• No results found

Philippines: Metro Manila Bridges Project

N/A
N/A
Protected

Academic year: 2021

Share "Philippines: Metro Manila Bridges Project"

Copied!
18
0
0

Loading.... (view fulltext now)

Full text

(1)

Resettlement Plan

June 2021

Philippines: Metro Manila Bridges Project

Bridge 3: Marikina – Kabayani St. – Matandang Balara Bridge

Appendices, Volumes 1 - 2

(2)

This resettlement plan is a document of the borrower. The views expressed herein do not

necessarily represent those of ADB's Board of Directors, Management, or staff, and may be

preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian

Development Bank does not intend to make any judgments as to the legal or other status of any

territory or area.

(3)

LIST OF APPENDICES

Volume 1: List of Affected Persons

1. Consolidated Master List of All Affected Persons

2. Parcellary Master List

3. As-Built Master List

Volume 2: Inventory of Affected Structures and other Improvements

1. Cut-off Dates for Eligibility

2. List of Affected Structures (from CAT)

3. Photo Documentation of Structure Tagging (from CAT)

Volume 3: Replacement Cost of Affected Land and Non-Land Assets

1. Valuation Methodology for Affected Land and Structures for Metro Manila

Three Bridges Project

2. Replacement Cost for Land

3. Replacement Cost for Structures

4. Replacement Cost for Crops and Trees

Volume 4: Documentation of Consultation Meetings and PIB

1. IEC

2. First Stakeholder Consultation Meeting

3. Focus Group Discussion with Vulnerable Sector

4. Focus Group Discussion with Business and other Livelihood Sector

5. Second Stakeholder Consultation Meeting

6. List of Invited APs

7. Public Information Brochure

Volume 5: Others

8. Survey Permit

(4)

Volume 1

List of Affected Persons

Contents

1. Consolidated Master List of All Affected Persons

2. Parcellary Master List

(5)

CONSOLIDATED MASTER LIST OF AFFECTED PERSONS Metro Manila Three Priority Birdges

(Bridge 3: Marikina (Kabayani) – Vista Real (Katipunan Ave. Ext.) Bridge)

BARANGAY NAME OF PAP LAND OWNERSHIP STRUCTURE OWNERSHIP STRUCTURE TAG Impact on Structure INTERVIEWS Type of AP Category of AP Impact to AP

TUMANA STA. LUCIA LAND INC. Landowner NONE

N/A N/A NOT INTERVIEWED Company

AP whose Impact is on

Property only Marginal NANGKA GOLDMARK DEVELOPMENT CORPORATION Landowner NONE

N/A N/A NOT INTERVIEWED Company

AP whose Impact is on

Property only Marginal NANGKA, CONCEPCION I TQG ENTERPRISES INC. Landowner NO

N/A N/A NOT INTERVIEWED Company

AP whose Impact is on

Property only Severe NANGKA THE CITY GOVERNMENT OF MARIKINA Landowner YES 01-06-S001,

MM3PB-01-05-S048 Marginal and Severe INTERVIEWED GOCC/LGU Institution Severe NANGKA MANILA WATER COMPANY INC. Landowner YES 01-05-S001,

MM3PB-01-06-S033 Marginal and Severe NOT INTERVIEWED Company

AP whose Impact is on

Property only Severe NANGKA NATIONAL HOUSING AUTHORITY Landowner YES

MM3PB-01-05-S004, 5,6,7,14 Marginal and Severe NOT INTERVIEWED GOCC/LGU

AP whose Impact is on

Property only Severe NANGKA CAASI, ROSITA Landowner YES MM3PB-01-05-S002, MM3PB-01-05-S003,

Severe INTERVIEWED Private Person Household Severe NANGKA ICASA, MINDA Landowner YES MM3PB-01-05-S004

Severe INTERVIEWED Private Person Household Severe NANGKA SAMANIEGO, ROSE MARIE Non-landowner YES MM3PB-01-05-S005

Severe INTERVIEWED Private Person Household Severe NANGKA ABO, AMELITA Landowner YES MM3PB-01-05-S006

Undetermined INTERVIEWED Private Person Househoold+Business Severe NANGKA BELO, SALVACION Non-landowner YES MM3PB-01-05-S014

Severe NOT INTERVIEWED Private Person Household Severe NANGKA JUEGO, ADAM Landowner YES MM3PB-01-05-S047

