Ques. No Page No RFP Section TCS Questionnaires
SAP GRC Access Control
1 10
Statement of
Work Can you provide GRC Landscape?
2 10
Statement of Work
Which GRC Access Control modules are to be implemented
3 10
Statement of Work
How many number of Back end system to be connected to GRC AC
4 10
Statement of Work
How many number of instance per system to be brought under the preview of GRC AC 5 10 Statement of
Work How many number of clients per system to be brought under the preview of GRC AC
6 10
Statement of
DWA Response
Yes, we can provide it to the successful bidder
All
SAP only for now
3
3 (what is the difference between question 4 and 5)
5000 users, I need clarity for the second part of the question
Ques. No Page No RFP Section TCS Questionnaires
SAP Technical Upgrade
1 6
Technical Upgrade
One TCS Tool(Used over many client locations) ACE+ can be utilized to better estimate the efforts needed for Upgrade. This tool will extract us the details of Z Programs, Objects , Utilization of System patches and other details. This will reduce manual efforts . This tool can be run in production replication environment(Staging or Quality) . Will WTA be open for this exercise ? If not, TCS will go ahead and put assumption based response from below answers provided by WTA.
2 6
Technical Upgrade
Estimation of Remidiation, Design Phases need a thorough understanding of level of customization , this helps in estimations as well as risk
managemnet and downtime.It's very critical to know below information for response.
3 6
Technical Upgrade
Can you please provide the details
Total number of Custom repository ( Z,Y Programs )
- Total Number of BDCs
- Total Number of Clone Program
4 6
Technical Upgrade Are you using customer name space or additional (partner, 3rd party ) name space?
5 6
Technical Upgrade
Please provide inputs on SAP system Landscape? - Number of Systems involved in the landscape - Development, Test,
Training, Quality, Production, etc. for all SAP Systems.
- Current OS / DB with its Version.
6 6 Technical Upgrade Did WTA already installed additional Code Pages to have additional language support
7 6
Technical Upgrade
Pl provide DB Size and hardware details for following systems -
Dev, QA, PRD
8 6
Technical Upgrade
What is current system status ? Is it Unicode or Non-Unicode ? If Non-Unicode , WTA open for Unicode conversion ?
9 6
Technical Upgrade
Unicode conversion , Upgrade to Higher version might need a change in the current Server Size, DB sizes and might need more Application Servers . Is this been considered during your primary
assessment ?
10 6
Technical Upgrade
Does WTA have test scripts available for all the business processes implemented? What percentage of business processes are covered by these scripts? Please provide total number of Test scripts.
11 6
Technical Upgrade
How is WTA's readiness on testing requirements during upgrade and Rollout ?
- Availability of test script - Testing strategy
12 6 Technical Upgrade Are you using customized role or SAP std? 13 6 Technical Upgrade Does WTA has Role based Authorizations?
14 6
Technical Upgrade
Please provide interface architecture detailing which legacy systems communicates with R/3 system?
How many interfaces are build (inbound plus out bound) around SAP?
15 6
Technical Upgrade
Are documents like Blueprint, Configuration, Functional Specifications, Technical Specifications, Training Material, etc available and can be provided at later point?
On scale of 1-10, what is the quality of this documentation in terms of coverage of implemented business processes. 10 being "everything is well covered"?
16 6 Technical Upgrade What is the IT team composition at DWA?
SAP ERP Implementation
1 10
Statement of Work Enterprise Master Data Management, is WTA looking for SAP MDM implementation? 2
General Request to provide SAP license Bill of Material for new modules in scope of this RFP 3
General
TCS Assumes that WTA would perform SAP server sizing and provide required infrastructure for performing system upgrade. Pl. confirm our understanding
4
General
Can we have exact scope / detailed business requirement of implementation for new
modules/SAP Components for the list mentioned in RFP?
5
General
Is the re-implementation option is explored instead of technical/functional approach. Pros/Cons of both the approachs need to be done
6 General Number of total SAP users. If possible, please also share module / function wise SAP users
7 General Number of locations (with names) where SAP is being used
8 General Post Go-live SAP Support required from central location, or locally at the major locations
9 General Training Scope - is it for the key users (train the trainer) or also required for the end users 10 8 3.2.2 Eloborate fleet management requirements
11 11
4.1 Eloborate EC&O requirements
12 11
4.1 Eloborate Portfolio and Project Mgmt (PPM) requirements
13 11
4.1 Eloborate MII requirements
14 8
15 9 3.4.2 Eloborate SRM requirements, what subcomponents of SRM are required
16 10
3.6.2
What sub component of CO (mgmt Acconting) is required - Internal order a/c, Activity based costing, profitability analysis, profit center accounting, etc
17 10
3.7.2 Eloborate Hire to retire requirements - what sub modules are required like PA, OM, Time Mgmt etc
18 10
3.7.2 Data migration from Persal to SAP - only balances to be migrated to SAP, or historical data is also required, if yes please eloborate
19 10
4.1 Eloborate treasury operations of WTE, 20
4.1 Business Objects - Number of dashboards / KPIs to be developed
21 11
4.1
Eloborate SAP BPC requirements, how many companies are involved WTE/WTA, and the structure
22 11
4.1
Eloborate Enterprise MDM requirements - is it gioing to be a central MDM server linking ERP, CRM, SRM and any other system for Master Data. How many Masters are required to be managed using MDM
23 11
4.1
Please provide the list of Interfaces currently in places. Please also provide functionalaties implemented within each system
24 11 4.1 Eloborate ARCGIS interfacing requirements, If integration engine available with WTA
25 General Is DWA is in favor of using train the trainer concept for end user training?
26
General TCS recommends onsite - offshore models for implementation and post live support. Does DWA is in favor of this models?
27
General
How is the current enviroment maintained today (Maintain here includes same scope as defined for application maintenance and operational support - service desk, support, medium+minor
development,monitoring, incident mgmt etc.).In the RFP only 3 months support is mentioned.Does DWA has any plan of long term maintenance support after the system is stable.
DWA Response
This project includes reimplementation of old modules therefore there is no need to concentrate on old mudules and the functionality included in them.
This project includes reimplementation of old modules therefore there is no need to concentrate on old mudules and the functionality included in them.
This project includes reimplementation of old modules therefore there is no need to concentrate on old mudules and the functionality included in them.
This project includes reimplementation of old modules therefore there is no need to obtain old documents.
The department does not have a testing for the upgrade and test scripts will be developed in line with ASAP
We are planning to have minimal customisation where necessary and SAP standard functionality
Yes
This project includes reimplementation of old modules therefore there is no need to obtain old documents. Refer to the TOR for systems that can interface with SAP.
This project includes reimplementation of old modules therefore there is no need to obtain old documents.
Yes
As per TOR
No, the implementor will have to perform server sizing and the WTE willl provide the infrastructure
±5000 users
In all the 9 provinces including 4 clusters and 4 construction sites
Centrally with first line of support (internal) at major locations Bidders are required to develop strategy as per TOR
The module should support WTE business as presented in the briefing session
The module should support WTE business as presented in the briefing session
The module should support WTE business as presented in the briefing session
The module should support WTE business as presented in the briefing session
The module should support WTE business as presented in the briefing session
All sub modules
The module should support WTE business as presented in the briefing session
The training strategy should be documented by the successful bidder