• No results found

This document lists the configurations that have been tested for the Oracle Primavera P6 version 7.0 release.

N/A
N/A
Protected

Academic year: 2021

Share "This document lists the configurations that have been tested for the Oracle Primavera P6 version 7.0 release."

Copied!
21
0
0

Loading.... (view fulltext now)

Full text

(1)

Oracle® Primavera P6™ Tested Configurations Release Version: 7.0

Date: November 2014 Revision: 7.0.0.0.16

This document lists the configurations that have been tested for the Oracle Primavera P6 version 7.0 release.

Notes

P6 Suite, as listed in this document, refers to the following components offered in the Primavera P6 Enterprise Project Portfolio Management media pack:

 Project Management module  Methodology Management module  P6 Web Access

 P6 Progress Reporter  P6 Integration API  P6 Web Services

 P6 Reporting Database R1 and R2 (R1 applies to all platforms except HP-UX)  P6 Analytics R1

The P6 product suite is supported on VMware.

In general, the P6 product suite is compatible with configurations supported by third party vendors.

The Business edition of Windows Vista and the Professional edition of Windows 7 were used during testing. Other editions were not tested but should be fully compatible with P6, with the exception of the Home edition.

For all Java Application Servers, a 64-bit JDK/JVM (Java Virtual Machine) is required for all 64-bit Platforms. Except where noted, all configurations were tested with English as the operating system locale and input language. For information on tested configurations for Contract Management, see the Contract Management Tested

Configurations document (Tested_Configurations.htm in the Documentation folder of the Contract Management physical media or download).

For more information on tested configurations for the Primavera Integration API, see the Oracle Primavera P6 Integration API Administrator’s Guide (located in \Documentation\<language>\Primavera Documentation Center.pdf of the P6 physical media or download).

* P6 now supports JRE 1.6.0_35 using Patch 15910202 or the latest patch available for P6. * P6 now supports JRE 1.6.0_38 using Patch 16041116 or the latest patch available for P6.

* P6 now supports JRE 1.7.0_13, 1.7.0_17, 1.7.0_21, 1.7.0_25, 1.6.0_39, 1.6.0_43 and 1.6.0_45 using Patch 17302830 or the latest patch available for P6.

* P6 now supports JRE 1.7.0_45, 1.7.0_51, Oracle Access Manager 11.1.2.0 (OAM 11g) using Patch 17631702 * P6 now supports JRE 1.7.0_55 and 1.7.0_71 using Patch 18637481 or the latest patch available for P6. ** P6 supports only Firefox 10.0.5 (ESR- Extended Support Release), IE8 with JRE 1.6.0_35 and 1.6.0_38. ** P6 supports only Firefox 10.0.12 (ESR- Extended Support Release), IE8 with JRE 1.7.0_13, 1.7.0_17, 1.6.0_39 and 1.6.0.43

** P6 supports only Firefox 17.0.6 (ESR- Extended Support Release), IE8 with JRE 1.7.0_25, 1.7.0_45 and 1.7.0_51 ** P6 supports only Firefox 24.4.0 (ESR- Extended Support Release), IE8 with JRE 1.7.0_55

(2)

Contents

 Databases

 Database Client Software

 Java Application Servers

 Web Servers

 Client Operating Systems

 Browsers

 Client JREs

 Content Repository Software

 Visualization Software

 Workflow Repository Software

 LDAP Software

 Single Sign-On Environments

 Citrix Client

 Citrix Server

 Other Primavera Applications

Databases

Generic Platform Database Server Platform Database Collation Page/Locale Primavera Applications

Linux x86

Oracle Enterprise

Linux 4 Oracle 10.2.0.4.0§ UTF8

Western European P6 Suite Oracle Enterprise Linux 5 Oracle 11.1.0.7.0§ Oracle 11.2.0.1.0†§ Linux x86-64 Oracle Enterprise Linux 4 Oracle 10.2.0.4.0§ UTF8 Western European P6 Suite Oracle Enterprise Linux 5 Oracle 11.1.0.7.0§ Oracle 11.2.0.1.0†§ UTF8 Western European P6 Suite

Red Hat Enterprise

Linux AS 5.3 Oracle 11.1.0.7.0 UTF8

(3)

Databases

Generic Platform Database Server Platform Database Collation Page/Locale Primavera Applications

(4)