Severe INTERVIEWED Private Person Household Severe NANGKA, CONCEPCION I BASILIO, MELIZA Non-landowner YES MM3PB-01-06-S003, MM3PB-01-06-S004

Severe NOT INTERVIEWED Private Person Househoold+Business Severe CONCEPCION UNO ROSIMO, JOSELITO Non-landowner YES MM3PB-01-06-S006

Severe NOT INTERVIEWED Private Person Household Severe NANGKA ABO, NEIL CHRISTIAN Non-landowner NO

MM3PB-01-05-S006 Severe INTERVIEWED Private Person Household Severe NANGKA ABUAG, OLIVE Non-landowner NO

MM3PB-01-05-S005 Severe NOT INTERVIEWED Private Person Household Severe NANGKA ADAM, MARY ROSE Non-landowner NO

MM3PB-01-05-S005 Severe INTERVIEWED Private Person Household Severe NANGKA BACUDO, JOHN PAUL Non-landowner NO

MM3PB-01-05-S004 Severe INTERVIEWED Private Person Household Severe NANGKA CAASI, MA. ROSELLE Non-landowner NO 01-05-S002,

MM3PB-01-05-S003 Severe INTERVIEWED Private Person Household Severe NANGKA ICASA, ISABEHENIO Non-landowner NO

MM3PB-01-05-S004 Severe INTERVIEWED Private Person Househoold+Business Severe NANGKA ICASA, JONATHAN Non-landowner NO

MM3PB-01-05-S004 Severe INTERVIEWED Private Person Household Severe NANGKA ICASA, ISABELO JAMES Non-landowner NO

MM3PB-01-05-S004 Severe INTERVIEWED Private Person Household Severe NANGKA MARIKINA NORTH SEWAGE TREATMENT PLANT Non-landowner YES

(6)

CITY/ MUNICIPALITY BARANGAY TITLE NUMBER TD NUMBER LOT NUMBER SURVEY PLAN

NUMBER REGISTERED OWNER (LAST, FIRST, MIDDLE) - ADDRESS

TOTAL AREA (SQ.M.) AFFECTED REMAINING LAND CLASSIFICATION (from Tax SOURCE REMARKS

B3-001 MARIKINA TUMANA 009-2020001098 E-0019-240748 20 (RESERVED AREA-1) PCS-00-015952 STA. LUCIA LAND INC. PENTHOUSE BLDG. 3, STA. LUCIA EAST GRAND MALL COR. FELIX AVE & MARCOS

HIGHWAY, CAINTA RIZAL 80,290 10,091.10 70,199 RESIDENTIAL TITLE

B3-002 MARIKINA NANGKA 254058 E-0006-134881 LOT 1 PCS-13-000367 GOLDMARK DEVELOPMENT CORPORATION 5548 BAWAN-GUENO COR. CUANGCO ST., MAKATI CITY 227439 4644.03 222794.97 RESIDENTIAL TITLE TOTAL AREA TAKEN BY MARIKINA CHANNEL: 1586.76 SQ.M.

B3-003 MARIKINA NANGKA N-88111 E-0006-234539 66-A-1-A-2-A-3 PSD-13-000597 TQG ENTERPRISES INC. 4166 D R MAGSASAY BLVD EXT SAMPALOC MANILA 20885 1934.51 18950.49 RESIDENTIAL LDC B3-004 MARIKINA NANGKA 009-2019007585 E-0006-235860 66-A-1-A-2-A-2 PSD-13-000597 THE CITY GOVERNMENT OF MARIKINA SHOE AVE., STA. ELENA, CITY OF MARIKINA 48640 2973 45667 RESIDENTIAL LDC B3-005 MARIKINA NANGKA 009-2014000078 E-0006-187241 66-A-1-A-2-A-1-B-11-B PSD-435761 MANILA WATER COMPANY INC. 489 KATIPUNAN ROAD, BALARA, QUEZON CITY 22311 3.59 22307.41 COMMERCIAL TITLE B3-006 MARIKINA NANGKA 009-2014000077 E-0006-187239 66-A-1-A-2-A-1-B-11-A PSD-435761 THE CITY GOVERNMENT OF MARIKINA 2/F MARIKINA CITY HALL SHOE AVE. STA. ELENA, MARIKINA CITY 3213 1155.04 2057.96 RESIDENTIAL TITLE B3-007 MARIKINA NANGKA 473633 E-0006-130302 66-A-1-A-2-A-1-B-19 (ROAD

