

Kitchen

7.84

2.54

3.5

3

Wash Area

2.54

1.66

3.5

4

Worker's Room

2.86

2.54

3.5

5

Store Room

6.11

2.95

3.5

6

Passage

14

1.5

3.5

7

W.C. & Bath (3nos)

1.2

1

3.5

Office Building

8

Store

4.86

2.3

3.35

9

Pantry

4.27

2.98

3.35

10

Conference Room

6

3

3.35

11

Junior Engineer

2.98

3.1

3.35

12

Library

5

3

3.35

13

Purchase Office

2.98

2.82

3.35

14

UPS

2.98

2

3.35

15

Passage

14.3

1.5

3.35

16

Corridor

9.8

2.5

3.35

17

Passage

10.61

1.2

3.35

18

Site Engineer

3

1.6

3.35

19

Senior Engg

3

3.6

3.35

20

Project manager

3

3.5

3.35

21

Chief Engg

3

4

3.35

22

Reception

4.44

3.31

3.35

23

Chemical Staff

3.8

2.9

3.35

24

Mechanical Staff

3.8

2.9

3.35

25

Civil Staff

4.38

2.9

3.35

26

Utility

2.9

1.3

3.35

27

Passage

21.04

1.2

3.35

28

Ladies Toilet

3.6

1.2

3.35

29

Gents Toilet

3.6

1.2

3.35

30

Steps

3.1

1.5

3.35

31

W.C. & bath (6 nos)

1.5

1.2

3.35

A Block

32

UPS

2.8

2

3.35

33

Conference Room

5.5

2.8

3.35

34

Cabin 1

5.3

2.8

3.35

35

Cabin 2

4.2

3.1

3.35

36

Cabin 3

4

2.8

3.35

37

Cabin 4

3.3

3.1

3.35

38

Pantry

3.1

2

3.35

39

Utility Block

3.1

1.2

3.35

40

Reception

3.3

3.1

3.35

41

Steps

3.1

1.5

3.35

42

Passage

21.1

1.5

3.35

43

Gents Toilet

3.1

2.4

3.35

44

Ladies Toilet

3.1

2

3.35

45

W.C. (5nos)

1.5

1.2

3.35

Security Cabin

46

Security Cabin

3.46

3.28

3

47

Changing Room

3.28

1.86

3

48

Tankfarm Area (Alt 1)

30

48

Tankfarm Area (Alt 2)

30

Sr. No.

Name of Area

Area Dimensions (m)

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

0

MUMBAI – 400 093

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(6)

ASSUMPTIONS :

For Indoor

lighting:-Work Plane height

= 0.80 m

Ceiling Reflectance

= 0.5 m

Wall Reflectance

= 0.5 m

Floor Reflectance

= 0.1 m

Maintenance Factor

= 0.7

For Outdoor

lighting:-Maintenance Factor

= 0.6

Note-

The lamps are mounted 20m from the finish floor level on the tank

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

0

MUMBAI – 400 093

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

Page 6 of 14

(7)

METHODOLOGY :

Lighting Calculations

Step 1: Understand the utilisation factor table that is available on most fittings:

Step 2: Calculate Room Index (K) Room

Index:-The room index is a number that describes the ratios of the rooms length,width and height Formula : K = L x W = Hm ( L + W ) Where : L = Room Length W = Room Width

Hm = Mounting Height of Fitting (from working plane)

Work Plane = Desk or Bench Height The result of this calculation will be a number usually between 0.75 and 5.

Note :-This formula for K is only valid when room length is less than 4 times the width or when the valve is greater than 0.75

Step 3: Using the room index and reflectance valves in the utilisation factor table

For the horizontal row select the reflectance that best describes the room

For the vertical column select the room index valve K as calculated above. The utilisation factor for this fitting in this room is where the row and column intersect

Step 4: To calculate the number of fittings required use the following formula:

N = E x A = F x uF x LLF

Where:

N = Number of Fittings

E = Lux level required on working plane

A = Area of Room (L x W )

F = Total Flux (Lumens) from all the lamps in one Fitting

UF = Utilisation Factor from the table for the fittings to be used

LLF = Light Loss Factor. This takes account of the depreciation over time of lamp output and dirt acculation on the fitting and walls of the building

Step 5: Space the number of fittings uniformly around thr room drawing and check the SHK nominal for trh fitting has not been exceeded

Step 6:

Work out the number of fittings required in each axis of the room

Number in Length = Sqrt( Total x L/W ) Number in Width = Sqrt( Total x W/L)

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

ROLTA TECHNOLOGY PARK, Rev no:

0

MUMBAI – 400 093

MIDC – MAROL , ANDHERI (EAST),

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(8)

CALCULATIONS :

LAB Lighting Division Kanjurmarg (East)

Mumbai - 400042 Date : 26/12/2007

Length Width Height Canteen

1 Canteen Area 10.33 7.51 3.5 CSBW1124HSB 8 16 FTL 36 W 200

2 Kitchen 7.84 2.54 3.5 IDJ1124HSB 7 14 FTL 36 W 300

3 Wash Area 2.54 1.66 3.5 IDJ1124HSB 2 4 FTL 36 W 200

4 Worker's Room 2.86 2.54 3.5 IGP1424HSB 2 4 FTL 36 W 200

5 Store Room 6.11 2.95 3.5 IGP1424HSB 3 6 FTL 36 W 200

6 Passage 14 1.5 3.5 IGP1414HSB 6 6 FTL 36 W 100

7 W.C. & Bath (3nos) 1.2 1 3.5 TLE211 3 6 CFL 11 W 100

Office Building 8 Store 4.86 2.3 3.35 IGP1424HSB 2 4 FTL 36 W 200 9 Pantry 4.27 2.98 3.35 CSBW1124HSB 2 4 FTL 36 W 200 10 Conference Room 6 3 3.35 CSBW1124HSB 8 16 FTL 36 W 500 11 Junior Engineer 2.98 3.1 3.35 CSBW1124HSB 4 8 FTL 36 W 300 12 Library 5 3 3.35 CSBW1124HSB 5 10 FTL 36 W 300 13 Purchase Office 2.98 2.82 3.35 CSBW1124HSB 3 6 FTL 36 W 300 14 UPS 2.98 2 3.35 CSBW1124HSB 4 8 FTL 36 W 300 15 Passage 14.3 1.5 3.35 IGP1414HSB 6 6 FTL 36 W 100 16 Corridor 9.8 2.5 3.35 IGP1414HSB 5 5 FTL 36 W 100 17 Passage 10.61 1.2 3.35 IGP1414HSB 4 4 FTL 36 W 100 18 Site Engineer 3 1.6 3.35 CSBW1124HSB 2 4 FTL 36 W 300 19 Senior Engg 3 3.6 3.35 CSBW1124HSB 4 8 FTL 36 W 300 20 Project manager 3 3.5 3.35 CSBW1124HSB 4 8 FTL 36 W 300 21 Chief Engg 3 4 3.35 CSBW1124HSB 4 8 FTL 36 W 300 22 Reception 4.44 3.31 3.35 CSBW1124HSB 6 12 FTL 36 W 300 23 Chemical Staff 3.8 2.9 3.35 CSBW1124HSB 4 8 FTL 36 W 300 24 Mechanical Staff 3.8 2.9 3.35 CSBW1124HSB 4 8 FTL 36 W 300 25 Civil Staff 4.38 2.9 3.35 CSBW1124HSB 6 12 FTL 36 W 300 26 Utility 2.9 1.3 3.35 CSBW1124HSB 2 4 FTL 36 W 300 27 Passage 21.04 1.2 3.35 IGP1414HSB 8 8 FTL 36 W 100

28 Ladies Toilet 3.6 1.2 3.35 IGP1414HSB 2 2 FTL 36 W 100

29 Gents Toilet 3.6 1.2 3.35 IGP1414HSB 2 2 FTL 36 W 100

30 Steps 3.1 1.5 3.35 IGP1414HSB 2 2 FTL 36 W 100

31 W.C. & bath (6 nos) 1.5 1.2 3.35 TLE211 1 x 6 2 x 6 CFL 11 W 100

A Block 32 UPS 2.8 2 3.35 CSBW1124HSB 2 4 FTL 36 W 300 33 Conference Room 5.5 2.8 3.35 CSBW1124HSB 6 12 FTL 36 W 300 34 Cabin 1 5.3 2.8 3.35 CSBW1124HSB 6 12 FTL 36 W 300 35 Cabin 2 4.2 3.1 3.35 CSBW1124HSB 4 8 FTL 36 W 300 36 Cabin 3 4 2.8 3.35 CSBW1124HSB 4 8 FTL 36 W 300 37 Cabin 4 3.3 3.1 3.35 CSBW1124HSB 4 8 FTL 36 W 300 38 Pantry 3.1 2 3.35 CSBW1124HSB 2 4 FTL 36 W 200 39 Utility Block 3.1 1.2 3.35 CSBW1124HSB 2 4 FTL 36 W 300 40 Reception 3.3 3.1 3.35 CSBW1124HSB 4 8 FTL 36 W 300 41 Steps 3.1 1.5 3.35 IGP1414HSB 2 2 FTL 36 W 100 42 Passage 21.1 1.5 3.35 IGP1414HSB 9 9 FTL 36 W 100

