Asset Name Type of O&M Activity O&M Activity Frequency O&M Tracking Location Runa Valves Planned Preventative
Maintenance
Exercise mainline valves. Semi Annually Work Order Software Wellington Booster
Pump 1
Planned Routine Maintenance
Inspect pumps, motors, and controls
Once per week Work Order Software/ Onsite Checklists Kreger 6 inch PVC Planned Standard
Operating Procedure
Flush the distribution system. Semi Annually Work Order Software Lakeview Heights
Hydrant 1
Planned Preventative Maintenance
Paint fire hydrants Once every 5 years
Excel Sheets Runa Blowoff Valve Planned Preventative
Maintenance
Inspect and exercise all Blowoff valves.
Semi Annually O&M Log books Wellington Booster
Station
Planned Monitoring Inspect any vaults or buildings for damage or water leaks
Semi Annually Work Order Software/ Onsite Checklists Planned Monitoring Take appropriate monthly water
quality samples.
Monthly Sampling Log Book
Kreger 6 inch PVC Planned Routine Maintenance
Routine Maintenance - Distribution: Inspect/Review pipe condition and leak history to evaluate areas needing future rehabilitation/replacement.
Annually GIS
Snow Cap PRV Planned Preventative Maintenance
Perform preventive maintenance on pressure reducing station. Clean strainer and control piping.
Semi Annually Work Order Software/ LCC/O&M Tracking tool Snow Cap PRV Planned Monitoring Inspect PRS, check all hatches,
seals, and vents for evidence of vandalism
Monthly Work Order Software/ LCC/O&M Tracking tool Old Mountain Road
Pressure Zone
Planned Preventative Maintenance
Exercise all valves Annually Google
Maps/O&M Log Books
Pool Meters Planned Monitoring Check meter readings for pressure changes.
Twice a week O&M Log books Snow Cap PRV Planned Monitoring Check PRV - check pressure in
downstream pipe Once per month Work Order Software/ LCC/O&M Tracking tool Anglin's Intake Pump
Planned Monitoring Inspect intake pumps, motors, and controls.
Monthly Checklist tracking sheets
Source Pump 1 Planned Routine Maintenance
Routine Maintenance - Source intake
Annually Work Order Software/ LCC/O&M Tracking tool Wellington Booster Station Planned Routine Maintenance
Routine Maintenance - Pump house control panels
Annually Work Order Software/ LCC/O&M Tracking tool/Onsite Checklists Wellington Booster Pump 2 Planned Routine Maintenance
Routine Maintenance - motors, pumps
Annually SEMS Software Water Treatment
Plant
Planned Routine Maintenance
Routine Maintenance - property Annually Work Order Software Anglin's Intake Planned Monitoring Inspect source intake, security
fencing, gates, and lubricate locks
Once per week O&M Log books
Zoar Water Storage Tank
Planned Monitoring Inspect storage tanks for defects and sanitary deficiencies.
Annually Work Order Software/ LCC/O&M Tracking tool/Onsite Checklists Zoar Water Storage
Tank
Planned Monitoring Inspect security fencing and gates. Lubricate locks.
Once per week O&M Log Books Zoar Water Storage
Tank
Planned Monitoring Check if tank has overflowed Monthly O&M Log Books Water Treatment
Plant Telemetry
Planned Monitoring SCADA- Inspect antenna, radios, electrical/batteries, panel enclosure
Once per week Excel Sheets
Zoar Water Storage Tank
Planned Preventative Maintenance
Clean/Inspect internal storage tanks as required. Every 3 years, two tanks cleaned per year. Work Order Software/ LCC/O&M Tracking tool Zoar Water Storage
Tank
Planned Repair Make needed repairs/paint internal storage tanks
Once every 10 years Work Order Software/ LCC/O&M Tracking tool Zoar Water Storage
Tank
Planned Preventative Maintenance
Clean/Paint external storage tanks
Once every 15 years
Wellington Booster Station
Planned Standard Operating Procedure
Conduct weekly security check.(1.Inspect all pump house plumbing for leaks. 2.Check all sump pumps for proper operation. 3.Check all station alarms. 4.Check backup power source to ensure it will operate when needed. 5.Inspect fencing and gates.)