LOT) PSD-00-071716 T.Q.G. ENTERPRISES, INC. 4077 R. MAGSAYSAY ST. SAMPALOC MANILA 5057 913.58 4143.42 ROAD LOT SURVEY PLAN/TITLE

B3-008 MARIKINA NANGKA 473623 E-0006-130292 66-A-1-A-2-A-1-B-9 PSD-00-071716 T.Q.G. ENTERPRISES, INC. 4077 R. MAGSAYSAY ST. SAMPALOC MANILA 787 240.88 546.12 RESIDENTIAL SURVEY PLAN/TITLE TOTAL AREA OF AFFECTED ROAD: 129.88 SQ.M. B3-009 MARIKINA NANGKA E-0006-207405 66-A-1-A-2-A-1-B-10 PSD-00-071717 NATIONAL HOUSING AUTHORITY NHA BUILDING, ELLIPTICAL ROAD, DILIMAN, QUEZON CITY 731 98.34 632.66 RESIDENTIAL SURVEY PLAN TOTAL AREA OF AFFECTED ROAD: 22.22 SQ.M. B3-018 MARIKINA NANGKA LOT 3 PCS-00-011610 NATIONAL HOUSING AUTHORITY ELLIPTICAL RD. DILIMAN QUEZON CITY 109 14.86 94.14 SURVEY PLAN

B3-019 MARIKINA NANGKA ROAD LOT NATIONAL HOUSING AUTHORITY ELLIPTICAL RD. DILIMAN QUEZON CITY 254.36 0.78 253.58 TAX MAP B3-020 MARIKINA NANGKA ROAD LOT 1-A PCS-8259 NATIONAL HOUSING AUTHORITY ELLIPTICAL RD. DILIMAN QUEZON CITY 23 0.14 22.86 SURVEY PLAN B3-021 MARIKINA CONCEPCION I 305560 E-0012-026525 LT 1-D, BLK 36 PSD-00-039655 TQG ENTERPRISES INC. 4077 R. MAGSAYSAY, SAMPALOK MANILA 175 41.78 133.22 RESIDENTIAL SURVEY PLAN B3-022 MARIKINA CONCEPCION I 305559 E-0012-026263 LT 1-C, BLK 36 PSD-00-039655 TQG ENTERPRISES INC. 4077 R. MAGSAYSAY, SAMPALOK MANILA 100 16.05 83.95 RESIDENTIAL SURVEY PLAN B3-023 MARIKINA CONCEPCION I 305558 E-0012-026246 LT 1-B, BLK 36 PSD-00-039655 TQG ENTERPRISES INC. 4077 R. MAGSAYSAY, SAMPALOK MANILA 100 27.22 72.78 RESIDENTIAL SURVEY PLAN

UPDATED (03APRIL2021) UPDATED (05APRIL2021)

MM3PB- BRIDGE 3 as of March 25, 2021

(7)

STRUCTURE TAG

NUMBER

LOT ID

STRUCTURE OWNER - LAST, FIRST,

MIDDLE

REGISTERED OWNER - LAST, FIRST, MIDDLE

(Based from Land Title)

CITY/

MUNICIPALITY

BARANGAY

MM3PB-01-05-S001

B3-005

MANILA WATER TREATMENT FACILITIES

MANILA WATER COMPANY INC.

MARIKINA

NANGKA

MM3PB-01-05-S002

B3-009

CAASI, ROSITA

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S003

B3-009

CAASI, ROSITA

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S004

B3-009

ICASA, MINDA

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S005

B3-009

SAMANIEGO, ROSE MARIE

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S006

B3-009

ABO, AMELITA

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S014

B3-018

BELO, SALVACION

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S047

B3-009

JUEGO, ADAM

NATIONAL HOUSING AUTHORITY

MARIKINA

NANGKA

MM3PB-01-05-S048

B3-008

BALUBAD SOCIAL DEVELOPMENT CENTER

T.Q.G. ENTERPRISES, INC.

MARIKINA

NANGKA

MM3PB-01-05-S049

B3-005

MANILA WATER TREATMENT FACILITIES

MANILA WATER COMPANY INC.