43 Gents Toilet 3.1 2.4 3.35 IGP1414HSB 2 2 FTL 36 W 100

44 Ladies Toilet 3.1 2 3.35 IGP1414HSB 2 2 FTL 36 W 100

45 W.C. (5nos) 1.5 1.2 3.35 TLE211 1 x 6 2 x 6 CFL 11 W 100

Security Cabin

46 Security Cabin 3.46 3.28 3 IGP1424HSB 2 4 FTL 36 W 200

47 Changing Room 3.28 1.86 3 IGP1424HSB 2 4 FTL 36 W 200

48 Tankfarm Area (Alt 1) 30 FAI40H 79 79 HPSV 400 W 20

48 Tankfarm Area (Alt 2) 30 FAI40H 79 79 HPSV 400 W 20

1 TLE211 15 1 TLE211 2 CSBW1124HSB 104 2 CSBW1124HSB 3 IDJ1124HSB 9 3 IDJ1124HSB 4 IGP1414HSB 50 4 IGP1414HSB 5 IGP1424HSB 11 5 IGP1424HSB 6 FAD1314 79 6 FAI40H REPORT FOR : LIGHTING CALCULATIONS Document no: C-E-003 Rev no: 0 Type of Luminaire

Note : We have not considered any kind of obstruction w hile design. Sr. No. Type of Luminaire

Total

No. of Sr. No.

Lux Level

PROJECT SUMMARY -ALT 1 PROJECT SUMMARY -ALT 2 No. of Luminaires No. of Lamps Lamp Type Sr. No. Nam e of Area

ROLTA INDIA LIMITED

ROLTA TOWER 'B', ROLTA TECHNOLOGY PARK, MIDC – MAROL , ANDHERI (EAST), MUMBAI – 400 093

Branch Ref. : Mumbai Design for : ROLTA Ref no. : W/191/12/07 Designed By : SPJ

Sum m ary Sheet

Area Dimensions (m) Type of Luminaire Lamp

Wattage

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(9)

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(10)

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(11)

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(12)

RESULTS :

1

Canteen Area

CSBW1124HSB

Surface

8

16

FTL

36 W

200

2

Kitchen

IDJ1124HSB

Surface

7

14

FTL

36 W

300

3

Wash Area

IDJ1124HSB

Surface

2

4

FTL

36 W

200

4

Worker's Room

IGP1424HSB

Surface

2

4

FTL

36 W

200

5

Store Room

IGP1424HSB

Surface

3

6

FTL

36 W

200

6

Passage

IGP1414HSB

Surface

6

6

FTL

36 W

100

7

W.C. & Bath (3nos)

TLE211

Surface

3

6

CFL

11 W

100

Office Building

8

Store

IGP1424HSB

Surface

2

4

FTL

36 W

200

9

Pantry

CSBW1124HSB

Surface

2

4

FTL

36 W

200

10

Conference Room

CSBW1124HSB

Surface

8

16

FTL

36 W

500

11

Junior Engineer

CSBW1124HSB

Surface

4

8

FTL

36 W

300

12

Library

CSBW1124HSB

Surface

5

10

FTL

36 W

300

13

Purchase Office

CSBW1124HSB

Surface

3

6

FTL

36 W

300

14

UPS

CSBW1124HSB

Surface

4

8

FTL

36 W

300

15

Passage

IGP1414HSB

Surface

6

6

FTL

36 W

100

16

Corridor

IGP1414HSB

Surface

5

5

FTL

36 W

100

17

Passage

IGP1414HSB

Surface

4

4

FTL

36 W

100

18

Site Engineer

CSBW1124HSB

Surface

2

4

FTL

36 W

300

19

Senior Engg

CSBW1124HSB

Surface

4

8

FTL

36 W

300

20

Project manager

CSBW1124HSB

Surface

4

8

FTL

36 W

300

21

Chief Engg

CSBW1124HSB

Surface

4

8

FTL

36 W

300

22

Reception

CSBW1124HSB

Surface

6

12

FTL

36 W

300

23

Chemical Staff

CSBW1124HSB

Surface

4

8

FTL

36 W

300

24

Mechanical Staff

CSBW1124HSB

Surface

4

8

FTL

36 W

300

25

Civil Staff

CSBW1124HSB

Surface

6

12

FTL

36 W

300

26

Utility

CSBW1124HSB

Surface

2

4

FTL

36 W

300

27

Passage

IGP1414HSB

Surface

8

8

FTL

36 W

100

28

Ladies Toilet

IGP1414HSB

Surface

2

2

FTL

36 W

100

29

Gents Toilet

IGP1414HSB

Surface

2

2

FTL

36 W

100

30

Steps

IGP1414HSB

Surface

2

2

FTL

36 W

100

31

W.C. & bath (6 nos)