Every Monday O&M Log books
All Equipment Planned Standard Operating Procedure
Maintain record of all equipment repairs/replacement
As they occur Workorder Software Backwash basin Planned Monitoring Check and clean backwash basin
for sediment build up
Once per month Work Order Software/ LCC/O&M Tracking tool Backwash basin Pump 1
Planned Monitoring Inspect backwash pumps, motors, and controls
Once per week System Specific Asset
Management Software Water Treatment
Plant High Service Pump 1
Planned Monitoring Inspect high service pumps, motors, and controls
Once per week SEMS Software
Effluent Pump 1 Planned Monitoring Inspect effluent pumps, motors, and controls
Once per week CUPPS Program Blower Pump 2 Planned Monitoring Inspect blower pumps, motors,
and controls
Once per week System specific software Water Treatment
Plant Disinfection System
Planned Monitoring Inspect disinfection equipment pumps, motors, and controls
Once per week CUPPS Program
Backwash Pump 1 Planned Preventative Maintenance
Rotate backwash pump Semi Annually Barcode Software/CUPPS Water Treatment
Plant High Service Pump 1
Planned Preventative Maintenance
Rotate high service pump Semi Annually Barcode Software/Excel Effluent Pump 1 Planned Preventative
Maintenance
Rotate effluent pumps Semi Annually Workorder Software Blower Pump 2 Planned Preventative
Maintenance
Rotate blower pump Semi Annually Workorder Software Water Treatment Plant Disinfection System Planned Preventative Maintenance
Rotate disinfection equipment pump
Planned Standard Operating Procedure
Confirm submittal of monthly reports. Monthly Logbook Water Treatment Plant Chlorinator 1 Planned Standard Operating Procedure
Inspect chlorine and fluoride testing equipment.
Every Monday Onsite Checklists
Shop Heater Planned Monitoring Inspect heater operation during winter months.
Every Monday Onsite Checklists Planned Preventative
Maintenance
Operate/exercise all valves inside the treatment plant and pump house. Maintain log continuously throughout the year.
Semi Annually Workorder Software
Water Treatment Plant building
Planned Preventative Maintenance
Perform preventive maintenance on treatment plant and pump house buildings.
Semi Annually Excel Sheets
All assets Planned Preventative Maintenance
Prepare system for winter operation.
Semi Annually Onsite Checklists Water Treatment
Plant Controls
Planned Monitoring Check all electrical controls Once per week Onsite Checklists Planned Monitoring Check all sanitation chemical
system for leaks
Once per week System Specific Asset
Management Software Planned Standard
Operating Procedure
Review emergency response plans.
Semi Annually Workorder Software Planned Standard
Operating Procedure
Take appropriate monthly water quality samples.
Monthly Work Order Software Production Meter 1 Planned Routine
Maintenance
Routine Maintenance - Water Production Meter Annually Workorder Software Water Treatment Plant chlorination System Planned Standard Operating Procedure
Calibrate chemical feed pumps Annually System Specific Asset
Management Software Raw Water Pump 1 Planned Monitoring Record pumping rate for each
well or source water pump.
Every Monday O&M Log books Water Treatment
Plant Chlorinator 3
Planned Standard Operating Procedure
Inspect and clean chemical feed lines and solution tanks
Annually Workorder Software Planned Standard
Operating Procedure
Begin the new years tracking logs for maintenance, safety, and security logs Annually Workorder Software Water Treatment Plant Presedimentation Tank Planned Standard Operating Procedure Inspect sedimentation
tanks/reservoirs; check drains are open
Monthly Workorder
Water Treatment Plant Chlorinator 3
Planned Standard Operating Procedure
Inspect chemical feed tanks Annually Excel Sheets
Water Treatment Plant Chemical Feed Tank 1
Planned Preventative Maintenance
Paint chemical feed tanks Once/10 years SEMS Software
Water Treatment Plant mixer 2
Planned Standard Operating Procedure
Check flocculator mixers for proper operations
Monthly System Specific Asset
Management Software Water Treatment
Plant Mixed Media Filter 1
Planned Standard Operating Procedure
Inspect filter media; check depth; condition of media
Semi Annually System Specific Asset
Management Software Water Treatment
Plant Mixed Media Filter 1
Planned Standard Operating Procedure
Inspect filter equipment for deterioration
Annually Work Order Software Water Treatment