Databases

Generic Platform Database Server Platform Database Collation Page/Locale Primavera Applications

(5)

Databases

Generic Platform Database Server Platform Database Collation Page/Locale Primavera Applications

Windows XP Professional sp3* Windows Vista sp2* Windows 7* Oracle Database 10g (10.2.0.1.0) Express Edition (Oracle Database XE) UTF8 AL32UTF8 (for XE only) Standalone version of Project Management and Methodology Management modules

Sun Solaris SPARC

(64-bit) Solaris 10 (Sparc)

Oracle 11.1.0.7.0 Oracle 11.2.0.1.0 UTF8 Western European P6 Suite HP-UX PA-RISC

(64-bit) HP-UX 11i v1 Oracle 10.2.0.4.0

UTF8 Western European

P6 Suite‡

IBM AIX Based

Systems (64-bit) IBM AIX 6.1 Oracle 11.1.0.7.0

UTF8 Western European

(6)

Database Client Software

Generic Platform Client Operating System Database Client Software Primavera Applications

(7)

Java Application Servers

Generic Platform Java Application Server Platform Java Application Server Primavera Applications

HP-UX PA-RISC

(64-bit) HP-UX 11i v1

Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18) P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services

IBM AIX Based Systems

(64-bit) IBM AIX 6.1

IBM WebSphere 7.0 fp7 with IBM SDK for multiplatforms, Java Technology Edition, V6.0 P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services

Linux x86 Oracle Enterprise Linux 5

Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18)* P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services Linux x86-64

Oracle Enterprise Linux 5

Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18)* IBM WebSphere 7.0 fp7 with IBM SDK for multiplatforms, Java Technology Edition, V6.0 P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services

Oracle Enterprise Linux 4

(8)

Java Application Servers

Generic Platform Java Application Server Platform Java Application Server Primavera Applications

Red Hat Enterprise Linux AS 5.3

IBM WebSphere 7.0 fp7 with IBM SDK for multiplatforms, Java Technology Edition, V6.0 P6 Web Access P6 Progress Reporter Microsoft Windows (32-bit) Windows 2003 Server R2 sp2

JBoss 5.0.1 GA-JDK6 with Oracle Java 2 JDK version 6.0 update 14 (1.6.0_14)* Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18)* IBM WebSphere 7.0 fp7 with IBM SDK for multiplatforms, Java Technology Edition, V6.0 P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services Windows 2008 Server sp2 JBoss 5.0.1 with

(9)

Java Application Servers

Generic Platform Java Application Server Platform Java Application Server Primavera Applications

Microsoft Windows (64-bit)

Windows 2008 Server sp2

JBoss 5.0.1 with

Oracle Java 2 JDK version 6.0 update 14 (1.6.0_14)* Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18)* IBM WebSphere 7.0 fp7 with IBM SDK for multiplatforms, Java Technology Edition, V6.0 P6 Web Access P6 Progress Reporter P6 Integration API P6 Web Services Windows 2008 Server R2 Oracle WebLogic 11gR1 (10.3.3.0) with Oracle Java 2 JDK version 6.0 update 18 (1.6.0_18)* P6 Web Access P6 Progress Reporter

Sun Solaris SPARC

(64-bit) Solaris 10 (Sparc)

(10)

Web Servers

Generic Platform Web Server Platform Web Server Primavera Applications

Linux x86

Oracle Enterprise

Linux 4 Oracle HTTP 10.1.3.2.0 Server§

(11)

Client Operating Systems

Generic Platform Client Operating System Primavera Applications

Linux x86 Ubuntu Linux 9

Ubuntu Linux 12.04

P6 Progress Reporter client

Microsoft Windows (32-bit)

Microsoft Windows XP Professional sp3*

Microsoft Windows Vista sp2* Microsoft Windows 7*

Microsoft Windows 7 SP1**

P6 Suite

Microsoft Windows (64-bit)

Microsoft Windows Vista sp2* Microsoft Windows 7*

Microsoft Windows 7 SP1**

P6 Suite (requires a 32-bit Oracle client)

Browsers

Generic Platform Client Operating System Browser Primavera Applications

Linux x86 Ubuntu Linux 9 Firefox 3.6

P6 Progress Reporter client Ubuntu Linux 12.04 Firefox 10.0.12**

Microsoft Windows (32-bit) Windows XP Professional sp3* Windows Vista sp2* Microsoft Internet Explorer 7 Microsoft Internet Explorer 8 Firefox 3.6 Firefox 10.0.5** Firefox 10.0.12** Firefox 17.0.6**

