ADDENDUM NO. 2 July 27, 2021

Bid No.: 21-054 (CD1911)

Bid Name: Abate & Demolish: 1103 E. 8th Street and 1608 Wabash Avenue-CDBG

1. The Mandatory Submittals Page has been revised and is attached to this addendum. This revised page must be used for bidding purposes.

2. Article 2 – Special Provisions has been revised. Sections 2.18, 2.31, and 2.32 are hereby replaced with the following (revisions shown in red):

2.18 PRE-DEMOLITION CONFERENCE

The Contractor shall attend a Pre-Demolition Conference with the Project Manager, City employees, representatives of the utility companies, and/or other interested parties prior to any demolition. Pre- Demolition Conference will be scheduled 7-10 days after notice of award is issued. Contractor is required to submit the following submittals at or prior to the Pre-Demolition Conference:

• Contractor’s Site Management Organization (to include Site Supervisor, Quality Control Manager, and Site Safety Manager with 24-hour contact information)

• Activity Hazard Analysis (AHA)

• Demolition Plan

• Project Schedule

• Project Design for Abatement

2.31 ASBESTOS ABATEMENT

A copy of the Asbestos Abatement Specifications as prepared by the City’s Environmental Consultants and AMS of record, All Phase Environmental Consultants, Inc (APEC), are included with these specifications following Article 3. Prior to commencing the project, contractor shall obtain the following:

A. An abatement and demolition permit from the Colorado Department of Public Health and Environment.

B. A demolition permit issued by the Regional Building Department.

Prior to the commencement of any abatement work, the Contractor shall submit for City of Pueblo review, a Project Design detailing their plan for accomplishing abatement of premises. Both properties shall be abated using containment methods. Open-air abatement is not permitted, variances have been approved by CDPHE.

PURCHASING DEPARTMENT

230 S. Mechanic Pueblo, CO 81003 www.pueblo.us/purchasing

719-553-2350 Phone 719-553-2351 Fax [email protected]

(2)

2.32 DEMOLITION SCOPE OF WORK

Demolish and remove all buildings, foundations, footings, floor slabs, fences, and concrete pathways and driveways from the project site unless otherwise identified by the City Engineer as an item that is to remain. Control dust resulting from demolition by sprinkling and wetting down; and install storm water control measures. Clean up the entire lot/parcel as identified by the City Engineer. This shall include all weeds, trash, abandoned items, etc. Contractor shall fill and compact all holes, pits, excavations, or depressions on the properties to bring the entire site back to grade.

3. A Sample and Material Location Map and Existing Site Conditions for 1608 Wabash Avenue are attached to this addendum.

4. Following are responses to Bidder’s questions:

Q1. Who will be responsible for utility disconnects?

Response: See Article 2-Special Provisions, Section 2.30 “Utility Disconnection”.

Q2. Will water and sanitary be capped within property lines or in the streets at the mains?

Response: See Article 2-Special Provisions, Section 2.30 “Utility Disconnection” for capping requirements.

Q3. Will City expedite termination of gas?

Response: The City has submitted the termination request to Xcel Energy for both properties as of July 20, 2021. It is anticipated that the termination request will be completed prior to start of work.

Q4. Is the ash considered ACM?

Response: See the Sample and Material Location Map for 1608 Wabash Avenue attached to this addendum. Due to the transite materials being mixed in with the ash, this is considered an ACM. CDPHE was informed of this spill on January 26, 2021, and discussed further on February 10 & 11, 2021 by APEC personnel.

Q5. Brandice mentioned discussions with CDPHE about Wabash: What engineering controls were agreed upon to keep the project from not becoming an open-air abatement?

Response: CDPHE was very against this structure being an open-air abatement. The sequence of work that was discussed with them was to treat the fire damaged section of the home (east side) as a major spill that would be cleaned prior to normal abatement. Then all transite that is lying on the soil is to be removed, along with all remaining transite on the home (east end exterior). The transite in the soil is non-friable even though this material is significantly damaged – friability was verified in the field on July 21, 2021. Once the spill is cleaned and cleared, then normal abatement of the interior can be performed. All-Phase Environmental staff walked the interior on July 21, 2021, and they were able to safely access all interior areas needing abatement.

