• No results found

Improvement of Rubber Smoked Sheet Plant Using Arena Layout for Increasing Productivity

N/A
N/A
Protected

Academic year: 2020

Share "Improvement of Rubber Smoked Sheet Plant Using Arena Layout for Increasing Productivity"

Copied!
5
0
0

Loading.... (view fulltext now)

Full text

Loading

Figure

Fig. 1.   Present Rubber Smoked Sheet plant layout
Fig 3. Drying of rubber sheets
Fig 4 Present plant layout; 4 A-1 present plat layout, 4 A-2 Arena Simulation

References

Related documents

We therefore conducted this randomized, double-blind study to test the role of ciprofloxacin oral monotherapy as prophylaxis for bacterial infection and toxic death

Methods: Clinical, laboratory findings, and maternal/foetal outcome were collected from patients with confirmed dengue infections in pregnancy treated at a tertiary

To drive a fluid through the micro- fluidic channels, a user places the PDMS suction cup at the outlet of the device and dispenses the fluid at the inlet.. The user then presses

This paper on small scale farming organised into cooperatives based in Limpopo Province, uses a livelihood rights approach focusing on the concept of food

The objectives of this paper are threefold: (1) to develop a model to predict air outlet temperature and humidity after evaporative cooling and the water evaporation rate; (2)

This bone- like apatite indicates good biological activity of the bio ceramics scaffold with PHVB coating suggesting that the composite has potential for bone tissue