TRADE ACTIVITY DESCRIPTION Unit Days Gv. Qty Gv. Days

005 EARTHWORKS Bed manual Final Grading in Normal soil m³ 0 70 1.0

EARTHWORKS Bed manual Final Grading in Rock m³ 0 18 1.0

010 FOUNDATIONS m³ 0 5 1.0

020 REINFORCED CONCRETE STRUCTURE m³ 0 5 1.0

GROUND SLAB/CRAWL SPACE m³ 0 5 1.0

VERTICAL STRUCTURE m³ 0 3 1.0

HORIZONTAL STRUCTURE m³ 0 5 1.0

030 MASONRY WORKS

BLOCKS (0.10; 0.15; 0.20) m² 0 5 1.0

REINFORCEMENT ML 0 10 1.0

REINFORCEMENT AND BLOCKS m² 0 3 1.0

PLASTERS 500 m² 42 3 1.0

SCREEDS m² 0 70 1.0

BLOCKS FOR CLOSING SHAFTS 500 m² 42 3 1.0

080 WATERPROOFING

INSULATING m² 0 175 1.0

WATERPROOF 2 LAYERS m² 0 150 1.0

DRAINING m² 0 150 1.0

PROTECTION WITH SCREED m² 0 70 1.0

PROTECTION WITH GRAVEL m² 0 125 1.0

MULTI-LAYERS WATERPROOF m² 0 30 1.0

INTERIOR (DAMP ROOM) m² 0 10 1.0

TECHNICAL ROOM (SURFACE<50 m²) m² 0 25 1.0

TECHNICAL ROOM (SURFACE>50 m²) m² 0 100 1.0

SWIMMING POOL AND FOUNTAIN m² 0 400 1.0

090 ROOF-COVERING TILES

TILES m² 0 2 1.0

DOMES m² 0 5 1.0

100 INSULATING LINING

DRY ROOM (CD1 panels 3.00 x 1.20) m² 0 25 1.0

DAMP ROOM (CD10 Siporex) m² 0 17 1.0

Ceiling CD30 (fibralith) m² 0 30 1.0

110 DRY AREA PARTITION

DRY ROOM WITH INSULATION (HT < 3m) m² 0 7 1.0

DRY ROOM WITH INSULATION (HT > 3m) m² 0 4 1.0

120 MOVABLE PARTITION RAIL m² 0 10 1.0 PANELS m² 0 20 1.0 130 FALSE CEILING MINERAL FIBER m² 0 20 1.0 METAL m² 0 15 1.0 131 FIBROUS PLASTER-GYPSUM

SIMPLE STAFF (Flat,no cornice with bank moulding) m² 0 3 1.0

MEDIUM STAFF (Cornice, rosace, frise) m² 0 2 1.0

COMPLEX STAFF (Cornice with fillet,rosace,luminous ramp) m² 0 2 1.0 150 EXTERIOR WOOD JOINERY

WINDOW (FRAME) u 0 4 1.0

WINDOW (LEAF) u 0 4 1.0

WINDOW (GLAZING) u 0 6 1.0

WINDOW: ALL (Frame,window leaf, glazing) u 0 1 1.0

DOOR (FRAME) u 0 10 1.0

DOOR (LEAF) u 0 2 1.0

ALL (Door frame & leaf) u 0 1 0.6

151 DOOR NOBLE (VIP) u 0 1 1.0

DOOR STAFF u 0 3 1.0

160 EXTERIOR ALUMINUM JOINERY

Estimated Quantity

(2)

WINDOW (Frame) u 0 10 1.0

WINDOW (Leaf) u 0 10 1.0

WINDOW (Glazing) u 0 5 1.0

WINDOW (Bulletproof glazing) u 0 5 1.0

WINDOW ALL STANDARD u 0 1 0.4

ROOLING SHUTTER FOR STANDARD WINDOW u 0 1 0.4

DOOR (Frame) u 0 1 0.4

DOOR (Leaf) u 0 1 0.4

DOOR (Block) u 0 1 0.5

ROOLING SHUTTER FOR STANDARD DOOR u 0 1 0.4

190 METAL WORKS

METAL GATE u 0 1 1.0

METAL DOOR u 0 3 1.0

SUPPORT CHANDELIER u 0 4 1.0

SUPPORT CHANDELIER TEST u 0 4 2.0

SUPPORT MARBLE (VANITY) u 0 3 1.0

BATHROOM ACCESSTRAP u 0 4 1.0

191 DECORATIVE METAL WORKS

RAILING u 0 1 1.0 STAIR HANDRAIL u 0 1 1.0 200 MIRRORS u 0 1 1.0 210 GLUED CARPET m² 0 200 1.0 VINYL TILE m² 0 100 1.0 211 PLAIN CARPET m² 0 30 1.0 DESIGN CARPET m² 0 20 1.0 220 TILING WORKS