Plant Mixed Media Filter 1
Planned Standard Operating Procedure
Check filter for uniform backwash Monthly Workorder Software Water Treatment
Plant Mixed Media Filter 1
Planned Preventative Maintenance
Paint filter equipment Once/10 years System Specific Asset Management Software Water Treatment Plant Clearwell Tank
Planned Monitoring Internal inspection of clearwell tank
Annually SEMS Software
Water Treatment Plant Clearwell Tank
Planned Preventative Maintenance
Paint external clearwell tank Once/10 years Work Order Software/ LCC/O&M Tracking tool Planned Standard
Operating Procedure
Check sludge storage; capacity levels
Monthly Onsite Checklists Shop Generator 2 Planned Standard
Operating Procedure
Exercise emergency generator and check fuel & oil levels
Once per week Work Order Software and Onsite Checklists All plumbing Planned Standard
Operating Procedure
Inspect all plumbing for leaks Once per week O&M Logbooks Wellington Booster
Pump 2
Planned Monitoring Check pump run times Monthly GIS Sump Pump 2 Planned Monitoring Check all sump pumps for proper
operation
Once per week GIS Wellington Booster
Pump Station
Planned Preventative Maintenance
Inspect, clean, and repair control panels in pump houses
Wellington Booster Pump Station
Planned Standard Operating Procedure
Check all station alarms Once per week Onsite Checklists
Wellington Booster Pump Station
Planned Standard Operating Procedure
Clean pump house and grounds. Make sure fire hydrants are accessible.
Every Monday Work Order Software/ Onsite Checklists Wellington Booster Pump Station Planned Preventative Maintenance
Exercise and operate all valves inside each booster station.
Semi Annually Onsite Checklists
Wellington Booster Pump Station
Planned Standard Operating Procedure
Prepare for winter operation Semi Annually Onsite Checklists
Wellington Booster Pump Station
Planned Preventative Maintenance
Preventative Maintenance on pump house buildings.
Semi Annually Work Order Software/ LCC/O&M Tracking tool/ Onsite Checklists Wellington Booster Pump Station Planned Preventative Maintenance
Check emergency power source to ensure it will operate when needed
Once per week Onsite Checklists
Wellington Booster Pump Station
Planned Preventative Maintenance
Inspect fencing and gates. Lubricate locks.
Once per week Workorder Software Kreger Meters Planned Standard
Operating Procedure
Read Meters Once per
month
Meter Reading Software All Meters Planned Preventative
Maintenance
Investigate customer complaints and/or check when reading meter and test meter accuracy.
Once per month or when customer calls
Workorder Software
Pool Master Meter Planned Standard Operating Procedure
Calibrate master meters Annually O&M Logbook All Meters Planned Preventative
Maintenance
Replace Meters and calibrate (schedule will replace 10% each year over 10 years)
Annually GIS
Dodge 2500 Ram Planned Preventative Maintenance
Maintenance Truck (oil/rotate tires, etc.)
Every three months
Workorder Software Dodge 2500 Ram Planned Preventative
Maintenance
Maintenance Truck (hydraulic fluid, overall mechanical system check)
Annually System Specific Asset
Management Software Cat 420F IT Planned Preventative
Maintenance
Maintenance Backhoe (oil/check hydraulics, etc.) Every three months CUPSS Software/ LCC/O&M tracking Tool
Cat 420F IT Planned Preventative Maintenance
Maintenance Backhoe ( hydraulic fluid, overall mechanical system check)
Annually Excel Sheets
Planned Monitoring Check fuel amount and condition Quarterly Excel Sheets Runa Generator Planned Standard
Operating Procedure
Run generator 1 hour Quarterly Onsite Checklists All electric Planned Standard
Operating Procedure
Check electrical connections for damage
Quarterly O&M Logbooks CUPSS Software Planned Standard
Operating Procedure
Update My CUPSS plan Annually Work Order
Software CUPSS Software Planned Standard
Operating Procedure
Update Financial plan Annually Work Order Software CUPSS Software Planned Standard
Operating Procedure
Review My CUPSS Plan with Board or Council
Annually Work Order Software Office Computer 2 Planned Preventative
Maintenance
Update computers and software Annually Work Order Software AMM Software Planned Preventative
Maintenance
Update Billing Equipment & Software
Annually Work Order Software Shop/Office
Building
Planned Preventative Maintenance
Inspect building for deterioration Semi-Annually Workorder Software