MARIKINA

NANGKA

MM3PB-01-06-S001

B3-006

CITY GOVERNMENT PUBLIC MARKET

THE CITY GOVERNMENT OF MARIKINA

MARIKINA

NANGKA

MM3PB-01-06-S003

B3-006 AND B3-007

BASILIO, MELIZA

THE CITY GOVERNMENT OF MARIKINA AND T.Q.G. ENTERPRISES, INC. MARIKINA

NANGKA

MM3PB-01-06-S004

B3-021

BASILIO, MELIZA

TQG ENTERPRISES INC.

MARIKINA

CONCEPCION UNO

MM3PB-01-06-S006

B3-023

ROSIMO, JOSELITO

TQG ENTERPRISES INC.

MARIKINA

CONCEPCION UNO

MM3PB-01-06-S033

B3-004 AND B3-006

MANILA WATER TREATMENT FACILITIES

THE CITY GOVERNMENT OF MARIKINA

MARIKINA

CONCEPCION UNO

(8)

Volume 2

Inventory of Affected Structures and

Improvements

Contents:

1. Cut-ff Date for Eligibility

2. List of Affected Structures

(9)

METRO MANILA 3 PRIORITY BRIDGES (MM3PB) PROJECT

Cut-Off Date

PROVINCE/

CITY/MUNICIPALITY

BARANGAY

CUT-OFF DATE

(First day of Census Tagging)

BRIDGE 1

MARIKINA CITY

CALUMPANG

February 11, 2021

TAÑONG

January 29, 2021

JESUS DELA PEÑA

January 28, 2021

BRIDGE 2

MARIKINA CITY

JESUS DELA PEÑA

January 29, 2021

STO. NIÑO

February 01, 2021

BRIDGE 3

MARIKINA CITY

NANGKA

February 08, 2021

CONCEPCION UNO

February 09, 2021

(10)

METRO MANILA 3 PRIORITY BRIDGES (MM3PB) PROJECT

LIST OF AFFECTED STRUCTURES

STRUCTURE TAGGING

NO.

NAME OF STRUCTURE OWNER

AFFECTED BY:

DATE TAGGED

REMARKS

BRGY. NANGKA, MARIKINA CITY (01-05)

MM3PB-01-05-S001

MANILA WATER TREATMENT

FACILITIES

BRIDGE 3

FEBRUARY 08, 2021

MM3PB-01-05-S002

ROSITA CAASI

BRIDGE 3

FEBRUARY 09, 2021

MM3PB-01-05-S003

ROSITA CAASI

BRIDGE 3

FEBRUARY 09, 2021

MM3PB-01-05-S004

MINDA ICASA

BRIDGE 3

FEBRUARY 08, 2021

MM3PB-01-05-S005

ROSE MARIE SAMANIEGO

BRIDGE 3

FEBRUARY 08, 2021

MM3PB-01-05-S006

AMELITA ABO

BRIDGE 3

FEBRUARY 08, 2021

MM3PB-01-05-S014

SALVACION BELO

BRIDGE 3

FEBRUARY 08, 2021

MM3PB-01-05-S047

ADAM JUEGO

BRIDGE 3

MARCH 19, 2021

MM3PB-01-05-S048

BALUBAD SOCIAL DEVELOPMENT

CENTER

BRIDGE 3

MARCH 19, 2021

MM3PB-01-05-S049

MANILA WATER TREATMENT

FACILITIES

BRIDGE 3

MARCH 19, 2021

BRGY. CONCEPCION UNO, MARIKINA CITY (01-06)

MM3PB-01-06-S001

CITY GOVERNMENT PUBLIC MARKET

BRIDGE 3

FEBRUARY 10, 2021

MM3PB-01-06-S003

MELIZA BASILIO

BRIDGE 3

FEBRUARY 09, 2021

MM3PB-01-06-S004

MELIZA BASILIO

BRIDGE 3

FEBRUARY 09, 2021

MM3PB-01-06-S006

JOSELITO ROSIMO

BRIDGE 3

FEBRUARY 09, 2021

MM3PB-01-06-S033

MANILA WATER TREATMENT

FACILITIES

BRIDGE 3

MARCH 19, 2021

(11)

Photo of Affected Structures

Barangay Nangka, Marikina City

1 |

P a g e

Structure Tagging No. : MM3PB-01-05-S001

Structure Owner

: MANILA WATER TREATMENT FACILITIES

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 08, 2021

Structure Tagging No. : MM3PB-01-05-S002

Structure Owner

: ROSITA CAASI

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 09, 2021

(12)