P6 Web Access client P6 Progress Reporter client P6 Integration API

(12)

Browsers

Generic Platform Client Operating System Browser Primavera Applications

Windows 7* Windows 7 SP1** Microsoft Internet Explorer 8 Firefox 3.6 Firefox 10.0.5** Firefox 10.0.12** Firefox 17.0.6** Firefox 24.4.0** Firefox 31.2.0** Microsoft Windows

(64-bit) Windows XP Professional sp3* Windows Vista sp2* Microsoft Internet Explorer 7 Microsoft Internet Explorer 8 Firefox 3.6 Firefox 10.0.5** Firefox 10.0.12** Firefox 17.0.6** Firefox 24.4.0** Firefox 31.2.0**

P6 Web Access client P6 Progress Reporter client P6 Integration API

(13)

Browsers

Generic Platform Client Operating System Browser Primavera Applications

Windows 7* Windows 7 SP1** Microsoft Internet Explorer 8 Firefox 3.6 Firefox 10.0.5** Firefox 10.0.12** Firefox 17.0.6** Firefox 24.4.0** Firefox 31.2.0** Client JREs

Generic Platform Client Operating System Client JRE Primavera Applications

Linux x86 Ubuntu Linux 9 Oracle Java Runtime

Engine: 1.6.0_26

P6 Progress Reporter client

(14)

Client JREs

Generic Platform Client Operating System Client JRE Primavera Applications

Microsoft Windows (32-bit) Windows XP Professional sp3 Windows Vista sp2 Windows 7 SP1

Oracle Java Runtime Engine: 1.6.0_26 Oracle Java Runtime Engine: 1.6.0_30 Oracle Java Runtime Engine: 1.6.0_31 (32-bit version) Oracle Java Runtime Engine: 1.6.0_35 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_38 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_39 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_43 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_45 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_13 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_17 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_21 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_25 * (32-bit version)

P6 Web Access client P6 Progress Reporter client

(15)

Client JREs

Generic Platform Client Operating System Client JRE Primavera Applications

(16)

Client JREs

Generic Platform Client Operating System Client JRE Primavera Applications

Microsoft Windows (64-bit) Windows XP Professional sp3 Windows Vista sp2 Windows 7 SP1

Oracle Java Runtime Engine: 1.6.0_26 (32-bit version) Oracle Java Runtime Engine: 1.6.0_30 (32-bit version) Oracle Java Runtime Engine: 1.6.0_31 (32-bit version) Oracle Java Runtime Engine: 1.6.0_35 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_38 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_39 * (32-bit version) Oracle Java Runtime Engine: 1.6.0_43* (32-bit version) Oracle Java Runtime Engine: 1.6.0_45* (32-bit version) Oracle Java Runtime Engine: 1.7.0_13 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_17 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_21 * (32-bit version) Oracle Java Runtime Engine: 1.7.0_25 * (32-bit version)

P6 Web Access client P6 Progress Reporter client

(17)

Client JREs

Generic Platform Client Operating System Client JRE Primavera Applications

(18)

Visualization Software

Visualization Software Content Software Primavera Application

Oracle AutoVue 20.0.0 Oracle Universal Content Management 10.1.3.4.1 (VueLink for UCM 19.3) P6 Web Access client

Oracle AutoVue 20.0.0 Microsoft Office SharePoint Server 2007

(VueLink for SharePoint 19.2 with hotfix) P6 Web Access client

Oracle AutoVue 19.3.3 JackRabbit 1.5.5 P6 Web Access client

Content Repository Software

Content Software Java Application Server for P6 Web Access Primavera Applications

Oracle Universal Content Management 10.1.3.4.1

Oracle WebLogic 11gR1 (10.3.3.0)

IBM WebSphere 7.0 fp7

P6 Web Access client Microsoft Office SharePoint

(19)

