• No results found

New England ISO - The Independent System Operator 16 CHAPTER 6

N/A
N/A
Protected

Academic year: 2021

Share "New England ISO - The Independent System Operator 16 CHAPTER 6"

Copied!
40
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

FIGURE 1. Geographic footprint of Independent  System Operator of New England (ISO-NE)
TABLE 1. Regional electricity generating capacity  and energy production by fuel type
FIGURE 3. Dramatic Changes in the Energy Mix
FIGURE 5. Efficiency Programs Save Energy and  Cost in New England
+3

References

Related documents

Even though the ISO 50001 standard specifies guidelines and requirements for an efficient energy management system to help companies plan and establish improved energy efficiency,

Accessing elements of a structure Initialization of structure data Using pointers to access structures

• If due to exceptional circumstances the high level structure or any of the identical core text, common terms and core definitions cannot be applied in a

Filed within 60 days after the petitioner learns (knowledge) of the judgment, final order, etc AND not more than 6 months after such judgment or final order, etc was entered or

• Clause has been expanded to include revision of current terms with reference to the new ISO9000. standard regarding terms & definitions to

○ If BP elevated, think primary aldosteronism, Cushing’s, renal artery stenosis, ○ If BP normal, think hypomagnesemia, severe hypoK, Bartter’s, NaHCO3,

In order for your NSB to vote on ‘Vote to all members’ ballots, your member body user administrator (MBUA) should make sure that the relevant staff from your NSB

controlled data with other less sensitive data (open or safeguarded), then it will be necessary to have obtained consent for this from RAG as part of the project proposal.