Photo of Affected Structures

Barangay Nangka, Marikina City

2 |

P a g e

Structure Tagging No. : MM3PB-01-05-S003

Structure Owner

: ROSITA CAASI

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 09, 2021

Structure Tagging No. : MM3PB-01-05-S004

Structure Owner

: MINDA ICASA

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 08, 2021

(13)

Photo of Affected Structures

Barangay Nangka, Marikina City

3 |

P a g e

Structure Tagging No. : MM3PB-01-05-S005

Structure Owner

: ROSE MARIE SAMANIEGO

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 08, 2021

Structure Tagging No. : MM3PB-01-05-S006

Structure Owner

: AMELITA ABO

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 08, 2021

(14)

Photo of Affected Structures

Barangay Nangka, Marikina City

4 |

P a g e

Structure Tagging No. : MM3PB-01-05-S014

Structure Owner

: SALVACION BELO

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: February 08, 2021

Structure Tagging No. : MM3PB-01-05-S047

Structure Owner

: ADAM JUEGO

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: March 19, 2021

(15)

Photo of Affected Structures

Barangay Nangka, Marikina City

5 |

P a g e

Structure Tagging No. : MM3PB-01-05-S048

Structure Owner

: BALUBAD SOCIAL DEVELOPMENT CENTER

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: March 19, 2021

Structure Tagging No. : MM3PB-01-05-S049

Structure Owner

: MANILA WATER TREATMENT FACILITIES

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: March 19, 2021

(16)

Photo of Affected Structures

Barangay Concepcion Uno, Marikina City

1 |

P a g e

Structure Tagging No. : MM3PB-01-06-S001

Structure Owner

: CITY GOVERNMENT PUBLIC MARKET

Affected By

: Bridge 3

Location

: Brgy. Concepcion Uno, Marikina City

Date Tagged

: February 10, 2021

Structure Tagging No. : MM3PB-01-06-S003

Structure Owner

: MELIZA BASILIO

Affected By

: Bridge 3

Location

: Brgy. Concepcion Uno, Marikina City

Date Tagged

: February 09, 2021

(17)

Photo of Affected Structures

Barangay Concepcion Uno, Marikina City

2 |

P a g e

Structure Tagging No. : MM3PB-01-06-S004

Structure Owner

: MELIZA BASILIO

Affected By

: Bridge 3

Location

: Brgy. Concepcion Uno, Marikina City

Date Tagged

: February 09, 2021

Structure Tagging No. : MM3PB-01-06-S006

Structure Owner

: JOSELITO ROSIMO

Affected By

: Bridge 3

Location

: Brgy. Concepcion Uno, Marikina City

Date Tagged

: February 09, 2021

(18)

Photo of Affected Structures

Barangay Concepcion Uno, Marikina City

3 |

P a g e

Structure Tagging No. : MM3PB-01-06-S033

Structure Owner

: MANILA WATER TREATMENT FACILITIES

Affected By

: Bridge 3

Location

: Brgy. Nangka, Marikina City

Date Tagged

: March 19, 2021

References

Related documents

A person is on a highway at 65 mph for 2 hours. Suddenly, there is a rain storm and the driver immediately hits his brakes and the car is now moving at 45 mph for the next 4 hours.

World Scout Bureau, Asia-Pacific Support Centre, Makati City, Metro Manila, Philippines..

b) Supplementary Benefit Funds – These are separate and distinct supplementary benefit funds created by the Corporation as eligible for use to provide supplementary coverage to

Local Language is not English: Students from India going to China, Russia, Ukraine, Armenia, Georgia and other non English speaking countries need to learn the

42 ASS ANGLO AMERICAN TOBACCO CO, PASAY CITY METRO MANILA 43 ASSOCIATED WIRE CORPORATION OF THE PHILIPPINES PASIG CITY METRO MANILA 44 ASTROBAG MANUFACTURING CORP VALENZUELA

En cuanto a las determinaciones analíticas, dado que de manera clásica la manifestación clínica más frecuente a parte de la clínica neurológica, han sido la alteración del

April 01 John Bell April 01 Larry Knott April 01 Marty Ratchford April 01 John Wilson April 03 Michael Bergh April 03 Jerry Price April 05 Eddie Guzman April 05 Donald Haynes April

June 01 Dennis Moore June 01 James Novak June 01 John Scanlan June 01 Greg Sheloski June 02 Richard Balwanz June 03 James Conner June 03 Ted Stark June 05 George Dyer June 05 Mark