• No results found

Conducting channel at the LaAlO3/SrTiO3 interface

N/A
N/A
Protected

Academic year: 2020

Share "Conducting channel at the LaAlO3/SrTiO3 interface"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

FIG. 1. (Color
FIG. 3. (Color online) The SrTiO3temperatures the SrTiOμ8–16 uc (green area), and below 6 uc the carriers are localizedcalculation of 2DEG energy per unit area of interface
FIG. 4. (Color online) (a) Fitted Eindicating the total number of carriers at the LaAlOSrTiO2D-density of states (DOS) (number of available electronic states perunit interface area) vs energy for the(b) is taken from Ref.the fitting parameters are discussed

References

Related documents

52 Precisely synthesizing plasmonic nanostructures in ultrahigh yield; creating the plasmonically enhanced EM field on many nanostructures, often assembled in a reproducible

As with other rapidly reconfigurable devices, optically reconfigurable gate arrays (ORGAs) have been developed, which combine a holographic memory and an optically programmable

This multi-layer approach has been justified by showing that with enough hidden units and correct initialization, increasing the number of layers improves the lower bound of the

Public awareness campaigns of nonnative fish impacts should target high school educated, canal bank anglers while mercury advisories should be directed at canal bank anglers,

As inter-speaker variability among these the two groups was minimal, ranging from 0% to 2% of lack of concord in the 21-40 group and from 41% to 46% in the 71+ generation, we

Their system lies on an archi- tecture consisting of five layers: (i) the data source layer represented by the available Twitter APIs, (ii) the ETL layer (Extract, Transform, and

According to endogenous growth models, technological development affects the national growth rates of labour productivity, and thus also differences between countries..

Institutions should provide a loan amortization table containing the date and detail of each of the payments that will be made as well as the outstanding balance of principal..