GLUED WALL TILLING m² 0 6 1.0

GLUED FLOOR TILLING m² 0 8 1.0

230 STRETCHED WALL FABRICS m² 0 100 2.0

240 INTERNAL MARBLE

MATCHED m² 0 2 1.0

GLUED m² 0 5 1.0

250 FAÇADE SURFACE FINISHING

MANUAL SANDTEX m² 0 20 1.0

MECHANICAL SANDTEX m² 0 150 1.0

CLOSE SURFACE m² 0 250 1.0

OPEN SURFACE m² 0 115 1.0

260 INTERIOR PAINTING

WALL (MAKING GOOD) m² 0 250 1.0

WALL (MECHANICAL SANDTEX) m² 0 450 1.0

ROLLER PAINTING m² 0 150 1.0

SPRAY GUN PAINTING m² 0 600 1.0

CEILING (PLASTER) m² 0 25 1.0

CEILING (SANDPAPER) m² 0 50 1.0

CEILING (SPRAYGUN PAINTING) m² 0 80 1.0

CEILING (COLOR FILLET) m² 0 2 1.0

261 BONDED COVERING WALL FABRICS

(3)

330 WOOD FITTINGS m² 0 1 1.0

WOOD WALL FITTING m² 0 2 1.0

WOOD CORNICE ML 0 2 1.0 WOOD SKIRTING ML 0 20 1.0 WOOD MOULDING ML 0 25 1.0 STAFF VERTICAL m² 0 2 1.0 CUPBOARD u 0 1 1.0 CURTAIN BOX m² 0 1 1.0

400 HVAC GLOBAL PER m² m² 0 1 1.1

DUCTING AND PIPPING m² 0 1 0.3

EQUIPMENT m² 0 1 0.4

FINISHING m² 0 1 0.3

TESTING m² 0 1 0.1

410 PLUMBING GLOBAL PER m² m² 0 1 0.5

PIPES AND NETWORKS m² 0 1 0.1

EQUIPMENT m² 0 1 0.3

FINISHING AND TESTING m² 0 1 0.0

420/430 INDUSTRIAL KITCHEN/PANTRIES

ELECTRIC EUROPEAN (VIP-ROYALE) u 0 1 15.0

ELECTRIC STAFF u 0 1 10.0

GAZ EUROPEAN (VIP-ROYALE) u 0 1 21.0

GAZ STAFF u 0 1 16.0

450/460 HIGH CURRENT / LOW CURRENT GLOBAL PER m² m² 0 1 0.7

INCORPORATIONS m² 0 1 0.1

CABLE TRAY m² 0 1 0.2

PIPPING AND WIRING m² 0 1 0.3

FINISHING AND TESTING m² 0 1 0.0

790 LANDSCAPING m² 0 1 0.2

800 SIGN POST INTERIOR u 0 10 1.0

SIGN POST EXTERIOR u 0 5 1.0

900 EXTERNAL PAVING m² 0 8 1.0

910 EXTERNAL FOUNTAIN MARBLE m² 0 1 1.0

EXTERNAL FOUNTAIN MOSAIC m² 0 3 1.0

(4)

Gv.men Hrs/unit 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 4 138.89 6 6 0.00 1 4 138.89 3 3 0.00 1 1 0.00 1 1 0.00 6 6 0.00 6 6 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 3 3 0.00 1 1 0.00 1 1 0.00 2 2 0.00 3 3 0.00 4 4 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 1 1 0.00 Min.Req'd No.of men

(5)

2 2 0.00 2 2 0.00 2 2 0.00 8 8 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 4 4 0.00 3 3 0.00 2 2 0.00 1 1 0.00 2 2 0.00 2 2 0.00 4 4 0.00 4 4 0.00 1 1 0.00 2 2 0.00 3 3 0.00 2 2 0.00 2 2 0.00 2 2 0.00 2 2 0.00 4 4 0.00 1 1 0.00 1 1 0.00 2 2 0.00 2 2 0.00 12 12 0.00 12 12 0.00 3 3 0.00 4 4 0.00 2 2 0.00 2 2 0.00 2 2 0.00 4 4 0.00 2 2 0.00 1 1 0.00 3 3 0.00 4 4 0.00 2 2 0.00 2 2 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00

(6)

1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 0 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 6 6 0.00 6 6 0.00 6 6 0.00 6 6 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 1 1 0.00 8 8 0.00

References

Related documents

Before the extraction of principal components, the mean is subtracted from the distribution of each feature, and the distribution is further normalized to range betweenn −1 and 1.

(2016) The bacteriophage carrier state of Campylobacter jejuni features changes in host non- coding RNAs and the acquisition of new host-derived CRISPR spacer sequences..

Thus the new mathematical model for mechanics consists of a symplectic manifold, together with a Hamiltonian vector field, or global system of first-order

A fixture, however, may sometimes be provided with a number of gages and stops, although it does not contain any special devices for the guiding of the tools.. The definition given,

With a 21 st century perspective of women, Hamlet could in fact have been a play governed by justice and beauty

Fees for global Investment Banking services, from M&amp;A advisory to capital markets underwriting, totaled US$82.6 billion during full year 2013, a 7% increase over last year at

La etapa adolescente constituye una fase esencial en el desarrollo de la persona; en estas edades las relaciones sociales y la adquisición de la personalidad son elementos

Big data is the term used to describe this massive volume of structured or unstructured data collected that is too large to be processed with traditional methods.. According