TLE211

Surface

1 x 6

2 x 6

CFL

11 W

100

A Block

32

UPS

CSBW1124HSB

Surface

2

4

FTL

36 W

300

33

Conference Room

CSBW1124HSB

Surface

6

12

FTL

36 W

300

34

Cabin 1

CSBW1124HSB

Surface

6

12

FTL

36 W

300

35

Cabin 2

CSBW1124HSB

Surface

4

8

FTL

36 W

300

36

Cabin 3

CSBW1124HSB

Surface

4

8

FTL

36 W

300

37

Cabin 4

CSBW1124HSB

Surface

4

8

FTL

36 W

300

38

Pantry

CSBW1124HSB

Surface

2

4

FTL

36 W

200

39

Utility Block

CSBW1124HSB

Surface

2

4

FTL

36 W

300

40

Reception

CSBW1124HSB

Surface

4

8

FTL

36 W

300

41

Steps

IGP1414HSB

Surface

2

2

FTL

36 W

100

42

Passage

IGP1414HSB

Surface

9

9

FTL

36 W

100

43

Gents Toilet

IGP1414HSB

Surface

2

2

FTL

36 W

100

44

Ladies Toilet

IGP1414HSB

Surface

2

2

FTL

36 W

100

45

W.C. (5nos)

TLE211

Surface

1 x 6

2 x 6

CFL

11 W

100

Security Cabin

46

Security Cabin

IGP1424HSB

Surface

2

4

FTL

36 W

200

47

Changing Room

IGP1424HSB

Surface

2

4

FTL

36 W

200

48

Tankfarm Area (Alt 1)

FAI40H

Highmast

79

79

HPSV

400 W

20

48

Tankfarm Area (Alt 2)

FAI40H

Highmast

79

79

HPSV

400 W

20

0

MUMBAI – 400 093

Lux

Level

No. of

Luminaires

No. of

Lamps

Sr. No.

Name of Area

Type of

Luminaire

Mounting

Type

Lamp

Type

Lamp

Wattage

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

(13)

REFERENCES :

1) Crompton Greaves - CG Lux Software

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

0

MUMBAI – 400 093

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

Page 13 of 14

(14)

Attachments

Enclousor (1) TANKFARM AREA

a) Layout map

b) Out door Luminaire Location

Enclousor (2) CANTEEN AREA

a) Project Data Sheet

b) Iso-Lux Diagram

c) IIIuminance Tabulation

d) Installation Dta

e) Project layout

ROLTA INDIA LIMITED

REPORT FOR :

Document no:

ROLTA TOWER 'B',

LIGHTING CALCULATIONS

C-E-003

ROLTA TECHNOLOGY PARK,

Rev no:

MIDC – MAROL , ANDHERI (EAST),

0

MUMBAI – 400 093

This document and all contained herein are proprietary property of ROLTA INDIA LIMITED

and is subjected to confidentiality restrictions between ROLTA INDIA LIMITED and RECIPIENT, Copyright reserved.

Page 14 of 14

References

Related documents

In this paper, we have introduced a new type of feature called the HLBP feature which com- bines the concepts of Haar feature introduced by Viola and Jones, with Local Binary

• Move the print drum to position A, insert the tool (print drum JIG 7) [C] through the holes in the drum front support ass’y [A], print drum support (F) [B], print drum support

Furthermore, this study contrasts to professional rugby union, which found the highest number of injuries in the third quarter.(Bathgate et al., 2002; Bottini et al., 2000;

The Contractor shall employ the services of a Specialty Contractor to provide the necessary load testing equipment and instrumentation and to perform the load test..

While many other transmission channels can be considered (see Section 2), this sub-section focuses on international trade as a transmission channel of economic activities due to data

Petitioner contends that the Department of Education failed to meet its burden of proof; that findings of fact which were necessary for the decision to revoke the teaching

While the new Qatari leadership under Emir amim has adjusted its tac- tics, the government continues to face significant regional backlash to its Arab Spring policies.. o

The use of aggregation methods aims to decrease the number of repetitive components participating to the simulations and thus to simplify the process by reducing the complexity