Q6. Is the entire lot at Wabash considered contaminated?

Response: No, only the east side of the home has transite (non-friable) lying in the soil.

(3)

Q7. What backfill requirements and specifications must be met?

Response: See Article 2-Special Provisions, Section 2.23 “Site Restoration & Cleanup” and Section 2.33 “BackfillRequirements”.

Q8. Will BMP’s be required after backfill?

Response: BMPs shall be maintained for the duration of the project until the project has been accepted as complete by the City. See Article 2-Special Provisions, Section 2.36 “Erosion and Sediment Control” for requirements and procedures.

Q9. Wabash is currently free of debris in the yard. If debris has accumulated by start date, who will be responsible for the costs of removal?

Response: Contractors shall bid the project based upon the current condition of the site as documented on the Existing Site Conditions for 1608 Wabash Avenue attached to this addendum.

Any significant changes to the site conditions as of the start date of the project will be documented by the City’s Project Manager as a changed site condition.

Q10. Who will work with the neighboring property to the east of 8th Street to meet OSHA regulations of safe fall distances?

Response: Awarded Contractor shall provide a demolition plan to the City for approval as part of at or prior to the Pre-Demolition Conference. Based upon the Contractor’s submitted plan, the City’s Project Manager will work with neighboring properties for notification. The Contractor shall adhere to Article 3-General Provisions, Section 3.64 “Protection of the Public, Work, and Property”.

Q11. Are you asking for a notarized letter from Abatement contractors stating that they have no Notice of Violation (NOV) or any pending NOV?

Response: Yes, abatement contractors shall provide a notarized letter documenting that they do not have a Notice of Violation or any pending Notice of Violation. Refer to the revised Mandatory Submittals Page attached to this addendum.

Q12. There was no spill delineation in the inspection report for 1608 Wabash Avenue. It appears that there is transite siding scattered in the entire backyard, the alley, and possibly the neighboring yards. Will the City’s inspector be providing spill delineation for outside containments?

Response: Transite siding materials are non-friable even though they are damaged lying on the soil. The property does not require a spill delineation by CDPHE. This material does not need a containment on the exterior of the property. This phase of work will only require a notification to the state. All associated transite from the property will need to be cleaned.

Q13. Who will be providing the project designs and variances, if needed, for this project? Will this be the GAC or All Phase Environmental?

Response: See Article 2 – Special Provisions, Section 2.18 “Pre-Demolition Conference” and Section 2.31 “Asbestos Abatement” as amended in this Addendum. The awarded Contractor shall submit a Project Design for review prior to the start of demolition. Abatement shall be accomplished using a containment method. A variance to Open-Air abatement was previously submitted and approved by CDPHE.

(4)

Q14. Can the bidding contractor select whether to complete the work in a full containment or with open air work practices with a variance?

Response: No, contractor shall abate both properties using a containment method.

Q15. Can you provide clarification with regard to who is providing water and power?

Response: Contractor shall coordinate water requirements through the Board of Water Works (BOWW). Contractors may check-out a water meter for connecting to existing hydrants or domestic water lines. A backflow preventer will be required to prevent cross-contamination.

Contact BOWW Service Line at 719-543-2217 for more information.

Contractor shall coordinate electrical requirements through Black Hills Energy or may provider their own temporary power solutions. Contact Derek Chavez at 719-546-5808 for more information.

This Addendum No. 2 to the above project shall become a part of the Contract Documents and shall be binding in all respects. Information contained in this Addendum No. 2 shall supersede any information presented in the specifications. This Addendum No. 2 must be included in Bidder’s submittal. The undersigned acknowledges receipt of this Addendum No. 2 and all attachments.