Workflow Repository Software

Workflow Software Primavera Application

JBoss jBPM-jpdl 3.2.3

P6 Web Access client c3po 0.9.1.2

LDAP Software

LDAP Platform LDAP Software Primavera Applications

Oracle Enterprise Linux 4 Oracle Internet Directory 10gR3 (10.1.4.0.1)§

Oracle Internet Directory 11g (11.1.1.1.0)§

P6 Suite

Windows 2003 Server R2 sp2

Oracle Internet Directory 10gR3 (10.1.4.0.1)§

Oracle Internet Directory 11g (11.1.1.1.0)§

P6 Suite

Windows 2008 Server sp2 Windows Server 2008 Active Directory§ P6 Suite

Windows 2008 Server R2

Oracle Internet Directory 10gR3 (10.1.4.0.1)

(20)

Single Sign-On (SS0) Environments

SSO Platform SSO Software LDAP Directory Server Primavera Applications

Windows 2003 Server R2 sp2 CA Netegrity SiteMinder 12 sp1 with SiteMinder Web Agent QMR5

Sun One 5.2 LDAP directory server P6 Web Access P6 Progress Reporter Oracle Access Manager 10.1.4.3.0 Oracle Internet Directory 10gR3 (10.1.4.0.1) Oracle Internet Directory 11g (11.1.1.1.0) P6 Web Access P6 Progress Reporter Oracle Application Server Single Sign-On Oracle Internet Directory 10gR3 (10.1.4.0.1) P6 Web Access P6 Progress Reporter Oracle Linux 5.8 x64 Oracle Access Manager 11.1.2.0.0 Oracle Internet Directory 11g (11.1.1.6.0) P6 Web Access P6 Progress Reporter Citrix Client

Generic Platform Citrix Software Citrix Client Primavera Applications

Microsoft Windows (32-bit)

Citrix Client 10.2 Citrix XenApp Plugin for Hosted Apps

Windows XP Professional sp3 Windows Vista sp2

(21)

Citrix Server

Generic Platform Platform Citrix Software Primavera Applications

Microsoft Windows

x64 (64-bit) Windows 2008 Server sp2

Citrix Presentation Server 4.5

Citrix XenApp 5.0

Project Management module Methodology Management module

Other Primavera Applications

Generic Platform Platform Primavera Applications

Microsoft Windows (32-bit)

Windows 2003 Server R2 sp2* (English only on server)

Windows 2008 Server sp2* (English only on server)

Compression Server (Oracle only)

Windows 2003 Server R2 sp2* Windows 2008 Server sp2*

Job Service

Microsoft Windows (64-bit) Windows 2008 Server sp2* (English only) Compression Server (Oracle only; requires a 32-bit JDK)

* Tested with the following core operating system locales and corresponding input languages:  English

 French  German  Japanese  Russian

 Latin American Spanish  Simplified Chinese  Traditional Chinese

† Includes Real Application Clusters, Advanced Compression, and DataGuard database features ‡ P6 Reporting Database R1 is not supported in this configuration

§ Tested with Secure Socket Layer (SSL)

References

Related documents

Pure Java Windows authentication supports connections to Microsoft SQL Server 2000 and Microsoft SQL Server 2000 Enterprise Edition (64-bit) SP2 or higher in a Windows domain

The installation process covers the 1-Wire Drivers for the following Microsoft Windows 32-bit and 64-bit operating systems: Windows 7, Windows Server 2008, Windows Vista, and Windows

Microsoft Windows Server 2003 Standard Edition Service Pack 1 or higher Microsoft Windows 7 (only at Server). Microsoft SQL Server (2005

Exchange 2010 SP1 Microsoft Windows Server 2008 R2 Standard Edition x86-64 Exchange 2010 SP2 Microsoft Windows Server 2008 R2 Enterprise Edition x86-64 Exchange 2010 SP2

Operating System • Microsoft Windows Server 2008 Standard Edition SP2 (64-bit) • Microsoft Windows Server 2008 R2 Standard Edition SP1 (64-bit) • Microsoft Windows Server 2012

• Microsoft SQL Server (Express version)* • Amyuni PDF Converter • Crystal Reports • Windows 7 Professional • Windows 8 Professional • Windows 10 Professional • Server

• Windows Server® 2003 SP2 (32-bit or 64-bit) • Windows Server 2003 R2 SP2 (32-bit or 64-bit) • Windows Server® 2008 SP2 (32-bit or 64-bit) • Microsoft® hotfix 955839

Any one of the following Microsoft SQL Server editions is required and must be installed on Windows Server 2008 (x64 SP2 or R2) versions, running, and available for Microsoft