Business Name: _______________________________________________________________________

Business Address: _____________________________________________________________________

_____________________________________________________________________

Signature: ________________________________________________ Date: _______________________

Printed Name and Title: _________________________________________________________________

Federal Identification Number: ______________________ DUNS Number: ________________________

E-mail address: ________________________________________________________________________

Office Phone: _____________________ Fax: ___________________ Cell Phone: __________________

Attachments: Revised Mandatory Submittals Page

Sample and Material Location Map for 1608 Wabash Avenue Existing Site Conditions for 1608 Wabash Avenue

(5)

Revised for Addendum No. 2

MANDATORY SUBMITTALS

Bids may be mailed, hand delivered, or submitted electronically in PDF format. Mailed and hand delivered bids must be delivered to the City’s Purchasing Department, 230 South Mechanic Street, Pueblo, Colorado, 81003, 719-553- 2350. Electronic bid submittals must be sent to [email protected]. Bidders must enter the following in the subject line of the email: “SEALED BID 21-054 – Your Company Name.” Submittals will be opened no sooner than the submittal deadline shown below.

The outside of mailed or hand delivered packages must be clearly marked with the following information:

Bid No.: 21-054 (CD1911)

Bid Name: Abate & Demolish: 1103 E. 8th Street and 1608 Wabash Avenue-CDBG Submittal Deadline: August 4, 2021 at 10:00:00 AM (MT)

Submittals Submitted

1. Article 1B – Request for Quotations

2. Bid Bond

3. Acknowledgements (signed)

4. Certification of Nonsegregated Facilities

5. Bidder Questionnaire (completed and signed)

6. State of Colorado Asbestos Abatement Contractor License

7. Notarized Letter/Statement of No Notices of Violation or Pending Notices of Violation

8. Any Addenda acknowledgement sheets *

* It is the bidder’s responsibility to verify whether any Addenda were issued prior to submitting bid. Addenda are available on the City’s website, www.pueblo.us/purchasing, or the Rocky Mountain E-Purchasing System (RMEPS) website, www.bidnetdirect.com/colorado.

Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Signature below will serve as the Bidder’s acknowledgement of understanding and ability to comply with all requirements and conditions for the above referenced project and that all mandatory submittals are included in this bid proposal. Failure to include all mandatory submittals may result in rejection of bid.

Business Name: ________________________________________________________________________________

Business Address: ______________________________________________________________________________

______________________________________________________________________________

Signature: ______________________________________________________ Date: _________________________

Printed Name and Title: __________________________________________________________________________

Federal Identification Number: ___________________________ DUNS Number: ___________________________

E-mail address: ________________________________________________________________________________

Office Phone: ______________________ Fax: ______________________ Cell Phone: ____________________

(6)

Walls

This area is an addition and during the site inspection, Transite was found mixed in with the Ash & Debris.

Damage in this area was due to the fire & fire fighting activities. This area will be abated as a spill separate from the normal abatement activities on the interior of the home. All Transite (non- friable) remaining on the exterior walls and lying on the soil to the east of the home will be removed prior to any demolition activities.

Non-Friable Roofing Material

= Transite on Soil Square Footage of ACM to be Removed, MUST be verified by the Bidding GAC. APEC

quantities are only estimated to provide the contractor with a general size and scope of the materials.

(7)

1608 Wabash Ave.

(8)
(9)
(10)

References

Related documents

Administration Sites allow their members to create, manage and delete WebLearn sites, for example, all sites used by the Chemistry Department will be managed by the

(1) When applying our method to Haskell source code that contains a single type error; Do we show improvement in locating the errors compared to the Glasgow Haskell Compiler.. The

/etc/group. Como el archivo passwd es accesible por cualquier usuario, lo que siempre se hace es activar el shadow. ¿Recuerda, cuando instalamos que en una de las pantallas

When filling the pool is completed, check that the water is not collecting on any side to ensure the pool is level2. IMPORTANT: If pool is not level, drain water and re-level ground

BEFORE TAXIING ON OR OFF THE RUNWAY FOR DEPARTURE 10 MILES OUT� ENTERING: DOWNWIND BASE FINAL LEAVING THE RUNWAY FSS CLOSED (NO TOWER) NO TOWER, FSS OR UNICOM TOWER OR

The result is a neural variant of the CDH model (the CDHn model) which revealed a functionally interconnected cerebro-cerebellar dorsal circuit [comprising the left inferior

The Job Viewer tab in the link discovery screen displays the message traffic between Dell OpenManage Network Manager and the device(s). See Audit Trail Portlet on page 93 for

Following installation of the Linux system, many distributions have an additional gui based firewall configuration tool such as the one seen in Figure 13 which is available in